These documents are 60% design plans for the Lower Mud River Flood Risk Management Project in Milton, West Virginia, prepared by the US Army Corps of Engineers Huntington District. The comprehensive set of architectural, mechanical, electrical, and structural drawings covers multiple critical infrastructure components, including two pump stations (Newmans Branch and Johns Branch), multiple gatewells, discharge arrangements, and associated mechanical and electrical systems.

The designs detail complex flood control infrastructure with specific technical specifications for pump stations featuring three pumps per station, sump configurations, discharge pipes (18" and 36" diameter), electric gate operators, trash racks, ventilation systems, and integrated electrical and control systems. The project includes various drainage area structures across multiple locations such as Western Drainage Area, Damon Avenue, and Johns Branch West, with precise elevation specifications, concrete structures, and mechanical components like sluice gates, flap gates, and culvert outfall systems. The documents are marked as "DRAFT ONLY FOR INDUSTRY DAY", indicating these are pre-final design documents intended for contractor review and feedback, with an upcoming Industry Day scheduled for October 21, 2025, in Milton, West Virginia.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:4

P

M

S-153

J O

H N

S B

R A

N C

H W

E S

T

C U

L V

E R

T O

U T

F A

L L

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

Text Box

DRAFT ONLY FOR INDUSTRY DAY

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-201

N E

W M

A N

S B

R A

N C

H P

U M

P S

T A

T

IO

N

E L E

V A

T

IO

N V

IE

W

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-202

N E

W M

A N

S B

R A

N C

H G

A T

E W

E L L

E L E

V A

T

IO

N V

IE

W

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-211

J O

H N

S B

R A

N C

H P

U M

P S

T A

T

IO

N

E L E

V A

T

IO

N V

IE

W

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-212

J O

H N

S B

R A

N C

H E

A S

T G

A T

E W

E L L

E L E

V A

T

IO

N V

IE

W

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-213

J O

H N

S B

R A

N C

H W

E S

T G

A T

E W

E L L

E L E

V A

T

IO

N V

IE

W

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-302

N E

W M

A N

S B

R A

N C

H P

U M

P S

T A

T

IO

N

S E

C T

IO

N

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-312

J O

H N

S B

R A

N C

H P

U M

P S

T A

T

IO

N

S E

C T

IO

N

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

T/ FINISHED GRADE

SEE NOTE 7, 8

#9 @ 12", TYP

#9 @ 12", TYP

#10 @ 12"

TYP, T&B

#10 @ 12"

TYP, T&B

14' - 0"

C V

R

REBAR TO AVOID

HP, TYP

2' - 0" 5' - 0" 5' - 0" 2' - 0"

HP12X53 @ 6'-0" C/C, TYP

CONTRACTOR TO

DETERMINE ACTUAL LENGTH

BASED UPON LENGTH NEEDED

TO REACH BEDROCK.

2'-0"

1'-0"

2'-0"

1'-0"

8' - 11"

3' - 0"

SEE DETAIL-2 FOR

TYPICAL H PILE

CONNECTION

C V

R

PS27.5

SHEET PILE

1' - 6"

3" CVR, TYP UNO

2' - 1"

1' - 0" 1' - 0"

#6 @ 12", TYP

3' - 0"

C V

R

WET SIDE DRY SIDE24'-0"

1'-0"

HP14X117 @ 6'-0" C/C, TYP

CONTRACTOR TO

DETERMINE ACTUAL LENGTH

BASED UPON LENGTH NEEDED

TO REACH BEDROCK.

PL1/2X10X12

CL PILE

H-PILE

2 - #11 HAIR-PIN BARS

AT EACH HP, TYP

#11 HAIR-PIN BARS

AT EACH HP

PL1/2X10X12

#11 HAIR-PIN

BARS

AT EACH HP,

TYP

STD 90°

RADIUS BEND

PL1/2X10X12, TYP

WEB ELEVATION FLANGE ELEVATION

PLAN VIEW

3/8

TYP

3/8

SEAL, TYP

3/8 4

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-317

P

IL

E F

O U

N D

E D

T -W

A L L

S E

C T

IO

N

E

A S

T W

A L L

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

J F

R E

E M

A N

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/2" = 1'-0"S-317

PILE FOUNDED T-WALL - SECTION1

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI.

2. REINFORCEMENT SHALL BE ASTM A615 GRADE 60 STEEL.

3. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

4. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

5. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

6. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

7. TYP T-WALL WIDTH TO BE 14'-0".

0 0.5' 1' 2'0 1' 2' 4' 1" = 1'-0"S-317

TENSION PILE FOOTING CONNECTION2

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

PL1/2X10X12

CL PILE

HP12X53, TYP 2 - #11 HAIR-PIN BARS

AT EACH HP, TYP

#11 HAIR-PIN BARS

AT EACH HP

PL1/2X10X12

#11 HAIR-PIN

BARS

AT EACH HP,

TYP

STD 90°

RADIUS BEND

PL1/2X10X12, TYP

WEB ELEVATION FLANGE ELEVATION

PLAN VIEW

3/8

TYP

3/8

SEAL, TYP

3/8 4

T/ FINISHED GRADE

SEE NOTE 7, 8

#6 @ 12", TYP

#6 @ 12", TYP

#9 @ 12"

TYP, T&B

#9 @ 12"

TYP, T&B

REBAR TO AVOID

HP12, TYP

HP12X53 @ 6'-0" C/C, TYP

CONTRACTOR TO

DETERMINE ACTUAL LENGTH

BASED UPON LENGTH NEEDED

TO REACH BEDROCK.

SEE DETAIL-2 FOR

TYPICAL H PILE

CONNECTION

PS27.5

SHEET PILE

#6 @ 12", TYP

WET SIDE DRY SIDE

1' - 6"

1' - 10 7/16"

3" CVR, TYP UNO

8' - 11"

C V

R

10' - 1 15/16"

14' - 0"

1' - 0" 1' - 0"

T Y

P

C V

R

C V

R

24'-0"

1'-0"

2' - 0" 5' - 0" 5' - 0" 2' - 0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-318

P

IL

E F

O U

N D

E D

T -W

A L L

T R

A N

S

IT

IO

N

S E

C T

IO

N

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

J F

R E

E M

A N

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 5,000 PSI.

