This document contains questions and answers related to a federal solicitation for cleaning and painting tainter gates at three lakes in Ohio. The U.S. Army Corps of Engineers, Huntington District is seeking a firm fixed-price construction contract to clean and paint tainter gates at Alum Creek Lake, Delaware Lake, and Paint Creek Lake. Work includes painting and cleaning gates at each location. The pre-solicitation notice provides details on the purpose and features of structures at each lake location. A site visit is scheduled for August 30th. The solicitation will be available on or around August 20th via SAM.gov. Electronic bids must be submitted through DOD SAFE by the specified due date after coordinating receipt of a file sharing link with the contract specialist and contracting officer. This is a 100% small business set-aside with a NAICS code of 237990 and size standard of $39.5 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123722B0004 – Questions and Answers
1. Spec Section 01 11 00 paragraph 1.3.1.3 General Project Features- DELAWARE, item h. Delaware Gate number 3- Trunnion Girder Support Column.
0. This paragraph only calls out the Gate #3 Trunnion Girder Support Column at Pier #4 to be repaired with grout. Additionally, contract drawing S-803, photo 5 shows the Gate #3 Trunnion Girder Support Column. My question is, on the Option 2, Option 3, and Option 4 Bid Schedules, there is a bid item (40, 54, and 68) labeled Trunnion Girder Support Column. Bid Item 54 is for Gate #3, but should Bid Items #40 and 68 be deleted, since they are for Gates 1, 2, 4, 5 and 6?
Response: Trunnion Girder Support Column to be repaired with grout only at pier #4, Gate 3.
1. Spec Section 01 45 00.00 10, paragraph 3.4.2 CQC System Manager.
1. This section requires the CQC System manager to be a construction engineer with 10 years experience and registered as a Professional Engineer (PE) in the State of Virginia. Why would we need a Virginia registered PE if the project site is in the state of Ohio?
Response: This is a typo. The PE registration should be in Ohio.