Text version

NORFOLK HARBOR 55’

DEEPENING:

ATLANTIC OCEAN CHANNEL,

AOC, PHASE 2

INDUSTRY DAY

Norfolk District 08 June 2023

AGENDA

• Project Overview

• Atlantic Ocean Channel, Phase 2 Scope, Dredged Material Characteristics

• Resort Beach & Croatan Beach – use and constraints

• Craney Island Dredged Material Management Area – use and constraints

• Dam Neck Ocean Disposal Site, DNODS – use and constraints

• Requirement for Subcontracting Plan

• Environmental Considerations

• Period of Performance

• Proposed bid schedule and optional items

• Contracting method - Invitation for Bids

PROJECT HISTORY OVERVIEW

• Cost sharing non-Federal sponsor, the Virginia Port

Authority (VPA).

• Authorized Project in 1986 to a depth of -55 ft.

• Maintained to a controlling depth of -50 ft since 2007.

• Executed Chief’s Report June 2018.

• A General Reevaluation Report (GRR) re-validated project economics in June 2018 and allowed project to move into design for the nominal 55 ft channel.

• Executed Project Partnership Agreement 26 April 2022.

PROJECT HISTORY NOTABLE MILESTONES

• Notable Milestones Construction

• Awarded VPA TSC-W Contract October 2019 & Scheduled Dredging Completion September 2022.

• Awarded VPA TSC-E contract & Scheduled Dredging Completion August 2022.

• Awarded VPA Meeting Area 1 Contract July 2022, Scheduled Dredging Commenced August 2022.

• Awarded VPA Meeting Area 2 Contract and Scheduled Completion August 2022.

• Awarded VPA Chesapeake Bay Bridge Tunnel Cover Relocation Contract & Scheduled Completion October 2022.

• Awarded Norfolk District Channel to Newport News and Norfolk Harbor Inner Channel Contract August 2022, scheduled dredging commencement December 2022.

• Awarded Norfolk District Atlantic Ocean Channel Phase 1 Contract March 2023.

PROJECT OVERVIEW & NAVIGATION BENEFITS

AOC, PHASE 1 & 2

• Awarded AOC Phase 1 in March 2023

• Placement site(s): CIDMMA, DNODS

• Volume: ~2.4M cubic yards

• Commence earthwork at CIDMMA in June 2023.

• Commence channel dredging in November 2023.

• AOC Phase 2

• Dimensions: 43,774’ length by 1,300’ width

• Target Depth 59’ + 1’ Allowable Overdepth

• Placement site(s): Resort & Croatan Beaches in VA Beach, CIDMMA, DNODS

• Volume: ~3.1M cubic yards

• Scheduled award date: 30 November 2023

Task Target Date Status USEPA Section 103 Concurrence 03/10/2022 Complete Sediment Sampling Data Interim Deliverable, District 404(b)1 CWA Determination for CIDMMA Placement Complete

09/27/2022 Complete

Sources Sought 11/14/2022 Complete 95% Draft Plans and Specifications (P&S) 02/10/2023 Complete District Quality Review Complete 04/14/2023 Complete

Agency Technical Review Complete 05/26/2023 Pending

Industry Coordination Day 06/08/2023 Pending RTA ( BCOES Complete & Acquisition Plan Approved) 07/14/2023 Pending Advertisement 08/28/2023 Pending Bid Opening 10/13/2023 Pending

Award 11/30/2023 Pending

Notice to Proceed 12/15/2023 Pending

Construction Physical Completion on AOC Phase 2 04/08/2025 – 08/31/2025 TBD. Anticipate between 480 days and 625 days

CRITICAL TASKS TO AOC PHASE 2 DREDGING

ATLANTIC OCEAN CHANNELS, AOC, PHASE 2

SCOPE OF WORK

• May include full scope of deepening from a nominal depth of 50-feet MLLW to 60-feet MLLW:

• Pay depth includes 1-foot of allowable overdepth. A not-to-exceed permitted depth of 64-feet MLLW has been established.

• Approximately 3.1 MCY of payable material is expected from the Atlantic Ocean Channel Phase 2 to be dredged over a period of performance TBD.

• Period of performance will range from 480-days to 625-days.

• Hopper dredging will not be permitted between the dates of September 1st and

November 14th. This seasonal restriction is included in the period of performance.

ATLANTIC OCEAN CHANNEL PHASE 2 DEEPENING

AOC PHASE 2 BENEFICIAL USE REQUIREMENTS

OPTION Bid Contract Work:

• CLIN 0011 Mob/Demob. beyond CLIN 0001 for Resort Beach placement.