2. REINFORCEMENT SHALL BE ASTM A615 GRADE 60 STEEL.

3. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

4. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

5. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

6. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

7. TYP T-WALL WIDTH TO BE 14'-0".

1" = 1'-0"S-318

TENSION PILE FOOTING CONNECTION2

0 0.5' 1' 2'0 1' 2' 4'1/2" = 1'-0"S-318

PILE FOUNDED T-WALL - TRANSITION SECTION1

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

S T

A

.5

S T

A

.8

S T

A

.0

23' - 4" 21' - 4"20' - 6"

S T

A

.1

10' - 0"

WATERSTOP

TYP

S-317

Sim

S-318

Sim

20' - 6" 23' - 4" 21' - 4"

2' - 8"

3' - 6"4' - 6"4' - 6"4' - 6"3' - 6" 4' - 6"4' - 6"4' - 6"4' - 6"2' - 8" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8"

1' - 0" 2' - 0"

S T

A

.0

S T

A

.5

S T

A

.8

S T

A

.1

WET SIDE

DRY SIDE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-319

T -W

A L L

E

A S

T W

A L L

S H

E E

T

O F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

J F

R E

E M

A N

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"2

EAST WALL TRANSITION ELEVATION

1/4" = 1'-0"1

EAST WALL TRANSITION LAYOUT

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8"

WET SIDE

DRY SIDE

C O

N T

R A

C T

IO

N

J O

IN

T

C O

N T

R A

C T

IO

N

J O

IN

T

E X

P A

N S

IO

N

J O

IN

T

E X

P A

N S

IO

N

J O

IN

T

S T

A

.1

36 SECTIONS @ 21'-4"

S T

A

.1

36 SECTIONS @ 21'-4"

WATERSTOP

TYP

S-317

Sim

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-320

T -W

A L L

E A

S T

W A

L L

S H

E E

T

O F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

J F

R E

E M

A N

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"1

EAST WALL TYPICAL PANEL LAYOUT

1/4" = 1'-0"2

EAST WALL TYPICAL PANEL ELEVATION

SEE SHEET S-327

FOR CONNECTION

AT STOPLOG.

SEE SHEET S-327

FOR CONNECTION

AT STOPLOG.

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

S T

A

.0

S

T A

.0

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

20' - 6"23' - 4"

T

A

.1

S T

A

.4

S T

A

.9

S T

A

.9

10' - 0"

WATERSTOP

TYP

S-318

Sim

S-317

Sim

S T

A

.1

S T

A

.9

S T

A

.4

S T

A

.9

23' - 4" 20' - 6" 10' - 0"

2' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 2' - 8" 3' - 6" 4' - 6" 4' - 6" 4' - 6" 3' - 6"

WET SIDE

DRY SIDE

1' - 0"

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-321

T -W

A L L

M

ID

D L E

W A

L L

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

J F

R E

E M

A N

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"2

MIDDLE WALL TRANSITION ELEVATION

SEE SHEET S-327

FOR CONNECTION

AT STOPLOG.

1/4" = 1'-0"1

MIDDLE WALL TRANSITION LAYOUT

SEE SHEET S-327

FOR CONNECTION

AT STOPLOG.

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

20' - 6" 21' - 4"S

A

.0

S T

A

.5

S T

A

.8

10' - 0"S T

A

.0

1' - 0"

RETURN KEY

3' - 6" 4' - 6" 4' - 6" 4' - 6" 3' - 6" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8"

WET SIDE

DRY SIDE

S T

A

.0

S T

A

.5

S T

A

.8

S T

A

.0

10' - 0" 20' - 6" 21' - 4"

WATERSTOP

TYP

S-318

Sim

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-322

T -W

A L L

W E

S T

W A

L L

S H

E E

T

O F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"1

WEST WALL TRANSITION LAYOUT

1/4" = 1'-0"2

WEST WALL TRANSITION ELEVATION

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

A

.8

S T

A

.2

S T

A

.5

23' - 4"213' - 4 13/16"10 SECTIONS @ 21'-4"

1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8" 2' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 2' - 8"

WET SIDE

DRY SIDE

213' - 4 13/16"

S T

A

.8

S T

A

.2

S T

A

.5

23' - 4"10 SECTIONS @ 21'-4"

2' - 0"

WATERSTOP

TYP

S-318

Sim

S-317

Sim

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-323

T -W

A L L

W E

S T

W A

L L

S H

E E

T

O F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"1

WEST WALL LAYOUT

1/4" = 1'-0"2

WEST WALL ELEVATION

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

A

.5

S T

A

.3

234' - 8 15/16"11 SECTIONS @ 21'-4"

WATERSTOP

TYP

S-317

Sim

234' - 8 15/16"

S T

A

.5

S T

A

.3

1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8"1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8" 1' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 1' - 8"

11 SECTIONS @ 21'-4"

WET SIDE

DRY SIDE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-324

T -W

A L L

W E

S T

W A

L L

S H

E E

T

O F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"1

WEST WALL TYPICAL PANEL ELEVATION

1/4" = 1'-0"2

WEST WALL TYPICAL PANEL LAYOUT

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

A

.3

S T

A

.6

S T

A

.1

S T

A

.1

10' - 0"20' - 6"23' - 4"

2' - 0"

WATERSTOP

TYP

S-317

Sim

S-318

Sim

S T

A

.3

S T

A

.6

S T

A

.1

S T

A

.1

23' - 4" 20' - 6" 10' - 0"

RETURN KEY

2' - 8" 4' - 6" 4' - 6" 4' - 6" 4' - 6" 2' - 8" 3' - 6" 4' - 6" 4' - 6" 4' - 6" 3' - 6"

1' - 0"

WET SIDE

DRY SIDE

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:0

P

M

S-325

T -W

A L L

W E

S T

W A

L L

S H

E E

T

O F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

O O

S

IE

R

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1/4" = 1'-0"2

WEST WALL END TRANSITION ELEVATION

1/4" = 1'-0"1

WEST WALL END TRANSITION LAYOUT

NOTES:

1. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI.

2. VERIFY ELEVATIONS IN FIELD WITH SURVEY DATA.

3. CHAMFER ALL CORNERS 3/4" UNLESS NOTED OTHERWISE.

4. CONCRETE AT CONSTRUCTION JOINTS TO BE CLEANED, FREE OF LAITANCE, AND ROUGHENED TO 1/4".

5. WATER STOPS SHALL BE INSTALLED AT ALL CONSTRUCTION JOINTS. SEE SHEET X-YYY FOR DETAIL.

6. EXPANSION JOINTS SHALL BE LOCATED AT EVERY THIRD MONOLITH JOINT ALONG THE WALL AND AT ALL JOINTS WHERE THERE IS A CHANGE IN HORIZONTAL ALIGNMENT. MAXIMUM SPACING BETWEEN EXPANSION JOINTS SHALL BE xx FEET. ALL OTHER JOINTS SHALL BE CONTRACTION JOINTS UNLESS

NOTED OTHERWISE.

