About this file

Amendment 0004 Specifications

View the file

Other files

File Type Posted
Amd_0007_-_Specifications.pdf PDF
Amd_0007_-_Drawings.pdf PDF
W91238-15-R-0028-0007.pdf PDF
Amendment_0006.pdf PDF
Amendment_0004_-_Drawings.pdf PDF
W91238-15-R-0028-0004.pdf PDF
Amd_0003_Specifications.pdf PDF
Amd_0003_Pricing_Schedule(Phase_I).pdf PDF
Amd_0003__Drawings_.pdf PDF
W91238-15-R-0028-0003.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
Site_Visit_Notes.pdf PDF
W91238-15-R-0028_Amd_0001.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Hamilton City Flood Damage Reduction and Ecosystem Restoration 1578

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 PAYMENT

1.2 REFERENCES

1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS

CONTRACTS

1.4 SUBMITTALS

1.5 GENERAL SAFETY REQUIREMENTS

1.5.1 General

1.5.2 The Prime Contractor's Superintendent

1.5.3 Violations

1.5.4 Fire Prevention

1.5.4.1 Inspections

1.5.5 Recordkeeping and Accident Reporting Requirements

1.5.6 Security

1.6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

1.6.1 Monthly Anticipated Adverse Weather Delays

1.6.2 Operations During the Flood Season

1.7 EQUIPMENT DATA FORM

1.8 HOURS OF OPERATION

1.9 BID ITEM OVERRUN

1.10 WARRANTY OF CONSTRUCTION

1.11 NON CONTRACT WORK

1.12 DAMAGE TO ROADS

1.12.1 Documentation Regarding Potential Damage to Access Routes

1.12.1.1 Pre-Construction Access Road Survey

1.12.1.2 Post-Construction Access Road Survey

1.13 SPECIAL SURVEY PROCEDURES

1.13.1 Survey Services

1.13.2 Survey Supervision and Scheduling

1.13.3 Personnel Plan

1.13.4 Special Survey Conditions - Pre-Construction Survey Cross

Sections

1.14 SPECIAL CONSTRUCTION CONDITIONS

1.14.1 Points of Contact for River Discharge Data

1.14.2 River Gaging Stations

1.14.3 Groundwater

1.14.4 Project Security and Public Safety

1.14.5 Cooperation With Others

1.15 MEETINGS

1.15.1 Preconstruction Meetings

1.15.2 Weekly Coordination Meetings

1.15.3 Contractor Quality Control Coordination Meeting

1.15.4 Preconstruction Safety Conference

1.16 WATER

1.17 UTILITIES

01 00 00 - 1 Amendment 0004

1.18 COMMERCIAL BORROW SITE

1.19 COMMERCIAL DISPOSAL SITE

1.20 HAUL ROUTE PLAN

PART 2 PRODUCTS

2.1 GOVERNMENT FURNISHED MATERIALS

PART 3 EXECUTION

3.1 AFTER AWARD DOCUMENTS

3.1.1 Hard Copies of Plans

ATTACHMENTS:

CESPK FORM 450

ENCROACHMENT PERMIT

-- End of Section Table of Contents --

01 00 00 - 2

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

1.1 PAYMENT

No separate payment will be made for the work covered under this section and all costs in connection therewith will be considered a subsidiary obligation.

1.2 REFERENCES

The publications listed below form a part of this section to the extent referenced. The publications are referred to within the text by the basic designation only.

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

EM 1110-1-1005 (2007) Control and Topographic Surveying

ER 415-1-15 (1989) Construction Time Extensions for Weather

U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT (CESPK)

CESPK FORM 450 (1992) Contractor Equipment Data Sheet

DM 4-805-10 (1991) Survey Manual

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1904 Recording and Reporting Occupational Injuries and Illnesses

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1926 Safety and Health Regulations for Construction

1.3 VETERANS EMPLOYMENT EMPHASIS FOR U.S. ARMY CORPS OF ENGINEERS CONTRACTS

In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS

222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:

01 00 00 - 3

Federal Veteran employment information at http://www.fedshirevets.gov/index.aspx

Department of Labor Veterans Employment Assistance http://www.dol.gov/vets/

Department of Veterans Affairs-VOW to Hire Heros Act http://benefits.va.gov/vow/

Army Wounded Warrior Program -http://wtc.army.mil/modules/employers/index.html

U.S. Chamber of Commerce Foundation-Hiring Our Heros http://www.hiringourheroes.org/

Guide to Hiring Veterans - Reference Material http://www.whitehouse.gov/sites/default/files/docs/white_house _business_council_-_guide_to_hiring_veterans_0.pdf

1.4 SUBMITTALS

Government approval is required for all submittals with a "G" designation;

submittals not having a designation are for information only. The following must be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

Pre-Construction Quantity Survey Plan; G

Personnel Plan

Pre-Construction Survey Cross Sections

Pre-Construction Access Road Survey

Disposal Site Plan; G

Haul Route Plan; G

Borrow Source Plan; G

Hard Copies of Plans

On-Site Safety Inspection Report

SD-11 Closeout Submittals

Accident Reporting

Post-Construction Access Road Survey

Documentation of Haul Road Repairs; G

01 00 00 - 4

1.5 GENERAL SAFETY REQUIREMENTS

1.5.1 General

For information regarding specific Safety Requirements see Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS. Refer to EM 385-1-1, Contract Clauses, and the Occupational Safety and Health Act (OSHA) Standards for Construction 29 CFR 1926; General Industry Standards 29 CFR 1910; and the National Fire Protection Association Codes are applicable to this contract. In case of conflict the most stringent requirement of the standards is applicable.

