Subset of 60 percent Plans for Industry Days_Part 1B.pdf

PDF 39 MB Posted

Attached to
Lower Mud River FRM Project, Milton, WV-Huntington District, USACE
Solicitation number
W91237-25-SB-SN03
Issued by

About this file

These are draft 60% design plans for the Lower Mud River Flood Risk Management (FRM) Project located in Milton, West Virginia, prepared for the U.S. Army Corps of Engineers Huntington District. The multi-phase design documents include detailed erosion and sediment control plans, grading plans, line of protection plans, drainage system layouts, and site plans covering approximately 183 linear stations along the Mud River. Key project components include constructing an earthen levee with stone slope protection, multiple box culverts, pump stations, channel modifications, access roads, drainage systems, utility relocations, and a stoplog storage building with a closure structure. The plans show detailed grading, drainage swales, ponding areas, and infrastructure modifications across multiple project phases, with specific attention to managing flood risks and maintaining site drainage while minimizing environmental impact.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W

CB

CB

CB

CB

TR

TR

TR

CB

CB

S

S

X J

X J

X J

X J

X J

X J

TRTR

X J

20+00

14+00

15+00

16+00

20+

21+00

22+00

23+00

24+00

C M

C M

C M

C M

13+00

CM

14+00

CM

15+00

CM

16+00

C M

C M

C M

C M

C M

C M

C M

L P

L P

L P

L P

L P

L P

0 L P

0 L P

0 L

P

L P

L P

L P

L P

A N

S I

D

M

IL

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

E

R

H U

N T

IN

G

T O

N W

E S

T V

IR

G

IN

IA

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

IC

T

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG804

W M

G

J B

F

M L

T N

W V

C

G

.d g n

N A

SSF

SF

C

CE

CC

DB

DD

F

LO

W

FLOW

F L

O W

FLOW

FLOW

FLOW

F L

O W

F

LO

W

FL

OW

F L O

W

FLOW

FLOW

FLOW

FLOW

F L

O W

F L O

W

F L O

W

F L O

W

FLOW

FLOW

F

LO

W

F L O

W

FL

O

W

FLOW

N

FL

OW

MUD

IV

ER

A B

B O

T T L

A N

E

RAILROAD

BORROW AREA

1 EAST

BORROW AREA

1 EAST

BORROW AREA 1 WEST

G A

B L E D

R

IV

E

YESTERDAY

DELIVERY

SERVICE

RAILROAD

SSF

SSF

SF

SF

CC

C

CE

SSF

DC

DD

DD

CC

C

LIMITS (LWL-L)

LIMITED WORK

LIMITS (LWL-I)

LIMITED WORK

LIMITS (LWL-K)

LIMITED WORK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 1

1"=100'SCALE: 100' 200'0

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

CULVERT CROSSING

CONSTRUCTION ENTRANCE

CULVERT

DIVERSION DITCH

DIVERSION BERM

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND KEY

NOTES

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE INSPECTED

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24 HOURS

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

ESTABLISH THE PROPOSED BMP CONTROLS PRIOR TO BREAKING GROUND.

THE INTENT OF THE PHASE 1 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE CONTRACTOR TO

H1ECXJBF

Text Box

DRAFT ONLY FOR INDUSTRY DAY

Z 576.840

640670

W.E. 557.1

W.E. 557.1

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG805

W M

G

J

M L

T N

W V

C

G

.d

C

CC

DB

DD

N

F L

O W

F L O

W

FLOW FLOW

FL

O

W

F L

O W

FLOW

FL

OW

FL

O

W

FLO

W

FLOW

F L O

W

F L O

W

FLOW

FL

OW

FLOW

F L O

W

FL

O

W

FLO

W

FLOW

FLOW

FL

O W

FL

O

W

FLOW

F L

O W

F L

O W

F L O

W

BORROW AREA 5

FL

IVER

PRICHARD ROAD

RAILROAD

WORK LIMITS

CONTRACTOR

DB

DD

DD

DB

SSF

CC

C

SSF

SSF

SSF

SSF

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 1

1"=100'SCALE: 100' 200'0

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

KEY

CULVERT CROSSING

CULVERT

DIVERSION DITCH

DIVERSION BERM

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND

NOTES

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

ESTABLISH THE PROPOSED BMP CONTROLS PRIOR TO BREAKING GROUND.

THE INTENT OF THE PHASE 1 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE CONTRACTOR TO

H1ECXJBF

N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG806

W M

G

J

M L

T N

W V

C

G

.d

C

DB

DD

CC

N

F L O

W

FLO

W

F L O

W

FLOW

FLOW

F L

O W

F L O

W

FL

OW

FL

OW

FL

OW

F

LO

W

FLOW

F L O

W

FL

OW

FLOW

F L O

W

F L O

W F

L O

W

PRICHARD ROAD

Y A T E S C

R O

S S

IN

G R

O A

D

BORROW AREA 5

FLOW

MUD

R

IVER

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

SSF

SSF

SSF

CC

C

DB

DD

CE

DD

DB

LIMITS (LWL-M)

LIMITED WORK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 1

1"=100'SCALE:

100' 200'0

CHANNEL CULVERT CROSSING

CULVERT

DIVERSION DITCH

DIVERSION BERM

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE HEIGHT

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

ESTABLISH THE PROPOSED BMP CONTROLS PRIOR TO BREAKING GROUND.

THE INTENT OF THE PHASE 1 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE CONTRACTOR TO

NOTES

H1ECXJBF

S

C O

N C

R E T E

D R

A

IN

B

IL

L B

O A

R D

D

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG807

W M

G

J

M L

T N

W V

C

G

.d

DB

DD

SSF

SF

C

CE

S

MH

N

BORROW AREA 3

KILGORE CREEK ROAD

FLOW

KILGORE CREEK

F L

O W

K

IL

G O

C

E

E K

ACCESS ROAD

CONTRACTOR

INTERSTATE

CE

SSF

SF

SSF

SSF

MH

C

C

S

DD

DC

F L O

W

F L O

W

F L O

W

F L O

W

MH

S

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

MANHOLE

SKIMMER

CONSTRUCTION ENTRANCE

CULVERT

SILT FENCE

SUPER SILT FENCE

DIVERSION DITCH

DIVERSION BERM

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND KEY

NOTES

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

CONTROLS DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

THE INTENT OF THE PHASE 2 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP

H1ECXJBF

X J

S

CB

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L S

CG808

W M

G

J

M L

T N

W V

C

G

.d

SSF

SF

C

CE

S

MH

OP

RC

FS

BORROW AREA 2

M

E R

F L

O W

FLOW

FL

O

W

FLOW

F L O

W

FL

O

W

F L O

W

C

SSF

SSF

CE

G E

O R

G

IA

A

V E

N U

E

TP

N

FS

SSF

SSF

SSF

RC

C

CE

M A

T C

H L

IN

E

S

E E

S H

E E

T C

S

SF

OP

BERM

LINE OF PROTECTION�

(LWL-N)

LIMITS

LIMITED WORK

LIMITS (LWL-C)

LIMITED WORK

SMH

C

S

MH

PROTECTION

STONE SLOPE

PROTECTION

STONE SLOPE

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

LEGEND

KEY

RIVER CROSSING

OUTLET PROTECTION

MANHOLE

SKIMMER

CONSTRUCTION ENTRANCE

CULVERT

FILTER SOCK

SILT FENCE

SUPER SILT FENCE

DIVERSION DITCH

DIVERSION BERM

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

NOTES

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

CONTROLS DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

THE INTENT OF THE PHASE 2 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP

H1ECXJBF

TR

CB

CB

CB

TR

S

CB

CB

TR

CB

S

S

CB

TR

CB

CB

CB

S

CB

CB

S

CB

CB

CB

S

S

CB

CB

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG809

W M

G

J

M L

T N

W V

C

G

.d

SSF

SF

C

CE

IP

OP

TP

DIP

FS

N

SSF

SSF

SSF

FS

FS

TP

CE

CE

CE

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

DIP

DIP

FS

BERM

LINE OF PROTECTION�

(LWL-D)

LIMITED WORK LIMITS

(LWL-F)

LIMITED WORK LIMITS

MUD RIVER

FLOW

SSF

SSF

SSF

SSF

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

KEYLEGEND

DROP INLET PROTECTION

OUTLET PROTECTION

INLET PROTECTION

CONSTRUCTION ENTRANCE

CULVERT

FILTER SOCK

SILT FENCE

SUPER SILT FENCE

DIVERSION DITCH

DIVERSION BERM

TREE PROTECTION

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

CONTROLS DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

THE INTENT OF THE PHASE 2 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP

NOTES

ENTERING STORM WATER SYSTEMS.

