This document provides details for a federal dredging project maintenance opportunity on the coast of Virginia. The U.S. Army Corps of Engineers, Norfolk District is seeking hydraulic dredging and pipeline services to maintain depths in the Bradford Bay channel and Finney Creek channel to a required 7 feet MLLW plus 1 foot allowable overdepth for a total estimated 46,000 cubic yards of material. Interested parties must attend the pre-solicitation industry day on August 29, 2023 to obtain project details. The formal solicitation is expected to be posted in November 2023 with a bid opening in December 2023 and contract award in February 2024. The selected contractor will be responsible for transporting and disposing of dredged materials within the designated 1000 foot by 1000 foot placement site in Bradford Bay and complying with special conditions including Coast Guard coordination and avoiding damage to nearby oyster grounds.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WATERWAY ON THE COAST OF VIRGINIA (WCV)

BRADFORD BAY CHANNEL AND FINNEY CREEK CHANNEL

MAINTENANCE DREDGING

Norfolk District

29 August 2023

INDUSTRY DAY GOALS

• Provide an overview of the dredging requirements prior to formal solicitation.

• Seek dredging industry input that can be valuable in developing the final solicitation documents.

• Address specific questions relating to the project, based upon currently available information.

KEY MILESTONE DATES

• Pre-solicitation announcement posted 16 October

• Solicitation tentatively planned to be posted

November 2023

• Bid Opening in December 2023

• Award in February 2024

• Construction duration 150 days from issuance of NTP

OVERALL VIEW OF WCV ON THE EASTERN SHORE

FINNEY CREEK AND BRADFORD BAY

DREDGING PROJECT - SCOPE

• Maintenance dredging in the channel to a required depth of 7 feet

MLLW and one foot of allowable overdepth to a total depth of 8 feet MLLW.

• Approximately 46,000 cubic yards of material, including allowable overdepth dredging and estimated accretion.

• The work will be performed by a hydraulic cutterhead dredge and pipeline method

• All dredged material transported and placed inside an authorized 1000 ft by 1000 ft overboard placement site within Bradford Bay.

PROJECT DETAILS

PROJECT DETAILS – DREDGING AREA

PROJECT DETAILS – PIPELINE CORRIDOR

PROJECT DETAILS – PLACEMENT SITE

BID SCHEDULE

SPECIAL WORK REQUIREMENTS

• Coast Guard dredging notification.

• Coast Guard relocation of navigation aids coordination.

• Oyster lease grounds and liability. Contractor should be made aware that they would be liable for damage that results from their dredging operations.

• Location and placement of Hydraulic Pipeline to not damage nearby

Oyster grounds.

• Maximum Dredging Depths. Not to exceed -9 Feet MLLW.

• Placement Site Elevation – No shallower than 2 Feet MLLW.

• Must ‘give way’ to vessel traffic to minimize impacts to navigation while working.

QUESTIONS OR COMMENTS?

Slide 1: Waterway on the coast of virginia (WCV) Bradford Bay channel and finney creek channel maintenance dredging
Slide 2: Industry day goals
Slide 3: KEY MILESTONE DATES
Slide 4: OVERALL view of wcv on the eastern shore
Slide 5: Finney creek and bradford bay
Slide 6: Dredging project - scope
Slide 7
Slide 8
Slide 9
Slide 10
Slide 11: Bid schedule
Slide 12: Special work requirements
Slide 13: Questions or comments?

File details come from the government source that posted it. Updated .