• CLIN 0012 Dredging 950,000 CY with hydraulic placement at Resort Beach.

• CLIN 0013 Mob/Demob. beyond CLIN 0001 for Croatan Beach placement.

• CLIN 0014 Dredging 130,000 CY with hydraulic placement at Croatan Beach.

• CLIN 0015 Mob./Demob. beyond CLIN 0001 for CIDMMA placement.

• CLIN 0016 Dredging 500,000 CY with hydraulic placement at

CIDMMA.

• CLIN 0017 Dredging 500,000 CY with hydraulic placement at

CIDMMA.

• Beach Nourishment

• Croatan Beach option work (CLINs 0013 &

0014) will ONLY be issued if Resort Beach options (CLINs 0011 & 0012) are issued.

• Beneficial Use Options

• Contractor may place up 1.08M CY at the beaches (Resort & Croatan) OR place up to 1M CY at the CIDMMA.

• Either

• Resort and/or Croatan Beaches Placement

• CLINs 0011, 0012, 0013, 0014

• Or

• CIDMMA Placement

• CLINs 0015, 0016, 0017

• Not

• CLINS 0011, 0012, 0013, 0014, 0015, 0016,

• May include full scope of deepening from a nominal depth of 50-feet MLLW to 60-feet MLLW:

• Pay depth includes 1-foot of allowable overdepth. A not-to-exceed permitted depth of 64-feet MLLW has been established.

• Approximately 3.1 MCY of payable material is expected from the Atlantic Ocean Channel Phase 2 to be dredged over a period of performance TBD.

• Period of performance will range from 480-days to 625-days.

• Hopper dredging will not be permitted between the dates of September 1st and

November 14th. This seasonal restriction is included in the period of performance.

ATLANTIC OCEAN CHANNEL PHASE 2 DEEPENING

BASE Bid Contract Work:

CLIN 0001 Mobilization/Demobilization & placement at DNODS.

CLIN 0002 LEVEL 1: Live Sea turtle response.

CLIN 0003 LEVEL 2: Live sea turtle response.

CLIN 0004 LEVEL 3: Live sea turtle response.

CLIN 0005 Sea turtle nest relocation.

CLIN 0006 Contracting Officer directed placement survey at DNODS CLIN 0007 Dredging 3,078,700 CY with placement at DNODS.

CLIN 0008 Contracting officer directed standby time.

CLIN 0009 Turtle trawling.

CLIN 0010 Onboard MEC Technician III and MEC Technician II.

OPTION Bid Contract Work:

CLIN 0011 Mob/Demob. beyond CLIN 0001 for Resort Beach placement.

CLIN 0012 Dredging 950,000 CY with hydraulic placement at Resort Beach.

CLIN 0013 Mob/Demob. beyond CLIN 0001 for Croatan Beach placement.

CLIN 0014 Dredging 130,000 CY with hydraulic placement at Croatan Beach.

CLIN 0015 Mob./Demob. beyond CLIN 0001 for CIDMMA placement.

CLIN 0016 Dredging 500,000 CY with hydraulic placement at CIDMMA.

CLIN 0017 Dredging 500,000 CY with hydraulic placement at CIDMMA.

CLIN STRUCTURE DISCUSSION

How to bid on the BASE scope of work and all OPTION items?

• BASE scope work

• Includes costs of placing ALL material at DNODS.

• OPTION Items

• Includes cost in addition to BASE CLIN to place up to 1.08M CY at Resort & Croatan Beaches or up to 1M CY at the CIDMMA.

Item No. Description QTY Unit Amount

CLIN 0001 Mob/Demob DNODS 1 Job $5.00 CLIN 0011 Mob/Demob Resort Beach 1 Job $1.00 CLIN 0013 Mob/Demob Croatan Beach 1 Job $0.25 CLIN 0015 Mob/Demob CIDMMA 1 Job $8.50

Sample Bid Mob/Demob for DNODs Placement (CLIN 0001), BASE

• Sample Mob/Demob Cost to Place at DNODS = $5.00

Sample Bid Mob/Demob for Resort Beach Placement (CLINs 0001 + 0011), BASE +

OPTION

• Sample Mob/Demob Cost to Place at Resort Beach = $5.00 + $1.00 = $6.00

Sample Bid Mob/Demob for Croatan Beach Placement (CLINs 0001 + 0011 + 0013), BASE + OPTION

• Sample Mob/Demob Cost to Place at Croatan Beach = $5.00 + $1.00 + $0.25 = $6.25

Bid Calculation for CIDMMA Placement (CLIN 0001 + CLIN 0015), BASE + OPTION

• Sample Mob/Demob Cost to Place at CIDMMA = $5.00 + $8.50 = $13.50

GEOTECHNICAL CONSIDERATIONS

SUMMARY OF AVAILABLE SUBSURFACE DATA

ATLANTIC OCEAN CHANNEL PHASE 2

In general, there is a combination of sand, silt, coarse-grained material, and fine-grained material between ST 1730+00 to ST 1880+00 and ST 1978+00 to ST 2215+74 as indicated in the Geotechnical Summary Report within the Specifications.

SUMMARY OF AVAILABLE SUBSURFACE DATA

ATLANTIC OCEAN CHANNEL PHASE 2

Norfolk Harbor and Channels Navigation Improvement Project General Reevaluation Report (2018)

• Summarized and evaluated geotechnical information for the entire Norfolk Harbor Improvements project.

• Subsurface data obtained between 1981 and 2009

• Exploration methods: Vibracores, Gravity cores, Grab samples, Boreholes, and Cone

Penetration Test (CPT) probes.

• Material encountered in Atlantic Ocean Channel Phase 2 may consists of sands, silts, clays, coarse-grained material, and fine-grained material.

PROJECT CONSTRAINTS

Craney Island

• Intent is to capture sandy material in a confined location for immediate use through separate earthwork contract.

• Optional beneficial use placement location of sandy dredged material from AOC Phase 2.

• Fine grain material not suitable for placement at CIDMMA may be directed for placement within the Damneck Ocean Disposal Site

(DNODS).

• Maximum daily production rate in a 24-hour period per cell is 22,500 CY.

Craney Island

• It is intended that the sub-containment cell within the CIDDMA northeastern cell is constructed concurrent to keep pace with AOC Phase 2 dredging and placement operations.

• There is a secondary sub-containment cell with the CIDMMA northeastern and center eastern cells. The secondary sub-containment cell shall be constructed under the AOC Phase 2 Contract.

• Other Contractors will be working in previously filled sub-cells concurrent with ongoing dredging and placement operations.

• Placement of dredged material will generally occur from the southern limit of the sub-containment cell advancing to the North then West.

Miscellaneous Constraints

• Mechanical Dredging

• Material Placement in Craney Island Rehandling Basin (CIRB) will not be allowed.

• Cell Rotation Requirements at CIDMMA

• Not to exceed 22,500 CY of placed material in a 24-hour period per cell.

• Government’s intent to limit the use of facility to one cell at a time.

• Most placement at the CIDMMA will be confined to the primary placement area in the North Cell.

• Some placement at the CIDMMA will be confined to the secondary placement area in the Center and North cells.

• Minimal freeboard currently available .

ENVIRONMENTAL CONSIDERATIONS

WATER QUALITY MONITORING

• Comply with requirements for Section 404 of the Clean

Water Act for discharges associated with confined disposal facilities.

• Manage spillboxes to ensure adequate ponding depth for effective sedimentation & to maximize use of the available effective weir length ensuring that only the clarified supernatant flows over the weir crest.

• The Contractor must maintain a daily average Total Suspended Solids (TSS) concentration of less than 500 mg/l. The "less than" 500 mg/l TSS concentration is a threshold limit and is not a TSS target or goal.

WATER QUALITY MONITORING

• Environmental Testing and Upland Effluent

• TSS samples

• Collect every 12 hours at the weir crest of each operating spillbox.

• Hach 900 Colorimeter model #48450-00, program 94

"Suspended Solids", or approved equal.

• 1000 ml wide mouth polyethylene bottle (Nalgene 2104-0032 or equal).

• Log digitally in Water Quality Database.

• Visual inspection for clarified water required every 4 hours at each operating spillbox.

• Spillboxes shall be maintained and weir boards adjusted so that only clarified water is released.

PROTECTED SPECIES

• Native habitat for eagles, hawks, egrets, herons, pelicans, terns, plovers, dolphins, manatees, whales, sturgeon, & other wildlife protected by federal law or species of special concern for Virginia agencies.

• Nesting birds may cause delays if found in placement/work area.

• May 15 – August 30: Least Tern and Black Necked Stilt nesting season

• January – May: 1st Bald Eagle Nest in 2020

• The Contractor shall monitor the pond area in the active containment cell to ensure pond backwaters do not flood nesting areas.

ENDANGERED SPECIES MONITORING-

MECHANICAL DREDGES

• Endangered Species Training provided by USACE.