7. STATIONS ARE APPROXIMATE AND MAY VERY DUE TO CONSTRUCTION +/- 2".

8. CONCRETE PANEL JOINTS TO BE CENTERED OVER SHEET PILE KNUCKLE, TYP.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:1

P

M

S-326

C L O

S U

R E

S T

R U

C T

U R

E A

T B

IL

L B

L E

N K

O D

R

IV

E

D O

W N

S T

R E

A M

E L E

V A

T

IO

N

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:1

P

M

S-327

C L O

S U

R E

S T

R U

C T

U R

E A

T B

IL

L B

L E

N K

O D

R

IV

E

P L A

N A

N D

E L E

V A

T

IO

N

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:1

P

M

S-330

C L O

S U

R E

S T

R U

C T

U R

E A

T B

IL

L B

L E

N K

O D

R

IV

E

B U

T T

R E

S S

A N

D S

IL

L M

O N

O L

IT

H

H A

L F

P L A

N A

N D

S E

C T

IO

N

S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:2

P

M

S-333

C L O

S U

R E

S T

R U

C T

U R

E A

T B

IL

L B

L E

N K

O D

R

IV

E

S T

O P

L O

G S

T O

R A

G E

B U

IL

D

IN

G

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:2

P

M

S-334

C L O

S U

R E

S T

R U

C T

U R

E A

T B

IL

L B

L E

N K

O D

R

IV

E

S T

O P

L O

G S

T O

R A

G E

B U

IL

D

IN

G

R

E

IN

F O

R C

E M

E N

T

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:2

P

M

S-335

C L O

S U

R E

S T

R U

C T

U R

E A

T B

IL

L B

L E

N K

O D

R

IV

E

M

IS

C

G A

T E

C L O

S U

R E

D E

T A

IL

S

W

A T

E R

S T

O P

S A

N D

S H

E E

T P

IL

E

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

15' - 0"

7' - 6" 7' - 6"

1/4" / 1'-0" 1/4" / 1'-0"

13' - 6" 1' - 6"

CONCRETE KEY

/1

#7 @ 12" EW, TYP

#7 @ 12"

#7 @ 12"

S-340

4 EQUAL SECTIONS = 85' - 0"

S-340

30' - 0"

F L O

W

S L O

P E

S L O

P E

30' - 0"

1/4" / 1'-0" 1/4" / 1'-0"

10' - 0"

5' - 0" 5' - 0"

/8

/8

CONCRTE KEY

1' - 6"8' - 6"

/4

US Army Corps of Engineers ®

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:2

P

M

S-340

T Y

P

IC

A L O

V E

R T

O P

P

IN

G S

E C

T

IO

N

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

W S

H E

R R

Y

C H

O O

S

IE

R

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

1" = 1'-0"S-340

OVERTOPPING SLAB - MIDDLE SECTION2

1/8" = 1'-0"S-340

OVERTOPPING SLAB - PLAN VIEW1

1" = 1'-0"S-340

OVERTOPPING SLAB - END SECTION3

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:3

P

M

S-503

N E

W M

A N

S B

R A

N C

H P

U M

P S

T A

T

IO

N

T R

A S

H R

A C

K

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:3

P

M

S-504

J O

H N

S B

R A

N C

H P

U M

P S

T A

T

IO

N

T R

A S

H R

A C

K

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:4

P

M

S-514

S T

O P

L O

G

L A

Y O

U T

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:4

P

M

S-515

S T

O P

L O

G

D E

T A

IL

S

I

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-516

S T

O P

L O

G

D E

T A

IL

S

I I

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:1

:5

P

M

S-517

S T

O P

L O

G

D E

T A

IL

S

I

II

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:2

:1

P

M

S-527

P U

M P

S T

A T

IO

N

G

E N

E R

A T

O R

T

R A

N S

F O

R M

E R

P A

D S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:2

:1

P

M

S-528

R A

W W

A T

E R

I N

T A

K E

G

E N

E R

A T

O R

A

IR

B

U R

S T

S Y

S T

E M

P A

D S

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

SHEET ID

U S

A R

M Y

C O

R P

S O

F E

N G

IN

E

E R

S

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

S U

B M

IT

T

E D

B Y

S

IZ

E

C H

E C

K E

D B

Y

A N

S I D

IS

S

U E

D A

T E

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

N

3 5 7 9 11 13 15 17 19

L

J

G

E

C

A

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

F ile

P a th

P lo t D a te

2 4 6 8 10 12 14 16 18 20

P

M

K

H

F

D

B

C

U s e rs

\h e cd rc h \D o c u m e n ts

\L o w e r

M u d R iv e r

M ilt o n

W V

F

R M ro b e rt

.c .h a rr is .r v t

/2

/2

:2

:1

P

M

S-529

C O

N T

R O

L B

U

IL

D

IN

G R

O O

F

M U

D R

IV

E

R

N A

S H

V

IL

L E

D

IS

T R

IC

T

T H

A V

E S

N

A S

H V

IL

L E

T

N

S D

A S

G U

P T

A

C H

A R

R

IS

J F

R E

E M

A N

N O

T C

H E

C K

E D

Is s u e D a te

M

IL

T O

N W

V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V F

R M

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

DETAIL

ELEVATION

WALL SECTION

BUILDING SECTION

A-A

A-XXX

COLUMN REFERENCE

LOUVER TYPE

WINDOW TYPE

CONTROL POINT/ELEVATION MARK

PARTITION TYPE

ROOM/SPACE NUMBER

A

ANCHOR BOLT

ABOVE

ALTERNATING CURRENT

AIR CONDITIONING

ACOUSTICAL

ACCESS DOOR

AREA DRAIN

ADJUSTABLE

ABOVE FINISH FLOOR

AGGREGATE

AIR HANDLING UNIT

AREA INLET

ALUMINUM

ACTIVE LEAF

ALTERNATE

AMPERE

ACCESS PANEL

APPROVED

APPROXIMATE

ARCHITECTURAL

ASBESTOS

ASPHALT

ACOUSTICAL TILE

ACOUSTICAL TILE CEILING

AUTOMATIC

AVERAGE

ACOUSTICAL WALL COVERING

AMERICAN WIRE GAUGE

B

BULLETIN BOARD

BOOKCASE

BOARD

BOUNDARY

BRICK EXPANSION JOINT

BITUMINOUS

BUILDING LINE

BUILDING

BLOCK

BLOCKING

BEAM

BOTTOM OF

BOTTOM

BRACING

BRIDGING

BEARING

BRICK

BRACKET

BENT

BRITISH THERMAL UNIT

BTU PER HOUR

BUILT UP ROOF

C

CABINET

CONDUIT

CAPACITY

CENTER TO CENTER

CATCH BASIN

CEMENT

CUBIC FEET PER MINUTE

CHIMNEY

CURB INLET

CAST IRON

CIRCLE

CONTRACTION JOINT

CHECKED

CIRCUIT

CIRCUIT BREAKER

CORNER GUARD

CENTER LINE

CEILING

CAULKING

CLOSET

CLOSED

CLEAR

CORRUGATED METAL PIPE

CONCRETE MASONRY UNIT

COUNTER

CLEANOUT

CARBON DIOXIDE

COLUMN

COMMON

COMBINATION

COMPRESSIBLE

CONCRETE

CONNECTION

CONSTRUCTION

CONTINUOUS

CORNER

CORRIDOR

COVERED

CEMENT PLASTER

CYCLES PER SECOND

CARPET

COURSE

COUNTER SINK

CASEMENT

CERAMIC TILE

CENTER

CONDENSING UNIT

CUBIC YARD

COLD WATER

CYLINDER

D

PENNY (AS IN NAIL)