1.5.2 The Prime Contractor's Superintendent

The Prime Contractor's superintendent must take an active role in enforcing the safety requirements by participation in safety conferences, hazard analysis (see below), tool box meetings, walk-through inspections, correction of violations, etc., and including that of the subcontractor's work.

1.5.3 Violations

If recurring violations and/or gross violation indicate that the safety performance is unsatisfactory, corrective action must be taken as directed, and at the discretion of the Contracting Officer the retention or some part thereof will be withheld from the progress payment until corrective action has been completed.

1.5.4 Fire Prevention

Cutting or welding will be permitted only in areas that are or have been made fire safe. Where possible, all combustibles must be located at least 40 feet horizontally from the work site. Where such location is impracticable, combustibles must be protected with fire blankets and/or protective welding screens to prevent slag from running out of the work area. Other fire prevention precautions must be in accordance with the latest National Fire Codes.

1.5.4.1 Inspections

All construction sites are subject to fire and safety inspections without notice. Any violation of fire and safety standards may result in a work stoppage at the expense of the Contractor.

1.5.5 Recordkeeping and Accident Reporting Requirements

On all contract operations, record and report all accident exposure and experience incident work. This includes exposure and experience of the prime contractor and sub-contractor(s). As a minimum these records must include exposure work-hours and a log of occupational injuries and illnesses (OSHA Form 300 or state equivalent as prescribed by 29 CFR 1904 ). Refer to EM 385-1-1, 01.D.04.

1.5.6 Security

The project location may be particularly subject to vandalism. Materials left on-site are done so at the Contractors' risk, and if lost, at the Contractor's expense. Provide security for all the work. Particularly, construct and maintain the signs, including but not limited to, those

01 00 00 - 5 necessary for Public Safety and Traffic Control, as specified in Section 6 of the General Provisions. Replace those signs damaged or destroyed due to vandalism at no additional expense to the Government.

1.6 TIME EXTENSIONS FOR UNUSUALLY SEVERE WEATHER

This provision specifies the procedure for the determination of time extensions for unusually severe weather. In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

1.6.1 Monthly Anticipated Adverse Weather Delays

The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY

WORK DAYS BASED ON (5) DAY WORK WEEK

STATE CALIFORNIA INSTALLATION/NOAA MARYSVILLE STATION

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

7 6 5 4 1 0 0 0 1 2 5 7

Upon execution of the Notice to Proceed (NTP) and continuing throughout the contract, the Contractor will record on the daily CQC report, the occurrence of adverse weather and resultant impact to normally scheduled work. Actual adverse weather delay days must prevent work on critical activities for 50 percent or more of the Contractor's scheduled work day.

Refer to ER 415-1-15.

Flow conditions in the Sacramento River will not be considered as adverse or unusually severe weather and no time extension to the contract will be granted to the Contractor for this circumstance.

1.6.2 Operations During the Flood Season

Construction activities is required throughare permitted during the flood season, weather permitting. Degrade of the existing "J" levee is not permitted until the official flood season has ended on the April 15.

01 00 00 - 6

1.7 EQUIPMENT DATA FORM

Furnish CESPK FORM 450 for all necessary equipment to perform work requiring adjustment of contract price and must submit these forms with the modification proposals. A sample form is at the end of this section.

1.8 HOURS OF OPERATION

Construction activities on weekdays Monday through Friday, including equipment warm-up, will be limited to daylight hours but not earlier than 7:00 A.M. and not later than 7:00 P.M. Construction activities Saturday and Sunday, are limited to daylight hours for scheduled maintenance only but not earlier than 9:00 AM and not later than 6:00 PM. Submit requests for work hour variations a minimum 10 working days prior to the desired change to Contracting Officer and thier represtative for approval. Work hours are the discretion of the local jurisdiction therefore additional limits on hours operations may be imposed during this construction event.

The Contractor will be notified a minimum of 10 working days prior to such changes.

1.9 BID ITEM OVERRUN

Throughout the contract (at a minimum, every five calendar days), monitor placement or installation of unit price items (if any) with respect to the original estimated quantities shown in the contract. If placement or installation indicates a possible overrun with respect to the original estimated quantities shown in the contract, immediately provide written notification to the Contracting Officer with revised total estimated quantities.

1.10 WARRANTY OF CONSTRUCTION

(a) Performance Bond.

(1) It is understood that the Contractor's Performance Bond will remain effective throughout the life of all warranties and warranty extensions.

(2) In the event the Contractor or his designated representative fails to commence and diligently pursue any work required under the Warranty of Construction Section of the Technical Provisions within a reasonable time after receipt of written notification pursuant to the requirements thereof, the Contracting Officer has a right to demand that said work be performed under the Performance Bond by making written notice on the surety. If the surety fails or refuses to perform the obligation it assumed under the Performance Bond, the Contracting Officer must have the work performed by others, and after completion of the work, make demand for reimbursement of any or all expenses incurred by the Government while performing the work, including, but not limited to administrative expenses.

(3) Warranty repair work which arises to threaten the health or safety of personnel, the physical safety of property or equipment, or which impairs operations, habitability of living spaces, etc., will be handled by the Contractor on an immediate basis as directed verbally by the Contracting Officer or his authorized representative. Written verification will follow verbal instructions. Failure of the Contractor to respond as verbally

01 00 00 - 7 directed will be cause for the Contracting Officer or his authorized representative to have the warranty repair work performed by others and to proceed against the Contractor as outlined in the paragraph b. above.

(b) Pre-Warranty Conference. Prior to contract completion and at a time designated by the Contracting Officer or his authorized representative, meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of SECTION 00 73 00 SUPPLEMENTARY CONDITIONS, Paragraph, WARRANTY OF CONSTRUCTION, of this specification. Communication procedures for Contractor notification of warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer or his authorized representative for the execution of the construction warranty will be established/reviewed at this meeting.

