SECTION 4
TECHNICAL SPECIFICATIONS
06E9045
READINESS CENTER REPAIRS
CALIFORNIA NATIONAL GUARD FACILITY
LOCATED AT
5565 EAST AIRWAYS BLVD.
FRESNO, CALIFORNIA
SECTION TITLE NUMBER OF PAGES
DIVISION 1
01016 UNIT PRICE BIDS 1
01600 MATERIAL AND EQUIPMENT 4
01700 CONTRACT CLOSEOUT 3
DIVISION 2
02082 ASBESTOS ABATEMENT 13
REPORT ASBESTOS ANALYSIS 11
DIVISION 6
06110 CARPENTRY 9
DIVISION 7
07536 SBS MODIFIED BITUMEN ROOFING 16
07565 PREPARATION FOR RE-ROOFING 4
07631 GUTTERS AND DOWNSPOUTS 7
DIVISION 9
09250 GYPSUM BOARD 9
09511 ACOUSTICAL CEILINGS 6
09650 RESILIANT FLOORING 5
09910 PAINTING 6
DIVISION 10
10800 TOILET AND SHOWER ACCESSORIES 6
DIVISION 15
15010 MECHANICAL REQUIREMENTS 5
15140 HANGERS AND SUPPORTS 4
15420 PLUMBING PIPING 7
15781 PACKAGED GAS-ELECTRIC AIR
CONDITIONING UNITS 9
15783 DIRECT GAS-FIRED MAKE-UP AIR UNIT 7
15800 MECHANICAL VENTILATION 5
15890 DUCTWORK 4
15900 MECHANICAL CONTROLS 4
DIVISION 16
16111 CONDUIT 5
16123 BUILDING WIRE AND CABLE 4
16130 BOXES 2
16141 WIRING DEVICES 3
16160 CABINET AND ENCLOSURE 3
16170 GROUNDING AND BONDING 3
16190 SUPPORTING DEVICES 2
16195 ELECTRICAL IDENTIFICATION 2
16510 LIGHTING FIXTURES 6
DRAWINGS 34
W91238-10-R-0052 Task Order Pricing Schedule Amendment 0002
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH
IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE
0001 Readiness Center 1 LUMP SUM $_________
Upgrade. All work to be performed according to the attached Plans and Specifications.
PRICING SCHEDULE BREAKOUT:
Base Schedule
1001 Readiness Center 1 LUMP SUM $_________
Upgrade
1002 Replaced Acoustic 5000 SQ. FT $______ Ceiling panels ** see section 01016
SUB-TOTAL BASE PRICE $_______________
(ITEM 1001)
SECTION 01016
UNIT PRICE BIDS
SECTION 01016
UNIT BID PRICES
I PART 1 GENERAL
I.1 UNIT PRICE BIDS
A. Contractor's lump sum base bid shall include acoustic ceiling panels (2’x 4’) replacement which are estimated at 5000 S.F. in the Assembly Hall and various locations in offices for this bid.
Contractor's lump sum base bid shall be adjusted based on the actual square footage of replaced acoustic panels. Contractor agrees to submit a square foot unit cost and do the following for actual repair work performed:
1. If the area of replaced acoustic panels does not exceed 5000 S.F. the lump sum base bid shall be reduced. The area difference between the estimated 5000 S.F. of replaced acoustic panels and the actual area of replaced acoustic panels shall be multiplied by the square foot unit cost.
This amount shall be deducted from the lump sum base bid.
2. If the area of replaced acoustic panels does exceed 5000 S.F. the lump sum base bid shall be increased. The area difference between the estimated 5000 S.F. of replaced acoustic panels and the actual area of replaced acoustic panels shall be multiplied by the square foot unit cost.
This amount shall be added to the lump sum base bid.
3. If no replaced acoustic panels is needed the lump sum base bid shall reduced by an amount equal to the estimated 5000 S.F. multiplied by the submitted square foot unit cost.
I.2 SCHEDULE OF UNIT PRICE BID ITEMS
ESTIMATED
ITEM DESCRIPTION UNIT QUANTITY
Replaced Acoustic Ceiling Panels Square Feet 5000 S.F.
END OF SECTION
SECTION 01600
MATERIAL AND EQUIPMENT
I PART 1 GENERAL
I.1 SECTION INCLUDES
A. Products
B. Transportation and handling
C. Storage and protection
D. Product options
E. Substitutions
I.2 RELATED SECTIONS
A. Document - Instructions to Bidders: Product options and substitution procedures.
I.3 PRODUCTS
A. Products: Means new material, machinery, components, equipment, fixtures, and systems forming the Work.
Does not include machinery and equipment used for preparation, fabrication, conveying and erection of the Work. Products may also include existing materials or components required for reuse.
B. Do not use materials and equipment removed from existing premises, except as specifically permitted by the Contract Documents.
C. Provide interchangeable components of the same manufacturer for similar components or details.
I.4 TRANSPORTATION AND HANDLING
A. Transport and handle products in accordance with manufacturer's instructions.
B. Promptly inspect shipments to assure that products comply with requirements, quantities are correct, and products are undamaged.
C. Provide equipment and personnel to handle products by methods to prevent soiling, disfigurement, or damage.
I.5 STORAGE AND PROTECTION
A. Store and protect products in accordance with manufacturer's instructions, with seals and labels intact and legible. Store sensitive products in weather-tight, climate controlled enclosures.
B. Assure that materials are kept clean, and away from excessive heat and cold; do not remove labels or tear off protective covering until ready for installation or application; store in an enclosed area where temperature is above 50 degrees and below 90 degrees Fahrenheit, securely tied with rope. Material shall not be stored directly on the ground.
C. For exterior storage of fabricated products, place on sloped supports, above ground.
D. Provide off-site storage and protection when site does not permit on-site storage or protection.
E. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to avoid condensation.
F. Provide equipment and personnel to store products by methods to prevent soiling, disfigurement, or damage.
G. Arrange storage of products to permit access for inspection. Periodically inspect to assure products are undamaged and are maintained under specified conditions.
I.6 PRODUCT OPTIONS
A. Products Specified by Reference Standards or by
Description Only: Any product meeting those standards or description.
B. Products Specified by Naming One or More Manufacturers:
Products of manufacturers named and meeting specifications, no options or substitutions allowed.