INSPECTED FOR EVIDENCE OF OR POTENTIAL FOR POLLUTANTS

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE

HEALTHY GROWTH.

MEASURES MUST BE INSPECTED FOR BARE SPOTS, WASHOUTS, AND

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION

IN THE GROUND.

FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY

TEARS, ETC. TO SEE IF THE FABRIC IS SECURELY ATTACHED TO THE

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT,

H1ECXJBF

S

S

TR

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N S

CG810

W M

G

J

M L

T N

W V

C

G

.d

SSF

SF

C

CE

OP

IP

CC

DIP

RC

BORROW

AREA 1 EAST

FLOW

FLOW

DD

DB

CE

SSF

RC

C

N

M A T

C H

L

IN

E S

E E S

H E

E T C

G

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

SF

SSF

SSF

OP

IP

IP

CE

RF

DIP

DIP

DIP

LIMITS (LWL-J)

LIMITED WORK

LIMITS (LWL-I)

LIMITED WORK

LIMITS (LWL-H)

LIMITED WORK

LIMITS (LWL-G)

LIMITED WORK

B

IL

L B

LE

N K O D

R

IV

E

C

M

E R

F

LO

W

CE

CC

SSF

SSF

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

NOTES

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES THE FOLLOWING INSPECTION AND

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP CONTROLS

THE INTENT OF THE PHASE 2 EROSION &

LEGEND

KEY

CULVERT

FILTER SOCK

SILT FENCE

SUPER SILT FENCE

DIVERSION DITCH

DIVERSION BERM

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND KEY

INLET PROTECTION

OUTLET PROTECTION

ENTRANCE

CONSTRUCTION

LEGEND KEY

RIVER CROSSING

DROP INLET PROTECTION

CULVERT CROSSING

H1ECXJBF

CB

CB

CB

TR

TR

TR

CB

CB

S

X J

X J

X J

X J

X J

TRTR

X J

L P

L P

L P

L P

L P

L P

0 L P

0 L P

0 L

P

L P

L P

L P

L P

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG811

W M

G

J

M

L T

N W

V C

G .d

SSF

SF

C

CE

S

MH

IP

N

BORROW

AREA 1 EAST

BORROW AREA 1 WEST

BORROW

AREA 1 EAST

SSF

SSF

DD

DB

DB

DD

CE

FL

OW

UD

ER

FLOW

FLOW

FLOW

FLOW

FLOW

FLOW

FLOW

FLOW

FLOW

FLOW

S

C

CS

IP

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

CE

SSF

SSF

LINE OF PROTECTION�

BERM

LIMITS (LWL-L)

LIMITED WORK

LIMITS (LWL-I)

LIMITED WORK

A B

B O

T T L

A N

E

MH

MH

BERM

BERM

MH

MH

S

S

C

C

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

LEGEND

KEY

INLET PROTECTION

MANHOLE

SKIMMER

CONSTRUCTION ENTRANCE

CULVERT

SILT FENCE

SUPER SILT FENCE

DIVERSION DITCH

DIVERSION BERM

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

CONTROLS DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

THE INTENT OF THE PHASE 2 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP

NOTES

H1ECXJBF

640670

W.E. 557.1

W.E. 557.1

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

CC

DB

DD

S

M W

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG812

W M

G

J

M L

T N

W V

C

G

.d

MH

BORROW AREA 5

BORROW AREA 5

PRI

CHARD

RO

AD

RAILROAD

FLOW

MUD RIVER

RF

C

C

CC

DD

DB

DD

DB

C

RF

SSF

SSF

SSF

F L O

W

FLOW

F

LO

W

F

LO

W

FLOW

F L O

W

FLOW

F

LO

W

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

MH

MH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

KEY

MANHOLE

SKIMMER

CULVERT CROSSING

CULVERT

DIVERSION DITCH

DIVERSION BERM

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

CONTROLS DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

THE INTENT OF THE PHASE 2 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP

NOTES

H1ECXJBF

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

CC

DB

DD

S

M W

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N S

CG813

W M

G

J

M L

T N

W V

C

G

.d

MH

FL

ER

PRICHARD ROAD

S A

M P B

R A

N C

H R

O A

D

B L A

C K H

O L L O

W R

O A

D

Y A T E S C

R O

S S

IN

G R

O A

D

BORROW AREA 5

BORROW AREA 5

DD

DB

DD

DB

S

C

C

CC

S

C

CE

SSF

SSF

FLO

W

FL

O

W

FLOW

FL

O

W

FLO

W

FLOW

LIMITS (LWL-M)

LIMITED WORK

MH

MH

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

EROSION AND SEDIMENT CONTROL PHASE 2

1"=100'SCALE: 100' 200'0

KEY

MANHOLE

SKIMMER

CULVERT CROSSING

CULVERT

DIVERSION DITCH

DIVERSION BERM

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

LEGEND

NOTES

POTENTIAL FOR POLLUTANTS ENTERING STORM WATER SYSTEMS.

6. DISTURBED AREAS AND MATERIALS STORAGE AREAS MUST BE INSPECTED FOR EVIDENCE OF OR

INSPECTED FOR BARE SPOTS, WASHOUTS, AND HEALTHY GROWTH.

5. TEMPORARY AND PERMANENT SEEDING AND ALL OTHER STABILIZATION MEASURES MUST BE

THE GROUND.

SECURELY ATTACHED TO THE FENCE POSTS, AND TO SEE THAT THE FENCE POSTS ARE SECURELY IN

4. SILT FENCES MUST BE INSPECTED FOR DEPTH OF SEDIMENT, TEARS, ETC. TO SEE IF THE FABRIC IS

HEIGHT OF THE FENCE.

3. BUILT UP SEDIMENT MUST BE REMOVED FROM SILT FENCE WHEN IT HAS REACHED ONE-THIRD THE

ARE FOUND TO BE NECESSARY, THEY MUST BE INITIATED WITHIN 24 HOURS.

2. ALL MEASURES MUST BE MAINTAINED IN GOOD WORKING ORDER; IF REPAIRS OR OTHER MEASURES

HOURS AFTER ANY STORM EVENT GREATER THAN 1/4 INCH OF RAIN PER 24 HOUR PERIOD.

1. ALL CONTROL MEASURES MUST BE INSPECTED EVERY SEVEN (7) CALENDAR DAYS AND WITHIN 24

SEDIMENT CONTROLS AND STABILIZATION MEASURES.

THE FOLLOWING INSPECTION AND MAINTENANCE PRACTICES MUST BE USED TO MAINTAIN EROSION AND

MAINTENANCE PROCEDURES FOR EROSION CONTROL DEVICES

WORKBENCH FOR BENTONITE CUTOFF WALL HAS BEEN CONSTRUCTED).