In connection with these requirements and at the time of the Contractor's quality control completion inspection, the Contractor will furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue warranty work action on behalf of the Contractor. This single point of contact will be located within the local service area of the warranted construction, will be continuously available, and will be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the Contractor of any of his responsibilities in connection with Section 00 73 00 SUPPLEMENTARY CONDITIONS, Paragraph, WARRANTY OF

CONSTRUCTION.

(c) Equipment Warranty Identification Tags. Provide warranty identification tags on all equipment installed under this contract.

(d) Contractor's Response to Warranty Service Requirements. The following warranty service requirements are applicable to this contract.

Following notification by the Contracting Officer or the Contracting Officer's Representative, respond to a warranty service requirement identified by the Contracting Officer's Representative in accordance with the "Warranty Service Priority List" of this program. This list prioritizes warranty work into the categories:

First Priority 1A Perform on site inspection to evaluate situation, determine course of action, initiate work within 24 hours and work continuously to completion or relief.

Second Priority 1B Perform on site inspection to evaluate situation, determine course of action, initiate work within 48 hours and work continuously to completion of relief.

Third Priority All other work to be initiated within 5 work days and work continuously to completion or relief.

The "Warranty Service Priority List" must be compiled by the Contractor and approved by the Contracting Officer.

Should parts be required to complete the work and the parts are not immediately available provide the Contracting Officer's Representative with firm written proposals for emergency alternatives and temporary repairs for Government participation within 12 hours after arrival at the job site, and provide emergency relief until the required parts are

01 00 00 - 8 available on site for the Contractor to perform permanent warranty repair. Include a firm date and time that the required parts must be available on site to complete the permanent warranty repair. The Contracting Officer's Representative will evaluate the proposed alternatives and negotiate the alternative considered to be in the best interest of the Government to reduce the impact of the emergency condition. Alternatives considered by the Contracting Officer's Representative will include the alternative for the Contractor to "Do Nothing" while waiting until the required parts are available to perform permanent warranty repair. Negotiating a proposal which will require Government participation and the expenditure of Government funds must constitute a separate procurement action by the using service.

1.11 NON CONTRACT WORK

Do not perform any work or erect any structure for third parties, landowners or otherwise, within the limits of the rights-of-way without prior approval of the Contracting Officer.

1.12 DAMAGE TO ROADS

Preserve and protect all existing private or project access or right-of-way roads. At the completion of work and prior to the Contractor leaving the project, he must restore to pre-project conditions all such roads and provide documentation of Haul Road Repairs. Repairs must include replacement of base rock and/or surface treatment as required. Refer also to paragraph PROTECTION OF TRAFFIC in section 01 50 00 TEMPORARY

CONSTRUCTION FACILITIES AND CONTROLS.

1.12.1 Documentation Regarding Potential Damage to Access Routes

1.12.1.1 Pre-Construction Access Road Survey

Complete and submit a Pre-Construction Access Road Survey including digital video and digital photographs of all public, private, and project access or right-of-way roads. Submit two copies of the survey, the digital video, and the digital photographs before the start of construction operations.

Video must be digital format. Photographs must be 3 X 5 inch prints.

1.12.1.2 Post-Construction Access Road Survey

After completion of construction of the project, submit a Post-Construction Access Road Survey including digital video and digital photographs of the same area where pre-construction digital video and digital photographs were taken. Submit two copies of the survey, the digital video, and digital photographs.

1.13 SPECIAL SURVEY PROCEDURES

1.13.1 Survey Services

Perform all survey services in accordance with EM 1110-1-1005. This publication can be downloaded from:

http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_1110-1

1.13.2 Survey Supervision and Scheduling

Submit a Pre-Construction Quantity Survey Plan of the proposed preconstruction quantity survey. All survey services must be performed by

01 00 00 - 9 or under the direct supervision of a person licensed to practice surveying in the State of California. Prior to commencement of survey work, the submit in writing the name and license number of the person who will perform the required surveys. Keep field notes in accordance with DM 4-805-10. The accuracy of the survey must be third order or better.

1.13.3 Personnel Plan

Plan stating the specific personnel names, license numbers and specific tasks of those whoewill be performing the Pre-Construction Survey Cross Sections, plus the procedures to be followed in conducting the Pre-Construction Survey Cross Sections.

1.13.4 Special Survey Conditions - Pre-Construction Survey Cross Sections

Survey cross sections along the entire length of the construction site and submit Pre-Construction Survey Cross Sections before construction begins.

Use these Pre-Construction Survey Cross Sections to reflect existing ground before any construction activities begin and when measuring pay quantities for excavation, riprap, and embankment. Use the Pre-Construction Survey Cross Sections for measurement of work specified in SECTION 31 00 00 EARTHWORK. Survey cross sections perpendicular to the Construction Reference Line. Survey the cross sections within 2 feet of the locations specified herein. Take the Pre-Construction Survey Cross Sections at 50 foot intervals along the Construction Reference Lines shown on the drawings. Perform a profile survey of the top of the levee. Use this survey to show the elevations of the top of the levee shown on the plan and profile sheets.

Cross sections along the Construction Reference Line must extend from 10 feet landward of the landside levee toe, across the Construction Reference Line, and continue out to a point at least 10 feet waterward of the waterside toe of the levee or to elevation 10 feet NGVD.