C. Products Specified by Naming One or More Manufacturers with a Provision for Substitutions: Submit a request for substitution for any manufacturer not named.
I.7 SUBSTITUTIONS
A. Instructions to Bidders specify time restrictions for submitting requests for Substitutions during the bidding period.
B. Engineer will consider requests for Substitutions only within 15 days after date of Contract Agreement.
C. Substitutions may be considered when a product becomes unavailable through no fault of the Contractor.
D. Document each request with complete data substantiating compliance of proposed Substitution with Contract Documents.
E. A request constitutes a representation that the
Contractor:
1. Has investigated proposed product and determined that it meets or exceeds the quality level of the specified product.
2. Will provide the same warranty for the Substitution as for the specified product.
3. Will coordinate installation and make changes to other Work which may be required for the Work to be complete with no additional cost to the Government.
4. Waives claims for additional costs or time extension which may subsequently become apparent.
F. Substitutions will not be considered when they are indicated or implied on shop drawing or product data submittals, without separate written request, or when acceptance will require revision to the Contract Documents.
G. Substitution Submittal Procedure:
1. Submit three copies of request for Substitution for consideration. Limit each request to one proposed Substitution.
2. Submit shop drawings, product data, and certified test results attesting to the proposed product equivalence.
3. The Engineer will notify Contractor, in writing, of decision to accept or reject request.
II PART 2 PRODUCTS
Not Used
III PART 3 EXECUTION
SECTION 01700
CONTRACT CLOSEOUT
I PART 1 GENERAL
I.1 SECTION INCLUDES
A. Closeout procedures.
B. Final cleaning.
C. Adjusting.
D. Project record documents.
I.2 CLOSEOUT PROCEDURES
A. Submit written certification that Contract Documents have been reviewed, Work has been inspected and accepted, and that Work is complete in accordance with Contract Documents and ready for inspection.
B. Comply with requirements of specification sections
01015 and 01300.
C. Provide warranty certificates to COR.
D. Submit final Application for Payment to Contracting
Officer identifying total adjusted Contract Sum, previous payments, and sum remaining due.
I.3 FINAL CLEANING
A. Execute final cleaning prior to final inspection.
B. Clean site; sweep paved areas.
C. Remove waste and surplus materials, rubbish, and construction facilities from the site.
D. Repair and repaint any items or surfaces damaged by work of this contract in accordance with, paint, and other manufacturer's requirements and Section 09910.
I.4 ADJUSTING
Adjust operating Products and equipment to ensure smooth, proper operation.
I.5 PROJECT RECORD DOCUMENTS
A. Maintain on site, one set of the following record documents; record actual revisions to the Work:
1. Project Drawings.
2. Specifications.
3. Change Orders and other Modifications to the
Contract.
4. Reviewed product data, and samples.
5. Manufacturers Warranty Certificate(s).
B. Store Record Documents separate from documents used for construction.
C. Record information concurrent with construction progress.
D. Specifications: Legibly mark and record at each
Product section description of actual Products installed, including the following:
1. Manufacturer's name and product model number.
2. Product substitutions or alternates utilized.
3. Changes made by Addenda and Modifications.
E. Record Documents and Shop Drawings: Legibly mark each item to record actual construction including:
1. Field changes of dimension and detail.
2. Details not on original Contract Drawings.
3. Submit one (1) set prior to final inspection, bound in 8-1/2 x 11 inch text pages, 3-D side ring binder.
4. Internally subdivide the binder contents with page dividers, logically organized, and tabbed to identify contents of binder.
5. Part 1: Directory, listing names, addresses, and telephone numbers of Contractor, and all Subcontractors.
6. Part 2: Project documents and certificates, including the following:
7. Shop drawings and product data.
8. Warranty certificates.
F. Submit one copy of completed volume in final form seven
(7) days prior to final inspection. Revise content of documents as required prior to final contract close out per COR directions.
G. Submit final revised volume within ten (10) days after final inspection.
SECTION 02082
ASBESTOS ABATEMENT
I PART 1 GENERAL
I.1 SECTION INCLUDES
Removal of asbestos-containing materials and paint preparation work.
I.2 RELATED DOCUMENTS AND SECTIONS
A. Section 07565: Preparation for Re-roofing.
B. Section 09910: Painting Maintenance.
I.3 REFERENCES
A. General - Codes, regulations and references applicable to asbestos abatement work include but are not limited to the following:
1. American National Standards Institute (ANSI) publications:
Z87.1-79 Occupational and Educational Eye and
Face Protection.
Z88.2-80 Practices for Respiratory
Protection.
Z89.1-81 Requirements for Protective Headgear for Industrial workers.
Z41-83 Personal Protection - Protective Footwear.
Z88.6-84 Respiratory Protection - Respiratory
Use Physical Qualifications for Personnel.
2. American Society for Testing and Materials
(ASTM) publications:
D1331-56 Surface and Interfacial Tensions of
Solutions of Surface Active Agents.
B. Code of Federal Regulations (CFR):
29 CFR 1910.12 Construction Work.
29 CFR 1910.20 General Safety and Health
Provisions Access to Employee Exposure and Medical Records.
29 CFR 1910 Subpart I, Personal Protective
Equipment.
29 CFR 1910.145 Specifications for Accident
Prevention Signs and tags.
29 CFR 1910.1101 Asbestos.
34 CFR 231 Appendix C, Procedures for
Containing and Removing Building Materials Containing Asbestos.
C. Compressed Gas Association, Inc.:
G-7.1 Commodity Specification for Air
(1973).
D. CEC - California Electrical Code 2007 Edition.
E. UL 586-77 (R1982) Test Performance of High Efficiency
Particulate Air Filter Units (June 10, 1977, 5th Ed.;
Rev. March 12, 1982).
F. National Institute for Occupation Safety and Health
(NIOSH):
N31, 3rd. Ed., Vol. 1, Manual of Analytical Methods, Method 7400 Fibers.
G. Environmental Protection Agency Documents:
EPA 530-SW-85-007 Asbestos Waste Management
Guidance, May 1985.
EPA 560/5-85-024 Guidance for Controlling
Asbestos-Containing Material in Buildings, June 1985.
EPA 600/4-85-049 Measuring Airborne Asbestos
Following an Abatement Action, November 1985.