CONTROLS DURING PEAK LAND DISTURBANCE (BORROW SITES HAVE BEEN FULLY EXCAVATED AND LEVEE

THE INTENT OF THE PHASE 2 EROSION & SEDIMENT CONTROL PLANS ARE FOR THE PROPOSED BMP

H1ECXJBF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

A1

EROSION AND SEDIMENT CONTROL PHASE 3

1"=100'SCALE: 100' 200'0

LEGEND

GRAVEL

TURF GRASS SEEDING

MITIGATION AREA

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

KEY

SSF

SF

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG103.

2. PERMANENT SEEDING SHALL BE PLACED ON ALL LAND DISTURBANCE.

SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF CONSTRUCTION TO THE WV DEP.

REQUIRED TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL PLANS, THE CONTRACTOR IS REQUIRED TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS

PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL NPDES CONSTRUCTION STORMWATER PERMIT.

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN THE CONSTRUCTION

KEY NOTES

M W

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG814

W M

G

J

M L

T N

W V

C

G

.d

S

D

B R

U S

H

B R

U S

H

B R

U S

H

B R

U S

H

C O

N C

R E T E

D R

A

IN

B

IL

L B

O A

R D

N

BORROW AREA 3

MITIGATION

ENVIRONMENTAL

MITIGATION

ENVIRONMENTAL

SSF

SSF

SSF

WORK LIMITS

CONTRACTOR

LIMITS (LWL-A)

LIMITED WORK

LIMITS (LWL-B)

LIMITED WORK

SSF

SF

F L O

W

K

IL

G O

R E

INTERSTATE

Y=1650127.622

X=520980.793

KILGORE CREEKFLOW

C R E E

K

H1ECXJBF

J

S

CB

BORROW AREA 2

F L

O W

M

E R

LINE OF PROTECTION�

ROAD

EAST ACCESS

EAST ACCESS RAMP

DRAINAGE

EASTERN

PUMP STATION

JOHNS BRANCH

OUTLET CHANNEL

JOHNS BRANCH

G E

O R

G

IA

A

V E

N U

E

84 LUMBER

APPALACHIAN

POWER

MOHR'S TIRES

FARM

ACCESS ROAD

MAINTANENCE

(LWL-C)

LIMITED WORK LIMITS

M A

T C

H L

IN

E

S

E E

S H

E E

T C

S

SSF

FS

SSF

JOHNS BRANCH

PONDING AREA

IP

OP

SSF

PROTECTION

STONE SLOPE

MODIFICATION

CHANNEL

LIMITS (LWL-N)

LIMITED WORK

TP

WORK LIMITS

CONTRACTOR

MITIGATION

ENVIRONMENTAL

SSF

PROTECTION

STONE SLOPE

PROTECTION

STONE SLOPE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N

W V

M U

D R

IV

N T

IN

G

T O

N

W E

S T

V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

1"=100'SCALE: 100' 200'0

M W

C

S H

E E

T

O F

P

H A

S E

E

R O

S

IO

N A

N D

S E

D

IM

E N

T C

O N

T R

O L P

L A

N

CG815

W M

G

J

M L

T N

W V

C

G

.d

KEY NOTES

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG103.

2. REFER TO ENVIRONMENTAL MITIGATION PLANS FOR PROPOSED PLANTINGS.

CONSTRUCTION TO THE WV DEP.

PLANS, SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF

TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL

TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS REQUIRED

NPDES CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR IS REQUIRED

THE CONSTRUCTION PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN

LEGEND

GRAVEL

CONCRETE

FLOODPLAIN SEEDING

TURF GRASS SEEDING

LEVEE TURF GRASS SEEDING

OUTLET PROTECTION

INLET PROTECTION

FILTER SOCK

TREE PRESERVATION

SILT FENCE

SUPER SILT FENCE

MITIGATION AREA

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

KEY

SSF

SF

IP

OP

TP

FS

H1ECXJBF

TR

CB

CB

CB

TR

S

CB

CB

CB

S

S

CB

TR

CB

CB

S

CB

S

CB

CB

S

CB

CB

CB

S

S

CB

CB

� LINE OF PROTECTION

MAINTANENCE ACCESS ROAD

ROAD

EAST ACCESS

JOHNS BRANCH

PONDING AREA

DAMON AVENUE

PONDING AREA

MILTON PLAZA

CHANNEL RELOCATION

DRAINAGE AREA

DAMON AVENUE

B

IL

L B

L E

N K

O D

R

IV

RI

VER

CONTRACTOR WORK LIMITS

(LWL-C)

LIMITED WORK LIMITS

SSF

SSF

PROTECTION

STONE SLOPE

STONE SLOPE PROTECTION

FSFS

LIMITS (LWL-F)

LIMITED WORK

(LWL-D)

LIMITED WORK LIMITS

MODIFICATION

CHANNEL

MODIFICATION

CHANNEL

MODIFICATION

CHANNEL

PROTECTION

STONE SLOPE

TP

SSF

PROTECTION

STONE SLOPE

FS

MITIGATION

ENVIRONMENTAL

DIP

DIP

DIP

FLO

W

SSF

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N

W V

M U

D R

IV

N T

IN

G

T O

N

W E

S T

V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

1"=100'SCALE: 100' 200'0

M W

C

S H

E E

T

O F

P

H A

S E

E

R O

S

IO

N A

N D

S E

D

IM

E N

T C

O N

T R

O L P

L A

N

CG816

W M

G

J

M L

T N

W V

C

G

.d

T C

H L

IN

E

, S E

E S

H E

E T

C G

7M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

KEY NOTES

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG103.

2. PERMANENT SEEDING SHALL BE PLACED ON ALL LAND DISTURBANCE.

CONSTRUCTION TO THE WV DEP.

PLANS, SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF

TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL

TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS REQUIRED

NPDES CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR IS REQUIRED

THE CONSTRUCTION PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN

LEGEND KEY

OUTLET PROTECTION

INLET PROTECTION

ENTRANCE

CONSTRUCTION

FILTER SOCK

TREE PRESERVATION

SILT FENCE

SUPER SILT FENCE

MITIGATION AREA

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

SSF

SF

CE

IP

OP

TP

FS

GRAVEL

CONCRETE

FLOODPLAIN SEEDING

TURF GRASS SEEDING

LEVEE TURF GRASS SEEDING

DROP INLET PROTECTION

LEGEND KEY

DIP

H1ECXJBF

CBCB

CB CB

CB CB

S

CB

CB

CB

CB

CB

TR

LINE OF PROTECTION�

DRIVE ACCESS ROAD

RIVERS EDGE

DRIVE ACCESS RAMP

RIVERS EDGE

BORROW AREA

1 EAST

N

LAGOON EXCAVATION

NEWMANS BRANCH

PONDING AREA

SYSTEM

DRAINAGE

WESTERN

SSF

SSF

SSF

SSF

SSF

SSF

PROTECTION

STONE SLOPE

PROTECTION

STONE SLOPE

PUMP STATION

NEWMANS BRANCH

LINE OF PROTECTION�

IPOP

IP

(LWL-J)

LIMITED WORK LIMITS

(LWL-I)

LIMITED WORK LIMITS

(LWL-H)

LIMITED WORK LIMITS

(LWL-G)

LMITED WORK LIMITS

ER

FL

OW

H

IG

H L A

W N A

V E

N U

E

BI

LL

B

LE

N

KO

D

R

IV

E

CHANNEL MODIFICATION

CHANNEL MODIFICATION

MODIFICATION

CHANNEL

PROTECTION

STONE SLOPE

PROTECTION

STONE SLOPE

MITIGATION

ENVIRONMENTAL

DIP

DIP DIP

RF

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N

W V

M U

D R

IV

N T

IN

G

T O

N

W E

S T

V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

1"=100'SCALE: 100' 200'0

M W

C

S H

E E

T

O F

P

H A

S E

E

R O

S

IO

N A

N D

S E

D

IM

E N

T C

O N

T R

O L P

L A

N

CG817

W M

G

J

M L

T N

W V

C

G

.d

T

C H L

IN

E S

E E S

H E

E T C

G

M A T

C H

L

IN

E S

E E S

H E

E T C

G

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG103.