Elevations must be taken at inflection points but at not more than 10 feet intervals. Horizontal and vertical accuracy must be to the nearest 0.1 foot. Horizontal locations must not deviate from the alignment of the cross section line by more than 1 foot. All cross sections must be plotted as viewed in the downstream direction. The survey data must be provided to the Contracting Officer on IBM-formatted CD ROM disks containing survey control and cross section points defined in the form of north and east coordinates and their elevations (i.e. X, Y and Z). Horizontal control must be referenced to the California Zone II, North American Datum (NAD) of 1983. Vertical control must be the National Geodetic Vertical Datum (NGVD) of 1929. Survey data must be provided in english units in either Microstation V8i 3D design file format (*.DGN), or AutoCAD 2013 or newer format (*.DWG).

Provide 2 CD/DVD of the electronic survey data files (including, but not limited to, CADD files, point data, etc.), and 2 sets of the cross section data, plotted as viewed in the downstream direction, with a 20 horizontal X 10 vertical grid, on a standard ANSI D size drawing sheet, at a scale of 1:10, horizontal and vertical. Preparing any needed layout drawings.

Black line prints from PDF files are acceptable.

If the results of the Pre-Construction Survey Cross Sections show significant (15 percent or more) erosion than on the contract drawings, meet with the Contracting Officer to resolve the differences and use the Pre-Construction Survey Cross Sections results to adjust designs as

01 00 00 - 10 necessary.

1.14 SPECIAL CONSTRUCTION CONDITIONS

1.14.1 Points of Contact for River Discharge Data

The site is subjected to regulated discharges on the Sacramento River.

Contact the following individual with the U.S. Bureau of Reclamation to obtain flow forecasting information for planning construction activities.

The forecasts are updated monthly toward the middle of the month and provide monthly average values. Daily flows are subject to variability in response to changing water demands.

Sacramento River Operations Mr. Paul Fugitani 916-979-2197

1.14.2 River Gaging Stations

Water surface elevation data is available for the stream gages operated by the Department of Water Resources. Obtain data from the California Department of Water Resources, California Data Exchange Center (CDEC) web site http://cdec.water.ca.gov. River forecasts available on the CDEC Website address is http://cdec.water.ca.gov/rivforecasts.html

The Government does not guarantee the reliability or accuracy of the hydrographs and will assume no responsibility for any deductions, conclusions, or interpretations that may be made from them. Undertake any such studies that are deemed necessary to assess the reliability and accuracy of the information presented in the hydrographs.

1.14.3 Groundwater

Groundwater at the site is expected to be near the same level as the Sacramento River water surface except when there is a rapid rise or decrease in the river, where the groundwater level will eventually follow by some unknown period of time.

1.14.4 Project Security and Public Safety

Require all visitors to abide by all construction site safety requirements. Notify the Contracting Officer 48 hours before the commencement of any physical activities on the site.

1.14.5 Cooperation With Others

Provide a weekly update of planned construction activities and traffic operations for distribution by the Government to local agricultural stakeholders and landowners within and adjacent to the project site.

Annual harvest operations from late summer through the end of October, 2015 are expected to produce significant agricultural equipment and truck traffic immediately adjacent to the project site including along designated haul/access routes. Stay within the designated haul/access routes as shown on the drawings. The designated haul/access routes isare not project exclusive and the construction operation must not interfere with others.

Also see paragraph UTILITIES of this section for additional information on

01 00 00 - 11 coordination with utility companies.

1.15 MEETINGS

There may be other meetings required by this contract or unforeseen circumstances not indicated below.

1.15.1 Preconstruction Meetings

Arrange a preconstruction meeting as specified in Contract Clause 52.236-26 Preconstruction Conference.

1.15.2 Weekly Coordination Meetings

Schedule, prepare and distribute agenda and administer the weekly coordination meeting throughout of the project. The purpose of these meetings is to review the actual progress and planned activities for the upcoming two weeks. The weekly progress meeting will address the status of the SWPPP, Environmental concerns, RFI's and Submittals. The meeting is to be facilitated by the Contractor's CQCM, and attended by the superintendent, SSHO, USACE Engineering and construction field personnel, and any partners or sponsors who would like to attend. Meeting attendes will be coordinated with the Contracting Officer's Representative.

1.15.3 Contractor Quality Control Coordination Meeting

See section 01 45 00 QUALITY CONTROL regarding the obligation to set up the Quality Control Coordination Meeting.

1.15.4 Preconstruction Safety Conference

See SECTION 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS Paragraph titled Site Safety and Health Officer (SSHO) regarding the obligation to set up the Preconstruction Safety Conference and hold safety meetings.

1.16 WATER

Water and associated equipment required for dust control must be supplied by water trucks.

1.17 UTILITIES

Plan to accommodate the relocation, removal, or raising of known electrical utilities by Pacific Gas & Electric (PG&E) concurrently with setback levee construction and "J" levee removal. All PG&E relocations are expected to occur within the first half of the contract period of performance.

Immediately notify the Contracting Officer in writing of any unidentified utilities encountered that may interfere with construction operations, within the construction limits. Identify the location of discovered utilities that were not shown on the plans and not visible as of the date of this contract. Notify the Contracting Officer at least 30 days in advance of the date on which work will be started which requires the removal or relocation of such unidentified utilities or private improvements. Care must be taken to preserve and protect any such improvements from injury or damage during construction operations.

Construction operations which cause damages to personal property, utilities, public lands or interference of services must be fully reimbursed by the Contractor. Should such damage be found to have been caused without the Contractor's fault or negligence an equitable adjustment

01 00 00 - 12 in the amount due under the contract will be made under the applicable

CONTRACT CLAUSES.