DATUM

DOUBLE ACTING

DRY BULB

DOUBLE

DOOR CLOSER

DEGREE

DEPARTMENT

DETAIL

DRINKING FOUNTAIN

DOUBLE HUNG

DUCT HEATER

DIAMETER

DIAGONAL

DIMENSION

DISCONNECT

DISPENSER

DISTRIBUTION

DRESSED AND MATCHED

DOWN

DOOR

DRAIN

DOWNSPOUT

DRAWING

DOWELS

E

EAST

EACH

EXPANSION JOINT

ELEVATION

ELECTRIC

ELEVATOR

EMERGENCY

ENCLOSURE

ENTRANCE

ELECTRIC PANEL

EQUAL

EQUIPMENT

ESTIMATED

ELECTRIC WATER COOLER

EXCAVATE

EXIT DEVICE

EXHAUST

EXISTING

EXPOSED

EXPLOSION

EXPANSION

EXTERIOR

F

FAHRENHEIT

FRESH AIR

FOOT CANDLE

FACING

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER

FINISH FLOOR

FIRE HYDRANT

FIRE HOSE CABINET

FIGURE

FINISH

FIXTURE

FLOOR

FLASHING

FLEXIBLE

FLOORING

FLUORESCENT

FOUNDATION

FIRE PROTECTION

FEET PER MINUTE

FIRE PROOF

FRAME

FURRING

FULL SIZE

FEET

FOOTING

FUTURE

FABRIC WALL COVERING

G

GAS

GAGE

GALLON

GALVANIZED

GRAB BAR

GENERAL

GROUND FAULT INTERRUPTER

GOVERNMENT INSTALLED

GLASS

GROUND

GOVERNMENT

GALLONS PER MINUTE

GRADE

GRATING

GYPSUM WALL BOARD

GLAZED WALL TILE

GYPSUM

H

HOSE BIBB

HARDBOARD

HANDICAPPED

HEAD

HEADER

HANDRAIL

HARDWARE

HARDWOOD

HOLLOW METAL

HORIZONTAL

HORSE POWER

HIGH POINT

HOUR

HIGH STRENGTH

HEIGHT

HEATING

HEATER

HOT WATER

I

IRON

INSIDE DIAMETER

INCH

INSULATION

INTERIOR

INVERT

J

JUNCTION BOX

JANITOR CLOSET

JUNCTION

JOIST

JOINT

K

KEY

KILOPOUND

KITCHEN

KNOCK OUT

KICK PLATE

KILOVOLT

KILOVOLT AMPERE

KILOWATT

L

LUMEN

LABORATORY

LAUNDRY

LAVATORY

LUMBER

POUNDS

LOAD

LENGTH

LINEAR

LEFT HAND

LINTEL

LONGITUDINAL

LOW POINT

LIGHT

LIGHTING

LIGHT WEIGHT

LOUVER

M

MEN

MACHINE

MAGNETIC

MARBLE THRESHOLD

MASONRY

MATERIAL

MAXIMUM

MECHANICAL

MEMBRANE

METAL LAY-IN PANEL

MANUFACTURE

MATTE GLAZED TILE

MANHOLE

MINIMUM

MIRROR

MISCELLANEOUS

METAL LATH

MOLDING

MASONRY OPENING

METAL STUD

MARBLE THRESHOLD

METAL

MOUNTED

N

NORTH

NOT IN CONTRACT

NUMBER

NOMINAL

NOT REQUIRED

NOT TO SCALE

O

OBSCURE

ON CENTER

OUTSIDE DIAMETER

OFFICE

OVERHEAD

OPENING

OPPOSITE

P

PIECE

PERFORATED

PLATE

PLASTER

PLASTIC LAMINATE

PLYWOOD

PLUMBING

PANEL

PORCELAIN

PAIR

PREFABRICATED

PREFINISHED

PROJECT

POUNDS / SQUARE FOOT

POUNDS / SQUARE INCH

PAINT

PAPER TOWEL DISPENSER

PAINTED

PARTITION

POLYVINYL CHLORIDE

PAVEMENT

PASS WINDOW

Q

QUARRY TILE

QUARTER ROUND

R

RISER

RETURN AIR

RADIUS

RESILIENT BASE

ROOF DRAIN

RIDGE

RECEPTACLE

REFRIGERATOR

REGLET

REFERENCE

REINFORCE

REQUIRED

RESILIENT

REVISIONS

ROOFING

RANGE

ROUGH

RIGHT HAND

ROOF LEADER

ROOM

ROUGH OPENING

REVOLUTION PER MINUTE

RUBBER

S

SOUTH

SPLASH BLOCK

SCHEDULE

SECTION

SOAP DISPENSER

SQUARE FOOT

SHEET

SHEATHING

SIMILAR

SPECIFICATIONS

SOUNDPROOF

SPECIAL

SQUARE

STAINLESS STEEL

STANDARD

STRINGER

STEEL

STONE

STRUCTURAL

SUSPENDED

SHEET VINYL FLOORING

SYMMETRICAL

STATION

T

TOILET

TOWEL BAR

TELEPHONE

TERRAZZO

TEMPORARY

TONGUE AND GROOVE

THRESHOLD

THICK

TREAD

TYPICAL

U

UNDERCUT

UNDERGROUND

UNIT HEATER

UNFINISHED

URINAL

V

VOLT

VINYL BASE

VERTICAL

VESTIBULE

VINYL TILE

VENT THRU ROOF

VINYL WALL COVERING

W

WEST

WITH

WATER CLOSET

WOOD

WINDOW

WIRE GLASS

WROUGHT IRON

WORK POINT

WAINSCOT

WITHOUT

WATERPROOF

WASTE RECEPTACLE

WEIGHT

WELDED WIRE FABRIC

MISC

AT

AND

POUND OR NUMBER

PERCENT

CHANNEL

ANGLE

CONSTRUCTION JOINT

UNDERWRITERS

LABORATORIES

UNLESS OTHERWISE

NOTED

VINYL COMPOSITION

TILE

INSTITUTE

OPERATOR

STEEL CONSTRUCTION

STANDARDS INSTITUTE

CEILING

INSTITUTE

EQUIPMENT

JOINT

BRACKET

CABINET

EQUIPMENT

FACING TILE

DISPENSER

RECEPTACLE

ROOFING

HZ HERTZ

TOPO TOPOGRAPHY

CONSTR. JT. A

A.B.

ABV.

