W91238-10-R-0038 Task Order Pricing Schedule Amendment 0004
CONTRACTOR SHALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT, ETC. NECESSARY TO
PERFORM ALL WORK IN STRICT ACCORDANCE WITH THE TERMS AND CONDITIONS SET FORTH
IN THE CONTRACT TO INCLUDE ALL ATTACHMENTS THERETO.
LINE ITEM UNIT OF UNIT TOTAL
NO. DESCRIPTION QUANTITY MEASURE PRICE PRICE
0001 Repair K-Line Wye 1 LUMP SUM $_________
See below Pricing Schedule Breakout for specific work items to be included in the price, Items 1001-1012, and 3001. All work to be performed according to the attached Plans and Specifications.
0002 Upgrade A Section of 1 LUMP SUM $_________ M-Line Track
See below Pricing Schedule Breakout for specific work items to be included in the price, Items 2001-2007, and 3002. All work to be performed according to the attached Plans and Specifications.
PRICING SCHEDULE BREAKOUT:
Base Schedule
Repair K-Line Left Leg of the Wye
1001 Demo existing 75 Lbs. 1,600 TLF $_________ $_________
Rail line, include all track accessories, complete.
1002 Install new 115 Lb rail 1,600 TLF $_________ $_________
Include double shoulder tie plates, spikes, joint bars, anchors over the existing tie and bed, and misc items to tie rail to the ties. Complete
1003 Install new ties 25 EACH $_________ $_________
7” x 9” x 8’6” with anti splitting devices. (Ties needing replaced shall be marked by the government).
1004 Existing skewed ties 40 EACH $_________ $_________ adjustment.
1005 Ballast (#4-a 100% 480 TON $_________ $_________ crushed lime stone).
1006 Connect/Tie-In to 1 LUMP SUM $_________ existing rail line.
Repair K-Line Right Leg of the Wye
1007 Demo existing 75 Lbs. 1,940 TLF $_________ $_________
Rail line, include all track accessories, 1008 Install new 115 Lb rail 1,940 TLF $_________ $_________ tie plates, spikes, joint bars, anchors over the existing tie and bed, and
1009 Install new ties 25 EACH $_________ $_________ splitting devices. (Ties needing replaced shall be
1010 Existing skewed ties 30 EACH $_________ $_________
1011 Ballast (#4-a 100% 580 TON $_________ $_________ crushed lime stone).
1012 Connect/Tie-In to 1 LUMP SUM $_________
Upgrade a Section of M-Line Track
2001 Demo existing 75 Lbs. 5,820 TLF $_________ $_________
Rail line, include all track accessories, and personal grade crossings, 2002 Install new 115 Lb rail 5,820 TLF $_________ $_________ tie plates, spikes, joint bars, anchors over the existing tie and bed, and
2003 Install new ties 250 EACH $_________ $_________ splitting devices. (Ties needing replaced shall be
2004 Install concrete 3 EACH $_________ $_________ crossing panels at personal crossing, including 7” x 9” x10’ ties and accessories, etc.
2005 Existing skewed ties 220 EACH $_________ $_________
2006 Ballast (#4-a 100% 500 TON $_________ $_________ crushed lime stone).
2007 Connect/Tie-In to 1 LUMP SUM $_________
Option Schedule
3001 Repair K-Line Wye 3,540 TLF $_________ $_________
Difference in cost to install 115 Lb. # 1 Relay Rail vs New Rail.
Include double shoulder tie plates, spikes, joint bars, anchors, over the existing tie and bed, and
3002 Upgrade A Section of 5,820 TLF $_________ $_________ M-Line Track
Difference in cost to install 115 Lb. # 1 Relay Rail vs New Rail.
Include double shoulder tie plates, spikes, joint bars, anchors, over the existing tie and bed, and the ties. Complete.