2. PERMANENT SEEDING SHALL BE PLACED ON ALL LAND DISTURBANCE.

CONSTRUCTION TO THE WV DEP.

PLANS, SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF

TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL

TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS REQUIRED

NPDES CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR IS REQUIRED

THE CONSTRUCTION PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN

KEY NOTES

KEYLEGEND

ENTRANCE

CONSTRUCTION

FILTER SOCK

SILT FENCE

SUPER SILT FENCE

MITIGATION AREA

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

SSF

SF

CE

ROCK FILTER

DROP INLET PROTECTION

INLET PROTECTION

OUTLET PROTECTION

LEGEND KEY

OP

IP

GRAVEL

CONCRETE

FLOODPLAIN SEEDING

TURF GRASS SEEDING

LEVEE TURF GRASS SEEDING

DIP

RF

LEGEND

H1ECXJBF

CB

CB

CB

TR

TR

TR

CB

CB

S

X J

X J

X J

X J

X J

TRTR

X J

BORROW AREA 1 EAST

BORROW AREA 1 WEST

N

LINE OF PROTECTION�

WEST ACCESS ROAD

ACCESS RAMP

ABBOT LANE

ACCESS RAMP

WEST

DRAINAGE AREA

WESTERN

A B

B O

T T L

A N

E

FL

RIV

ER

RAILROAD

CHANNEL MODIFICATION

CHANNEL MODIFICATION

SSF

SSFSSF

SSF

SSF

IP

SSF

MODIFICATION

CHANNEL

PROTECTION

STONE SLOPE

(LWL-L)

LIMITED WORK LIMITS

MITIGATION

ENVIRONMENTAL

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N

W V

M U

D R

IV

N T

IN

G

T O

N

W E

S T

V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

1"=100'SCALE: 100' 200'0

M W

C

S H

E E

T

O F

P

H A

S E

E

R O

S

IO

N A

N D

S E

D

IM

E N

T C

O N

T R

O L P

L A

N

CG818

W M

G

J

M L

T N

W V

C

G

.d

T C

H L

IN

E

S

E E

S H

E E

T C

G

KEYLEGEND

OUTLET PROTECTION

INLET PROTECTION

ENTRANCE

CONSTRUCTION

SILT FENCE

SUPER SILT FENCE

MITIGATION AREA

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

SSF

SF

CE

IP

OP

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG104.

2. PERMANENT SEEDING SHALL BE PLACED ON ALL LAND DISTURBANCE.

CONSTRUCTION TO THE WV DEP.

PLANS, SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF

TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL

TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS REQUIRED

NPDES CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR IS REQUIRED

THE CONSTRUCTION PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN

KEY NOTES

GRAVEL

CONCRETE

FLOODPLAIN SEEDING

TURF GRASS SEEDING

LEVEE TURF GRASS SEEDING

H1ECXJBF

640670

W.E. 557.1

W.E. 557.1

N

FLOW

MUD RIVER

PRICHARD ROAD

BORROW AREA 5

RAILROAD

SSF

SSF

SSF

SSF

SSF

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

1"=100'SCALE: 100' 200'0

M W

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG819

W M

G

J

M L

T N

W V

C

G

.d

T C

H L

IN

E , S

E E S

H E

E T C

G

4. SHEET TO BE REPRODUCED IN COLOR FORMAT.

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG103.

2. PERMANENT SEEDING SHALL BE PLACED ON ALL LAND DISTURBANCE.

CONSTRUCTION TO THE WV DEP.

PLANS, SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF

TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL

TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS REQUIRED

NPDES CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR IS REQUIRED

THE CONSTRUCTION PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN

NOTES

KEYLEGEND

SILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

SSF

SF

H1ECXJBF

FLOW

MUD RIVER

PRICHARD ROAD

Y

A T

E S C

R O

S S

IN

G R

O A

D B L A C

K H

O L L O

W R

O A D

S A

M P B

R A

N C

H R

O A

D

BORROW AREA 5

SSF

SSF

SSF

(LWL-M)

LIMITED WORK LIMITS

M A

T C

H L

IN

E

S

E E

S H

E E

T C

G

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

1"=100'SCALE: 100' 200'0

M W

C

S H

E E

T

O F

P H

A S

E

E R

O S

IO

N

A N

D S

E D

IM

E

N T

C O

N T

R O

L P

L A

N

CG820

W M

G

J

M L

T N

W V

C

G

.d

4. SHEET TO BE REPRODUCED IN COLOR FORMAT.

3. FOR ENVIRONMENTAL MITIGATION SEE SHEETS LE_LG101 - LE_LG104.

2. PERMANENT SEEDING SHALL BE PLACED ON ALL LAND DISTURBANCE.

CONSTRUCTION TO THE WV DEP.