A.C.

A/C

A.C.I. AMERICAN CONCRETE

ACST.

A.D.

A.D.

ADJ.

A.D.O. AUTOMATIC DOOR

A.F.F.

AGG.

A.H.U.

A.I.

A.I.S.C. AMERICAN INSTITUTE OF

ALUM.

A.L.

ALT.

AMP.

A.N.S.I. AMERICAN NATIONAL

A.P.

A.P.C. ACOUSTICAL PANEL

APPD.

APPROX.

ARCH.

A.R.I. AMERICAN REFRIGERATION

ASB.

ASPH.

A.T.

A.T.C.

AUTO.

AVG.

A.W.C.

A.W.G.

B

B.B.

BC.

BD.

BDY.

B.E.J.

BIT.

B.L.

BLDG.

BLK.

BLKG.

BM.

B.O.

BOT.

BRCG.

BRDG.

BRG.

BRK.

BRKT.

BT.

BTU

BTUH

BUR.

C

CAB.

CND.

CAP.

C TO C

C.B.

CEM.

CFE CONTRACTOR FURNISHED

CFM

CHIM.

C.I.

CI

CIR.

C.J.

CKD.

CKT.

C.B.

C.G.

C.L.

CLG.

CLKG.

CLO.

CLOS.

CLR.

CMP.

CMU.

CNTR.

CO.

CO2

COL.

COM.

COMB.

COMP.

CONC.

CONN.

CONSTR.

CONT.

COR.

CORR.

COV.

CPL.

C.P.S.

CPT.

CRSE.

CS.

CSMT.

C.T.

CTR.

C.U.

CU. YD.

C.W.

CYL.

D d

D.

D.A.

D.B.

DBL.

D.CL.

DEG.

DEPT.

DET.

D.F.

D.H.

D.H.

DIA.

DIAG.

DIM.

DISC.

DISP.

DIST.

D.&M.

DN.

DR.

DRN.

DS.

DWG.

DWLS.

E

E

EA.

E.J.

EL.

ELEC.

ELEV.

EMERG.

ENCL.

ENT.

E.P.

EQ.

EQUIP.

EST.

E.W.C.

EXC.

EX.D.

EXH.

EXIST.

EXP.

EXPL.

EXPN.

EXT.

F

F.

F.A.

F.C.

FCG.

F.C.J. FLOOR CONSTRUCTION

F.D.

FDN.

F.E.

F.E.B. FIRE EXTINGUISHER

F.E.C. FIRE EXTINGUISHER

F.F.

F.H.

F.H.C

FIG.

FIN.

FIX.

FL.

FLASH.

FLEX.

FLG.

FLUOR.

FOUND.

F.P.

FPM.

F.PRF.

FR.

FRG.

F.S.

FT.

FTG.

FUT.

F.W.C.

G

G.

GA.

GAL.

GALV.

G.B.

GEN.

G.F.E. GOVERNMENT FURNISHED

G.F.I.

G.I.

GL.

GND.

GOVT.

GPM.

GR.

GRTG.

G.W.B.

G.W.T.

GYP.

H

H.B.

HDB.

HCPD.

HD.

HDR.

HDRL.

HDW.

HDWD.

H.M.

HORZ.

H.P.

H. PT.

HR.

H.S.

HT.

HTG.

HTR.

H.W.

HYD. HYDRAULIC

I

I.

I.D.

IN.

INSUL.

INT.

INV.

J

J.B.

J.C.

JCT.

JST.

JT.

K

K.

KIP.

KIT.

K.O.

K.P.

KV

KVA

KW

L

L.

LAB.

LAU.

LAV.

LBR.

LBS.

LD.

LG.

LIN.

L.H.

LNTL.

LONG.

L.PT.

LT.

LTG.

LT. WT.

LVR

M

M.

MACH.

MAGN.

MAR. T.

MAS.

MAT.

MAX.

MECH.

MEMB.

M.L.P.

MFR.

M.G.T.

MH.

MIN.

MIR.

MISC.

M.L.

MLDG.

M.O.

M.S.

M.T.

MTL.

MTD.

N

N

N.I.C.

NO.

NOM.

N.R.

N.T.S.

O

OBSC.

O.C.

O.D.

OFF.

OH.

OPNG.

OPP.

P

PC.

PERF.

PL.

PLAS.

PLAS. LAM.

PLWD.

PLBG.

PNL.

PORC.

PR.

PREFAB.

PREFIN.

PROJ.

PSF

PSI

PT.

P.T.D.

PTD.

PTN.

PVC

PVMT.

P.W.

Q

Q.T.

1/4 RD.

R

RSR.

R.A.

RAD.

R.B.

R.D.

RDGE.

RECP.

REF.

REG.

REF.

REINF.

REQD.

RESIL.

REV.

RFG.

RGE.

RGH.

R.H.

R.L.

RM.

R.

RPM

RUB.

S

S

S.B.

SCHD.

SECT.

S.D.

S.F.

SGFT. STRUCTURAL GLAZED

SHT.

SHTG.

SIM.

S.N.D. SANITARY NAPKIN

S.N.R. SANITARY NAPKIN

SPEC.

SPF.

SPL.

SQ.

S.S.M.R. STANDING SEAM METAL

S.S.

STD.

STGR.

STL.

STN.

STRUCT.

SUSP.

S.V.F.

SYM.

STA.

T

T.

T.B.

TEL.

TERR.

TEMP.

T.& G.

TH.

THK.

T.O. TOP OF

TR.

TYP.

U

U.C.

UG.

U.H.

U.L.

UNF.

U.O.N.

UR.

V

V

V.B.

V.C.T.

VERT.

VEST.

V.T.

V.T.R.

V.W.C.

W

W

W/

W.C.

WD.

WDW.

W.G.

W.I.

WK. PT.

WNSCT.

W/O

WP.

W.R.

WT.

W.W.F.

