FOR INFORMATION:
The deletion of a specification section still requires the contractor to provide all labor, equipment and material in performance of the scope of work, plan and IDIQ specification. The contractor shall follow the IDIQ specification for the material not listed in the task order specification.
The date for Receipt of Proposals has not been changed.