PLANS, SWPPP, AND GPP PER THEIR PROPOSED MEANS AND METHODS OF

TO SUBMIT ANY PROPOSED REVISIONS TO THE EROSION & SEDIMENT CONTROL

TO SUBMIT TO THE WV DEP AS A CO-PERMITEE. THE CONTRACTOR IS REQUIRED

NPDES CONSTRUCTION STORMWATER PERMIT. THE CONTRACTOR IS REQUIRED

THE CONSTRUCTION PLANS AND SPECIFICATION ARE APART OF A CONDITIONAL

1. FOR BIDDING PURPOSES ONLY. EROSION & SEDIMENT CONTROLS INCLUDED IN

NOTES

KEYLEGEND

SSF

SFSILT FENCE

SUPER SILT FENCE

DRAINAGE DIVIDE

DRAINAGE AREA

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

H1ECXJBF

L P

L P

L P

.6

S

T A

P C

.0

.0

.0

.1

.2

.8

.2

.4

.7

.0

.2

.7

.7

.7

.7

.7

.7

.6

.5

.3

.2

.3

.2

.0

.4

.9

.8

.2

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S T

A

.7

S

D T

O S

T A

S

D

P L

A N

A N

D P

R O

F

IL

E

M

IL

T O

N P

L A

Z A

G R

A V

IT

Y

C U

L V

E R

T

CU102

D L

R

J

M L

T N

W V

S

D

C U

.d

M

SD

XXXXXX569.59569.61645744.63524063.93DROP INLETD2.2

XXXXXX--571.161645469.47524132.82HEADWALLD2.1

SHEET

REFERENCE

NUMBER

DETAIL

OUT

INVERT

IN

INVERT

EASTING NORTHING

TYPE

STRUCTURE

NUMBER

STRUCTURE

STORM STRUCTURE SCHEDULE

S D

S D

S D

S D

S D

S D

CB

N

CONTRACTOR WORK LIMITS

LINE OF PROTECTION�

DAMON AVENUE

PONDING AREA

STA. 41+56.84 SD

WINGWALL

STRUCT. NO. D2.1

7'X7' BOX CULVERT

M A T

C H

L

IN

E S

T A . 4

S

D , S

E E S

H E

E T S

D

C U

LEVEEEAST ACCESS ROAD

7'X7' BOX CULVERT

CONTRACTOR WORK LIMITS

SLOPE

TOE OF

PONDING AREA

TOP OF

STA. 44+41.67 SD

DROP INLET

STRUCT. NO. D2.2

PONDING AREA

TOP OF

7'X7' BOX CULVERT

E: 1,645,469.47 N: 524,132.82

STA. 41+56.84 SD

END WORK

BOTTOM OF DITCH

BOTTOM OF DITCH

EX. GROUND

M A

T C

H L

IN

E

S T

A

S

D

S E

E S

H E

E T

S D

C

U

11.25° DEFLECTION

DAMON AVENUE

PONDING AREA

S T

R U

C T

N

O D

.2

M A

N H

O

A

.6

S D

R

IM

E L

.7

S T

R U

C T

N

O D

.1

H E

A D

W A

L L

S T

A

.8

S

D T

O P

E L .3

IN

V E

L .1

6F

IN

G

R A

D E

(T Y

P

E X

G

R A

D E

(T Y

P

602.13' - 7'X7' BOX CULVERT @ -0.50%89.05' - 7'X7' BOX CULVERT @ -0.50%

.5

.4

.4

.3

.2

.2

.1

.0

.9

.8

.7

.6

.5

.4

.3

.2

.0

.9

.8

.7

.6

.5

.4

.3

.2

.1

40+00 SD 40+20 SD 40+40 SD 40+60 SD 40+80 SD 41+00 SD 41+20 SD 41+40 SD 41+60 SD 41+80 SD 42+00 SD 42+20 SD 42+40 SD 42+60 SD 42+80 SD 43+00 SD 43+20 SD 43+40 SD 43+60 SD 43+80 SD 44+00 SD 44+20 SD 44+40 SD 44+60 SD 44+80 SD 45+00 SD 45+20 SD 45+40 SD 480 480

500 500

520 520

540 540

560 560

580 580

600 600

620 620

640 640

FINISHED GRADE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

H1

MILTON PLAZA GRAVITY CULVERT - PLAN

1"=20'SCALE: 20' 40'0

A1

MILTON PLAZA GRAVITY CULVERT - PROFILE

1"=20', V:1"=20'SCALE: H: 20' 40'0

BEHIND MILTON PLAZA, SEE SHEET XXX.

3. FOR MORE INFORMATION ON GRADING

SHEETS AR_CS100 - AR_CS105.

FOR EAST ACCESS ROAD INFORMATION, SEE 2.

SHEET XXX.

FOR 7'X7' BOX CULVERT TYPICAL DETAILS, SEE 1.

NOTES

CONTRACTOR WORK LIMITS

LEGEND

20' 40'0

D C

E A

U D

IT

H1ECXJBF

L P

0 L P

L P

CB

.3

.2

.3

.2

.5

.4

.5

.7

.5

.6

.7

.7

.2

.1

.8

.0

.6

.1

.2

.5

.2

.4

.6

.8

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S T

A

S

D T

O S

T A

S

D

P L

A N

A N

D P

R O

F

IL

E

M

IL

T O

N P

L A

Z A

G R

A V

IT

Y

C U

L V

E R

T

CU103

D L

R

J

M L

T N

W V

S

D

C U

.d

M

SD

567.521646144.04523989.55HEADWALLD2.5

568.28568.291645993.65524017.56DROP INLETD2.4

XXXXXX568.84568.851645884.21524037.94DROP INLETD2.3

SHEET

REFERENCE

NUMBER

DETAIL

OUT

INVERT

IN

INVERT

EASTING NORTHING

TYPE

STRUCTURE

NUMBER

STRUCTURE

STORM STRUCTURE SCHEDULE

S D

S D

S D

S D

S D

CB

CB

N

JOHNS BRANCH

PONDING AREA

TOE OF SLOPE

SLOPE

TOE OF

LINE OF PROTECTION�

CONTRACTOR WORK LIMITS

EAST ACCESS ROAD

7'X7' BOX CULVERT

J O

H

A

N C

H F L

O W

M A T

C H

L

IN

E S

T A . 4

S

D , S

E E S

H E

E T S

D

C U

7'X7' - BOX CULVERT

GATEWELL

STA. 48+48.00 SD

HEADWALL

STRUCT. NO. D2.5

LEVEE 8

'X

T

W

IN

B

O X C

U

LV

E R T S

7'X7' - BOX CULVERT

STA. 45+83.65 SD

DROP INLET

STRUCT. NO. D2.3

STA. 46+94.98 SD

DROP INLET

STRUCT. NO. D2.4

E: 1,646,144.09 N: 523,989.54

STA. 48+48.00 SD

END WORK

EX. GROUND

M A

T C

H L

IN

E

S T

A

S

D

S E

E S

H E

E T

S D

C

U

JOHNS BRANCH

PONDING AREA

MILTON PLAZA GRADING

F

IN

G

R A

D E

(T Y

P

E X

G

R A

D E

(T Y

P

S T

R U

C T

N

O

D

.3 D

R O

P I N

L E

T S

T A

.6

S

D R

IM

E

L .8

S T

R U

C T

N

O

D

.4 D

R O

P I N

L E

T S

T A

.9

S

D R

IM

E

L .5

S T

R U

C T

N

O

D

.5 H

E A

D W

A L

L S

T A

.9

S

D T

O P

E L .7

(O

U T

IN

V

E L

.5

602.13' - 7'X7' BOX CULVERT @ -0.50%

45+40 SD 45+60 SD 45+80 SD 46+00 SD 46+20 SD 46+40 SD 46+60 SD 46+80 SD 47+00 SD 47+20 SD 47+40 SD 47+60 SD 47+80 SD 48+00 SD 48+20 SD 48+40 SD 48+60 SD 48+80 SD 49+00 SD 49+20 SD 49+40 SD 49+60 SD 49+80 SD 50+00 SD 50+20 SD 480 480

500 500

520 520

540 540

560 560

580 580

600 600

620 620

640 640

50+40 SD

.0

.9

.8

.7

.6

.5

.4

.3

.2

.0

.9

.8

.7

.6

.5

.5

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

H1

MILTON PLAZA GRAVITY CULVERT - PLAN

1"=20'SCALE: 20' 40'0

A1

MILTON PLAZA GRAVITY CULVERT - PROFILE

V:1"=20'1"=20'SCALE: H: 20' 40'0

LEGEND

CONTRACTOR WORK LIMITS

NOTES

SHEET AR_CS103.

FOR EAST ACCESS ROAD INFORMATION, SEE2.

SHEET XXX.

FOR 7'X7' BOX CULVERT TYPICAL DETAILS, SEE 1.

D C

E A

U D

IT

H1ECXJBF

EX. 8" W

ATER

S

CB

TR

CB

CB

L P

L P

L P

L P

WAT-UT

WAT-UTWAT-UTWAT-UTS

WAT-UT

WAT-UTWAT-UTWAT-UT

S

S

S

CB

CB

CB

CB

.7

.2

.1

.7

.4

.5

.5

.5

.7

.2

.2

.2

.4

.5

.3

.3

.6

.4

.3

.5

.0

.5

.6

.7

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S T

A

.0

S

D T

O

S

D

P L

A N

A N

D P

R O

F

IL

E

D A

M O

N A

V E

G R

A V

IT

Y

C U

L V

E R

T

CU104

R C

D

J

M L

T N

W V

S

D

C U

.d

M

SD

XXXXXX563.97564.221644848.19524155.24JUNCTION BOXD1.4

XXXXXX562.17562.421644590.48524074.18JUNCTION BOXD1.3

XXXXXX561.94562.011644599.23524036.88GATEWELLD1.2G

XXXXXX561.38--1644615.16523969.04HEADWALLD1.1

SHEET

REFERENCE

NUMBER

DETAIL

OUT

INVERT

IN

INVERT

EASTING NORTHING

TYPE

STRUCTURE

NUMBER

STRUCTURE

STORM STRUCTURE SCHEDULE

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

69.68' - 5'X6'