MISC

OF CUTTING PLANE

ARROW INDICATES DIRECTION

WALL SECTION

LETTER INDICATES

REFERENCE DRAWING NUMBER

ELEVATION

LETTER INDICATES

REFERENCE DRAWING NUMBER

DETAIL

LETTER INDICATES

REFERENCE DRAWING NUMBER

(DOOR TYPE AND DOOR NUMBER)

DOOR SYMBOL

BRICK

FINISH WOOD

WOOD FRAMING

EARTH/COMPACT FILL

POROUS FILL/GRAVEL

CONCRETE

CONCRETE BLOCK

ALUMINUM

STEEL/OTHER MATERIALS

WOOD BLOCKING

CONCRETE AND PAD

PLYWOOD

GLASS

BATT/LOOSE FILL INSULATION

SPRAY-APPLIED INSULATION

RIGID INSULATION

CERAMIC TILE

GYPSUM WALLBOARD

METAL LATH AND PLASTER

BRICK (ELEVATION)

CERAMIC TILE (ELEVATION)

CONCRETE/PLASTER (ELEVATION)

GLASS (ELEVATION)

SHEET METAL (ELEVATION)

B-B

A-XXX

BUILDING SECTION

LETTER INDICATES

REFERENCE DRAWING NUMBER

C

A-XXX

A

A-XXX

A

D1

A

B

A B

B R

E V

IA

T

IO

N

S A

N D

S Y

M B

O L

S

/0

/2

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S I

D

H U

N T

IN

G

T O

N D

IS

T

R

IC

T

T H

S T

R E

E T

H U

N T

IN

G

T O

N

W V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

BRICK

FINISH WOOD

WOOD FRAMING

EARTH/COMPACT FILL

POROUS FILL/GRAVEL

CONCRETE

CONCRETE BLOCK

ALUMINUM

STEEL/OTHER MATERIALS

WOOD BLOCKING

CONCRETE AND PAD

PLYWOOD

GLASS

BATT/LOOSE FILL INSULATION

SPRAY-APPLIED INSULATION

RIGID INSULATION

CERAMIC TILE

GYPSUM WALLBOARD

METAL LATH AND PLASTER

D .C

.R

T O ls e n

D .C

.R

T

O ls e n

A-001

ARCHITECTURAL ABBREVIATIONS AND GENERAL NOTES

ARCHITECTURAL MATERIAL SYMBOLS

PLAN VIEW

SECTION VIEW ELEVATION VIEW

STANDARDS.

AS WELL AS REGULATIONS, ORDINANCES, UTILITY PROVIDER REQUIREMENTS, AND SIMILAR

2021 NATIONAL FIRE PROTECTION - 101 (NFP-101)

2024 INTERNATIONAL RESIDENTIAL CODE (IRC)

1. CONTRACTOR SHALL PERFORM ALL WORK IN CONFORMANCE WITH:

(USACE) PROJECT MANAGER (PM) REGARDING THE STATUS OF INSPECTION.

CONTRACTOR MUST REGULARLY UPDATE OWNER AND US ARMY CORPS OF ENGINEERS

2. CONTRACTOR MUST OBTAIN ALL REQUIRED INSPECTIONS AND PERMITS OF THE WORK.

3. CONTRACTOR MUST COORDINATE WORK WITH APPLICABLE UTILITY PROVIDERS.

COMPLIANCE WITH REFERENCED FIRE-RATED ASSEMBLY TESTS AND STANDARDS.

4. CONTRACTOR MUST BE FAMILIAR WITH REQUIREMENTS AND CONSTRUCTION MUST BE IN

SEQUENCES OF CONSTRUCTION.

1. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE MEANS, METHODS, AND

PERSONNEL AND AUTHORIZED VISITORS AT THE SITE.

2. CONTRACTOR MUST BE SOLELY RESPONSIBLE FOR THE SAFETY OF ALL CONSTRUCTION

RESOLUTION PRIOR TO PROCEEDING WITH WITH WORK RELATED TO THE DISCREPANCY.

CONDITIONS SHALL BE REPORTED TO THE OWNER AND OR USACE PROJECT MANAGER FOR

WORK. ANY KNOWN DISCREPANCIES BETWEEN THE DOCUMENTS AND THE ACTUAL

3. CONTRACTOR MUST BECOME FULLY ACQUAINTED WITH CONDITION RELATED TO THE

CONTRACTOR MUST INSTALL NEW ITEMS.

CLEANING AND/OR REPAIR DOES NOT RETURN ITEMS TO ORIGINAL CONDITION

DAMAGE TO EXISTING ITEMS SOILED OR DAMAGED BY THE DEBRIS REMOVAL PROCESS. IF

ETC., PRIOR TO REMOVAL OF DEBRIS. CONTRACTOR MUST CLEAN AND REPAIR ANY

STAIRS AND ELEVATORS, REMOVAL OF WINDOWS, LOCATION OF CHUTES AND DUMPSTER,

RELATING TO REMOVAL OF TRASH, INCLUDING SUCH ISSUES AS PATH OF TRAVEL, USE OF

DEMOLITION DEBRIS. CONTRACTOR SHALL OBTAIN APPROVAL OF OWNER FOR DETAILS

4. CONTRACTOR MUST REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION AND

MAINTAINING A SECURE CONSTRUCTION SITE AND BUILDING.

5. CONTRACTOR MUST BECOME FAMILIAR WITH AND COMPLY WITH OWNER'S PROCEDURES FOR

INSTALLATION. INSTALLATION MUST SIGNIFY ACCEPTANCE OF THE CONDITIONS.

PROCEED UNTIL THE UNSATISFACTORY CONDITIONS SHALL BE CORRECTED PRIOR TO

EXIST WHICH WILL HAVE A DETRIMENTAL EFFECT ON THE QUALITY OF THE INSTALLATION.

WHICH AFFECT THE QUALITY OF EACH PRODUCT TO BE INSTALLED. IF ANY CONDITIONS

6. EACH INSTALLER MUST EXAMINE SUBSTRATE CONDITIONS AND/OR SITE CONDITIONS

7. CONTRACTOR MUST MAINTAIN RECORD DRAWINGS AT ALL TIMES.

SUBCONTRACTORS.

8. CONTRACTOR MUST BE RESPONSIBLE FOR ENSURING COORDINATION EFFORTS OF ALL

QUESTION.

BE REPORTED TO USACE FOR RESOLUTION PRIOR TO PROCEEDING WITH THE WORK IN

9. CONTRACTOR MUST LAY OUT ALL WORK AS SOON AS POSSIBLE. ANY DISCREPANCIES MUST

GENERAL NOTES:

ADMINISTRATION OF THE WORK:

ARCHITECTURAL GENERAL NOTES:ARCHITECTURAL SYMBOLS

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

29'-0"

'-0

29'-0"29'-0"

2'-0" 14'-0" 6'-4" 3'-4" 3'-4"

'-0

2'- 0"

8'- 0"

2'- 0"

X-101

X-101

X-101

X-101

X-101

X-101

OVERHEAD

DOOR

HOUSING

OVERHEAD

DOOR

HOUSING

EXPANSION JOINT

29'-0"

5'-6" 6'-0" 6'-0" 6'-0" 5'-6"

'-0

6'- 0"

6'- 0"

1X4 PENDENT

LIGHT (TYP)

ROLL-UP DOOR

HOUSING (TYP)

CONCRETE

LINTEL

PRESSURE TREATED

PRE-ENGINEERED

WOOD FRAMING @ 2'-0

O.C.

