AM-07 Revisions.pdf
PDF 17 MB Posted
- Solicitation number
- W91238-12-R-0001
About this file
Revision Sec 01 10 10 26 00 00.00 20 28 05 26.40 01 33 16 Multiple Drawings Rm Data Sheets Preparing As-Builts
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Dugway Proving Ground 1825
Life Science Test Facility Addition
SECTION 01 10 10-Page 1
SECTION TABLE OF CONTENTS
SECTION 01 10 10
SPECIFIC TECHNICAL ENGINEERING AND DESIGN CRITERIA
1.0 Scope Design and Construction
1.1 Quality
1.2 Drawings
2.0 Summary Descriptions
2.1 General Description
2.2 Proposed Siting Summary
2.3 Building Construction Summary
3.0 Description Of Operations
4.0 Design Submittal Requirements
4.1 Design Standards
4.2 Codes
4.3 English Design
4.4 BIM Documentation
4.5 Drawings
4.6 Specifications
4.7 Sustainable Design
4.8 Force Protection
4.9 Barrier Free Design
4.10 Consolidated List of Codes and Standards
4.11 Energy Compliance Requirement
5.0 Civil Design
5.1 General
5.2 Site
5.3 Technical Criteria and Standards
5.4 Project Site Field Survey Topography
5.5 Site Demolition
5.6 Site Development
5.7 Permits
5.8 Grading
5.9 Earthwork
SECTION 01 10 10-Page 2
5.10 Site Improvements
5.11 Contractor Storage Yard
5.12 Storm Runoff and Drainage
5.13 Utilities
5.14 Force Protection
5.15 Pipe Bedding and Trench Backfill
5.16 Landscape Architecture
6.0 Geotechnical Design Requirements
6.1 General
6.2 Geotechnical Engineering Firm
6.3 Geotechnical Work
6.4 Acceptance
6.5 Contractor-Performed Geotechnical Investigations
6.6 Preliminary Data
7.0 Architectural Design
7.1 Scope
7.2 Codes and Standards
7.3 External Activities
7.4 Space Allocations
7.5 Barrier Free Design
7.6 Life Safety
7.7 Fire Safety
7.8 Security
7.9 Energy Conscious Design
7.10 Acoustical Design
7.11 Ceiling Heights
7.12 Building Systems, Materials, and Equipment
7.13 Environmental Design
7.14 Interior Finishes
8.0 Structural Design
8.1 Description
8.2 Applicable Standards/Criteria
8.3 Design Loads
8.4 General Design Criteria
SECTION 01 10 10-Page 3
8.5 Design Criteria
8.6 Concrete
8.7 Foundation and Slab Systems
8.8 Steel
8.9 Superstructure System
9.0 Mechanical, Plumbing, and Fire Protection Design
9.1 General Requirements for HVAC, Plumbing, and Fire Protection
9.2 Energy Conservation
9.3 Plumbing
9.4 Fire Protection
9.5 HVAC Design
9.6 Water Quality and Treatment
9.7 Service Piping Systems
9.8 CO2
9.9 LP Gas
9.10 Cathodic Protection
9.11 Energy Compliance Requirement
9.12 Options
10.0 Electrical Design
10.1 Commercial Codes and Design Manuals
10.2 Calculations
10.3 Drawings
10.4 Design Specifications
10.5 UFGS Editing Process
10.6 Exterior Electrical System
10.7 Interior Electrical System
10.8 References
10.9 LEED Certification
10.10 UL Label or a Similar Organization Acceptable to the Government
10.11 PCB Standards
10.12 New Equipment
10.13 Coordination
10.14 Digging Permits
10.15 Exterior Electrical
SECTION 01 10 10-Page 4
10.16 Interior Electrical
10.17 Sizing Services and Feeders
10.18 Panelboards
10.19 Conductors
10.20 Conduit Stub-Ups
10.21 Motors
10.22 Motor Control
10.23 Branch Circuits, Receptacles and Outlets
10.24 Receptacles
10.25 Equipment Power
10.26 Surge Protection
10.27 Grounding
10.28 Uninterruptible Power Supply (UPS) System
10.29 Interior Lighting
10.30 Restrooms
10.31 Emergency Power System
10.32 LEED for Lighting System
10.33 Concealed Wiring and Conduit
10.34 Seismic Considerations
10.35 Device Body and Coverplate Colors
10.36 Bonding
10.37 Voltage Drop
10.38 Equipment Identification
10.39 Open Storage Room
10.40 Energy Compliance Requirement
11.0 Fire Alarms and Mass Notification Systems
11.1 Fire Alarm Equipment
11.2 Fire Alarm System
12.0 Spill Alarm System
13.0 Security Systems
13.1 Access Control
13.2 Biometric Devices
13.3 Intrusion Detection System
13.4 Power
SECTION 01 10 10-Page 5
13.5 CCTV System
13.6 Paging System
13.7 Testing and Commissioning
14.0 Telecommunications/Data
14.1 Requirements
14.2 Open Storage
14.3 Monitoring System CCTV
14.4 Auditorium
14.5 Telephone System
14.6 Data (LAN) Communications System
14.7 Cable Tray
14.8 Conduit
14.9 Comm. Network Rooms
14.10 Equipment Layout
14.11 Grounding and Bonding
14.12 Testing and Drawings
-- End of Section Table of Contents --
SECTION 01 10 10-Page 6
SECTION 01 10 10
SPECIFIC TECHNICAL ENGINEERING AND DESIGN CRITERIA
1.0 SCOPE DESIGN AND CONSTRUCTION
Design and construct the Life Science Test Facility (LSTF) Addition at Dugway Proving
Ground (DPG), Utah, in accordance with the criteria contained herein and using industry standard materials and efficient practices.
The objective of this contract is to design and construct the required facility as described in this document and Section 01 10 11, Functional Design Criteria Room by Room
Requirements, and to meet the operational requirements of the Army. The Contractor shall provide all labor, equipment and material to perform the design and construct the complete, operational facility. The Contractor is responsible for visiting the site before submitting his proposal.
The design and construction of this facility shall conform to the DPG Installation Design
Guide (IDG) and the requirements issued in this solicitation. The Contractor is responsible and liable for the compete design and is required to produce a complete set of construction documents. The Contractor shall perform any additional design as required to supplement the design criteria and drawings provided in this solicitation.
1.1 Quality
The Contractor shall be responsible for the professional quality, technical accuracy and coordination of all designs, drawings, specifications and other documents or publications upon which construction is based. The design of architectural, interior design, structural, mechanical, electrical, civil, fire protection and other engineering features of the work shall be accomplished, reviewed and approved by engineers, architects and interior designers who are licensed professionals with a minimum of six years‘ experience to practice in their respective professional field in a state or possession of the United States. The structural interior design shall be designed/supervised by a registered or certified (as Appropriate for the state) interior designer who is National Council for Interior Design Qualifications (NCIDQ) certified.
1.2 Drawings
The attached drawings indicate the siting location of the facility and its approximate maximum size, and other system parameters that have been developed to date and approved by the United States Army Corps of Engineers (USACE) and Post. These shall be used to develop a full set of construction documents.
2.0 SUMMARY DESCRIPTIONS
2.1 General Description
This project (the Project) shall construct an LSTF Addition by adding 41,200 square feet to the existing Building 2029 and altering the existing building to provide connecting hallways to
SECTION 01 10 10-Page 7
Building 2029‘s interior. The proposed addition will be attached to the south side of the existing LSTF facility, but have its own secondary public entrance from the east. The east entry serves a long corridor that separates the new construction from the existing building, permitting the existing exterior walls to be left in place to minimize operations disruption. The addition will mimic the appearance of the existing building on the east and will use materials giving the same appearance though constructed differently. The remainder of the building also uses materials used in the existing facility, but in new ways. The differences in structure, systems and operations have made spatial demands on the building that makes it taller and more linear than the existing facility. A steel frame building with masonry bearing walls, the addition is taller than the existing LSTF. The use of daylighting has expanded the use of fiberglass reinforced panels. The panels form skylights over the two corridors serving the
Labs, and over the corridor at the east entry. The walls and roof are insulated using foam boards to achieve a minimum R-26 in the walls and an R-32 at the roofs exceeding DOD mandated insulating requirements achieving a 40 percent reduction in energy use beyond
ASHRAE 90.1 2007 per Engineering Construction Bulletin (ECB) 2011-1.
The roofing will be a standing seam metal roof except at the low-slope roof on the east side where an ethylene propylene diene monomer (EPDM) single-ply membrane will be used. A large utility yard is located on the west serving the two-story mechanical room along the west side of the building. The utilities are organized with the pumps, electrical, communications and shop area on the ground floor and the large air handlers and fans on the second floor.
The second floor mechanical is tall to accommodate the top ducted air handlers, and the large ductwork required to meet Leadership in Energy and Environmental Design (LEED) ventilation requirements. The Project shall be designed within the criteria prescribed in
United Facilities Criteria (UFC) 1-200-01, UFC 3-600-01, Architectural Barriers Act Accessibility Guidelines (ABA), United States Department of Defense (DoD) Antiterrorism/
Force Protection requirements, and operations and maintenance manuals. The Project shall be designed within the criteria prescribed in UFC 1-200-01, UFC 3-600-01, and ETL 02-15.
See paragraph 4.10 SITE IMPROVEMENTS for a complete list of applicable codes and criteria.
2.2 Proposed Siting Summary
The Life Science Test Facility addition to building 2029 shall be located in the Baker
Complex of the Dugway Proving Ground. The design shall maximize solar exposure.
2.3 Building Construction Summary
The addition will include new, concrete foundation and floor slabs, structural steel frame, masonry walls and standing seam metal roof, and shall be Type II, unprotected, noncombustible construction throughout.
3.0 DESCRIPTION OF OPERATIONS
The mission of the Project is to expand the test and evaluation capacities of the LSTF at
DPG through the addition of biosafety laboratories, support, and administrative spaces to the existing LSTF. The Project would provide permanent space to accommodate the rapidly expanding workforce, responding to the need to test and evaluate new equipment being developed in response to the threat of use of chemical and biological weapons by other nations and terrorist groups. The Project will provide areas for test design and development, SECTION 01 10 10-Page 8 data reduction, film development, and report writing, as well as operation of electron microscopes and repairs and adjustments to critical instruments used in the laboratory and in the field. The Project will add a total of nine Biosafety Level 2 (BSL2) labs and five Biosafety
Level 3 (BSL3) labs (including one for an Aerosol Chamber).
The LSTF is a facility located in the Baker Area of DPG. Tests conducted at the LSTF are part of biological defense testing activities. Both biological simulants and biological agents are used at this facility. The existing LSTF was built in 1998. The LSTF Addition will consist of laboratories and chambers that are capable of working at BSL1 through BSL3 laboratory controlled environments. The new facility is divided into the following four major functional areas
• Administrative section consists of offices, restroom facilities, etc.
• General Analytical Support Unit houses microscopes and conventional analytical instrumentation. This unit does not require biological containment equipment.
• BSL2 Microbiological Area consists of laboratory rooms used for routine microbiological procedures such as culture preparation, analytical tests, and handling of biological simulants. Low activity radionuclides may also be used as tracer materials for some analytical tests.
• BSL3 Suite consists of multipurpose test rooms, BSL3 cultivation and assay room, aerosol chamber support room, and a special containment aerosol chamber (CAC) for conducting
BSL3 testing with pathogenic microorganisms and toxins. The chamber can simulate a wide range of environmental conditions dealing with temperature, humidity, and aerosol concentration.
4.0 DESIGN SUBMITTAL REQUIREMENTS
The design requirements within this Section 01 10 10 and the following Section 01 10 11
FUNCTIONAL DESIGN CRITERIA ROOM BY ROOM REQUIREMENTS represent the minimum quality and quantity acceptable for the proposals and Project submittals. The standards, documents, and criteria referenced within this RFP, although not all attached within this RFP document, are modified to the extent indicated within this section. Each
Offeror shall be responsible for obtaining any documents not attached as part of this RFP but referenced as criteria for the Project. Requirements of this section may delete, revise, add to, or substitute for criteria contained in the referenced documents and this section shall be deemed the controlling authority of any changes to the other referenced documents and criteria.
4.1 Design Standards
Equipment, hardware, and materials shall be standard manufactured domestic items unless otherwise specified. Replacement parts shall be standard and readily available through commercial means. Discontinued products will not be accepted unless approved by the
Contracting Officer.
4.2 Codes
The design, materials, equipment, and installation shall be in accordance with the requirements of the listed codes and design manuals, with the requirements of this section, SECTION 01 10 10-Page 9 and with the listed specifications. The building shall be of a noncombustible construction classification. Wood structural elements will not be acceptable.
4.3 English Design
The Project shall be designed in English inch-pound (I-P) units per the preference of the using agency, USACE and the Army.
4.4 BIM Documentation
The builder is to develop all further building drawings and specifications using Revit resulting in a building information model (BIM) and database. Revit drawing files will also be provided in CADD-formatted files for reviewers without Revit software.
4.5 Drawings
Attached drawings provide information on the site and approved building floor plan as developed in coordination with the using agency and shall be considered in the design of the facility. Adjustments to the floor plan are allowed to accommodate structural and mechanical design issues, and energy efficiency improvements.
4.5.1 Field Information
The utility and as-built information provided in the drawings is the best information available.
It is provided to assist the offerors in preparing their proposal and then during the design of the Project. The Contractor is responsible for field verifying all information given. The
Contractor is also responsible for obtaining all information necessary to properly design and install all work. Gathering information during design shall be coordinated through the
Contracting Officer. Any survey required to provide utility locations, manhole inverts, verification of existing features, etc., shall be the responsibility of the Contractor and shall tie into the Project datum.
4.5.2 Design Details and Standards
The Contractor shall create design details as required, but shall conform to the requirements of the RFP, and are subject to approval by the Government.
4.6 Specifications
The contractor shall follow all Unified Facilities Guide Specifications (UFGS) already included in this RFP, and the Contractor shall also provide all other applicable, edited UFGS specifications as required for the design and construction of the Project. The Unified
Facilities Guide Specifications can be retrieved at:
http://www.wbdg.org/ccb/browse_org.php?o=70
Items to be deleted from the specifications shall use the ―strikethrough‖ formatting process to delete any portion of the specifications. Additions to the specifications shall be shown in a color font. Unless noted otherwise, material specifications, equipment efficiencies, equipment listing (e.g., UL, ANSI, NEMA, etc.), testing requirements, execution, etc., shall not be changed unless dictated by more stringent requirements in this RFP, including technical http://www.wbdg.org/ccb/browse_org.php?o=70
SECTION 01 10 10-Page 10 criteria such as codes and government and industry publications that are referenced in this
RFP.
4.7 Sustainable Design
The Contractor shall take appropriate actions and incorporate features in the design, and maintain all necessary records for the application of the Project to the US Green Building
Council (USGBC) to achieve a USGBC Leadership in Energy and Environmental Design
(LEED) ―Silver‖ rating under the New Construction, version 3 system, and meet the
Environmental Protection Agency (EPA) ―Designed to Earn Energy Star‖ program requirements. The contractor shall certify and register the Project with the USGBC. Also, see paragraph 4.11 ENERGY COMPLIANCE for sustainable design requirements.
4.7.1 LEED Credits and “Designed to Earn Energy Star” Program
Requirements
The Project design and construction shall, at a minimum, achieve all LEED prerequisites and
50 to 59 LEED credits. LEED credits are awarded after the Project is registered and official review and evaluation by the USGBC is complete; full explanation of the USGBC LEED processes, associated fees and design-construction documentation requirements can be found on the USGBC web site. This Solicitation establishes achievement of specific LEED credits which is driven by statutes, federal Executive Orders; the balance of the 50 to 59 credits not specifically mandated shall be established by the Contractor‘s design. The
―Designed to Earn the Energy Star‖ program is administered by the Environmental Protection
Agency; analysis of the Contractor‘s design shall be accomplished using the ―Target Finder‖ program and achieve a rating of 75 or higher. Conduct analysis per EPA guidelines and document the results in the Project ―Sustainable Design Analysis‖ (described below). Results of the ―Target Finder‖ analysis shall be submitted to the EPA for review; once accepted by the EPA, they will provide the Architect of Record an electronic file with the ―Designed to
Earn the Energy Star‖ graphic. The Contractor shall place this graphic in the title block on all construction drawings and on the cover of all Contract Documents. Complete ―Designed to
Earn the Energy Star‖ information and requirements can be found at the EPA Energy Star website at:
http://www.energystar.gov/index.cfm?c=new_bldg_design.new_bldg_design_benefits
4.7.2 Mandatory LEED Credits
The Contractor‘s Project design shall achieve the following specific LEED credits as part of the 50 to 59 total credits required.
4.7.2.1 Sustainable Sites, Credit SS7.2 (Heat Island Effect – Roof)
The Project directive requires roofs to meet or exceed the following Solar Reflectance Index
(SRI) for a minimum of 75 percent of the roof surface: SRI > 78 for low-slope roofs; SRI > 29 for high-slope roofs.
4.7.2.2 Water Efficiency, Credit WE1 (No Potable Use or No Irrigation)
The Project policy directive prohibits the use of potable water for new landscape irrigation systems. This requirement takes precedence over all requested landscape Bid Options. Note http://www.energystar.gov/index.cfm?c=new_bldg_design.new_bldg_design_benefits
SECTION 01 10 10-Page 11 that in meeting the requirements of WE1.2, four LEED credits are awarded. In addition, by achieving this credit another point is earned in the Regional Priority credit for satisfying
WE1.1.
4.7.2.3 Water Efficiency, Credit WE3.1 (30% Water Use Reduction)
Employ strategies that in aggregate use a minimum of 30 percent less potable water than the indoor water use baseline calculated for the building, after meeting the Energy Policy Act of
1992 fixture performance requirement.
4.7.2.4 Energy and Atmosphere, Credit EA1 (Optimize Energy Performance)
The Contractor shall perform an energy analysis per LEED Energy Efficiency, EA1; however the exact number of LEED credits required cannot be predetermined before individual project analysis is complete as the energy efficiency calculation established for Federal facilities by the Department of Energy in Code of Federal Regulations (CFR) Title 10 Part 433 is not the same as that used in LEED EA1 calculations. Required energy performance for Federal facilities is determined by the calculation established by the Department of Energy (DOE) in
CFR Title 10 Part 433. Energy usage for this facility shall reflect minimum 40 percent improvement over the levels established in the baseline ASHRAE 90.1 2007 per ECB 2011-1 building using the Performance Rating Method found in Appendix G of
ANSI/ASHRAE/IESNA Standard 90.1–2007, Energy Standard for Buildings Except Low-Rise
Residential Buildings, except the formula for calculating the Performance Rating in paragraph G1.2 shall be changed to read as follows:
• Percent improvement = 100 x (Baseline building consumption—Proposed building consumption) / (Baseline building consumption—Receptacle and process loads).
• The Contractor shall assure Project design complies with CFR Title 10 Part 433 minimum
30-percent improvement and then derive the appropriate number of LEED Energy
Efficiency, EA1 (Optimize Energy Performance) credits. Informal Government review of other Federal projects show 4 (four) to 6 (six) EA1 credits are earned when meeting the
CFR Title 10 Part 433 requirement; however, performance is driven by numerous Project specific factors and cannot be broadly applied.
• Additionally, the Contractor shall assure the Project design earns the ―Designed to Earn
Energy Star‖ rating by receiving a rating of 75 or higher.
According to Office of the Under Secretary of Defense Memo Oct 25 2010, Department of
Defense Sustainable Buildings Policy, the following applies. "Beginning in FY 12 for projects in the planning stage, the sum of energy and water efficiency credits shall equal or exceed
40 percent of the points required for a LEED-Silver (or equal) rating; this highlights the importance of pursuing additional energy-and water-related credits in areas such as cool roofs and day lighting."
Percent improvement = 100 x (Baseline building consumption—Proposed building consumption) / (Baseline building consumption—Receptacle and process loads).
4.7.2.5 Energy and Atmosphere, Credit EA4 (Enhanced Refrigerant Management)
Reduce ozone depletion and support early compliance with the Montreal Protocol while minimizing direct contributions to global warming.
SECTION 01 10 10-Page 12
4.7.2.6 Energy and Atmosphere, Credit EA5 (Measurement and Verification)
Install building level utility meters to track and continuously optimize performance. Compare actual performance data from the first year of operation with the energy design target. Enter data and lessons learned into the Federal High Performance Buildings Database.
4.7.2.7 Materials and Resources, Credit MR2.1 (Construction Waste Management – Divert 50% from Disposal)
Divert construction and demolition debris from disposal in landfills and incinerators. Redirect recyclable recovered resources back into the manufacturing process. Redirect reusable materials to appropriate sites. Achieving this point will automatically earn an additional point in the Regional Priority credit.
4.7.2.8 Materials and Resources, Credit MR4.1 (Recycled Content 10%)
Use materials with recycled content such that the sum of post-consumer recycled content plus one-half of the pre-consumer content constitutes at least 10-percent (based on cost) of the total value of the materials in the Project.
4.7.2.9 Materials and Resources, Credit MR6 (Rapidly Renewable Materials)
Reduce the use and depletion of finite raw materials and long-cycle renewable materials by replacing them with rapidly renewable materials. The Contractor shall pursue this Credit and document progress and actions; however if this Credit cannot be achieved due to the limited amount of rapidly renewable materials capable of being used in the Project, the Government may waive this requirement. Waiving the MR6 requirement shall not reduce the overall total number of LEED credits required for this Project and as listed in paragraph 4.7
SUSTAINABLE DESIGN.
4.7.2.10 Indoor Environmental Quality, Credit IEQ3.1 (Construction Indoor Air Quality management Plan – During Construction)
Reduce indoor air quality problems resulting from the construction process in order to help sustain the well-being of construction workers and building occupants.
4.7.2.11 Indoor Environmental Quality, Credits IEQ4.1, IEQ4.2, IEQ4.3 and IEQ4.4 (Low- Emitting Materials)
Use materials and products with low pollutant emissions, including adhesives, sealants, paints, coatings, carpet systems, and wood.
4.7.2.12 Indoor Environmental Quality, Credit IEQ5 (Indoor Chemical and Pollutant Source Control)
Minimize exposure of building occupants to potentially hazardous particulates and chemical pollutants.
SECTION 01 10 10-Page 13
4.7.2.13 Indoor Environmental Quality, Credit IEQ6.2 (Controllability of Systems – Thermal Comfort
Provide a high level of thermal comfort system control by individual occupants or by groups in multi-occupant spaces to promote the productivity, comfort and well-being of building occupants.
4.7.2.14 Innovation in Design, Credit ID2 (LEED Accredited Professional)
The LEED accredited professional (LEED AP) shall be a full member of the Contractor‘s team and responsible for coordinating the team efforts in achieving the LEED Silver rating for the Project. The LEED AP shall at a minimum attend all Government review meetings, coordinate the information up-load to the USGBC LEED project site and present the ―Project
Sustainable Design Analysis‖ (described below) and address fully what steps are being taken and implemented across all disciplines to meet sustainable design and ―Designed to
Earn Energy Star‖ goals.
4.7.2.15 Additional recommended LEED Credits
The Contractor‘s Project design can also pursue the following specific LEED credits as part of the 50 to 59 total credits required. These credits have been recommended as Preferred
LEED credits in the USACE LEED Implementation Guide.
4.7.2.16 Sustainable Sites, Credit 4.2 Alternative Transportation, (Bicycle Storage and Changing Rooms)
Provide secure bicycle racks and/or storage within 200 yards of a building entrance for 5 percent or more of all building users(measured at peak periods) Also provide shower and changing facilities for 0.5 percent of Full time equivalent occupants.
4.7.2.17 Sustainable Sites, Credit 6.1 (Stormwater Design: Quantity Control)
To limit disruption of natural hydrology by reducing impervious cover, increasing on-site infiltration, reducing or eliminating pollution from stormwater runoff and eliminating contaminants. This credit relates to High Performance and Sustainable Building (HPSB) stormwater requirements. Coordinate with Post on allowable solutions. Achieving this point will automatically earn an additional point in the Regional Priority credit.
4.7.2.18 Sustainable Sites, Credit 6.2 (Stormwater Design: Quality Control)
To limit disruption and pollution of natural water flows by managing stormwater runoff. This credit relates to HPSB stormwater requirements. Coordinate with Post on allowable solutions.
4.7.2.19 Materials and Resources, Credit 4.2, (Recycled Content)
Twenty percent post-consumer + ½ pre-consumer) Related to EPA CPG compliance.
Significant concrete and steel in Project facilitate earning of this credit.
SECTION 01 10 10-Page 14
4.7.2.20 Materials and Resources, Credit 7, (Certified Wood)
Use a minimum of 50 percent (based on cost) of wood-based materials and products that are certified in accordance with the Forest Stewardship Council‘s principles and criteria, for wood building components. All projects should include certified wood to the extent budget can support cost. Credit is easily earned at minimal first cost in projects that include very little wood.
4.7.2.21 Indoor Environmental Quality, Credit 3.2 (Construction IAQ Management Plan Before Occupancy)
Construction schedule must accommodate activities required for this credit.
4.7.2.22 Indoor Environmental Quality, Credit 6.1 (Controllability of Systems: Lighting)
Provide individual lighting controls for 90 percent (minimum) of the building occupants to enable adjustments to suit individual task needs and preferences. Provide lighting system controls for all shared multi-occupant spaces.
4.7.2.23 Regional Priority, (Up to 4 Credits)
One to four credits can be earned of the six Regional Priority credits identified by the USGBC regional councils as having environmental importance for a project‘s region. The purpose of this credit is to provide an incentive for the achievement of credits that address geographically specific environmental priorities.
4.7.3 Reporting
The Contractor shall prepare a ―Project Sustainable Design Analysis‖ as part of all design and contract document submittals; a LEED checklist by itself does NOT meet this requirement. Using the LEED checklist as a guide, the Project Sustainable Design Analysis shall fully address each sustainable design feature incorporated into the project; shall discuss why other features were not included; shall discuss synergies between sustainable features and shall clearly describe construction-phase sustainable design features and activities. Additionally, the Contractor shall prepare a LEED checklist, reflective of the design strategies employed, and submit to the Contracting Officer for the Government‘s internal reporting and tracking requirements.
4.7.3.1 USGBC On-Line Project Registration
This Project shall be registered with the USGBC as discussed in paragraph 4.7
SUSTAINABLE DESIGN.
4.8 Force Protection
Force Protection shall be provided and designed in accordance with UFC DoD Minimum Antiterrorism Standards for Buildings, UFC 4-010-01, dated 8 October 2003, Including change 1, dated 22 January 2007. Current threat protection level is Low. Building glazing, entries, mechanical room design, mechanical/electrical equipment enclosure walls and parking standoff distances shall incorporate the requirements of the standard. See also requirements for Design and O&M: Mass Notification Systems, UFC 4-021-01.
SECTION 01 10 10-Page 15
4.8.1 Physical Security
This facility shall conform to JAFAN 6/99ICD 705 Physical Security Standards for Special
Access Program Facilities.
4.9 Barrier Free Design
This facility shall be fully accessible to all handicapped individuals in accordance with the requirements of the Architectural Barriers Act Accessibility Guidelines (ABA) and the Uniform
Federal Accessibility Standards. Handicapped parking spaces and curb cuts shall be provided on site, near primary building ingress and egress. Exposed plumbing pipes under toilet lavatories shall be fully screened both physically and visually. Level transition, where required, shall be by ramps.
4.10 Consolidated List of Codes and Standards
Each design discipline cites references to various codes and standards that govern the design of the Project. A listing of the primary codes and standards required for compliance with the requirements of this RFP follows. Additional UFGS specifications may also apply to the contract. Note: Use the latest edition for all reference standards or criteria listed in this section.
29 CFR 1910.106 (d) (4) Occupational Safety and Health Standards, Flammable and
Combustible Liquids, Design and Construction of Inside Storage
Rooms
29 CFR 1910.165 Occupational Safety and Health Standards, Fire Protection, Employee Alarm Systems
29 CFR 1910.94 Occupational Safety and Health Standards, Occupational Health and Environment Control, Ventilation
29 CFR 1910.96 OSHA Coverage of Ionizing Radiation Sources Not Covered by
Atomic Energy Act of 1954
AAMA (NWWDA 101/I.S.2 Voluntary Specification for Aluminum, Vinyl
(PVC) and Wood Windows and Glass Doors
ABA Architectural Barriers Act Accessibility Standard for Department of
Defense Facilities
A-E Guide, Volume 1 General Instructions for Army Projects, Sacramento District
A-E Guide, Volume 2a & 2b Cost Estimating, Sacramento District
A-E Guide, Volume 3 Specifications, Sacramento District
ANSI A 137.1 Ceramic Tile
ANSI A 250.8 Standard Steel Doors and Frames
ANSI C2 National Electrical Safety Code
ANSI C57.12.00 General Requirements for Liquid-Immersed Distribution, Power, and Regulating Transformers
ANSI C57.12.26 Requirements for Pad-Mounted, Compartmental-Type, Self-
Cooled, Three-Phase Distribution Transformers for use with
Separable Insulated High-Voltage Connectors, High-Voltage, 34500GrdY/19920 Volts and Below; 2500 kVA and Smaller
SECTION 01 10 10-Page 16
ANSI C57.12.27 Conformance Requirements for Liquid-Filled Distribution
Transformers Used in Pad-Mounted Installations, Including Unit
Substations
ANSI C57.12.28 Switchgear and Transformers - Pad-Mounted Equipment -
Enclosure Integrity
ANSI C84.1 Electric Power Systems and Equipment - Voltage Ratings.
ANSI TIA/EIA 758 Customer Owned Outside Plant Telecommunications Cabling
Standard
ANSI TIA/EIA-526-14 Optical Power Loss Measurements of Installed Multimode Fiber
Cable Plant - OPSTP-14
ANSI TIA/EIA-526-7 Measurement of Optical Power loss of Installed Single-Mode Fiber
Cable Plant - OFSTP-7
ANSI TIA/EIA-568-A Commercial Building Telecommunications Cabling Standard
ANSI TIA/EIA-568-B.1 Commercial Building Telecommunications Cabling Standard
Part 1: General Requirements
ANSI TIA/EIA-568-B.2 Commercial Building Telecommunications Cabling Standard
Part 2: Balanced Twisted-Pair Cabling Components
ANSI TIA/EIA-569-A Commercial Building Standard For Telecommunications Pathways and Spaces
ANSI TIA/EIA-598 Optical Fiber Cable Color Coding
ANSI TIA/EIA-606 The Administration Standard For the Telecommunications
Infrastructure of Commercial Buildings
ANSI TIA/EIA-607 Commercial Building Grounding and Bonding Requirements for
Telecommunications
ANSI TIA/EIA-TSB-67 Transmission Performance Specifications for Field Testing of
Unshielded Twisted Pair (UTP) Cabling System
ANSI/ASHRAE/IESNA Standard 90.1
Energy Standard for Buildings Except Low-Rise Residential
Buildings
ANSI/IEEE Std. 141 Recommended Practice for Electric Power Distribution for
Industrial Plants. (The Red book.)
ANSI/IEEE Std. 242 Recommended Practice for Protection and Coordination of
Industrial and Commercial Power Systems. (The Buff book.)
Architectural Woodwork Quality Standards
Guide Specifications and Quality Certification Program, AWI (latest edition)
ASHRAE Handbook Fundamentals
ASHRAE Handbook HVAC Applications
ASHRAE Handbook HVAC Systems and Equipment
ASHRAE Handbook Refrigeration
ASHRAE Standard 15 Revision
Safety Code for Mechanical Refrigeration
ASHRAE Standard 62.1 Ventilation for Acceptable Indoor Air Quality
SECTION 01 10 10-Page 17
ASTM B221 Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Profiles, and Tubes
ASTM C 1028 Standard Test Method for Determining the Static Coefficient of
Friction of Ceramic Tile and Other Like Surfaces by the Horizontal
Dynamometer Pull-Meter Method
ASTM C 373 Water Absorption, Bulk Density, Apparent Porosity, and Apparent
Specific Gravity of Fired Whiteware Products
ASTM C 648 Breaking Strength of Ceramic Tile
ASTM E 514 Water Penetration and Leakage Through Masonry
ASTM E 90 Standard Test Method for Laboratory Measurement of Airborne
Sound Transmission Loss of Building Partitions and Elements
ASTM F 1066 Standard Specification for Vinyl Composition Floor Tile
ECB 2011-1 High Performance Energy and Sustainability Policy
Fire Resistance Directory, Vol. 1 and 2, UL
Glass Manufacturer Standards
GSA-PBS-CZ Public Building Service Standard Test
Gypsum Association Fire Resistance Design Manual
IBC International Building Code, 2009 Edition, (except as modified in
UFC 1-200-01 & UFC 3-301-01)
IEEE C62.41 Surge Voltage in Low Voltage AC Power Circuits
IEEE Std. 1100 Recommended Practice for Powering and Grounding Electronic
Equipment-IEEE Emerald Book
IEEE Std. 142 Recommended Practice for Grounding of Industrial and
Commercial Power Systems - IEEE Green Book
IEEE Std. 241 Recommended Practice for Electric Power Systems in Commercial
Buildings-IEEE Gray Book
IEEE Std. 399 Recommended Practice for Industrial and Commercial Power
Systems Analysis-IEEE Brown Book
IEEE Std. 446 Recommended Practice for Emergency and Standby Power
Systems for Industrial and Commercial Applications-IEEE Orange
Book
IEEE Std. 493 Recommended Practice for the Design of Reliable Industrial and
Commercial Power Systems-IEEE Gold Book
IEEE Std. 519 Recommended Practices and Requirements for Harmonic Control in Electrical Power Systems-Second Printing
IESNA Lighting Handbook, Reference and Application Volume
IMC International Mechanical Code
Installation Design Guide Dugway Proving Ground
IPC International Plumbing Code, (except as modified in UFC 3-420-
01)
Mil-HDBK-1190 Military Handbook Facility Planning and Design Guide
NECA 1 Standard Practice of Good Workmanship in Electrical Construction
SECTION 01 10 10-Page 18
NETA-ATS Standard for Acceptance Testing Specifications for Electrical
Power Equipment and Systems
NFPA 101 Life Safety Code
NFPA 110 Emergency and Standby Power Systems
NFPA 111 Stored Electrical Energy Emergency Standby Power Systems
NFPA 13 Installation of Sprinkler Systems
NFPA 20 Installation of Stationary Pumps for Fire Protection
NFPA 24 Installation of Private Fire Service Mains
NFPA 291 Recommended Practice for Fire Flow Testing and Marking of
Hydrants
NFPA 30 Flammable and Combustible Liquids Code
NFPA 45 Standard on Fire Protection for Laboratories Using Chemicals
NFPA 54 National Fuel Gas Code
NFPA 70 National Electrical Code
NFPA 72 National Fire Alarm Code
NFPA 780 Lightning Protection Systems
NFPA 80 Fire Doors and Fire Windows
NFPA 90A Installation of Air Conditioning And Ventilating Systems
NFPA 90B Installation of Warm Air Heating and Air-Conditioning Systems
NSF National Science Foundation
OSHA Occupational Safety and Health Administration
SMACNA Architectural Sheet Metal Manual
SMACNA HVAC Systems – Duct Design Manual.
Tile Council of America Handbook for Ceramic Tile Installation
TM 5-822-2 General Provisions and Geometric Design for Roads, Streets, Walks, and Open Storage Areas
TM-5-804-14 Roofing and Waterproofing
TM-5-805-6 Caulking and Sealing
TM-5-805-8 Building Hardware
TM-5-812-2 Firestopping
UFC 1-200-01 Design: General Building Requirements
UFC 3-120-01 Army Sign Standard
UFC 3-210-01A Area Planning, Site Planning, and Design
UFC 3-230-07A Water Supply, Sources and General Considerations
UFC 3-230-10A Water Supply, Water Distribution
UFC 3-240-07FA Design Drainage Areas for Other Than Airfields
UFC 3-240-08FA Sanitary and Industrial Wastewater Collection – Pumping Stations and Force Mains
UFC 3-301-01 Structural Engineering
UFC 3-310-04 Design: Seismic Design for Buildings
SECTION 01 10 10-Page 19
UFC 3-400-01 Design: Energy Conservation
UFC 3-400-02 Design: Engineering Weather Data
UFC 3-410-01FA Design: Heating, Ventilating and Air Conditioning
UFC 3-410-02A Design: Heating, Ventilating and Air Conditioning (HVAC) Control
Systems
UFC 3-410-04N Design: Industrial Ventilation
UFC 3-420-01 Design: Plumbing
UFC 3-420-02FA Design: Compressed Air
UFC 3-450-01 Design: Noise and Vibration Control
UFC 3-501-01 Electrical Engineering
UFC 3-520-01 Electrical Design, Interior Electrical System
UFC 3-530-01 Design: Interior and Exterior Lighting and Controls
UFC 3-535-01 Visual Air Navigation Facilities
UFC 3-550-01 Exterior Power Distribution
UFC 3-550-03FA Electrical Power Supply and Distribution
UFC 3-560-01 Electrical Safety, O & M
UFC 3-570-02A Cathodic Protection
UFC 3-580-01 Telecommunications Building Cabling Systems Planning and
Design
UFC 3-600-01 Design: Fire Protection Engineering for Facilities
UFC 4-010-01 DoD Minimum Antiterrorism Standards for Buildings
UFC 4-010-02 DoD Minimum Standoff Distances for Buildings
UFC 4-021-01 Design and O&M: Mass Notification Systems
UFGS Unified Facilities Guide Specifications
UL Listing File No. E76704, UL 1286
UL 268 Smoke Detectors for Fire Protective Signaling Systems
UL 497 Protectors for Paired Conductor Communication Circuits
UL 50 Enclosures for Electrical Equipment
UL 910 Test for Flame-Propagation and Smoke-Density Values for
Electrical and Optical-Fiber Cables Used in Spaces Transporting
Environmental Air
USACE Standard Detail 40-06-04, Lighting Fixtures
USACE Pavement-Transportation Computer Assisted Structural
Engineering (PCASE) Design Program
Woodwork Institute of Utah (WIC)
Manual of Millwork, Standards of the Woodwork Industry for
Arizona, Utah, Utah & Oregon, 10th Edition
SECTION 01 10 10-Page 20
4.11 Energy Compliance Requirement
In order to demonstrate compliance with the requirements of paragraph BASIC CRITERIA in
UFC 3-400-01 with regards to achieving the required reduction in energy consumption, the
Contractor shall prepare an Energy Compliance Analysis (ECA) for the Project. The ECA shall identify the specific energy conservation criteria that applies to the Project, the software used to prepare the necessary calculations, a summary of all input to and output from the calculations, the Project's energy target, and the calculated energy consumption of the proposed design. The ECA shall also include a separate narrative prepared by each of the following individuals: the Lead Project Architect, Lead Project Mechanical Engineer, and the
Lead Project Electrical Engineer. Each of the three narratives shall list the conservation measures considered for that discipline, the impact of each measure considered on the calculated energy consumption, and finally a list of conservation measures adopted in the design. The ECA shall be submitted for approval along with the Concept Design, shall be updated as necessary as the design progresses, and the completed document submitted with the Final Design.
In order to demonstrate compliance with Title 10 Code of Federal Regulations Part 436, Subpart A, and to demonstrate compliance with the paragraph BASIC CRITERIA in UFC 3-
400-01 with regards to life cycle cost effectiveness of the proposed design, the design team shall prepare a project Life Cycle Cost Analysis (LCCA) using the Building Life Cycle Costing
(BLCC) program, available from the Department of Energy's BLCC Programs website:
http://www1.eere.energy.gov/femp/information/download_blcc.html
The Project goal is a minimum 40 percent improvement (energy reduction) over the levels established in the baseline ASHRAE 90.1 2007 per ECB 2011-1. If design team's LCCA shows a 40 percent energy reduction is economically feasible, the design team shall also prepare an LCCA to show the cost effectiveness of a 50 percent energy reduction for the
50 percent energy reduction bid option.
The following Federal energy laws, orders, guidances, and regulations apply to the design and construction of the Project:
1. Energy Policy Act of 2005 (EPAct05) (PL 109-58)
2. Energy Independence and Security Act 2007
3. Executive Order 13514 - Federal Leadership in Environmental, Energy, and Economic Performance
4. Executive Order 13423 - Strengthening Federal Environmental, Energy, and Transportation Management
5. Department of the Army (27 October 2010) Memorandum on the Utilization of Efficient Lighting
6. Department of the Army (27 October 2010) Sustainable Design and Development Policy Update (Environmental and Energy Performance)
7. USACE, ECB 2011-1 (19 January 2011) High Performance Energy and Sustainability Policy
8. USACE, ECB 2010-14 (28 June 2010) Improving building performance through enhanced requirements for energy performance and select LEED credits
9. USACE Army LEED Implementation Guide (15 January 2008)
SECTION 01 10 10-Page 21
5.0 CIVIL DESIGN
5.1 General
The civil portion of the Project includes force protection, grading, paving, curb and gutter, storm drainage, utilities, and parking. Included in the utilities shall be the sanitary sewer service, domestic and fire water services, electrical power service, and communication service for the addition to LSTF Building 2029.
5.2 Site
The work at this site consists of design and construction of the Life Science Test Facility
Addition, its appurtenances and expansion of the wastewater treatment system.
5.3 Technical Criteria and Standards
See paragraph 4.10 CONSOLIDATED LIST OF CODES AND STANDARDS for all required standards.
5.4 Project Site Field Survey Topography
Project Site Field Survey Topography of the Life Science Test area and wastewater lagoon area is provided (see Topographical Report in Attachment F). Contractor shall perform additional survey(s) as required to complete his/her design (see paragraph 5.13.2 EXISTING
UTILITIES herein and paragraphs 1.4 and 1.8 of 01 10 11 for requirement details).
5.5 Site Demolition
The new building shall be constructed on the south side of Building 2029. For demolition work required to connect the existing building with the new building, see Architectural
Design. The existing facility parking lot is to be demolished and replaced. The access road around Building 2029 will be demolished and realigned for the addition.
5.5.1 Waste Disposal
Inert, non-recyclable wastes from demolition and construction activities may be disposed of in the English Village Class 2 Landfill, on Garrison. The landfill is open from 0700 to 1600, Monday through Thursday, except federal holidays. The Contractor shall prepare an estimate of the quantity of expected waste in tons, and coordinate the approximate timetable of disposal with Gerald Mason (435-831-3369, Gerald.L.Mason.civ@mail.mil), prior to start of site activities, to allow the Garrison to maintain compliance with their operating permit regulations.
5.5.2 Recycling
The Contractor shall examine non-hazardous solid wastes generated during demolition and construction for recyclability. Materials may be accepted into the Dugway recycling program including
• Concrete
• Metals, segregated by type
SECTION 01 10 10-Page 22
• Wood, except particle board; some nails okay
• Asphalt
The Contractor shall coordinate estimates of recyclable wastes with Gerald Mason (435-831-
3369, Gerald.L.Mason.civ@mail.mil), prior to site activities. If quantities indicate, containers/roll-offs for recyclable materials may be provided at the construction site to facilitate recycling.
5.6 Site Development
The site is currently developed. The parking lot east of Building 2029 is surrounded on the east and north sides by existing buildings and an elevated water tower.
5.6.1 Building Siting
Building includes an addition to existing Building 2029 and a limited remodel of spaces inside
Building 2029 to accommodate hallway connections. The new facility shall be sited by the
Contractor meeting the minimum provisions of all applicable references indicated in these
RFP documents. The Contractor shall confine proposed development to the Project area as designated in these RFP documents. The Contractor storage yard and trailer shall be located within the secure perimeter of the facility at a location approved by the Contracting Officer.
5.6.2 Parking
The existing parking lot shall be demolished and replaced with a larger parking lot area (as shown on sheet C-101). All new parking areas must comply with the requirements of UFCs
4-010-01 and 4-010-02.
5.7 Permits
5.7.1 UPDES Storm Water General Permit
Construction, both site and building related, will result in disturbance of more than one acre of total land area. A Notice of Intent (NOI) to discharge and a Storm Water Pollution
Prevention Plan (SWPPP) shall be required in accordance with the Utah Pollutants
Discharge Elimination System (UPDES) requirements of the Clean Water Act which mirror the National Pollutants Discharge Elimination System (NPDES) permit process. The
Contractor shall be responsible to pay the associated NOI fee to the State Water Board along with the NOI application.
The following are requirements for Dugway Proving Ground:
• A completed NOI must be submitted (Jason Redeen at 801-586-3315) USACE Resident
Office, DPG, Department of Public Works (DPW) Engineering and Environmental sections, and the Utah Department of Environmental Quality (DEQ), Division of Drinking Water and
Division of Water Quality (DWQ) for review at least thirty (30) days prior to the proposed commencement of construction activities (e.g. the initial disturbance of soils associated with clearing, grading, excavation, or other construction activities).
• A completed SWPPP must be prepared and submitted to (Jason Redeen at 801-586-
3315) USACE Resident Office, DPG, DPW Engineering and Environmental sections, and the DEQ for review and approval at least sixty (60) days prior to commencement of
SECTION 01 10 10-Page 23 construction activities. Guidance for SWPPP preparation is available in the Environmental
Protection Agency document EPA-823-R-92-0005 titled, ―Storm Water Management for
Construction Activities‖. A copy of the approved SWPPP shall be kept at the construction site during the duration of the construction activities to insure compliance with the storm water pollution prevention measures outlined in the SWPPP.
• Notify (Jason Redeen at 801-586-3315) USACE Resident Office, DPG and submit a
Notice of Termination (NOT) to the DEQ ten (10) days prior to the completion of the
Project. The NOT document is a formal notification of Project completion and terminates the NPDES Storm Water Construction Permit.
• The Contractor shall prepare specifications to reflect the permit and plans.
• No hazardous chemicals (toxins, corrosives, flammables, oil/grease, fuels, etc.) shall be discharged to the ground surface, storm water drains or sanitary sewer system during construction activities. The issues outlined above should be considered early in the
Project. The final SWPPP shall be incorporated into the Project design specifications. The
Contractor shall contact DPG Environmental office Storm Water Quality personnel at 435-
831-3581 for guidance on the preparation of the NOI and the SWPPP.
5.7.2 Dust Permit
Dust permits will be required from Tooele County for clearing, grading, and trenching.
5.7.3 Digging Permit
A number of permits and permit modifications will be required due to this Project. Tooele
County does not issue any permits nor inspect for compliance to codes at DPG. The main permit required to initiate construction activities is USACE approval of the plans and specifications. The main permit to allow mobilization and initiation of field activities is the
Dugway Excavation Permit, issued by the Directorate of Public Works (DPW). At least one month prior to the initiation of site disturbance activities, the Contractor shall contact the
DPW (Clifford Johnson, 435-831-2649, Clifford@cmartin.com) with the following information:
• Detailed written description of the site disturbance activities planned.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .