2023-08-10 WCV Bradford Bay and Finney Creek DRAFT BID SCHEDULE.pdf

PDF 669 KB Posted

Attached to
Industry Day for Waterway on the Coast of Virginia (WCV) - Bradford Bay Channel and Finney Creek Maintenance Dredging, VA
Solicitation number
W9123624B5003
Issued by

About this file

This draft bid schedule outlines pricing requirements for the 2024 maintenance dredging of Bradford Bay Channel and Finney Creek in Virginia. The contractor will be responsible for dredging approximately 45,900 cubic yards of material from the channel and creek to a depth of -7 feet MLLW, with one foot of allowable overdepth, and placing the dredged material in the designated overboard disposal site in Bradford Bay. The bid schedule includes line items for mobilization/demobilization costs and dredging costs per cubic yard. Interested parties can obtain more information about this opportunity at the Industry Day event for the Waterway on the Coast of Virginia project being held by the Department of the Army Corps of Engineers Engineering District Norfolk. The solicitation number for reference is W9123624B5003.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DRAFT - N

OT FOR SOLIC

ITATIO

N

IFB NUMBER:________________________________

OFFEROR’S NAME:____________________________

WCV Bradford Bay and Finney Creek Maintenance Dredging 2024 Bid Schedule

Item No. Description Quantity Unit Unit Price Amount

0001 Mobilization and Demobilization 1 Job $___________ $___________

All costs connected with the mobilization and demobilization of all of the Contractor's dredging plant and equipment as defined below will be paid for at the contract lump sum price for this item.

0002 Dredging Bradford Bay Channel and Finney Creek (-7 feet MLLW)

Maintenance Dredging of Bradford Bay Channel from Station 14+40 to 78+00, to a required depth of -7 feet MLLW with one foot of allowable overdepth, and placement of the dredged material within the overboard disposal site in Bradford Bay, complete, including all work as indicated and specified.

45,900 Cubic Yards

TOTAL ESTIMATED AMOUNT BASE BID $___________

File details come from the government source that posted it. Updated .