8" SPLIT FACED CMU

BELOW

OVERHANG FRAMING

(TYP)

6" PREFINISHED

FASCIA (TYP)

31'-0"

'-3

STANDING SEAM

METAL ROOF

5/12 SLOPE

5/12 SLOPE

RIDGE VENT

6" PREFINISHED

METAL GUTTER

SCALE: 1/4''=1'-0''A1 FIRST FLOOR PLAN

SCALE: 1/4''=1'-0''H1 REFLECTED CEILING PLAN

SCALE: 1/4''=1'-0''A11 TRUSS FRAMING PLAN

SCALE: 1/4''=1'-0''H11 ROOF PLAN

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

H U

N

TI

N G

TO

N

D

IS

TR

IC

T

EI

G H

TH

S

TR

EE

T H

U N

TI

N

G

TO

N , W

V

/0

7/

SD

1.

dw g

AN

SI

D

LO

W

ER

M

U D

R

IV

ER

M

IL

TO

N , W

V

FL

O O

D R

IS

K

M

AN

AG

EM

EN

T

ST

O

P

LO

G B

U

IL

D

IN

G

R . H

U N

SI

C

KE

R

T.

O

LS

EN

T.

O

LS

EN

C . C

H

AN

D

LE

R

FL

O O

R P

LA

N

, R C

P

PL

AN

, F

R

AM

IN

G

P

LA

N A

N D

R O

O F

PL

AN

A-101C

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

/0

/2

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S I

D

H U

N T

IN

G

T O

N D

IS

T

R

IC

T

T H

S T

R E

E T

H U

N T

IN

G

T O

N

W V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

D .C

.R

T

O ls e n

D .C

.R

T

O ls e n

ROOF PLAN JOHNS BRANCH

C

LEGEND

SHEET KEY NOTES

ROOF SLAB REINFORCEMENT

SEE STRUCTURAL DRAWINGS FOR CONCRETE FLOOR, WALL AND 3.

AND ELECTRICAL DRAWINGS.MECHANICAL SHOWN ON

MECHANICAL AND ELECTRICAL FIXTURES SHALL BE LOCATED WHERE 2.

EXTERIOR DIMENSIONS SHOWN ARE TO OUTSIDE OF CONCRETE1.

GENERAL NOTES

NORTH

4 5

SCALE 1/4" = 1'-0"

SLOPE: 1/4:12

SLOPE: 1/4:12

AND 2 LAYERS 2.4 INCH THICK POLYISO INSULATION. SEE DETAIL

FULLY ADHERED 90 MIL REINFORCED EPDM ROOF OVER COVER BOARD 12.

WALL MOUNTED VENTILATORS. SEE MECHANICAL11.

ENTRY ROOF CANOPY. SEE DETAIL10.

PUMP FRAME INSTALLED. SEE DOOR SCHEDULE

CLEAR OPENING 12 INCHES WIDER IN WIDTH AND LENGTH THAN THE

LOCATE FRAME OPENING CENTERED ON PUMP FRAME BELOW WITH A

ALUMINUM INSULATED ROOF HATCH WITH DOUBLE OUTSWING DOORS 9.

INTERMEDIATE HORIZONTAL RAIL AT 21 INCHES ABOVE ROOF SURFACE

INTERIOR PERIMETER OF ENTIRE ROOF. PROVIDE ANCHORAGE AND

42 INCH HIGH GUARDRAILS FOR BOTH OPEN ENDS OF HATCHES AND8.

2 PER OSHA AND ANSI STANDARDS AND CERTIFICATION

WORKERS WITH A LOAD OF 5000 LBS. EACH WITH A SFETY FACTOR OF

GALVANIZED STEEL ROOF ANCHOR CAPABLE OF SUPPORTING 2 ROOF 7.

30 INCH SQUARE ROOF WALKPADS6.

SEE EXTERIOR ELEVATIONS.

WALL MOUNTED EXTERIOR LED FIXTURES AT 8'-0" A.F.F. 5.

FIXED ROOF ACCESS LADDER. SEE DETAIL4.

SEE DETAIL & MECHANICAL DRAWINGS

PLUMBING VENT, (VTR). LOCATE MINIMUIM 12 INCHES FROM ROOF CURB3.

6 INCH SQUARE, .032 INCH THICK ANODIZED ALUMINUM DOWNSPOUT.2.

SLOPE 1/2:120 MINIMUM

6 INCH SQUARE, .032 THICK ANODIZED ALUMINUM GUTTER1.

D6

D6

D6

R O

O F

P L

A N

J O

H N

S P

U M

P S

T A

T

IO

N

A103b

C

A303

C

A-201b

D

A304

D

A201b

B

A201b

D

A304

A

A201b

C

A303

11 11

22'

4'-6"

22'

12'-4"2'-8"7'

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

TOP OF CMU

TOP OF SLAB

E.L. 11'-4"

E.L. 0'-0"

STANDING SEAM

METAL ROOF

6" PREFINISHED

GUTTER

6" PREFINISHED METAL

WRAPPED FASCIA

SPLIT -FACED CMU

4" PREFINISHED

METAL TRIM

4" VINYL SIDING

ROLL-UP METAL

DOOR

CONCRETE

FOUNDATION

WALL

8'- 8"

TOP OF CMU

TOP OF SLAB

E.L. 11'-4"

E.L. 0'-0"

STANDING SEAM

METAL ROOF

6" PREFINISHED

GUTTER

6" PREFINISHED METAL

WRAPPED FASCIA

SPLIT -FACED CMU

ROLL-UP METAL

DOOR

CONCRETE

FOUNDATION

WALL

INSULATED

METAL

DOOR

9'- 0"

7'- 4"

TOP OF CMU

TOP OF SLAB

E.L. 11'-4"

E.L. 0'-0"

STANDING SEAM

METAL ROOF

6" PREFINISHED

GUTTER

6" PREFINISHED METAL

WRAPPED FASCIA

SPLIT -FACED CMU

4" PREFINISHED

METAL TRIM

4" VINYL SIDING

CONCRETE

FOUNDATION

WALL

TOP OF CMU

TOP OF SLAB

E.L. 11'-4"

E.L. 0'-0"

STANDING SEAM

METAL ROOF

6" PREFINISHED

GUTTER

6" PREFINISHED METAL

WRAPPED FASCIA

SPLIT -FACED CMU

CONCRETE

FOUNDATION

WALL

SCALE: 1/4''=1'-0''B1 FRONT ELEVATION

SCALE: 1/4''=1'-0''H1 LEFT SIDE ELEVATION

SCALE: 1/4''=1'-0''B11 BACK ELEVATION

SCALE: 1/4''=1'-0''H11 RIGHT SIDE ELEVATION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

H U

N

TI

N G

TO

N

D

IS

TR

IC

T

EI

G H

TH

S

TR

EE

T H

U N

TI

N

G

TO

N , W

V

/0

7/

SD

1.

dw g

AN

SI

D

LO

W

ER

M

U D

R

IV

ER

M

IL

TO

N , W

V

FL

O O

D R

IS

K

M

AN

AG

EM

EN

T

ST

O

P

LO

G B

U

IL

D

IN

G

R . H

U N

SI

C

KE

R

T.

