Agenda for Industry Day 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sign_In_Sheet.pdf | ||
| JFP_Industy_Day_II_Agenda_Rev2_10-10-12.pdf | ||
| JFP_Industry_Combined_Slides_R2_10-10-12.pdf | ||
| JFP_Industy_Day_II_Agenda_dft_2_as_of_27_Sep_2012.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agenda Pre-Solicitation Industry Day #2 Phase IV Folsom Joint Federal Project October 11, 2012– 8:00 AM – 1:00 PM Folsom City Hall, 50 Natoma Street, Folsom, CA 95630
In response to: FedBizOpps.gov Special Notice W91238-13-R-0001
Industry Day Objective:
1. Introduce prospective contractors to the proposed procurement process and generalized scope and site conditions for the proposed Phase IV construction.
2. Through discussion, clarify remaining contractor questions.
DISCLAIMER: The information provided in preliminary drawings and specifications and answers provided to questions during this Industry Day shall be construed as draft, subject to change, and are not final solicitation or contract requirements. The Contractor is responsible to ascertain final requirements from the formal solicitation expected to be advertised in December 2012.
Topic
| 8:00-8:15 |
| Check-In/Registration |
| 8:15-8:30 |
| Welcome, Introductions, Objectives, Agenda, logistics |
| 8:30-8:45 |
| Opening Comments |
| 8:45-9:30 |
| Procurement Process |
· Timeline
· Availability of documents
· Submittal of formal questions
· Measurement and Payment items
· Content of Submitted Proposals
· Proposal Evaluation Factors
| 9:30-10:15 |
| Project overview/Major Project Features |
· Approach Channel (wet and dry blasting and excavation)
· Approach Walls, Slab and rock trap
· Upper Chute
· Stepped Chute
· Stilling Basin
· Key environmental protection factors
· Storm Water Pollution Protection (SWPP)
· Project Schedule
· Phase III/Phase IV site overlap & coordination
· Construction Partnering
| 10:15-10:30 |
| Open Discussion and Comments between Contractors and Government staff |
| 10:30-11:00 |
| Transportation to Project Site |
· The Site Tour will be conducted in an area of active construction on the Phase III Control Structure.
· Transportation on the site tour will be by bus. No contractor vehicles will be allowed.
· Tour participants will be provided a safety briefing and security briefing prior to entering the project site.
· Personal Protective Equipment (PPE) for participant safety will be required on site. Tour participants must wear safety shoes. The Government will provide other necessary PPE. Participants can elect to provide their own hard hats, safety glasses, and visibility vests.
| 11:00-12:30 |
| Site Visit |
· Geographic orientation
· Former Folsom Dam “Overlook” area
· Haul Route
· Dike 7 Stockpile of existing material for Ph IV use
· Dike 8 Optional Ph IV material spoil area
· Mormon Island Auxiliary Dam (MIAD) staging and spoil area
· Transload Facility site
· Chute and Stilling Basin from vicinity of existing pipe bridge
| 12:30-1:00 |
| Return to Folsom City Hall |
USACE Representatives will be available for questions image1.png image2.gif image3.gif image4.png