BOX CULVERT

@ 0.60%

RANDOM FILL

FLOODWALL

EX. GROUND

270.16' - 5'X6' BOX CULVERT @ 0.60%

ROAD FILL

EAST ACCESS

M A

T C

H L

IN

E

S T

A

S

D S

E E

S H

E E

T C

U

EAST ACCESS ROAD

SANITARY LINE

8" GRAVITY

38.32' - 5'X6'

BOX CULVERT

@ 0.60%

EX. 36" CULVERT

ROAD FILL

EAST ACCESS

SUPPLY LINE

RAW WATER INTAKE

EX. WATERLINE

EX. WATERLINE

F

IN

G

R A

D E

(T Y

P

E X

G

R A

D E

(T Y

P

192.16' - 5'X6'

BOX CULVERT

@ 0.96%

S T

R U

C T

D

.1

H E

A D

W A

L L

S T

A

.0

S

D

T O

P E

L .5

(O U

T

IN

V

E

L .3

S T

R U

C T

D

.2

G

G A

T E

W E

L L

S T

A

.6

S

D

T O

P E

L .2

(I N

IN

V

E L

.0

(O U

T

IN

V

E

L .9

S T

R U

C T

D

.3

J U

N C

T

IO

N B

O X

S T

A

.0

S

D

T O

P E

L .3

(I N

IN

V

E L

.4

(O U

T

IN

V

E

L .1

S T

R U

C T

D

.4

J U

N C

T

IO

N B

O X

S T

A

.1

S

D

T O

P E

L .3

(I N

IN

V

E L

.2

(O U

T

IN

V

E

L .9

(SEE NOTE 3)

EX. 8" GRAVITY

29+60 SD 29+80 SD 30+00 SD 30+20 SD 30+40 SD 30+60 SD 30+80 SD 31+00 SD 31+20 SD 31+40 SD 31+60 SD 31+80 SD 32+00 SD 32+20 SD 32+40 SD 32+60 SD 32+80 SD 33+00 SD 33+20 SD 33+40 SD 33+60 SD 33+80 SD 34+00 SD 34+20 SD

480 480

500 500

520 520

540 540

560 560

580 580

600 600

620 620

640 640

.3

.3

.4

.5

.7

.0

.1

.4

.5

.6

.7

.9

.0

.1

.2

.3

.5

.6

.7

.8

.0

.2

.4

.5

EX. WATERLINE

30+00 SD

S

D

S

D

S

D

S

D1

N

M A

T C

H L

IN

E S

T A S

D S

E E S

H E

E T C

U

TOP OF FLOODWALL

5'X6' BOX CULVERT

GRAVITY CULVERT

DAMON AVENUE�

CONTRACTOR WORK LIMITS

EAST ACCESS ROAD

(SEE NOTE 3)

8" SANITARY LINE

(SEE NOTE 5)

WATERLINE

8" RELOCATED

SUPPLY LINE

RAW WATER INTAKE

(SEE NOTE 4)

SANITARY LINE

RELOCATED 8"

EX. 36" CULVERT

STA. 29+85.01 SD

WINGWALL

STRUCT. NO. D1.1

'X

B O

X C

U

LV

E R

T

STA. 30+54.69 SD

GATEWELL

STRUCT. NO. D1.2G

'X

B O

X C

U

LV

E R

T

STA. 30+93.01 SD

12'X12' JUNCTION BOX

STRUCTURE D1.3

STA. 33+63.17 SD

12'X12' JUNCTION BOX

STRUCTURE D1.4

LEVEE

INV. EL. 563.12

EX. 36" CULVERT

STRUCTURE

RAW WATER INTAKE

5'X6' BOX CULVERT

PROPOSED WEIR

LIMITED WORK LIMITS

E: 1,644,615.16 N: 523,969.04

STA. 29+85.01 SD

BEGIN WORK

1 2

3 4

H2

DAMON AVENUE GRAVITY CULVERT - PLAN

1"=20'SCALE: 20' 40'0

B2

DAMON AVENUE GRAVITY CULVERT - PROFILE

, V:1"=20'1"=20'SCALE: H: 20' 40'0

CONDUITS THROUGH THE LINE OF PROTECTION.

6. SEE SHEETS B-112 THROUGH B-115 FOR FILTER DETAILS ON

CONTRACTOR. SEE SHEET CUXXX.

5. RELOCATED 8" WATERLINE TO BE RELOCATED BY

BY CONTRACTOR. SEE SHEET CUXXX.

4. RELOCATED 8" GRAVITY SANITARY LINE TO BE RELOCATED

CONTRACTOR ONCE RELOCATED LINE IS OPERATIONAL.

3. EXISTING 8" GRAVITY SANITARY LINE TO BE REMOVED BY

CSXXX.

FOR EAST ACCESS ROAD INFORMATION, SEE SHEET2.

SEE SHEET XXX.

FOR DAMON AVENUE BOX CULVERT TYPICAL DETAILS, 1.

NOTES

CONTRACTOR WORK LIMITS

LEGEND

RIVER

FLOWMUD

D C

E A

U D

IT

H1ECXJBF

.6

S T

A

P C

WAT-UT

S

S

.3

.5

.5

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

.0

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

C

S T

A

S

D T

O S

T A

.3

S

D

P L

A N

A N

D P

R O

F

IL

E

D A

M O

N A

V E

G R

A V

IT

Y

C U

L V

E R

T

CU105

D L

R

J

M L

T N

W V

S

D

C U

.d

M

SD

XXXXXX--565.331645037.49524188.29HEADWALLD1.5

SHEET

REFERENCE

NUMBER

DETAIL

OUT

INVERT

IN

INVERT

EASTING NORTHINGSTRUCTURE TYPE

NUMBER

STRUCTURE

STORM STRUCTURE SCHEDULE

S

D

S

D

S

D

N

DAMON AVENUE PONDING AREA

REMNANT MUD RIVER

SLOPE

TOE OF

5'X6' BOX CULVERT

M A

T C

H L

IN

E S

T A S

D S

E E S

H E

E T C

U

STA. 36+16.58 SD

WINGWALL

STRUCT. NO. D1.5

SLOPE

TOE OF

PONDING AREA

TOP OF

CONTRACTOR WORK LIMITS

DAMON AVENUE ACCESS RAMP

EAST ACCESS ROAD

LEVEE

(SEE NOTE 4)

SANITARY LINE

8" GRAVITY

AFTER RELOCATION

TO BE REMOVED

CONTROL PANEL

EX. RAW WATER INTAKE

LIMITS

LIMITED WORK

E: 1,645,097.83

N: 524,198.82

STA. 36+16.58 SD

END WORK

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

DAMON AVENUE PONDING AREA

192.16' - 5'X6' BOX CULVERT @ 0.96%

M A

T C

H L

IN

E

S T

A

S

D S

E E

S H

E E

T C

U

34+40 SD 34+60 SD 34+80 SD 35+00 SD 35+20 SD 35+40 SD 35+60 SD 35+80 SD 36+00 SD 36+20 SD 36+40 SD 36+60 SD 36+80 SD 37+00 SD 37+20 SD 37+40 SD

480 480

500 500

520 520

540 540

560 560

580 580

600 600

620 620

640 640

F

IN

G

R A

D E

(T Y

P

E X

G

R A

D E

(T Y

P

WATER SURFACE ELEVATION

APPROXIMATE EXISTING

S T

R U

C T

D

.5

H E

A D

W A

L L

S T

A

.3

S

D

T O

P E

L .4

(I N

IN

V

E L

.3

EX. GROUND

FINISHED GRADE

.9

.0

.2

.4

.6

.8

.0

.3

.5

.7

.0

.2

.4

.7

.9

.2

H2

DAMON AVENUE GRAVITY CULVERT - PLAN

1"=20'SCALE: 20' 40'0

A2

DAMON AVENUE GRAVITY CULVERT - PROFILE

, V:1"=20'1"=20'SCALE: H: 20' 40'0 IS THEN TO BE REMOVED BY THE CONTRACTOR.