1.18 COMMERCIAL BORROW SITE

In the case that the indicated borrow sites define in section 31 00 00 EARTHWORK and as shown on the Drawings do not provide adequate amounts of borrow for completion of the project, locate a reliable commercial borrow site, and secure borrow material as needed for the project. Comply with requirements defined in the plans, specifications, and contract documents in the selection and use of the borrow site and materials. Comply with all applicable local, state, and federal regulations in the selection and use of the borrow site and activities associated with removal of borrow material.

Prior to beginning construction work submit a Borrow Source Plan to the Contracting Officer. Include the location of borrow site(s), as well as copies of borrow site current and valid NEPA/CEQA documentation, applicable Federal, State and Local permits. Provide certification to the Contracting Officer that the borrow material is free from contaminants and is suitable for use on the project. Prepare and submit the Borrow Source Plan at no additional cost to the Government.

1.19 COMMERCIAL DISPOSAL SITE

Locate a reliable commercial disposal site, and secure a disposal site as needed for the project. The disposal site must be in compliance with the requirements defined in the plans, specifications, and contract documents.

Disposal site and disposal activities must be in compliance with all applicable local, state, and federal regulations.

Prior to beginning construction work submit a Disposal Site Plan to the Contracting Officer. Include the location of borrow site(s), as well as copies of borrow site current and valid NEPA/CEQA documentation, applicable Federal, State and Local permits. Provide certification to the Contracting Officer that the borrow material is free from contaminants and is suitable for use on the project. Prepare and submit the Borrow Source Plan at no additional cost to the Government.

1.20 HAUL ROUTE PLAN

Submit a Haul Route Plan prior to beginning work. This plan must include offices, material storage areas and structures and the access routes to these areas. Indicate haul routes from the sites to major highways. Show all required traffic signs, special limits, warning devices, lighting and other such safety devices required by EM 385-1-1, OSHA, local cities and Cal TransCALTRANS (on state roads), and any required permits for use of public roads from local and state agencies. Comply with the conditions setforth in the ENCROACHMENT PERMIT attached at the end of this section for use of County Road 23 as a haul road. Provide alternate routes in the plan for when interferences block designated haul routes. Revise and resubmit the plan if the haul routes being used are not as shown on the plan.

Require all visitors to abide by all construction site safety requirements. Notify the Corps Contracting Officer 48 hours before the commencement of any physical activities on the site. Work for sections such as Demolition, Grading, Tree Removal and other sections with excavations must be coordinated with this plan.

01 00 00 - 13

PART 2 PRODUCTS

2.1 GOVERNMENT FURNISHED MATERIALS

The Government will provide an CD at the preconstruction conference that contains the following:

a. One set of electronic CADD drawing files in the specified software and format, revised to reflect all amendments,

b. A submittal register data file in comma separated value (CSV) format for import into the Resident Management System (RMS).

c. Informational copies of the contract specifications and drawings, the original solicitation drawings and specifications, plus all amendments in Portable Data Format (PDF).

PART 3 EXECUTION

3.1 AFTER AWARD DOCUMENTS

3.1.1 Hard Copies of Plans

Provide five (5) hard copy sets of the contract drawings and specifications from the PDF contract drawings and specifications. Provide these documents within 5 work days of receipt of the AWARD CD. Provide two (2) hard copy prints of the drawings in ANSI D (22" x 34")format, three (3) hard copy prints of the drawings in 11"x17" format, and three (3) sets of the specifications in standard 8-1/2" x 11", double side, 3-hole punched.

-- End of Section --

01 00 00 - 14

CONTRACTOR EQUIPMENT DATA SHEET

(Data to be furnished by Contractor for all equipment to be used on modifications as required under the Special Provisions of the Contract.)

DATE

CONTRACTOR CONTRACT NUMBER

1. EQUIPMENT DESCRIPTION

2. MODEL AND SERIES

3. YEAR PURCHASED

4. PURCHASE PRICE AT YEAR PURCHASED

5. LIST PRICE, YEAR OF MANUFACTURE

6. YEAR MANUFACTURED

7. EQUIPMENT HORSEPOWER

8. CARRIER HORSEPOWER

9. FUEL TYPE

10. SHIPPING WEIGHT

11. TIRE SIZE: FRONT - ______________________ DRIVE - _______________________ TRAILING - _______________________

REMARKS:

CESPK FORM 450 1 SEP 92 (Edition of Apr 84 will be used) FormFlow 2.2, ver 1

DIVISION 02 - EXISTING CONDITIONS

SECTION 02 82 10

FENCING

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

PART 2 PRODUCTS

2.1 FENCE FABRIC

2.1.1 Deer Fence Fabric

2.2 GATES

2.3 POSTS

2.3.1 Fence Posts

2.3.2 "T" Posts

2.4 BRACES AND RAILS

2.5 ACCESSORIES

2.6 CONCRETE

PART 3 EXECUTION

3.1 INSTALLATION

3.2 EXCAVATION

3.3 POST INSTALLATION

3.3.1 Posts for Deer Fence

3.4 BRACES AND TRUSS RODS

3.5 DEER FENCE FABRIC

3.6 GATE INSTALLATION

3.7 GROUNDING

-- End of Section Table of Contents --

02 82 10 - 1

SECTION 02 82 10

FENCING

PART 1 GENERAL

The fencing and gates must be removed and replaced as shown on the contract plans. All removed posts must be salvaged and replaced by new posts. Fabric may be reused if it is in the same condition after replacement as it is prior to removal. Replaced fabric must have no open or gapped areas including the connection with the portion of fence not affected.

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM A780/A780M (2009) Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings

ASTM A 702 (1989; R 2006) Standard Specification for Steel Fence Posts and Assemblies, Hot Wrought

ASTM C94/C94M (2014b) Standard Specification for Ready-Mixed Concrete

ASTM F1043 (2014) Strength and Protective Coatings on Metal Industrial Chain-Link Fence Framework

ASTM F1083 (2013) Standard Specification for Pipe, Steel, Hot-Dipped Zinc Coated (Galvanized) Welded, for Fence Structures

ASTM F1184 (2005; R 2010) Industrial and Commercial Horizontal Slide Gates

ASTM F626 (2014) Standard Specification for Fence Fittings

ASTM F900 (2011) Industrial and Commercial Swing Gates

1.2 SUBMITTALS

Government approval is required for submittals with "G" designation;

submittals not having a "G" designation are for information only. The following must be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-07 Certificates

02 82 10 - 2

Deer Fence

Statement, signed by an official authorized to certify on behalf of the manufacturer, attesting that the deer fence and component materials meet the specified requirements.

PART 2 PRODUCTS

2.1 FENCE FABRIC

Fence fabric must conform to the following:

2.1.1 Deer Fence Fabric

Deer Fence fabric must have 12.5 gauge line wires with galvanized coating.

Wire connection constructed of tightlock knots (Solidlock, or approved equal), allowing for expansion and contraction. The fence must be 96 inches in height with 18 graduated spaced horizontal wires. Fasteners for wire mesh connections to steel posts must use 12.5 gauge post clips.

2.2 GATES

ASTM F900 and/or ASTM F1184. Gate must be the type and swing shown on the Drawings. Gate frames must conform to strength and coating requirements of ASTM F1083 for Group IA, steel pipe, with external coating Type A, nominal pipe size (NPS) 1-1/2. Gate frames must conform to strength and coating requirements of ASTM F1043, for Group IC, steel pipe with external coating Type A or Type B, nominal pipe size (NPS) 1-1/2. Gate fabric must be as specified for deer fence fabric. Gate leaves more than 8 feet wide must have either intermediate members and diagonal truss rods or must have tubular members as necessary to provide rigid construction, free from sag or twist. Gate leaves less than 8 feet wide must have truss rods or intermediate braces. Intermediate braces must be provided on all gate frames with an electro-mechanical lock. Gate fabric must be attached to the gate frame by method standard with the manufacturer except that welding will not be permitted. Latches, hinges, stops, keepers, rollers, and other hardware items must be furnished as required for the operation of the gate. Latches must be arranged for padlocking so that the padlock will be accessible from both sides of the gate. Stops must be provided for holding the gates in the open position. For high security applications, each end member of gate frames must be extended sufficiently above the top member to carry three strands of barbed wire in horizontal alignment with barbed wire strands on the fence.

2.3 POSTS

2.3.1 Fence Posts

ASTM F1083, zinc-coated. Group IA, with external coating Type A steel pipe. Group IC steel pipe, zinc-coated with external coating Type A or Type B and Group II , roll-formed steel sections, must meet the strength and coating requirements of ASTM F1043. Group III, ASTM F1043 steel H-section may be used for line posts in lieu of line post shapes specified for the other classes. Post must be either Group IA steel pipe, Group IC, Group II, roll-formed steel sections, or Group III steel H-sections and must be zinc coated (Type A) and polyvinyl chloride coated conforming to the requirements of ASTM F1043. Sizes must be as shown on the drawings.

Line posts and terminal (corner, gate, and pull) posts selected must be of

02 82 10 - 3 the same designation throughout the fence. Gate post must be for the gate type specified subject to the limitation specified in ASTM F900 and/or

ASTM F1184.

2.3.2 "T" Posts

"T" posts must meet the requirements of ASTM A 702, be made of solid steel, type A, and be enamel coated.

2.4 BRACES AND RAILS

ASTM F1083, zinc-coated, Group IA, steel pipe, size NPS 1-1/4. Group IC steel pipe, zinc-coated, must meet the strength and coating requirements of ASTM F1043. Braces and rails must be Group IA , steel pipe, size NPS 1-1/4 or Group II,formed steel sections, size 1-21/32 inch and must be zinc coated (Type A) and polyvinyl chloride-coated conforming to the requirements of ASTM F1043. Group II, formed steel sections, size 1-21/32 inch, conforming to ASTM F1043, may be used as braces and rails if Group II line posts are furnished.

2.5 ACCESSORIES

ASTM F626. Ferrous accessories must be zinc or aluminum coated. Truss rods must be furnished for each terminal post. Truss rods must be provided with turnbuckles or other equivalent provisions for adjustment.

2.6 CONCRETE

ASTM C94/C94M, using 3/4 inch maximum size aggregate, and having minimum compressive strength of 3000 psi at 28 days. Grout must consist of one part portland cement to three parts clean, well-graded sand and the minimum amount of water to produce a workable mix.

PART 3 EXECUTION

3.1 INSTALLATION

Where existing fence fabric must be cut, Contractor must either splice the fabric vertically and roll up to one side or make two vertical splices and completely remove the portion of fabric necessary to do the work. When replaced, the fabric must be overlapped a minimum of one foot using new fabric and metal ties with a maximum of 6 inch spacing.

Fence must be installed to the lines and grades indicated. The area on either side of the fence line must be cleared to the extent indicated.

Line posts must be spaced equidistant at intervals not exceeding 2010 feet.

Terminal (corner, gate, and pull) posts must be set at abrupt changes in vertical and horizontal alignment. Fabric must be continuous between terminal posts; however, runs between terminal posts must not exceed 500 feet. Any damage to galvanized surfaces, including welding, must be repaired with paint containing zinc dust in accordance with ASTM A780/A780M.

3.2 EXCAVATION

Post holes must be cleared of loose material. Waste material must be spread where directed. The ground surface irregularities along the fence line must be eliminated to the extent necessary to maintain a 1 inch clearance between the bottom of the fabric and finish grade.

02 82 10 - 4

3.3 POST INSTALLATION

3.3.1 Posts for Deer Fence

Posts must be set plumb and in alignment. Except where solid rock is encountered, posts must be set in concrete to the depth indicated on the drawings. Where solid rock is encountered with no overburden, posts must be set to a minimum depth of 18 inches in rock. Where solid rock is covered with an overburden of soil or loose rock, posts must be set to the minimum depth indicated on the drawing unless a penetration of 18 inches in solid rock is achieved before reaching the indicated depth, in which case depth of penetration must terminate. All portions of posts set in rock must be grouted. Portions of posts not set in rock must be set in concrete from the rock to ground level. Posts set in concrete must be set in holes not less than the diameter shown on the drawings. Diameters of holes in solid rock must be at least 1 inch greater than the largest cross section of the post. Concrete and grout must be thoroughly consolidated around each post, must be free of voids and finished to form a dome. Concrete and grout must be allowed to cure for 72 hours prior to attachment of any item to the posts. Group II line posts may be mechanically driven, for temporary fence construction only, if rock is not encountered. Driven posts must be set to a minimum depth of 3 feet and must be protected with drive caps when being set. For high security fences, fence post rigidity must be tested by applying a 50 pound force on the post, perpendicular to the fabric, at 5 feet above ground; post movement measured at the point where the force is applied must be less than or equal to 3/4 inch from the relaxed position; every tenth post must be tested for rigidity; when a post fails this test, further tests on the next four posts on either side of the failed post must be made; all failed posts must be removed, replaced, and retested at the Contractor's expense.

3.4 BRACES AND TRUSS RODS

Braces and truss rods must be installed as indicated and in conformance with the standard practice for the fence furnished. Horizontal (compression) braces and diagonal truss (tension) rods must be installed on fences over 6 feet in height. A center brace or 2 diagonal truss rods must be installed on 12-foot fences. Braces and truss rods must extend from terminal posts to line posts. Diagonal braces must form an angle of approximately 40 to 50 degrees with the horizontal. No bracing is required on fences 6 feet high or less.

3.5 DEER FENCE FABRIC

Deer fence fabric must be installed on the side of the post indicated.

Fabric must be attached to terminal posts with wire fabric connections using 12.5 gauge post clips. The fabric must be installed and pulled taut to provide a smooth and uniform appearance free from sag, without permanently distorting the fabric square or reducing the fabric height.

Fabric must be fastened to line posts at approximately 15 inch intervals and fastened to all rails and tension wires at approximately 12 inch intervals. Fabric must be cut by untwisting and removing pickets.

Splicing must be accomplished by weaving a single picket into the ends of the rolls to be joined. The bottom of the installed fabric must be 1 plus or minus 1/2 inch above the ground. For high security fence, after the fabric installation is complete, the fabric must be exercised by applying a 50 pound push-pull force at the center of the fabric between posts; the use of a 30 pound pull at the center of the panel must cause fabric deflection of not more than 2-1/2 inches when pulling fabric from the post side of the

02 82 10 - 5 fence; every second fence panel must meet this requirement; all failed panels must be resecured and retested at the Contractor's expense.

3.6 GATE INSTALLATION

Gates must be installed at the locations shown. Hinged gates must be mounted to swing as indicated. Latches, stops, and keepers must be installed as required. Slide gates must be installed as recommended by the manufacturer. Padlocks must be attached to gates or gate posts with chains. Hinge pins, and hardware must be welded or otherwise secured to prevent removal. For farm style fencing, standard metal gate assemblies with frame and fittings necessary for complete installation or wood gates must be furnished as shown.

3.7 GROUNDING

Fences must be grounded on each side of all gates, at each corner, at the closest approach to each building located within 50 feet of the fence, and where the fence alignment changes more than 15 degrees. Grounding locations must not exceed 650 feet. Each gate panel must be bonded with a flexible bond strap to its gate post. Fences crossed by powerlines of 600 volts or more must be grounded at or near the point of crossing and at distances not exceeding 150 feet on each side of crossing. Ground conductor must consist of No. 8 AWG solid copper wire. Grounding electrodes must be 3/4 inch by 10 foot long copper-clad steel rod.

Electrodes must be driven into the earth so that the top of the electrode is at least 6 inches below the grade. Where driving is impracticable, electrodes must be buried a minimum of 12 inches deep and radially from the fence. The top of the electrode must be not less than 2 feet or more than 8 feet from the fence. Ground conductor must be clamped to the fence and electrodes with bronze grounding clamps to create electrical continuity between fence posts, fence fabric, and ground rods. After installation the total resistance of fence to ground must not be greater than 25 ohms.

-- End of Section --

02 82 10 - 6

DIVISION 31 - EARTHWORK

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 REFERENCES

1.2 SYSTEM DESCRIPTION

1.3 DEFINITIONS

1.3.1 Satisfactory Materials

1.3.2 Unsatisfactory Materials

1.3.3 Degree of Compaction

1.3.4 Unstable Material

1.3.5 Embankment Construction

1.3.6 Cohesionless and Cohesive Materials

1.3.7 Hard/unyielding materials

1.3.8 Expansive Soils

1.3.9 Import Fill

1.4 SUBMITTALS

1.5 SUBSURFACE DATA

1.6 CLASSIFICATION OF EXCAVATION

1.7 CRITERIA FOR BIDDING

1.8 PLAN OF OPERATIONS

1.9 BORROW SITE NOTIFICATION

PART 2 PRODUCTS

2.1 REQUIREMENTS FOR OFFSITE SOILS

2.1.1 General Chemical Testing Requirements

2.1.2 Sample Collection

2.1.3 Chemical Testing

2.1.4 Solids Analysis

2.1.5 Soluble Constituent Testing

2.1.6 Potential Contaminants of Concern and Screening Criteria

2.1.7 Sampling Cost

2.1.8 Borrow Site Chemical Suitability Certification Report

2.2 TYPES OF FILL MATERIAL

2.2.1 Embankment Fill Material

2.2.2 Import Fill

2.3 TOPSOIL

2.4 SOURCE FOR EARTH MATERIALS

2.5 CONTROLLED LOW STRENGTH MATERIAL (CLSM)

2.5.1 Materials

2.5.1.1 Cementitious Materials

2.5.1.2 Aggregates

2.5.1.3 Admixtures

2.5.1.4 Water

2.5.1.5 Mixture Requirements

2.6 FORMWORK

PART 3 EXECUTION

31 00 00 - 1

3.1 GENERAL EXCAVATION

3.1.1 Drainage

3.1.2 Topsoil Stripping, Handling, Storage, and Stockpiling

3.1.2.1 Topsoil Stripping

3.1.2.2 Topsoil Handling and Storage

3.1.2.3 Topsoil Stockpiles

3.2 OPENING AND DRAINAGE OF EXCAVATION

3.3 EXCAVATION OF INSPECTION TRENCH

3.4 EXCAVATION FOR DRAINAGE STRUCTURES

3.5 GROUND SURFACE PREPARATION

3.5.1 General Requirements

3.6 UTILIZATION OF EXCAVATED MATERIALS

3.7 EMBANKMENT FILL PLACEMENT

3.7.1 General

3.7.2 Gradation and Distribution

3.7.3 Benching

3.7.4 Equipment Traffic

3.7.5 Placement on Surfaces Containing Frozen Materials

3.7.6 Partial Fills

3.8 MOISTURE CONTROL

3.8.1 General

3.8.2 Excessive Moisture for Suitable Bond

3.8.3 Insufficient Moisture for Suitable Bond

3.8.4 Drying Wet Material

3.8.5 Increasing Moisture in Dry Material

3.9 COMPACTION

3.9.1 Compaction Equipment

3.9.1.1 Tamping Rollers

3.9.1.2 Rubber-Tired Rollers

3.9.1.3 Hand Operated Compactors

3.9.1.4 Crawler-Type Tractors

3.9.1.5 Sprinkling Equipment

3.9.1.6 Disks

3.9.1.7 Miscellaneous Equipment

3.9.2 General

3.9.3 Compaction Adjacent to Structures and Utilities

3.10 FINISHING

3.11 SUBGRADE AND EMBANKMENTS

3.11.1 Grading Around Structures

3.11.2 Topsoil

3.11.3 Construction Verification Survey

3.11.3.1 Surveyor's Levee Elevation Certificate

3.12 QUALITY CONTROL TESTING OF SOILS

3.12.1 General

3.12.2 Materials Testing

3.12.3 Materials

3.12.4 Fill Placement

3.12.5 Grade and Cross Section

3.12.6 Testing by the Government

3.12.7 Reporting

3.13 DISPOSITION OF SURPLUS MATERIAL

3.14 MIXING, TRANSPORTING, AND PLACING CLSM

3.14.1 Cold-Weather Requirements

3.14.2 Formwork Installation

3.14.3 Formwork Removal

3.15 FIELD QUALITY CONTROL OF CLSM

3.15.1 Sampling

3.15.2 CLSM Testing

3.16 "J" LEVEE DEGRADE

31 00 00 - 2

3.17 MAINTENANCE ROADS

3.18 WATER WELL ABANDONMENT

3.19 WATERLINE REMOVAL

ATTACHMENTS:

Imported Fill Chemical Screening Limits for the Hamilton City Flood Damage Reduction and Ecosystem Restoration Project

-- End of Section Table of Contents --

31 00 00 - 3

SECTION 31 00 00

EARTHWORK

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS

(AASHTO)

AASHTO T 180 (2010) Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse Particles in the Soil Compaction Test

AMERICAN CONCRETE INSTITUTE INTERNATIONAL (ACI)

ACI 229R (1999; R 2005) Controlled Low-Strength Materials

ACI 304R (2000; R 2009) Guide for Measuring, Mixing, Transporting, and Placing Concrete

ASTM INTERNATIONAL (ASTM)

ASTM C136 (2006) Standard Test Method for Sieve Analysis of Fine and Coarse Aggregates

ASTM C150/C150M (2012) Standard Specification for Portland Cement

ASTM C260/C260M (2010a) Standard Specification for Air-Entraining Admixtures for Concrete

ASTM C33/C33M (2013) Standard Specification for Concrete Aggregates

ASTM C403/C403M (2008) Standard Test Method for Time of Setting of Concrete Mixtures by Penetration Resistance

ASTM C494/C494M (2013) Standard Specification for Chemical Admixtures for Concrete

ASTM C618 (2012a) Standard Specification for Coal Fly Ash and Raw or Calcined Natural

31 00 00 - 4

Pozzolan for Use in Concrete

ASTM C94/C94M (2014b) Standard Specification for Ready-Mixed Concrete

ASTM D1140 (2000; R 2006) Amount of Material in Soils Finer than the No. 200 (75-micrometer) Sieve

ASTM C1602/C1602M (2012) Standard Specification for Mixing Water Used in Production of Hydraulic Cement Concrete

ASTM D1556 (2007) Density and Unit Weight of Soil in Place by the Sand-Cone Method

ASTM D2216 (2010) Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass

ASTM D2487 (2011) Soils for Engineering Purposes (Unified Soil…