B.08.02 W9123720B0003 0001.pdf
PDF 387 KB Posted
- Attached to
- Zoar Levee Repair Federal contract opportunity
- Solicitation number
- W9123720B0003
About this file
This document contains an amendment to a solicitation for construction services. The US Army Corps of Engineers, Huntington District is seeking a firm-fixed price contract to complete repairs to the Zoar Levee system located in Tuscarawas County, Ohio by June 2022. Work will include installing an internal erosion interceptor trench, extending manholes, vibration monitoring, and disposing of excess soils. The amendment updates the price breakout schedule to correct quantities and replace one construction plan. The closing date of August 6, 2020 at 1:00PM Eastern remains unchanged. The option to increase quantities is modified such that the Contracting Officer may exercise the option by written notice prior to the base award expiration. All other terms and conditions are unchanged.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| C.04.01 Abstract of Bids.pdf | ||
| Pre-Bid Attendees.docx | DOCX document | |
| B.07.01 Pre-Bid Question & Answers.docx | DOCX document | |
| A.03.09 Revised Plan_CG102.pdf | ||
| A.03.09 Plans 6 of 6.pdf | ||
| B.08.02 W9123720B0003.pdf | ||
| A.03.09 Plans 4 of 6.pdf | ||
| A.03.09 Plans 5 of 6.pdf | ||
| A.03.09 Plans 3 of 6.pdf | ||
| A.03.09 Plans 2 of 6.pdf | ||
| A.03.09 Plans 1 of 6.pdf | ||
| A.03.09 Specifications.pdf | ||
| B.01.03 Pre-Solicitation Synopsis.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W81F8E01346565
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The above referenced solicitation for Zoar Levee Repair, Zoar, OH is hereby AMENDED as follow s:
The Price Breakout Schedule is updated to correct quantities and replace Plan CG102 (Attached Seperately). The highlighted areas are quantities or items that are changed by this Amendment. The closing date of the solicitation w ill remain August 6, 2020 at 1:00PM Eastern.
FAR CLAUSE 52.217 OPTION FOR INCREASED QUANTITY - SEPARATELY PRICED LINE ITEM (MAR 1989) has been updated to ref lect the follow ing: "The Contracting Officer may exercise the option by w ritten notice to the Contractor prior to the expiration of the base aw ard."
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 03-Aug-2020
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123720B0003
X 9B. DATED (SEE ITEM 11)
06-Jul-2020
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
03-Aug-2020
CODE
USACE, CONTRACTING DIVISION
PATRINA SINGLETON, 502 8TH STREET
HUNTINGTON WV 25701
W91237 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123720B0003
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 10 00 - SOLICITATION
The following have been modified:
BID SCHEDULE
Base Bid work concists of construction of an Internal Erosion Interception Trench (IEIT) along with seepage berm and work platform fills, and related interior drainage feature modifications.
ITEM
NO
DESCRIPTION EST
QTY
UNIT UNIT PRICE ESTIMATED
AMOUNT
1 Reimbursement of Actual Cost of Performance and Payment Bonds for Bids in Excess of $150,000.00
1 Job SUM (Not to Exceed)
2 Mobilization and Demobilization 1 Job SUM $ 3 Installing Project Identification and Safety
Performance Signs 1 Job SUM $
4 Contractor-Furnished Government Office 12 Mo $ $ 5 Contractor-Furnished Janitorial Services 12 Mo $ $ 6 Environmental Protection 1 Job SUM $ 7 Working “As-built” Documents (Price shall not be less than $10,000.00) 1 Job SUM $
8 Final “As-built” Documents (Price shall not be less than $20,000.00)
1 Job SUM $
9 Topsoil 3,000 CY $ $ 10 Seepage Berm Fill 7,900 CY $ $ 11 Seepage Filter 5,800 CY $ $ 12 Work Platform Fill 11,400 CY $ $ 13 Excavation and Backfill for Gas Line Installation 120 LF $ $ 14 Monitoring Vibrations 1 Job SUM $ 15 Internal Erosion Interception Trench (IEIT) 50,700 SF $ $ 16 Added Verification Drilling and Testing 50 LF $ $ 17 Asphalt Removal 55,700 SF $ $ 18 Aggregate Base Course 770 CY $ $ 19 Asphalt Concrete Base Course 520 CY $ $ 20 Asphalt Concrete Surface Course 190 CY $ $ 21 Tack Coat 4,620 SY $ $ 22 Prime Coat 4,620 SY $ $ 23 Pavement Marking 1 Job SUM $ 24 Geotextile 4,620 SY $ $ 25 Site Work 1 Job SUM $ 26 Seeding 20 Acre $ $ 27 HDPE, 18-inch 375 LF $ $ 28 RW-1A Housing Replacement 1 EA $ $ 29 RW-2 Housing Replacement 1 EA $ $ 30 RW-3-Housing Replacement 1 EA $ $ 31 RW-4-Housing Replacement 1 EA $ $ 32 RW-4A Housing Raise 1 EA $ $ 33 RW-5A Housing Raise 1 EA $ $
W9123720B0003
34 RW-6A Housing Raise 1 EA $ $ 35 RW-7 Housing Raise 1 EA $ $ 36 RW-7A Housing Raise 1 EA $ $ 37 RW-8a Housing Raise 1 EA $ $ 38 RW-9 Housing Raise 1 EA $ $ 39 RW-9A Housing Raise 1 EA $ $ 40 RW-10 Housing Raise 1 EA $ $ 41 RW-10A Housing Raise 1 EA $ $ 42 RW-11 Housing Raise 1 EA $ $ 43 RW-12 Housing Raise 1 EA $ $ 44 MH-1 Raise 1 EA $ $ 45 MH-2 Raise 1 EA $ $ 46 MH-3 Raise 1 EA $ $ 47 MH-4 Raise 1 EA $ $ 48 MH-5 Raise 1 EA $ $ 49 MH-6 Raise 1 EA $ $ 50 MH-7 Raise 1 EA $ $ 51 MH-8 Raise 1 EA $ $ 52 18-inch Flared End Section 11 EA $ $ 53 Video Inspection of Pipe 1 Job SUM $
TOTAL FOR BASE ITEMS (1-53) $
54 Option 1 – Emergency Backfill 1 Job SUM
Not to Exceed
TOTAL FOR BASE AND OPTION
SECTION 00 70 00 - CONDITIONS OF THE CONTRACT
The following have been modified:
52.217-7 OPTION FOR INCREASED QUANTITY--SEPARATELY PRICED LINE ITEM (MAR 1989)
The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor prior to the expiration of the base award. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.
(End of clause)
(End of Summary of Changes)