UNTIL RELOCATED LINE HAS BEEN PLACED. THE EXISTING LINE

4. EX. 8" GRAVITY SANITARY LINE TO REMAIN OPERATIONAL

IS THEN TO BE REMOVED BY THE CONTRACTOR.

UNTIL RELOCATED LINE HAS BEEN PLACED. THE EXISTING LINE

3. EX. 8" POTABLE WATERLINE TO REMAIN OPERATIONAL

AR_CS100 TO AR_CS105.

FOR EAST ACCESS ROAD INFORMATION, SEE SHEETS 2.

SEE SHEET XXX.

FOR DAMON AVENUE BOX CULVERT TYPICAL DETAILS, 1.

NOTES

CONTRACTOR WORK LIMITS

LEGEND

D C

E A

U D

IT

H1ECXJBF

CB

CB

S

S

CB

S

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

CB

TR

TR

TR

CB

CB

S

S

CB

TR

J

X J

X J

X J

X J

X J

TRTR

X J

S S

S S

S

S

W

FH

G

LCO

S

S

S

S

S S

S

S

SG

G

G

G

GGG

D

W W

W

W

W W

W

W

W

W W

W

W W

W

W

W

W

WW

W

W

CB

CB

L P

L P

L P

L P

L P

0 L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

0 L

P

L P

L P

L P

L P

L P

L P

L P

L P

L P

L P

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

S

O V

E R

A L

L S

IT

E

P L

A N

W E

S T

E R

N D

R A

IN

A

G E

A R

E A

CU110

R C

D

J

M L

T N

W V

S

D

C U

.d

M

SD

S D

0 S

D

S D

S D

S D

S D

S D

S D

S D

S D

S D

S D

SD10+00

S-302

PUMP STATION PLAN VIEW

NEWMANS BRANCH

S-101

HEADWALL

EXISTING

N

SECTION

OVER TOPPING

CONTRACTOR WORK LIMITS

CONTRACTOR WORK LIMITS

W1.5 W1.4

W1.3

W3.1

W3.2

W3.3 W3.4

W4.1

W3.1 - W4.1

SYSTEM

NEWMANS BRANCH

PONDING AREA

RIVER

FLOW

MUD

W1.1

W1.1 - W1.6E

SYSTEM

W1.2

PUMP STATION

NEWMANS BRANCH

SYSTEM SWALE

WESTERN DRAINAGE

W1.3 - W3.4

SYSTEM

LIMITED WORK LIMITS

LIMITED WORK LIMITS

LIMITED WORK LIMITS

LIMITED WORK LIMITS

LIMITED WORK LIMITS

CONTRACTOR WORK LIMITS

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

A1

WESTERN DRAINAGE OVERALL SITE PLAN

1"=100'SCALE: 100' 200'0

CONTRACTOR WORK LIMITS

LEGEND

NOTES

LIMITED WORK LIMITS

SEE SHEET CS305 FOR OVERTOPPING SECTION DETAILS.1.

D

D

D C

E A

U D

IT

H1ECXJBF

S

L P

L P

L P

.5

.1

.5

.9

.0

.8

.8

.8

.7

.9

.4

.4

.6

.8

.9

.8

.5

.5

.4

.5

.0

.5

.0

.4

.7

.0

.4

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

S

A N

A N

D P

R O

F

IL

E

W E

S T

E R

N D

A R

A

IN

A G

E S

Y S

T E

M W

.1

W

.5

CU111

R C

D

J

M L

T N

W V

S

D

C U

.d

M

SD

XXXXXX564.381640855.08523669.25HEADWALLW1.5

XXXXXX563.8564.051640921.67523674.31108" MANHOLEW1.4

XXXXXX562.29562.541641171.87523694.029'X9' JUNCTION BOXW1.3

XXXXXX561.64561.741641180.42523585.56GATEWELLW1.2

XXXXXX561.241641186.76523505.16HEADWALLW1.1

SHEET

REFERENCE

NUMBER

DETAIL

OUT

INVERT

IN

INVERT

EASTING NORTHINGSTRUCTURE TYPE

NUMBER

STRUCTURE

STORM STRUCTURE SCHEDULE

D

S D

N

STA. 10+00 SD

HEADWALL

STRUCT. NO. W1.1

STA. 10+80.64 SD

GATEWELL

WESTERN DRAINAGE

STRUCT. NO W1.2

STA. 11+89.45 SD

W/ GRATED TOP

9'X9' JUNCTION BOX

STRUCT. NO. W1.3

STA. 14+40.43 SD

W/GRATED TOP

108" MANHOLE

STRUCT. NO. W1.4

STA. 15+07.21 SD

HEADWALL

STRUCT. NO. W1.5

1. FOR 5'X6' BOX CULVERT TYPICAL DETAILS, SEE SHEET XXX

2. FOR WEST ACCESS ROAD INFORMATION, SEE SHEETS CSXXX.

3. FOR TYPICAL DETAILS OF WVDOH MANHOLES, SEE SHEET XXXX

4. SEE SHEETS B-112 THROUGH B-115 FOR FILTER DETAILS ON

CONDUITS THROUGH THE LINE OF PROTECTION.

NOTES

CONTRACTOR WORK LIMITS

'X

C

IP

B

O X

C U

L V

E R

T

'X

C

IP

B

O X

C U

L V

E R

T

WES

T A

CCES

S R

OAD

LE

VEE

PROTECTION

LINE OF �

72" RCP 67' - 72" RCP

CONTRACTOR WORK LIMITS

LEGEND

E: 1,641,187.48 N: 523,496.03

STA 9+90.83 SD

BEGIN WORK

E: 1,640,848.76 N: 523,668.90

STA. 15+13.54 SD

END WORK

LINE OF PROTECTION�

ROAD

ACCESS

WEST S

T R

U C

T N

O W

.1

H E

A D

W A

L L

S T

A

S

D T

O P

E L .0

'X

B

L

V E

R T

O

U T

IN

V E

L .2

S T

R U

C T

N

O W

.2

G A

T E

W E

L L

S T

A

.6

S

D T

O P

E L .7

'X

' B

O X

C U

L V

E

(I

IN

V

E L

.7

'X

' B

O X

C U

L V

E

(O

T

IN

V

E

L

.6

74.14' - 5'X7' BOX CULVERT @ 0.50% 97.14' - 5'X7' BOX CULVERT @ 0.51%

S T

R U

C T

N

O W

.3

'X

' J

U N

C T

IO

N

B O

X S

T A

.4

IM

E

L

.5

R

C P

IN

IN

V E

L .5

'X

' B O

X C

U L

V E

(O

T

IN

V

E L

.2

251' - 72' RCP @ 0.50%

EX. GROUND

67' - 72" RCP @ 0.50%

S T

R U

C T

N

O W

.4

M A

N H

O L E

S T

A

.4

S

D R

IM

E

L

.1

R C

P

IN

IN

V

E

L .0

R C

P

O U

T

IN

V

E

L .8

S T

R U

C T

N

O W

.5

H E

A D

W A

L L

S T

A

.2

S

D T

O P

E L

.4

'X

' B

O X

C U

L V

E R

T

IN

IN

V

E

L .3

M A

T C

H L

IN

E

S T

A

S

D

S E

E S

H E

E T

C U

LEVEE

FINISHED GRADE

9+80 SD 10+00 SD 10+20 SD 10+40 SD 10+60 SD 10+80 SD 11+00 SD 11+20 SD 11+40 SD 11+60 SD 11+80 SD 12+00 SD 12+20 SD 12+40 SD 12+60 SD 12+80 SD 13+00 SD 13+20 SD 13+40 SD 13+60 SD 13+80 SD 14+00 SD 14+20 SD 14+40 SD 14+60 SD 14+80 SD 15+00 SD 15+20 SD 500 500

520 520

540 540

560 560

580 580

600 600

620 620

640 640

.2

.3

.5

.6

.8

.0

.1

.2

.3

.4

.5

.6

.7

.8

.9

.0

.2

.3

.4

.5

.6

.7

.9

.1

.2

.3

.5

F

IN

G

R A

D E

(T Y

P

E X

G

R A

D E

(T Y

P

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S

IZ

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

F1

WESTERN DRAINAGE SYSTEM W1.1 - W1.6E - PLAN

1"=20'SCALE:

20' 40'0A1

WESTERN DRAINAGE SYSTEM W1.1 - W1.6E - PROFILE

1"=20'SCALE:

20' 40'0

M A T

C H

L

IN

E S

T A S

D S

E E S

H E

E T C

U

D C

E A

U D

IT

H1ECXJBF

CB

TR

CB

CB

CB

L P

L P

L P

L P

L P

WAT-UT

WAT-UT

WAT-UT

WAT-UT

S

S

W

CB

CB

CB

.1

.7

.6

.0

.6

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E R

M

IL

T O

N W

V

M U

D R

IV

N T

IN

G

T O

N W

E S

T V

IR

G

E

IG

H

T H

S T

H U

N T

IN

G

T O

N D

IS

T

R

LWL-58

check fieldbook

4" PVC:580.87'

4" PVC:581.05'

4" PVC:581.30'

4" PVC:581.09'

4" PVC:564.42'

4" PVC:574.77'

4" PVC:570.42'

4" PVC:575.92'

4" PVC:576.92'

15" CMP:564.52'

84" STEEL:569.71'

4" PVC:580.87'

4" PVC:581.05'

4" PVC:575.72'

M

W W

A T

E R

L

IN

E R

E L

O C

A T

IO

N

D A

M O

N A

V E

N U

E

CU111

D L

R

C

M L

T N

W V

U

T

C U

.d

M

UT

8" PVC POTABLE WATER

WORK LIMITS

CONTRACTOR

90° 6" M.JT. DI FITTING

90° 6" M.JT. DI FITTING

MORE DETAILS

CUXXX FOR

SEE SHEET

SEWER LINE

SANITARY

GRAVITY

RELOCATED

90° 6" M.JT. DI FITTING

E: 1,644,728.86

N: 524,089.50

STA. 2+10.47

END WORK

E: 1,644,882.58

N: 524198.21

STA. 0+00

BEGIN WORK

45° 6" M.JT. DI FITTING

VALVE TO CONNECT TO EXISTING 8" WATERLINE

STA. 0+10 8"X8" TAPPING SLEEVE AND PLUG

CUT AND CAP EXISTING WATERLINE

HAND WHEEL

FOR VALVE STEMS

PROVIDE 3 HOLES

(TOP OF PROTECTION)

WET RIM ELEV.= 594.30'

RIM ELEV. = 585.50'

VALVE VAULT

OF GRADE = 585.00'

APPROX. TOP

ELEV. = 579.00'

4" SCH. 40 PE PIPE

PIPE SUPPORT

6" DIP

BARS

GUIDE

INV. ELEV. = 556.50'

WET WELL

SEE SPECIFICATIONS

SUBMERSIBLE PUMPS,

WALL THUMBLE, TYP.

R.J., TYP.

SUPPORT PEDESTAL

MIN. 2 PER VALVE

STEM SUPPORT

LOWER MUD RIVER BANK

SHEET PILE

12" DUCTILE IRON PIPE

OF RIVER = 558.00'

APPROXIMATE BOTTOM

SUPPORT PEDESTAL

CENTERLINE ELEVATION = 560.00'

INTAKE SCREEN #1

CENTERLINE ELEVATION = 561.00'

INTAKE SCREEN #2

HAND WHEELS

PENETRATION

SEALED WALL

EXISTING GROUND

196.76' 8" PVC

16" DUCTILE IRON

8" PVC

0+00 0+50 1+00 1+50 2+00

540 540

550 550

560 560

570 570

580 580

590 590

600 600

610 610

620 620

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

A

B

C

D

E

F

G

H

J

K

L

M

N

P

S U

B M

IT

T

E D

B Y

C H

E C

K E

D B

Y

D R

A W

N B

Y

D E

S

IG

N E

D B

Y

C O

N T

R A

C T

N O

S O

L

IC

IT

A

T

IO

N N

O

IS

S

U E

D A

T E

S I Z

E

M A

R K

D E

S C

R

IP

T

IO

N D

A T

E

SHEET ID

®of Engineers

US Army Corps

U .S

A

R M

Y C

O R

P S

O F

E N

G

IN

E E

R S

S

S

S

S

N

S D

S D

1H

DAMON AVENUE RAW WATER INTAKE - PLAN

1"=50'SCALE: 50' 100'0

50' 100'0A1

DAMON AVENUE RAW WATER INTAKE - PROFILE

1"=50'SCALE:

NOTES

OF CONCRETE FLOODWALL, AND INSTALLATION OF EARTHEN LEVEE.

FEATURES, INSTALLATION OF RAW WATER INTAKE RELOCATION, INSTALLATION

TO ACCOMMODATE THE INSTALLATION OF DAMON AVENUE INTERIOR DRAINAGE

THE RAW WATER LINE RELOCATION SHOWN ON THIS SHEET IS NECESSARY 7.

NO CUSTOMER SERVICE INTERRUPTIONS WILL BE PERMITTED. 6.

PRIOR TO INITIATING WORK ON THIS UTILITY RELOCATION.

NOTIFICATION AND COORDINATION WITH THE CITY OF MILTON IS NECESSARY5.

TO CONNECTION.

CONTRACTOR SHALL FIELD VERIFY EXISTING PIPE TYPES AND O.D. PRIOR4.

ALL LINES SHALL HAVE 36" MINIMUM COVER.3.

AND JACKING.

CONTRACTOR TO LOCATE WATER AND UTILITY SERVICES BEFORE BORING2.

811 OR (1-800-245-4848) AND LOCAL UTILITY COMPANIES.

LOCATIONS PRIOR TO CONSTRUCTION BY CONTACTING MISS UTILITY AT

OF UTILITY LINES NOT KNOWN. CONTRACTOR TO VERIFY UTILITY

FOUND OR PROVIDED BY LOCAL UTILITIES. EXACT DEPTH AND LOCATION

EXISTING UTILITIES SHOWN ON PLANS WHERE EVIDENCE HAS BEEN 1.

D

R

IV

E R

F

LO

LEGEND

CONTRACTOR WORK LIMITS

WATER MAIN PIPE

SANITARY MAIN PIPE

STORM DRAIN MAIN PIPE

RAW WATER INTAKE DETAIL

CUSTOM 1:84SCALE:

IN

TE

R

IM

D C

E A

U D

IT

H1ECXJBF

L P

L P

L P

L P

CB

WAT-UT

WAT-UT

WAT-UT

WAT-UT

S

S

W

CB

CB

CB

A N

S

T O

N W

V F

R M

L O

W E

R M

U D

R

IV

E…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .