2023-06-02 AOC PHII Industry Day Bid Schedule.pdf
PDF 166 KB Posted
- Attached to
- Atlantic Ocean Channel Deepening Phase 2
- Solicitation number
- W9123623B5006ID
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Atlantic Ocean Channel
Virginia Beach, VA
IFB NUMBER:
OFFEROR'S NAME:
Item No. Description Quantity Unit Line Item
Price Amount
Mobilization and Demobilization for Placement at
Dam Neck Ocean Disposal Site
All costs connected with the mobilization and demobilization, inclusive of additional remobilizations and demobilizations for seasonal restriction windows, of the Contractor's plant and equipment for dredging Atlantic Ocean Channel and overboard placement at the Dam Neck Ocean Disposal
Site (DNODS) are included in this bid item. 1 JOB $ $
Live Sea Turtle Response with Traumatic Fatal Injuries
(Level One)
See Measurement and Payment section 01 22 00 of the specifications for more details. 2 JOB $ $
Live Sea Turtle Response and Rehabilitation with Mild to Moderate Traumatic Injuries (Level Two)
See Measurement and Payment section 01 22 00 of the specifications for more details. 2 JOB $ $
Live Sea Turtle Response and Rehabilitation with
Severe Traumatic Injuries (Level Three)
See Measurement and Payment section 01 22 00 of the specifications for more details. 2 JOB $ $
Sea Turtle Nest Relocation
See Measurement and Payment section 01 22 00 of the specifications for more details. 2 JOB $ $
CONTRACT LINE ITEM SCHEDULE - ATLANTIC OCEAN CHANNEL PHASE 2
BASE BID
e4wrotal Stamp
Contracting Officer Directed Placement Survey at
DNODS
The contract price per individual DNODS placement cell
(e.g. cell 3, cell 4, etc.) as directed for performance of a hydrographic survey at the direction of the Contracting
Officer in accordance with survey methodology specified in Section 35 20 23. Payment of this item is for Contracting Officer directed surveys only and excludes reimbursement for the periodic, acceptance, and other surveys of DNODS required by the project specifications. (Price per DNODS Cell Survey) 7 JOB $ $
Dredging Atlantic Ocean Channel to -59 Feet MLLW with Placement at DNODS
Entire work with labor, material, equipment, testing, transportation, and all appurtenances to dredge
Atlantic Ocean Channel to a depth of -59 feet with one foot of allowable overdepth and dispose of the material at Dam Neck Ocean Disposal Site (DNODS), in accordance with the plans and specifications. Final quantity shall be adjusted up or down depending on the project requirements and volume measurements.
Post dredging clean-up of shoals regardless of means and methods (hydraulic or mechanical) shall be paid for under this line item. Removal of material accumulated due to accretion shall also be paid under this line item. 3,078,700 CY $ $
Contracting Officer Directed Standby Time
The contract price per day for Contracting Officer directed standby time shall include the Contractor's costs for holding his plant, equipment, and crew on site until further direction is given by the Contracting
Officer. Time will be measured and paid for by the day
(24 hours) and calculated to the nearest hour (1/24 day) for payment. 5 DAY $ $
Turtle Trawling
Unit price is for actual days engaged in Turtle trawling only. The unit cost shall include all mobilization/demobilization costs of the trawler, and all material, equipment, and labor required to accomplish the intended purpose in accordance with
Section 01 57 40 of the specifications. 10 DAY $ $
Onboard MEC Technician III and MEC Technician II
See specification section 01 35 30 MEC Construction
Support, page 3 paragraph 1.4 c. for details on when these personnel would be required. The optional bid item will be for onboard required MEC support personnel and will be based on a daily rate. No separate payment will be made for travel time to and from the dredge. All transportation costs to and from the dredge shall be included in the daily rate. Costs will be paid for based on actual time onboard the dredge. 30 DAY $ $
Beneficial Use Option 1 - City of Virginia Beach Resort
Beach: Mobilization/Demobilization for Beach Fill
All costs connected with the mobilization and demobilization (beyond CLIN 0001), inclusive of additional remobilizations and demobilizations for seasonal restriction windows, of the Contractor's plant and equipment for the placement of beach fill are included in this bid item. Mobilization shall include all
Contractor costs for operations accomplished prior to commencment of beach fill operations; this shall include project layout, utility locations, installation and maintenance of erosion and sediment control at the designated sites; traffic control, site preparation;
transfer of attendant plant and equipment to site;
placement site inspection; and any other associated work that is necessary in advance of actual dredging operations. Demobilization and Site Restoration shall include demobilization of all equipment, restoration of site conditions, and cleanup of the Contractor's staging area. 1 JOB $ $
TOTAL BASE BID
OPTION BID
Beneficial Use Option 1 - City of Virginia Beach Resort
Beach: Hydraulic Beach Fill
Payment to be made for this item includes all incremental costs of transpotation and placement of dredged material beyond that included in CLIN 0006.
This item shall include additional transport of dredged material for the purpose of beach fill material to the pump out mooring facility, screening of material at the pipeline discharge on the beach, ordnance and explosives safety specialists, construction of the designated beach to the lines and grades indciated, surveying, and all other associated costs of removal and placement of material as indicated and specified exclusive of the mobilization and demobilization defined in CLIN 0011. The total cost of these items shall be based on the cubic yard price for this item and the computed difference in the amount of material measured by the cubic yard in place for the pre-construction and post-construction surveys for each beach fill segment. Final quantity shall be adjusted up or down depending on project requirements and measurements. (Price per cubic yard delivered and accepted in place). 950,000 CY $ $
Beneficial Use Option 2 - City of Virginia Beach
Croatan Beach: Mobilization/Demobilization for
Beach Fill.
Note: CLIN 0013 and CLIN 0014 are only eligible for award if CLIN 0011 and CLIN 0012 are awarded.
All supplemental costs connected with the mobilization and demobilization (beyond CLIN 0001 and CLIN 0011), inclusive of additional remobilizations and demobilizations for seasonal restriction windows, of the Contractor's plant and equipment for the placement of beach fill are included in this bid item.
Mobilization shall include all Contractor costs for operations accomplished prior to commencment of beach fill operations; this shall include project layout, utility locations, installation and maintenance of erosion and sediment control at the designated sites;
traffic control, site preparation; transfer of attendant plant and equipment to site; placement site inspection;
and any other associated work that is necessary in advance of actual dredging operations. Demobilization and Site Restoration shall include demobilization of all equipment, restoration of site conditions, and cleanup of the Contractor's staging area. 1 JOB $ $
Beneficial Use Option 2 - City of Virginia Beach
Croatan Beach: Hydraulic Beach Fill.
Note: CLIN 0013 and CLIN 0014 are only eligible for award if CLIN 0011 and CLIN 0012 are awarded.
Payment to be made for this item includes all incremental costs of transpotation and placement of dredged material beyond that included in CLIN 0006.
This item shall include additional transport of dredged material for the purpose of beach fill material to the pump out mooring facility, screening of material at the pipeline discharge on the beach, ordnance and explosives safety specialists, construction of the designated beach to the lines and grades indciated, surveying, and all other associated costs of removal and placement of material as indicated and specified exclusive of the mobilization and demobilization defined in CLIN 0013. The total cost of these items shall be based on the cubic yard price for this item and the computed difference in the amount of material measured by the cubic yard in place for the pre-construction and post-construction surveys for each beach fill segment. Final quantity shall be adjusted up or down depending on project requirements and measurements. (Price per cubic yard delivered and accepted in place). 130,000 CY $ $
Beneficial Use Option 3 - Craney Island Dredged
Material Management Area: Mobilization/
Demobilization
All costs connected with the mobilization and demobilization (beyond CLIN 0001), inclusive of additional remobilizations and demobilizations for seasonal restriction windows, of the Contractor's plant and equipment for the placement of dredged material at Craney Island Dredged Material Management Area
(CIDMMA) are included in this bid item. Mobilization shall include all Contractor costs for operations accomplished prior to CIDMMA dredged material placement operations; this shall include site preparation; transfer of attendant plant and equipment to site; placement site inspection; and any other associated work that is necessary in advance of actual placement operations. Demobilization shall include demobilization of all equipment, restoration of original site conditions, and cleanup of the Contractor's staging area. 1 JOB $ $
Beneficial Use Option 3 - Craney Island Dredged
Material Management Area: Hydraulic Placement at
Craney Island
Payment to be made for this item includes all incremental costs of transpotation and placement of dredged material beyond that included in CLIN 0006, associated with material dredged with placement at the CIDMMA, including additional transport of the dredged material prior to pump out, screening of material at the pipeline discharge end, Ordnance and
Expolsives Safety Specialist work, maintenance of containment area at the CIDMMA, and all other associated costs. 500,000 CY $ $
Beneficial Use Option 3 - Craney Island Dredged
Material Management Area: Hydraulic Placement at
Craney Island
Payment to be made for this item includes all incremental costs of transpotation and placement of dredged material beyond that included in CLIN 0006, associated with material dredged with placement at the CIDMMA, including additional transport of the dredged material prior to pump out, screening of material at the pipeline discharge end, Ordnance and
Expolsives Safety Specialist work, maintenance of containment area at the CIDMMA, and all other associated costs. 500,000 CY $ $
ACKNOWLEDGE
Hopper dredging with upland disposal at the CIDMMA and Beach Fill at Resort Beach or Croatan Beach.
Post dredging clean-up with hopper dredge.
Combination of hopper dredging with upland disposal at the CIDMMA, Beach Fill at Resort Beach and
Croatan Beach and mechanical dredging with hydraulic unloading for upland disposal at the CIDMMA and
Beach Fill at Resort Beach and Croatan Beach. Post dredging clean-up with either hopper or mechanical dredge.
Mechanical dredging with hydraulic unloading for upland disposal at CIDMMA and Beach Fill at Resort
Beach and Croatan Beach. Post dredging clean-up with mechanical dredge.
The Contractor must check the box below to acknowledge that the predetermined VAQS costs must be included in CLINs 0002, 0003, 0004, and 0005. More information regarding these line items and the predetermined costs can be found in the specifications Section 01 22 00 Measurement and Payment paragraphs 1.3.2-1.3.5.
The Contractor must check ONE box below to indicate method of dredging to be used if material is to be placed at the CIDMMA or Beach Fill for Resort Beach, Croatan Beach:
TOTAL BASE + OPTION BID
TOTAL OPTION BID
c c c c
File details come from the government source that posted it. Updated .