• Designate a look out to monitor visible action area from dredge plant:

• Look for parts/pieces of Atlantic sturgeon entrained in the cutterhead, floating around the dredge or collected in the inflow inside the upland placement area.

• Document observations & notify COR ASAP.

• Follow “Sturgeon Incidental Take Procedures.”

• Fin clips

• Measurements, photos, specimen preservation

ENDANGERED SPECIES MONITORING-HOPPER

DREDGES

• Two Protected Species Observers (PSO) are required.

• Operate dredge per the specifications to minimize takes.

• PSOs must inspect draghead, Turtle Excluder Device

(TED), & UXO after each load.

• No openings larger than 4 inches x 4 inches on

TED or draghead.

• Follow “Sea Turtle Incidental Take Procedures” & 2018

Biological Opinion RPMs.

• Measurements, photos, specimen preservation

(keep remains cold on ice, not in water).

• Transfer of remains or live turtles to VAQS.

ENDANGERED SPECIES MONITORING-OPTIONAL

BEACH RENOURISHMENT (CROATAN/RESORT)

• Protected Species Observers (PSO) are required to inspect the beach for turtle nesting activity every 2 hours, 24 hours/day from May 1 through Nov 15.

• All placement activities will be halted within a 500 ft buffer if activity is discovered.

• Nests within construction zone will be relocated by qualified entity. A predetermined relocation fee will be charged. Contractor must pay the relocation fee. USACE will reimburse the Contractor for the fee.

• VAQS conducts early morning crawl surveys during nesting season and must be provided unimpeded and safe access.

• New required environmental training for all beach construction crew members conducted by USACE Biologist.

• Follow all 2023 Biological Opinion Conservation Measures and RPMs.

ENVIRONMENTAL PROTECTION PLAN (E.P.P.)

• Contractor must submit E.P.P. that includes:

• Spill Control Plan

• Hazardous Waste Controls

• Non-Hazardous Solid Waste Disposal

Plan

• Recycling & Solid Waste Disposal Plan

• Contaminant Prevention Plan

• Historical, Archaeological, Cultural, Biological, & Wetland Resources Plan

• Endangered Species Plan

UXO/MEC SCREEN

• Unexploded ordinances have been documented in Atlantic Ocean Channel.

• Land-based UXO technician(s) are required at CIDMMA during placement.

• UXO/MEC screens are required on dragheads and at the CIDMMA.

• Screens on the dredge shall be no larger than 1.25 inches x 6 inches.

• Discharge end screens shall retain all items 0.75 inches in diameter.

• Modifications to the required size of the UXO/MEC screen will only be considered for use between December 1 and March 31.

CONTRACTING REQUIREMENTS

ACQUISITION STRATEGY

• Dredging contract will most likely be full and open sealed bid.

• Sources Sought issued 14 November 2022.

• Magnitude $25 - $100 M anticipated.

• C type contract will be awarded.

• Contract scheduled to be advertised 28 August 2023.

• Web-page: https://sam.gov/content/home

NORFOLK DISTRICT SMALL BUSINESS

Ms. Cherie Kunze Deputy for Small Business Programs Norfolk District, U.S. Army Corps of Engineers 803 Front Street Norfolk, VA 23510-1096

Phone: (757) 675-4428 cherie.a.kunze@usace.army.mil

OPEN DISCUSSION

Norfolk HARBOR 55’ Deepening:��Atlantic Ocean Channel, AOC, Phase 2��industry day
agenda
Project History Overview
Project History Notable Milestones
Project Overview & Navigation BenefitS
AOC, Phase 1 & 2
Critical Tasks to AOC Phase 2 Dredging
Atlantic Ocean Channels, AOC, Phase 2�scope of WORK
Atlantic Ocean Channel Phase 2 Deepening
AOC PHASE 2 BENEFICIAL USE REQUIREMENTS
Atlantic Ocean Channel Phase 2 Deepening
CLIN Structure Discussion
Geotechnical considerations
Summary of available subsurface data�Atlantic Ocean Channel Phase 2
Summary of available subsurface data�Atlantic Ocean Channel Phase 2
Project constraints
Project constraints
Project constraints
Project constraints
Environmental considerations
water Quality Monitoring
water Quality Monitoring
Protected species
Endangered species Monitoring-Mechanical dredges
Endangered species Monitoring-hopper dredges
Endangered species Monitoring-Optional Beach renourishment (croatan/Resort)
Environmental protection plan (e.p.p.)
UXO/MEC Screen
Contracting requirements
Acquisition strategy
Norfolk District SMALL BUSINESS
Open discussion