O

LS

EN

T.

O

LS

EN

C . C

H

AN

D

LE

R

EL

EV

AT

IO

N

S

A-201C

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

R

IM

D C

E A

U D

IT

H1ECXJBF

E.L. 11'-4"

E.L. 0'-0"

'-5

STANDING SEAM

METAL PANEL

3/4" WOOD

SHEATHING

PRE-ENGIEERED

WOOD TRUSS

8" SPLIT-FACED CMU

CONCRETE FOUNDATION

PREFINISHED METAL

WRAPPED FASCIA

PREFINISHED METAL

SOFFIT

RIDGE VENT

TOP OF CMU

TOP OF SLAB

E.L. 11'-4"

E.L. 0'-0"

STANDING SEAM

METAL PANEL

3/4" WOOD

SHEATHING

PRE-ENGIEERED

WOOD TRUSS

8" SPLIT-FACED CMU

W/ REINFORCEMENT

CONCRETE FOUNDATION

PREFINISHED METAL

WRAPPED FASCIA

PREFINISHED METAL

SOFFIT

RIDGE VENT

3/4" WOOD

SHEATHING

W/ VINYL SIDING

ROLL-UP

COILING DOOR

SPLIT-FACED CMU

BOND BEAM

8" SPLIT-FACED CMU

BOND BEAM

1X6 PRESSER

TREADED TOP PLATE

SCALE: 1/4''=1'-0''A8 BUILDING SECTION

SCALE: 1/4''=1'-0''G8 LONGITUDINAL SECTION

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

SU

BM

IT

TE

D B

Y:

C H

EC

KE

D B

Y:

D R

AW

N

B Y:

D

ES

IG

N

ED

B

Y:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

IS

SU

E D

AT

E:

SI

ZE

M

AR

K

D

ES

C R

IP

TI

O N

D

AT

E

SHEET ID

US Army Corps of Engineers

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

H U

N

TI

N G

TO

N

D

IS

TR

IC

T

EI

G H

TH

S

TR

EE

T H

U N

TI

N

G

TO

N , W

V

/0

7/

SD

1.

dw g

AN

SI

D

LO

W

ER

M

U D

R

IV

ER

M

IL

TO

N , W

V

FL

O O

D R

IS

K

M

AN

AG

EM

EN

T

ST

O

P

LO

G B

U

IL

D

IN

G

R . H

U N

SI

C

KE

R

T.

O

LS

EN

T.

O

LS

EN

C . C

H

AN

D

LE

R

BU

IL

D

IN

G

S

EC

TI

O

N S

A-301C

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

/0

/2

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S I

D

H U

N T

IN

G

T O

N D

IS

T

R

IC

T

T H

S T

R E

E T

H U

N T

IN

G

T O

N

W V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

D .C

.R

T O ls e n

D .C

.R

T O ls e n

LEGEND

SHEET KEY NOTES

GENERAL NOTES

T. O. CONCRETE

ELEV. +17.33

FIN. FLOOR

ELEV. 0.00

B U

IL

D

IN

G

S E

C T

IO

N

S

N E

W M

A N

S P

U M

P S

T A

T

IO

N

A302

FIN. FLOOR

ELEV. - 12.89

B

BUILDING SECTION - NEWMAN'S BRANCH

SCALE 1/4" = 1'-0"

EXIT

RESTROOM

ROOF SLAB REINFORCEMENT

SEE STRUCTURAL DRAWINGS FOR CONCRETE FLOOR, WALL AND 3.

AND ELECTRICAL DRAWINGS.MECHANICAL SHOWN ON

MECHANICAL EUIPMENT AND ELECTRICAL FIXTURES SHALL BE LOCATED WHERE 2.

REFER TO CIVIL DRAWINGS FOR EXTERIOR CONCRETE FLATWORK.1.

CONCRETE FOUNDATION WITH PIER FOOTINGS, SEE STRUCTURAL15.

INLET GATE, SEE MECHANICAL DRAWINGS14.

TRASH RACK, SEE MECHANICAL DRAWINGS13.

ELECTRIC GATE OPERATOR, SEE MECHANICAL DRAWINGS12.

SEE DETAIL.

3'-6' SQUARE ACCESS HATCH TO FIXED LADDER AND SUMP AREA.11.

PANEL SEPARATE PANELS 6 INCHES APART. SEE ELECTRICAL DRAWINGS.

FROM ADJACENT WALL. CONCRETE PAD TO EXTEND 4 INCHES IN FRONT OF

ELECTRICAL EQUIPMENT ON 6 INCH HIGH CONCRETE PADS, CABINET 6 INCHES 10.

8 INCH THICK CONCRETE WALL, SEE STRUCTURAL DRAWINGS9.

SUSPENDED LUMINAIRE SEE ELECTRICAL DRAWINGS8.

SLOPE 1/2:120 MINIMUM

6 INCH SQUARE, .032 THICK ANODIZED ALUMINUM GUTTER7.

AND 2 LAYERS 2.4 INCH THICK POLYISO INSULATION. SEE DETAIL

FULLY ADHERED 90 MIL REINFORCED EPDM ROOF OVER COVER BOARD 6.

INTERMEDIATE HORIZONTAL RAIL AT 21 INCHES ABOVE ROOF SURFACE

INTERIOR PERIMETER OF ENTIRE ROOF. PROVIDE ANCHORAGE AND

42 INCH HIGH GUARDRAILS FOR BOTH OPEN ENDS OF HATCHES AND5.

PUMP INLET SEE MECHANICAL DRAWINGS 4.

DISCHARGE PIPE SEE MECHANICAL DRAWINGS3.

PUMP MOTOR SEE MECHANICAL DRAWINGS2.

PUMP FRAME INSTALLED. SEE DOOR SCHEDULE

CLEAR OPENING 12 INCHES WIDER IN WIDTH AND LENGTH THAN THE

LOCATE FRAME OPENING CENTERED ON PUMP FRAME BELOW WITH A

ALUMINUM INSULATED ROOF HATCH WITH DOUBLE OUTSWING DOORS 1.

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

/0

/2

S O

L

IC

IT

A

T

IO

N N

O

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

A

M A

R K

S I Z

E

S U

B M

IT

T

E D

B Y

D A

T E

C O

N T

R A

C T

N O

C

H E

C K

E D

B Y

D R

A W

N B

Y

IS

S

U E

D A

T E

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S I

D

H U

N T

IN

G

T O

N D

IS

T

R

IC

T

T H

S T

R E

E T

H U

N T

IN

G

T O

N

W V

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

F L

O O

D R

IS

K

M A

N A

G E

M E

N T

D .C

.R

D .C

.R

LEGEND

SHEET KEY NOTES

GENERAL NOTES

T. O. CONCRETE

E…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .