Amendment 0003
Bid Schedule (Phase I)
Hamilton City Flood Damage Reduction
And Ecosystem Restoration Project Phase I
Glenn County, California
CLIN Description Estimated Quantity
Unit of Measure Unit Price
Total Price
0001 Mobilization and Demobilization 1 JOB $________ $__________
0002 Clearing and Grubbing* 100
AC $________ $__________
0003 Temporary Storm Water Pollution Control
1 JOB $________ $__________
0004 Topsoil Stripping* 98,000 113,000
CY $________ $__________
0005 Water Well Abandonment 7
EA $________ $__________
0006 Remove Pump 3 EA $________ $__________
0007 Remove Waterline* 560 4,180
LF $________ $__________
0008 8’ Deer Fence* 15,100 LF $________ $__________
0009 Double Swing Gates 4 EA $________ $__________
0010 “J” Levee Degrade* 120,000 CY $________ $__________
0011 Inspection Trench* 43,100 42,400
CY $________ $__________
0012 Levee Embankment and Ramps* 195,000 225,000
CY $________ $__________
0013 Grass Seeding and Erosion Control* 100
AC $________ $__________
0014 Grade Maintenance Roads* 10,000 CY $________ $__________
0015 42” Reinforced Concrete Culvert 156 LF $________ $__________
0016 42” Sluice Gate 1 JOB $________ $__________
0017 42” Flap Gate 1 JOB $________ $__________
0018 36” Reinforced Concrete Culvert 208
LF $________ $__________
0019 36” Sluice Gate 1 JOB $________ $__________
0020 36”Flap Gate 1 JOB $________ $__________
0021 Concrete Culvert Risers, Walls, and Headwalls
1 JOB $________ $__________
Amendment 0003
CLIN Description Estimated Quantity
Unit of Measure Unit Price
Total Price
0022 Pipe Gates 6 EA $________ $__________ 0023 Stone Protection* 1110 TN $________ $__________ 0024 Riprap* 340 TN $________ $__________
0025 Bedding Material* 500 TN $________ $__________
0026 Aggregate Surface Course* 8,400 TN $________ $__________ 0027 Aggregate Base Course* 2,540 SY $________ $__________
0028 Hot Mix Bituminous Pavement 1 JOB $________ $__________
NOTE: AC is acre, CY is cubic yard, EA is each, TN is ton, SY is square yard, and LF is linear foot.
*Indicates quantity is estimated
TOTAL ESTIMATED PRICE $__________