W91238-10-R-0038 Task Order Pricing Schedule Amendment 0006
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH
IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE
0001 Repair K-Line Wye 1 LUMP SUM $_________
See below Pricing Schedule Breakout for specific work items to be included in the price, Items 1001-1012, and 3001. All work to be performed according to the attached Plans and Specifications.
0002 Upgrade A Section of 1 LUMP SUM $_________ M-Line Track
See below Pricing Schedule Breakout for specific work items to be included in the price, Items 2001-2007, and 3002. All work to be performed according to the attached Plans and Specifications.
PRICING SCHEDULE BREAKOUT:
Base Schedule
Repair K-Line Left Leg of the Wye
1001 Demo existing 75 Lbs. 1,600 TLF $_________ $_________
Rail line, include all track accessories, complete.
1002 Install new 115 Lb rail 1,600 TLF $_________ $_________
Include double shoulder tie plates, spikes, joint bars, anchors over the existing tie and bed, and misc items to tie rail to the ties. Complete
1003 Install new ties 25 EACH $_________ $_________
7” x 9” x 8’6” with anti splitting devices. (Ties needing replaced shall be marked by the government).
1004 Existing skewed ties 40 EACH $_________ $_________ adjustment.
1005 Ballast (#4-a 100% 480 TON $_________ $_________ crushed lime stone).
1006 Connect/Tie-In to 1 LUMP SUM $_________ existing rail line.
Repair K-Line Right Leg of the Wye
1007 Demo existing 75 Lbs. 1,940 TLF $_________ $_________
Rail line, include all track accessories, 1008 Install new 115 Lb rail 1,940 TLF $_________ $_________ tie plates, spikes, joint bars, anchors over the existing tie and bed, and
1009 Install new ties 25 EACH $_________ $_________ splitting devices. (Ties needing replaced shall be
1010 Existing skewed ties 30 EACH $_________ $_________
1011 Ballast (#4-a 100% 580 TON $_________ $_________ crushed lime stone).
1012 Connect/Tie-In to 1 LUMP SUM $_________
Upgrade a Section of M-Line Track
2001 Demo existing 75 Lbs. 5,820 TLF $_________ $_________
Rail line, include all track accessories, and personal grade crossings, 2002 Install new 115 Lb rail 5,820 TLF $_________ $_________ tie plates, spikes, joint bars, anchors over the existing tie and bed, and
2003 Install new ties 250 EACH $_________ $_________ splitting devices. (Ties needing replaced shall be
2004 Install concrete 3 EACH $_________ $_________ crossing panels at personal crossing, including 7” x 9” x10’ ties and accessories, etc.
2005 Existing skewed ties 220 EACH $_________ $_________
2006 Ballast (#4-a 100% 500 TON $_________ $_________ crushed lime stone).
2007 Connect/Tie-In to 1 LUMP SUM $_________
Option Schedule
3001 Repair K-Line Wye 3,540 TLF $_________ $_________
Difference in cost to install 115 Lb. # 1 Relay Rail vs New Rail.
Include double shoulder tie plates, spikes, joint bars, anchors, over the existing tie and bed, and
3002 Upgrade A Section of 5,820 TLF $_________ $_________ M-Line Track
Difference in cost to install 115 Lb. # 1 Relay Rail vs New Rail.
Include double shoulder tie plates, spikes, joint bars, anchors, over the existing tie and bed, and the ties. Complete.
Task Order Pricing Schedule Notes:
1. Prices must be submitted on all individual items of this Pricing Schedule.
Failure to do so may cause the proposal to be determined "unacceptable".
2. If a modification to a price is submitted which provides for a lump sum adjustment to the total price, the application of the lump sum adjustment to each item in the Pricing Schedule must be stated. If it is not stated, the offeror agrees that the lump sum adjustment shall be applied on a pro rata basis to every item in the Pricing Schedule.
3. The offeror shall distribute his indirect costs (overhead, profit, bond, etc.) over all the items in the Pricing Schedule. The Government will review all submitted Pricing Schedules for any unbalancing of the items. Any submitted Pricing Schedule determined to be unbalanced may cause the proposal to be determined "unacceptable".
4. In the event there is a difference between a unit price and the extended total, the unit price will be held to be the intended proposed price. If the offeror shows only the total price but fails to enter a unit price, the total divided by the estimated quantity will be held to be the intended unit price.
5. The successful offeror grants the options listed in the Pricing Schedule to the Government. The options may be exercised up to 30 calendar days after receipt of notice to proceed (NTP).
6. Exercise of the option occurs upon mailing of written notice to the Contractor. Exercise will be made by the Contracting Officer. The price for exercise of the option includes all work and effort associated with the scope of that item. The proposed additional time for contract completion will be allowed when the option is exercised.
7. Quantities are estimates and a future contract modification will be issued for actual provided amounts based on the proposed unit pricing.
8. EFARS 52.214-5000 ARITHMETIC DISCREPANCIES
(a) For the purpose of initial evaluation of bids, the following will be utilized in the resolving arithmetic discrepancies found on the face of Pricing Schedule as submitted by the bidder:
(1) Obviously misplaced decimal points will be corrected;
(2) Discrepancy between unit price and extended price, the unit price will govern;
(3) Apparent errors in extension of unit prices will be corrected;
(4) Apparent errors in addition of lump-sum and extended prices will be corrected.
(b) For the purpose of bid evaluation, the Government will proceed on the assumption that the bidder intends the bid to be evaluated on basis of the unit prices, the totals arrived at by resolution of arithmetic discrepancies as provided above and the bid will be so reflected on the abstract of bids.
(c) These correction procedures shall not be used to resolve any ambiguity concerning which bid is low.