W9123722B0004 Questions and Answers 2.docx
DOCX document 21 KB Posted
- Solicitation number
- W9123722B0004
About this file
This document contains a pre-solicitation notice for a construction contract opportunity with the U.S. Army Corps of Engineers Huntington District. The contract is for cleaning and painting tainter gates located at three lakes in Ohio, including removing and reinstalling the gates. Interested bidders are encouraged to attend an organized site visit on August 30, 2022. The solicitation will be available on or after August 20, 2022 via SAM.gov. Bids must be submitted electronically through DOD SAFE by the due date. This is a 100% small business set-aside with a NAICS code of 237990 and size standard of $39.5 million. FAR clause 52.219-14 applies regarding limitations on subcontracting of no more than 50% of the contract amount to entities that are not similarly situated.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Spec Section 01 11 00 paragraph 1.3.1.3 General Project Features- DELAWARE, item h. Delaware Gate number 3- Trunnion Girder Support Column.
0. This paragraph only calls out the Gate #3 Trunnion Girder Support Column at Pier #4 to be repaired with grout. Additionally, contract drawing S-803, photo 5 shows the Gate #3 Trunnion Girder Support Column. My question is, on the Option 2, Option 3, and Option 4 Bid Schedules, there is a bid item (40, 54, and 68) labeled Trunnion Girder Support Column. Bid Item 54 is for Gate #3, but should Bid Items #40 and 68 be deleted, since they are for Gates 1, 2, 4, 5 and 6?
Response: Trunnion Girder Support Column to be repaired with grout only at pier #4, Gate 3.
1. Spec Section 01 45 00.00 10, paragraph 3.4.2 CQC System Manager.
1. This section requires the CQC System manager to be a construction engineer with 10 years experience and registered as a Professional Engineer (PE) in the State of Virginia. Why would we need a Virginia registered PE if the project site is in the state of Ohio?
Response: This is a typo. The PE registration should be in Ohio.
1. Period of Performance will remain unchanged.