EPA 560 OPTS-86.001 A Guide to Respiratory
Protection for the Asbestos Abatement Industry, April 1986.
H. California Code of Regulations (CCR):
Title 8, Article 2.5 Registration Asbestos-Related
Work, Section 341.6 through 341.14.
Title 8, Section 5208 General Industry Safety Orders, Asbestos Regulations.
Title 22, Division 4, Minimum Standards for Chapter 30 Management of Hazardous and
Extremely Hazardous Waste.
I. Local Air Pollution Control District Regulations.
I.4 DEFINITIONS
A. Abatement: Procedures to control fiber release from asbestos-containing building materials. Includes removal, repair, encapsulation, and enclosure.
B. Action Level: An exposure of airborne concentrations of asbestos fibers in excess of 0.10 fiber per cubic centimeter of air.
C. Air Monitoring: The process of measuring the fiber content of a specific volume of air in a stated period of time.
D. Air Sampling Professional: The professional contracted or employed to supervise air monitoring and analysis schemes. This individual is also responsible for recognition of technical deficiencies in Worker protection equipment and procedures during both planning and on-site phases of an abatement project.
This individual shall be certified in the comprehensive practice of (industrial hygiene) or (air sampling of hazardous materials) by The Comprehensive Practice of Industrial Hygiene (C.I.H.) and have specialized experience in air sampling for asbestos and be approved by the State. Other acceptable air sampling professionals include environmental engineer, architects, chemists, and environmental scientists with equivalent experience in asbestos/air monitoring and worker protection.
E. Amended Water: Water to which a surfactant has been added.
F. Area Monitoring: Sampling of asbestos fiber concentrations within the asbestos Work Area and outside the asbestos Work Area which is representative of the airborne concentrations of asbestos fibers which may reach the breathing zone.
G. Asbestos: The term asbestos includes chrysotile, amosite, crocidolite, tremolite, anthophyllite, and actinolite.
H. Asbestos-Containing Material (ACM) - Material composed of asbestos of any type and in any amount greater than one-tenth of one percent by weight, either alone or mixed with other fibrous or non-fibrous materials.
I. Asbestos Fibers: This expression refers to asbestos fibers having an aspect ratio of 3:1 and longer than 5 micrometers.
J. Authorized Visitor: The State's Project team member, the State's Representative, and any Representative of a regulatory or other agency having jurisdiction over the project.
K. Encapsulant (sealant): A liquid material which can be applied to asbestos containing material and which controls the possible release of asbestos fiber from the material either by creating a membrane over the surface (bridging encapsulant) or by penetrating into the material and binding its components together (penetrating encapsulant).
L. Encapsulation: Procedures necessary to apply an encapsulant to asbestos-containing building materials to control the possible release of asbestos fibers into the ambient air.
M. Excursion Limit: A limit of 1.0 f/cc over a 30-minute sampling period to which employees may not be exposed without appropriate respiratory protection.
N. Friable Asbestos Material: Material that contains more than one tenth percent asbestos by weight and that can be crumbled, pulverized, or reduced to powder by hand pressure when dry.
O. HEPA Vacuum Equipment: Vacuuming equipment with a HEPA filter system.
P. Non-Friable Asbestos Material: Material that contains asbestos in which the fibers have been locked in by a bonding agent, coating, binder, or other material so that the asbestos is well bound and will not release fibers in excess of the asbestos control limit during any appropriate use, handling, demolition, storage, transportation, processing or disposal.
Q. Personnel Monitoring: Sampling of asbestos fiber concentrations within the breathing zone of an asbestos Worker.
R. Removal: Procedures necessary to remove asbestos-containing materials from designated areas and to dispose of these materials at an acceptable site.
I.5 SUBMITTALS
A. Product data shall include manufacturer's product data, specifications, samples and application instructions and other pertinent information as necessary.
B. Disposal Certifications: Submit proof satisfactory to the State that required permits, site location and arrangements for transport and disposal of asbestos-containing waste materials have been made.
I.6 QUALITY ASSURANCE
A. Qualification: Within ten (10) days from Notice to
Proceed, submit the following documents.
B. Registration: Submit copy of the registration for
Asbestos-Related Work from the Division of Occupational Safety and Health in accordance with Title 8, Article
2.5 of the California Code of Regulations.
C. Personnel Training-Superintendent and Foreman: Submit copy of signed certificates that the superintendent and foreman has successfully completed a training course in asbestos abatement project supervision offered by an EPA endorsed educational institution.
D. Personnel Training-Workers: Submit copy of the asbestos abatement employee training program, and certificates signed by each employee that he or she has had instructions on the hazards of asbestos exposure, has had training in asbestos removal, and understands this instruction.
E. Respirators: Submit a written standard operating procedure governing selection, fit-testing, and use of respirators in accordance with 29 CFR 1910, Subpart I, 29 CFR 1926.58, CGAI Standard G7.1, ANSI Z88.2, and Z88.6. Also submit manufacturer's certification that the respirators to be used in this project comply with these regulatory requirements.
F. Medical Examination: Submit proof that personnel who will be entering contaminated areas have had medical examinations, and furnish the results of said exam to the State. Comply with 29 CFR 1910.20 for access to employee exposure and medical records.
1. Before exposure to airborne asbestos, provide each employee with a comprehensive medical exam meeting the general definition outlined in California Administration Code Title 8, CCR Section 5208 (j).
No employee shall be allowed to enter the Work Area without having first provided a copy of his Medical History to the State.
2. Submit an employee roster to the State for each
Work shift and confirm in writing within 24 hours of commencement of shift.
G. Notifications, Communications and Postings:
1. Submit copies of notifications to all appropriate
Government agencies, including the following:
a. Division of Occupational Safety and Health Occupational Carcinogen Control Unit 525 Golden Gate Avenue San Francisco, CA 94602
(415) 557-2037
Notification shall be in accordance with the Section 341.9 of Title 8 of California Code of Regulations.
2. Copies of Government agency correspondence shall be included in the submittals.
H. Safety Compliance: In addition to detailed requirements of this Specification, comply with laws, ordinances, rules, and regulations of federal, state, regional, and local authorities regarding handling, storing, transporting, and disposing of asbestos waste materials. Comply with applicable requirements of the current issue of 29 CFR 1910.1101, 29 CFR 1926.58, and 40 CFR 61, Subparts A, & M, 40 CFR 61.152, and CCR Section 5208. Submit matters of interpretation of standards to the appropriate administrative agency for resolution before starting Work. Where requirements of this Specification and reference documents vary, the most stringent requirement shall apply.
I. Contractor shall have at least one copy each of 29 CFR
1910, Subpart I, 29.CFR.1910.1101; 29 CFR 1926.58; 40 CFR Part 61, Subparts A & M; and CCR, Title 8, Section 5208, at his office and also at the job site.
J. Before the commencement of any Work at the site, post bilingual EPA and CAL/OSHA caution signs in and around the Work Area to comply with EPA and OSHA regulations.
I.7 FIELD AIR SAMPLING:
Personnel monitoring and other monitoring which is required by law or considered necessary by the Contractor for Worker protection shall be the responsibility of the Contractor and performed by Contractor's Air Sampling Professional.
I.8 CERTIFICATIONS:
Rental Equipment: When rental equipment is to be used in removal areas or to transport waste materials, a copy of the written notification provided to the rental company informing them of the nature of use of the rented equipment shall be submitted to the Contracting Officer's Representative, and signed by the rental company.
II.1 GENERAL
Submit manufacturer's product data for all the items listed under this part.
II.2 PROTECTIVE PACKAGING
A. All asbestos containing material shall be disposed of at a Class III Disposal facility that will accept asbestos containing materials.
B. The abatement Contractor shall comply with all Federal, State, Local and OSHA requirements for the disposal of asbestos containing roofing materials.
II.3 WARNING LABELS AND SIGNS
As required by 29 CFR 1926.58 and 29 CFR 1910.145.
II.4 PERSONAL PROTECTIVE EQUIPMENT
A. Personal Protective Equipment shall comply with the requirements of 29 CFR 1910, Subpart I.
B. Work clothes shall consist of disposable, full-body coveralls, head covers, boots, rubber gloves, and sneakers or equivalent in accordance with 29 CFA 1926.58, and ANSI Z41. Sleeves at wrists and cuffs at ankles shall be taped secure.
C. Eye protection and hard hats shall be available as required by applicable safety regulations and shall conform to ANSI 87.1 and 89.1.
D. Provide authorized visitors with suitable protective clothing, headgear, eye protection, and footwear whenever they are required to enter Work area.
II.5 RESPIRATORS
A. Provide all workers, foremen, superintendents, authorized visitors, and inspectors personally issued and marked respiratory equipment jointly approved by NIOSH/MSHA. When respirators with disposable filters are employed, provide sufficient filters for replacement as recommended by manufacturers or this specification. Selection of respirators shall be made according to the guidance of 29 CFR 1910 Subpart I;
ANSI Z88.2; CGAI G7.1; EPA 560 OPTS-86.001.
B. When positive pressure supplied air Type "C" equipped with full face piece respirators are employed, the Air Supply System shall provide Grade "D" breathing air in accordance with OSHA 29 CFR 1910 Subpart I and ANSI Z88.2 and CGAI G7.1.
C. The Compressed Air system for Type "C" Respirators shall be high pressure (nominal 100 psi), with a compressor capacity to satisfy the respirator manufacturer's recommendations. The receiver shall have sufficient capacity to allow a 15 minute escape time for the respirator wearers in the event of compressor failure or malfunction. Type C supplied air respirators with HEPA filter disconnect may be used as an alternate to the 15 minute escape time required with event of compressor failure for Type C respirators.
The Compressed Air System shall have compressor failure alarm, high temperature alarm, carbon monoxide alarm, and suitable in-line air purifying sorbent beds and filters to assure Grade "D" breathing air.
D. The minimum respiratory protection required for this project is as follows:
1. Use half face mask air purifying respirators approved for asbestos in case the removal activity generates fibers.
2. If the fiber level at the work area exceeds 0.1 fiber/cc the respirator shall be upgraded to "powered air purifying respirator" full face piece with high efficiency filters.
III.1 PROJECT PROCEDURES
Initial Testing Procedures:
A. Furnish a minimum of two workers to manually remove existing roofing for a period of four hours.
Workers and area of work will be monitored by an Air Sampling Professional, certified by the American Board of Industrial Hygiene and approved by the State. Use work practices to minimize fragmentation and tearing of material that contribute to increased dust generation, such as wetting roof, cutting roofing felts by hand and removing with spud bars.
B. Testing shall determine worker exposure level on an 8-hour time weighted average. If testing demonstrates that worker exposure is below action level of 0.1 fiber/cc of air calculated as an 8-hour time weighted average, the following shall not be required: Worker's using Personal Protective Equipment, Respirators, Decontamination Enclosure System (General), Worker Decontamination Enclosure System and Equipment Decontamination Enclosure System.
C. Dispose of removed material as specified in
Paragraph III.5.
III.2 ABATEMENT PROCEDURE PLANS
A. Submit a detailed plan of the work procedures for abatement of asbestos-containing roofing materials to COR. Include the following:
B. Initial Testing Procedures. If initial testing procedure results in fiber level below action level, follow the same manual removal procedure for remainder of roofing removal as outlined in the Paragraph III.1.A. above.
C. Personnel monitoring procedures in accordance with 29
CFR 1926.58.
D. Phasing of abatement work indicating daily roster of workers for each phase.
E. Security system warning signs locations in accordance with 29 CFR 1926.58.
F. Detailed plans for worker decontamination facility and equipment decontamination facility, and toilets showing connections to the work area.
G. Standard procedures for protecting workers, visitors, and employees and protection of spaces outside work area from contamination.
III.3 EMERGENCY PRECAUTIONS AND PROCEDURES
A. Establish emergency and fire exits from the Work Area.
B. Local medical emergency personnel, both ambulance crews and hospital emergency room staff, shall be notified prior to commencement of abatement operations as to the possibility of having to handle contaminated or injured Workers, and shall be advised on safe decontamination.
C. Contractor shall be prepared to administer first aid to injured personnel after decontamination. Seriously injured personnel shall be treated immediately or evacuated without delay for decontamination. When an injury occurs, the Contractor shall stop Work and implement fiber reduction techniques (e.g., water spraying) until the injured person has been removed from the Work Area.
III.4 PREPARATION
A. Work Areas:
1. Do not begin Work until area is free of loose equipment.
2. Clean the proposed work areas using HEPA filtered vacuum equipment or wet cleaning methods as necessary to maintain fiber levels at or below O.1 f/cc. Methods that raise dust, such as dry sweeping or vacuuming with equipment not equipped with HEPA filters shall not be used.
3. Seal off openings, including but not limited to corridors, doorways, ducts, grills, diffusers, and any other penetrations into building interior, with plastic sheeting sealed with tape. Doorways and corridors which will not be used for passage during Work must be sealed with barriers.
4. Maintain emergency and fire exits from Work Areas.
B. Equipment Decontamination Enclosure System:
1. Provide an equipment decontamination enclosure system consisting of areas as follows:
a. A wet sponge area to clean the outside of bagged waste.
b. A holding area for the bagged asbestos roofing waste.
C. Asbestos abatement work shall not commence until:
1. Arrangements have been made for disposal of waste at an acceptable site and submitted to the Engineer for approval.
2. Tools, equipment and material waste receptors are on hand.
3. Preparatory steps have been taken and applicable notices posted and permits obtained.
4. Contractor’s submittals for isolating non-asbestos work areas have been reviewed and approved by the Government.
5. Timing of removal work has been coordinated with reroofing work, through the Construction Inspector and COR. Removal shall not be commenced until it is determined that removal can be accomplished and reroofing or temporary protective roofing can be completed without danger of damage by inclement weather.
III.5 DISPOSAL
A. Waste Transportation: Submit to ECI the method of transport of Asbestos containing material waste including name, address, EPA I.D. number and telephone number of transporter.
B. Asbestos Containing Material Waste Site: Submit to ECI for approval, the name, address, EPA I.D. number and telephone number of the Class III (3) waste site(s) to be utilized for disposal.
C. The sealed asbestos containers shall be delivered to
Contractor's pre-designated approved Class III Waste Site, in accordance with Title 22, CCR, EPA guidelines and 40 CFR 61.156 and local Air Pollution Control District Regulations.
D. Notify the State 48 hours in advance of the time when contaminated materials are to be removed from the site.
E. Contractor shall be responsible for safe handling and transportation of asbestos-containing waste generated by this Contract to the designated Class III Waste Site.
F. Contractor shall hold the State of California Military
Department harmless for claims, damages, losses, and expenses against the Government, including attorney's fees arising out of or resulting from asbestos spills on the site or spills enroute to the disposal site.
III.6 AIR MONITORING
Area Air Monitoring:
1. Throughout the abatement process area air monitoring shall be conducted by an approved Observation Service to ensure Work is done in conformance with fiber concentration limits in accordance with 29 CFR 1926.58.
2. If area air monitoring outside the Work Area or personnel air monitoring results are in excess of
0.05 f/cc Contractor shall make changes in work procedures to assure compliance with minimum standards. Unsatisfactory results are fiber counts in excess of 0.05 fibers/cc by PCM or 0.01 asbestos fibers/cc by TEM, determined as a TWA outside the work area for Area Air Monitoring.
III.7 CLEAN UP
Maintain a clean project site during and upon completion of
Work of this Section. Cleaning shall be in accordance with Section 01700.
ASBESTOS BULK SAMPLING RECORD
Dresser Services, Inc. PO Box 378, Bakersfield, CA 93302 Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
The samples itemized below were collected from the following location: ARMED FORCES RESERVE CENTER
5565 AIRWAYS DRIVE
FRESNO, CA
OFFICE BUILDING.
Sample Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974001 11/10/09 ROOM 68 SW CORNER TEXTURE FR ND
974002 11/10/09 ROOM 68 SW CORNER JOINT COMPOUND FR ND
974003 11/10/09 ROOM 68 SW CORNER DRYWALL NF ND
974004 11/10/09 ROOM 68 SW CORNER JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974005 11/10/09 ROOM 69 FLOOR GLUE / WHITE TILE / BLACK MASTIC NF/NF/NF ND/<1/5 22,500 SQ
FT*
974006 11/10/09 ROOM S-1 N WALL BLACK BASEBOARD / TAN GLUE /
JOINT COMPOUND
NF/NF/FR ND/ND/ND
974007 11/10/09 ROOM S-1 N WALL BROWN BASEBOARD / BROWN
MASTIC
NF/NF ND/2 1100 SQ FT
974008 11/10/09 ROOM S-1 FLOOR 12” TAN TILE / BLACK MASTIC NF/NF <1/5 SEE 974005
974009 11/10/09 ROOM 67 N WALL VINYL WALLPAPER / JOINT
COMPOUND
NF <1 SEE 974011
974010 11/10/09 ROOM 67 DOOR FRAME CAULK NF ND
* TOTAL ESTIMATE FOR UPSTAIRS AND DOWNSTAIRS FLOORS. QUANTITY SHOULD BE VERIFIED BY
CONTRACTOR FOR BIDDING PURPOSES.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Sample Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974011
PT COUNT
11/10/09 ROOM S-1 N WALL JOINT COMPOUND FR <1
<0.1
974012 11/10/09 ROOM S-1 N WALL DRYWALL NF ND
974013
PT COUNT
11/10/09 ROOM S-1 N WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR <1
<0.25
REFER TO
974011
974014 11/10/09 ROOM S-1 CEILING 2 X 4 TILE FR ND
974015 11/10/09 ROOM S-1 ATTIC FIBERGLASS DUCT INSULATION FR ND
974016 11/10/09 ROOM 70A FLOOR BLUE BASEBOARD / GLUE NF/NF ND/ND
974017 11/10/09 ROOM 70A FLOOR CARPET NF ND/ND
974018 11/10/09 ROOM 70A FLOOR GLUE / PINK TILE NF/NF ND/<1 SEE 974005
974019 11/10/09 ROOM 70A FLOOR BLACK MASTIC NF 5 SEE 974005
974020 11/10/09 FIRING RANGE CEILING 2 X 4 TILE FR ND
974021 11/10/09 FIRING RANGE CEILING 12” TILE FR ND
974022 11/10/09 FIRING RANGE CEILING BROWN MASTIC NF ND
974023 11/10/09 FIRING RANGE FLOOR CARPET / GLUE NF/NF ND/ND
974024 11/10/09 FIRING RANGE FLOOR GLUE NF ND
974025 11/10/09 FIRING RANGE WALL SOUND ATTENUATING BOARD FR ND
974026 11/10/09 VAULT # 2 8” PIPE BLACK COATING NF ND
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974027 11/10/09 S HALL W END @ DOUBLE DOORS 6” BLACK BASE / GLUE / JOINT
COMPOUND
NF/NF/FR ND/ND/ND
974028 11/10/09 ROOM 53 WOMEN’S LATRINE W WALL JOINT COMPOUND PATCH FR ND
974029 11/10/09 ROOM 53 WOMEN’S LATRINE W WALL TEXTURE NF ND
974030 11/10/09 ROOM 53 WOMEN’S LATRINE W WALL PLASTER FINISH COAT NF ND
974031 11/10/09 ROOM 53 WOMEN’S LATRINE W WALL PLASTER BASE COAT NF ND
974032 11/10/09 ROOM 62 W WALL JOINT COMPOUND FR ND
974033 11/10/09 ROOM 62 W WALL DRYWALL NF ND
974034 11/10/09 ROOM 62 W WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974035 11/10/09 ROOM 62 FLOOR BROWN BASEBOARD / BROWN
GLUE
NF/NF ND/ND
974036 11/10/09 ROOM 61 W WALL TAN JOINT COMPOUND FR ND
974037 11/10/09 ROOM 61 W WALL WHITE JOINT COMPOUND FR ND
974038 11/10/09 ROOM 61 W WALL DRYWALL NF ND
974039 11/10/09 ROOM 61 W WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974040 11/10/09 ROOM 61A PARTITION OFFICE S WALL TEXTURE FR ND
974041 11/10/09 ROOM 61A PARTITION OFFICE S WALL JOINT COMPOUND FR ND
974042 11/10/09 ROOM 61A PARTITION OFFICE S WALL DRYWALL NF ND
NOTE: RESTROOM MIRRORS ARE MECHANICALLY FASTENED.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974043 11/10/09 ROOM 61A PARTITION OFFICE S WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974044 11/10/09 ROOM 58 KITCHEN E PARTITION WALL TAN JOINT COMPOUND FR ND
974045 11/10/09 ROOM 58 KITCHEN E PARTITION WALL BROWN DRYWALL NF ND
974046 11/10/09 ROOM 58 KITCHEN E PARTITION WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974047 11/10/09 ARMORY W WALL LIGHT TAN BASEBOARD / BROWN
GLUE
NF/NF ND/ND
974048 11/10/09 HALL FLOOR @ ROOM 19 DOOR 12” WHITE TILE / BLACK MASTIC NF/NF <1/5 SEE 974005
974049 11/10/09 ROOM 19 W WALL TAN JOINT COMPOUND FR <1 SEE 974011
974050 11/10/09 ROOM 19 W WALL BROWN DRYWALL NF ND
974051 11/10/09 ROOM 19 W WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974052 11/10/09 ROOM 19 W WALL BROWN BASEBOARD / BROWN
GLUE
NF/NF ND/ND
974053 11/10/09 ROOM 14 S WALL PANEL GLUE NF ND
974054 11/10/09 ROOM 14 E WALL WALLPAPER NF ND
974055 11/10/09 ROOM 14 E WALL JOINT COMPOUND FR <1 SEE 974011
974056 11/10/09 ROOM 14 E WALL DRYWALL * NF <1 SEE 974011
* SAMPLE CONTAINS TRACE JOINT COMPOUND.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974057 11/10/09 ROOM 14 E WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR <1 SEE 974011
974058 11/10/09 ROOM 14 SINK COATING NF ND
974059 11/10/09 ROOM 14 FLOOR WHITE W/ BLUE FLECKS 12” TILE /
BLACK MASTIC
NF/NF ND/3 SEE 974005
974060 11/10/09 ROOM 13A FLOOR WHITE W/ GRAY FLECKS 12” TILE /
GLUE
NF/NF ND/ND
974061 11/10/09 HALLWAY CEILING @ ROOM 14 2 X 4 TILE FR ND
974062 11/10/09 ROOM 7 CEILING 2 X 4 TILE FR ND
974063 11/10/09 ROOM 4 S WALL JOINT COMPOUND FR ND
974064 11/10/09 ROOM 4 S WALL DRYWALL NF ND
974065 11/10/09 ROOM 4 S WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974066 11/10/09 ROOM 4 FLOOR 12” WHITE TILE / GLUE / BLACK
MASTIC
NF/NF <1/ND/5 SEE 974005
974067 11/10/09 ROOM 4 FLOOR BLACK BASEBOARD / GLUE /
BROWN MASTIC
NF/NF/NF ND/ND/<1 SEE 974007
974068 11/10/09 ROOM 26 MEN’S LATRINE W WALL TEXTURE NF ND
974069 11/10/09 ROOM 26 MEN’S LATRINE W WALL PLASTER FINISH COAT NF ND
NOTE: ROOM 12 IS LOCKED – NOT INSPECTED.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974070
PT COUNT
11/10/09 ROOM 26 MEN’S LATRINE W WALL PLASTER BASE COAT NF <1
974071 11/10/09 BRIEFING AREA PARTITION WALL JOINT COMPOUND FR ND
974072 11/10/09 BRIEFING AREA PARTITION WALL DRYWALL NF ND
974073 11/10/09 BRIEFING AREA PARTITION WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974074 11/10/09 E STAIRS NON-SLIP TREAD NF ND
974075 11/10/09 E STAIRS TAN MARBLE BASEBOARD / BLACK
MASTIC
NF/NF ND/ND
974076
PT COUNT
11/10/09 ROOM 78 E WALL JOINT COMPOUND FR <1
974077 11/10/09 ROOM 78 E WALL DRYWALL NF ND
974078
PT COUNT
11/10/09 ROOM 78 E WALL JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR <1
<0.25
REFER TO
974076
974079 11/10/09 ROOM 81 FLOOR 12” TAN TILE / BLACK MASTIC NF/NF 2/3 SEE 974005
974080 11/10/09 ROOM 81 FLOOR BLACK MASTIC NF 3 SEE 974005
974081 11/10/09 UPSTAIRS HALL S END CEILING 12” TILE * FR ND
974082 11/10/09 ROOM 80 CEILING 12” TILE * FR ND
974083 11/10/09 UPSTAIRS HALL N END CEILING 12” TILE * FR ND
* THE 12” CEILING TILE LOCATED UPSTAIRS IS INSTALLED AS A T-BAR SYSTEM – NO MASTIC.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974084 11/10/09 E ROOF ELASTOMERIC COATING / FOAM NF/FR ND
974085 11/10/09 E ROOF PARAPET / SEAMS CAULK NF ND
974086 11/10/09 E ROOF VALLEY GRAY MASTIC NF ND
974087 11/10/09 E ROOF METAL PANELS BROWN PAINT NF 4 SEE 974099
974088 11/10/09 E ROOF DUCTS BROWN / WHITE MASTIC NF ND
974089
PT COUNT
11/10/09 E ROOF WALL STUCCO COLOR COAT NF <1
0.10
8000 SQ FT
974090
PT COUNT
11/10/09 E ROOF WALL STUCCO SCRATCH COAT NF <1
974091 11/10/09 W ROOF ELASTOMERIC COATING / FOAM NF/FR ND
974092 11/10/09 W ROOF FOAM / TAR NF ND
974093 11/10/09 W ROOF PARAPET CAULK NF ND
974094 11/10/09 W ROOF WINDOWS SILICONE NF ND
974095 11/10/09 W ROOF VENTS SILVER MASTIC * NF 6 100 SQ FT
974096 11/10/09 W ROOF DUCTS BROWN MASTIC NF ND
974097 11/10/09 W ROOF WALL STUCCO COLOR COAT NF <1 SEE 974089
974098 11/10/09 W ROOF WALL STUCCO SCRATCH COAT NF <1 SEE 974090
* LOCATED ON ALL ROOFS.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Number
Date Collected
Location of Sample Description of Sample Friable (FR) Nonfriable(NF)
Percentage of asbestos
Estimated Quantity
974099 11/10/09 W ROOF METAL PANELS BROWN PAINT NF 8 7500 SQ FT
974100 11/10/09 ARMORY CEILING 2 X 4TILE FR ND
974101 11/10/09 ARMORY S WALL 12” TILE FR ND
974102 11/10/09 ARMORY S WALL BROWN MASTIC NF ND
974103 11/10/09 ARMORY ROOF HATCH JOINT COMPOUND FR <1 SEE 974011
974104 11/10/09 ARMORY ROOF HATCH DRYWALL NF ND
974105 11/10/09 ARMORY ROOF HATCH JOINT COMPOUND / DRYWALL
COMPOSITE SAMPLE
FR ND
974106 11/10/09 MAIN ROOF PARAPET GRAY MASTIC NF ND
974107 11/10/09 E ENTRY SOFFIT STUCCO COLOR COAT NF <1 SEE 974089
974108 11/10/09 E ENTRY SOFFIT STUCCO SCRATCH COAT NF <1 SEE 974090
974109 11/10/09 N ENTRY SOFFIT STUCCO COLOR COAT NF <1 SEE 974089
974110 11/10/09 N ENTRY SOFFIT STUCCO SCRATCH COAT NF <1 SEE 974090
974111 11/10/09 METAL ROOF PANEL SEAMS WHITE CAULK ** NF 10 500 SQ FT
** MATERIAL IS LOCATED ALONG EACH SEAM OF THE METAL ROOF.
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
A R M E D FOR C E S
R E SER V E CE N T E R
5565 A IR W A Y S D R .
FR E SN O , C A
D O W N ST A IR S
FL O OR PL AN &
SA M PL E
L O C AT IO N M A P
N
A SB EST O S
IN SPE C T IO N
NO SC AL E
54-57 60
58-59
61 62
49-52 48 63-67
71-73 68-70
6-8
14-15
28-31 11-13
16 -19
44-46 32-35
21-22 20 25 23-24 9 1 -4 5
40 -43
36-39
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
A R MED FOR C ES R ESER VE C EN TER
5565 A IR WA Y S D R . FR ESN O , C A
U PSTA IR S FLO O R PLA N & SA M PLE LOC A TIO N M A P
N
A SB ESTO S
IN SPEC TIO N
NO SC AL E
81 83
74-75 79-80
76-78
Office: (661) 589-8655 Fax: (661) 589-8658
Job #: 974 Job Name: CALIFORNIA NATIONAL GUARD AREA 3 Owner Representative: GEOFF NICKLESS File: 974 5565 AIRWAYS OFFICE Date: 11/12/2009
N = NORTH S = SOUTH E = EAST W = WEST EXT = EXTERIOR INT = INTERIOR FR = FRIABLE NF = NON-FRIABLE ND = NONE DETECTED
Samples analyzed by: LA Testing 159 Pasadena Ave. South Pasadena, Ca. 91030
Dresser Services, Inc.
_____________________ Inspected by: ____________________ Glenn Plaskett Stephen Smith President Vice President
CAC# 92-0669 CSST # 06-3941
SECTION 06110
CARPENTRY
I PART 1 GENERAL
I.1 SECTION INCLUDES
A. Rough and finish carpentry.
B. Framing Devices
C. Curb framing.
D. Nailer installation.
E. Fasteners.
F. Preservative treatment of wood.
G. Workmanship.
I.2 RELATED SECTIONS
A. Section 07536 – SBS Modified Asphalt Roofing.
B. Section 07565 - Preparation for Re-roofing.
C. Section 07620 - Sheet Metal Flashing and Trim.
D. Section 07631 - Gutters and Downspouts.
I.3 REFERENCES
A. MIL-V-13518C (1) Wood Preservative:
Tetrachlorophenol and Pentachlorophenol, Surface Sealing Compound.
B. Federal Specification TT-W-572B Wood Preservative:
Copper Naphthenate - field applied.
C. APA: American Plywood Association.
D. AWPA (American Wood Preservers Association) C1 - All Timber Products Preservative Treatment by Pressure Process.
E. AWPA (American Wood Preservers Association) C20 - Structural Lumber Fire Retardant Treatment by Pressure Process.
F. PS 1 - Construction and Industrial Plywood.
G. PS 20 - American Softwood Lumber Standard.
H. NFPA - National Design Specification for Wood Construction.
I. RIS: Redwood Inspection Service.
J. SPIB: Southern Pine Inspection Bureau.
K. California Building Code 2007 Edition and Building Code Standards.
L. WCLIB: West Coast Lumber Inspection Bureau.
M. WWPA: Western Wood Products Association.
I.4 SUBMITTALS
A. Submit shop drawings of nailer layout, curb framing, and other framing as shown on project drawings.
B. Product Data: Provide technical data on wood preservative materials and application instructions.
I.5 DELIVERY, STORAGE, AND HANDLING
A. Deliver, store, protect and handle products under provision of Section 01600.
B. Do not deliver shop fabricated carpentry items until site conditions are adequate to receive the work.
Protect items from weather while in transit and while stored on site.
II PART 2 PRODUCTS
II.1 LUMBER
A. General: S4S, grade stamped, WCLIB, or WWPA;
current grading rules govern. Sizes shall conform to PS 20-70. Lumber 2" thick or less shall be seasoned to moisture content of 19% or less at time of installation. Except as otherwise noted on drawings, species shall be Douglas Fir, No. 1 Grade or better. All wood in contact with concrete, masonry, or gypsum shall be pressure preservative treated.
B. Minimum grades shall be as follows:
1. Light Framing 2" to 4" thick; 2" to 4" wide:
Construction Grade.
2. Studs: 2" to 4" thick; 2" to 6" wide; 10' and shorter: Stud Grade. 2" to 4" thick; 2" to 4" wide; over 10': No. 2 or better. 2" to 4" thick; 6" wide; 10' and longer: No. 1 Grade.
3. Structural Joists and Planks 2" to 4" thick; 5" and wider: No. 1 Douglas Fir.
4. Beams and Stringers; Posts and Timbers 5" X 5" and larger: Select Structural Douglas Fir.
C. Plywood: APA Grade CDX; exposure durability 1; 5-ply minimum for 1/2" or thicker, touch sanded.
D. Fascia and Trim: Select Redwood species, 1 1/2" thick, 14" and wider.
E. Furring and Stripping: Douglas Fir or Spruce Species, 19 percent maximum moisture content.
F. Roof Blocking/Nailers: 2” X 6” minimum, Douglas Fir species, 19 percent maximum moisture content, pressure treated.
G. Parapet Nailers: 2” X width as required, Douglas Fir species, 19 percent maximum moisture content, No. 2 or better.
II.2 ACCESSORIES
Fasteners and Anchors:
1. Fasteners: Hot-dipped galvanized steel for high humidity and treated wood locations.
2. Anchors: Toggle bolt type for anchorage to hollow masonry. Wedge anchor and lag bolt type for anchorage to solid masonry or concrete. Bolt or ballistic fastener for anchorages to steel.
3. Framing Devices: Beam Hangers, galvanized, sized to fit beam blocking under new roof access hatch. Manufacturer: Simpson or equal.
II.3 FACTORY WOOD TREATMENT
A. Fire retardant: AWPA Treatment C20, Exterior Type, chemically treated and pressure impregnated.
B. Wood Preservative (Pressure Treatment): AWPA Treatment C1 using water borne preservative with
0.25 percent retainment.
C. Wood Preservative (Surface Application): green colored. Treat ends of cut members with copper naphthenate.
III PART 3 EXECUTION
III.1 PREPARATION
A. Remove existing coping and flashing as identified in project drawings. Install new parapet cap nailer as shown on project drawings.
B. Replace existing materials damaged during the foam removal, damaged mansard / soffit framing as directed by ECI, under provisions of specification section 01016.
III.2 ROUGH CARPENTRY
A. Workmanship: Accurately cut, fit, and securely fasten items to produce plumb, level, true, and rigid work. Do not splice individual framing members between supports. Erect faces of framing members (studs, plates, joists, rafters and/or headers) in straight, accurate alignment, plumb or level in same plane to receive sheet type finish materials. Place horizontal members crown side up.
Install joists, beams, rafters and trusses with bottom edge free of defects affecting tensile strength.
B. Plates and Sills on Concrete or Masonry: Bed plates and sills of exterior walls in portland cement mortar to obtain continuous level bearing, bolt down after mortar sets. Bolt sizes and spacing as required per applicable provisions of the UBC. Use washers under nuts.
C. Rafters: Notch to fit bearings. Cut in solid blocking at ends and over bearings.
D. Ledgers, Headers Fascia and Nailers: Accurately cut to required sizes and securely fasten to structure.
E. Furring and Stripping: Provide where necessary to align faces of finish materials in single plane.
III.3 FINISH CARPENTRY
Exposed surfaces shall be free from tool marks, torn grain, cross sanding, or any workmanship defects that cannot be concealed by specified painter's finish.
III.4 FRAMING DEVICES
Provide stock framing devices including joist hangers, 3 way framing anchors, clips, shear plates, metal straps, timber connectors, post caps and anchors of type, size and quantity required.
III.5 NAILS, SCREWS, BOLTS, NUTS AND WASHERS
A. Common wire nails except as otherwise noted.
Provide 16d for 2" material and 8d for 1" material;
a minimum of 2 nails per bearing, or more if directed. Use finishing nails for finish work.
Provide screws, straight bolts, nuts, and washers as required. Wax or other lubricants not permitted on nails, lag screws or other fasteners that depend on friction for holding power. Use galvanized or cadmium plated fastenings for work exposed to weather.
B. Type, size and spacing of nails, when not otherwise indicated on plans, shall equal or exceed minimum requirements of the California Building Code, 2007 Edition.
III.6 CURB MODIFICATIONS AND SUPPORT FRAMING
A. Curb roof openings shall be supported where prefabricated curbs are specified. Bolt or nail together using steel angles. Securely fasten curbs to roof deck.
B. Curb modifications shall accommodate new roof membrane and new/existing metal flashings.
C. Coordinate curb installation with installation of decking and support of deck openings, and insulation height requirements.
D. Maintain finished curb height at a minimum of 8" above finished roof surface. Modify existing curbing or replace with new as specified. Modify utility connections as required to accommodate curb modifications.
III.7 NAILER INSTALLATION
Provide pressure treated nailers at roof edge perimeters, field, and at all roof penetrations requiring…