NORFOLK HARBOR AND CHANNELS DEEPENING

ATLANTIC OCEAN CHANNEL

PHASE 2

SPECIFICATIONS

VIRGINIA BEACH, VIRGINIA May 16, 2023 e4wrotal Stamp

Technical Specifications

Division 01 01 11 00 01 14 00 01 22 00 01 30 00 01 32 01.00 10 01 33 00 01 35 26 01 35 30 01 42 00 01 45 00.00 10 01 45 00.15 10 01 57 20.00 10 01 57 30 01 57 40

Division 35 35 20 23

35 20 23.13

35 20 23.23

35 20 24

Appendices

Appendix A

Appendix B

Appendix C

Appendix D

Summary of Work Special Work Conditions Measurement and Payment Administrative Requirements Project Schedule Submittal Procedures Government Safety Requirements Munitions and Explosives of Concern (MEC) Construction Support Sources for Reference Publications Quality Control Resident Management System Contractor Mode Environmental Protection Environmental Permit Work Requirements Equipment and Procedures for Protecting Endangered Species

Dredging

National Dredging Quality Management Program Scow – Monitoring Profile

National Dredging Quality Management Program Hopper Dredge

Beach Fill

Biological Opinion, dated October 5, 2018

Dam Neck Ocean Disposal Site Environmental Protection Agency Final MPRSA Section 103 Concurrence Letter, March 10, 2022

Geotechnical Data

Sample Forms e4wrotal Highlight Division 31 e4wrotal Highlight Earthwor e4wrotal Highlight 31 00 0 e4wrotal Highlight ivision 31 31 00 0

Appendix E Dam Neck Ocean Disposal Site – Site Management and Monitoring Plan

Appendix F WRD-01

Appendix G Biological Opinion, dated February 2023

Atlantic Ocean Channel Phase 2 Deepening FY23AOCPHASE2

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

1.1.2 Location

1.1.3 Seasonal Restrictions

1.2 SEQUENCE OF WORK

1.3 PRIORITY OF WORK FOR BENEFICIAL USE OPTIONS

1.4 SPECIAL REQUIREMENTS FOR CRANEY ISLAND DREDGED MATERIAL MANAGEMENT

AREA

1.4.1 Personnel Restrictions

1.4.2 Transportation Restrictions

1.5 COOPERATION WITH USING AGENCY AND OTHER CONTRACTORS

1.6 HISTORICAL AND ARCHAEOLOGICAL FINDS

PART 2 PRODUCTS

PART 3 EXECUTION

-- End of Section Table of Contents --

SECTION 01 11 00 Page 1

SECTION 01 11 00

SUMMARY OF WORK

08/15

PART 1 GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

1.1.1 Project Description

The work at the Atlantic Ocean Channel consists of deepening dredging the Atlantic Ocean Channel to a required depth of -59 feet MLLW. One (1) foot of overdepth dredging will be allowed as part of the contract dredging pay prism. Dredged material placement within Dam Neck Ocean Disposal Site (DNODS) is associated with base scope of work. The optional work also includes containment area earthwork maintenance at the CIDMMA. Dredged material placement within the Craney Island Dredged Material Management Area (CIDMMA) shall be dependent on award of optional bid items. Dredged material placement on the beach for beach nourishment beneficial use shall be dependent on award of optional bid items for Resort Beach and Croatan Beach.

1.1.2 Location

The work is located at the Atlantic Ocean Channel in Hampton Roads, Virginia.

1.1.3 Seasonal Restrictions

Seasonal restrictions of hopper dredging operations will apply for this contract. No hopper dredging shall occur between the dates of September 1 and November 14 due to seasonal migration of endangered species.

1.2 SEQUENCE OF WORK

Work under this contract includes both maintenance dredging and new work dredging of the Atlantic Ocean Channel. Placement at the CIDMMA or placement at Resort Beach or Croatan Beach for beach nourishment shall be dependent on award of optional bid items. A single Notice to Proceed (NTP) will be issued. The NTP will direct the Contractor to proceed with all work associated with the Bid Schedule. The sequence of work is to be defined by the Contractor as their most efficient method.

1.3 PRIORITY OF WORK FOR BENEFICIAL USE OPTIONS

Priority of award for beneficial use optional work is 1) Resort Beach, 2) Croatan Beach and 3) CIDMMA. Croatan Beach CLINs are eligible for award only if the Resort Beach CLINs are awarded. CIDMMA CLINs are eligible for award only if Resort Beach and Croatan Beach CLINs are not awarded.

1.4 SPECIAL REQUIREMENTS FOR CRANEY ISLAND DREDGED MATERIAL MANAGEMENT AREA

All activities at Craney Island Dredged Material Management Area shall be conducted in accordance with "COMMANDER'S POLICY MEMORANDUM NUMBER WRD-01" which is available for review at the Craney Island Reservation Office.

Point of contact for review of the Regulation or to visit the site is

SECTION 01 11 00 Page 2

Carlos Quinones, telephone (757) 484-1021. It is also included in Appendix F of these specifications. The government retains ownership of all materials deposited within the disposal area. The removal of existing scrap iron, steel, or any other material located in CIDMMA for personal use is prohibited.

1.4.1 Personnel Restrictions

Personnel working at Craney Island are limited to the immediate site areas where work is to be performed and shall not enter buildings or facilities not involved in the work. All employees of the Contractor will be subject to all rules and regulations of the Craney Island Dredged Material Management Area which pertain to personnel.

1.4.2 Transportation Restrictions

Craney Island is served by an all weather surfaced road network, except at the diked placement area which is compacted earth. Roads within the CIDMMA proposed to be used by the Contractor shall be subject to prior approval of the Facility Manager and such roads, if used, shall be maintained throughout construction and restored to as good condition as existed prior to their use. Other roads may be used only with the approval of the Facility Manager. The Contractor shall keep all roads free of mud and other foreign materials resulting from operations. All temporary construction shall be removed and the affected areas restored to their original condition. The Contractor's vehicles shall at no time follow a vehicle closer than 50 feet, and all vehicles shall pull off the road and come to a complete stop when meeting emergency vehicles and vehicles with flashing lights. Craney Island speed limits and traffic controls shall be observed. All costs for the use of existing transportation facilities, and for the removal of temporary construction and subsequent restoration, shall be borne by the Contractor.

1.5 COOPERATION WITH USING AGENCY AND OTHER CONTRACTORS

During the period of this contract, other contracts may be in force for the construction of other features of work on or adjacent to the site of work being accomplished under this contract. It shall be the responsibility of the Contractor on this contract to be fully informed of the extent of the limits of work to be performed by other Contractors.

Should there be any conflict between these limits, it shall be brought to the attention of the Contracting Officer (CO), and the CO's decision shall be final. Also, prior to completion of work under this contract, members of the Using Agency may be performing work or occupying facilities on or adjacent to the area. The Contractor shall arrange his plant and shall schedule and perform this work while effectively cooperating with all other Contractors and Government agencies. Adjacent contracts anticipated at this time include, but are not limited to:

Various dredging contracts requiring use of the Rehandling Basin.

The Contractor shall anticipate barges and scows putting dredged material in the Rehandling Basin during this contract

Various dredging contracts hydraulically placing dredged material into the existing CIDMMA placement cells. The Contractor shall anticipate pipelines and support barges operating along the eastern CIDMMA perimeter and associated land based support equipment during this contract.

SECTION 01 11 00 Page 3

Earthwork contract for raising of the perimeter dikes at the CIDMMA. The contractor shall anticipate dump trucks, excavators, and other heavy equipment operating along the perimeter dikes.

1.6 HISTORICAL AND ARCHAEOLOGICAL FINDS

Federal legislation provides for the protection, preservation, and collection of scientific, prehistoric, historical, and archaeological data, including relics and specimens which might otherwise be lost due to alteration of the terrain or building features as a result of any Federal construction project. Should the Contractor, or any of the Contractor's employees, or parties operating or associated with the Contractor, in the performance of this contract discover evidence of possible scientific, prehistoric, historical, or archaeological data, the Contractor shall immediately cease work at that location, avoid further disturbance, and notify the Contracting Officer, giving the location and nature of the findings. The Contractor shall forward written confirmation to the Contracting Officer as directed. The Contractor shall exercise care so as not to disturb or damage artifacts or fossils uncovered during excavation operations, and the Contractor shall provide such cooperation and assistance as may be necessary to preserve the findings for removal or other disposition. Any person who, without permission, injures, destroys, excavates, appropriates, or removes any historical or prehistoric artifact, object of antiquity, or archaeological resource on the public lands of the United States is subject to arrest and penalty of law. Where appropriate by reason of discovery, the Contracting Officer may order delays in the time of performance or changes in the work, or both. If such delays or changes are ordered, an equitable adjustment will be made in the contract in accordance with the applicable clauses of the contract.

PART 2 PRODUCTS

Not used.

PART 3 EXECUTION

Not used.

-- End of Section --

SECTION 01 11 00 Page 4

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 14 00

SPECIAL WORK CONDITIONS

08/11

PART 1 GENERAL

1.1 SUBMITTALS

1.2 CONTRACTOR'S NOTIFICATIONS

1.2.1 Dredging Intent Notification to the U.S. Coast Guard and the

National Marine Fisheries Service (NMFS)

1.3 REFERENCES

1.4 CONTRACTOR WORK REQUIREMENTS

1.4.1 Order of Work - Beach Placement

1.4.2 Hopper Dredge Seasonal Restriction

1.4.3 Access to Work Site

1.4.4 Access-Egress Restrictions and Beach Activities for Special

Events

1.4.5 Contracting Officer Directed Stand By Time

1.4.6 Designated Marine Plant Anchorage and Equipment Working Area

Restrictions

1.4.7 Noise Control and Abatement

1.4.8 Beach Lighting

1.4.9 Protected Species Surveys

1.4.10 Early Morning Sea Turtle Nest Surveys

1.4.11 Coordination with Other Contractors

1.5 Notification Of Beach Fill Operations

1.6 PHYSICAL DATA

1.6.1 Physical Conditions Information

1.6.2 Site Related Weather Conditions

1.6.3 Time Extensions For Unusually Severe Weather

1.6.4 Schedule

1.6.5 Additional Information for Local Physical Conditions

1.6.6 Responsibility

1.6.7 Condition of Dredging Areas

1.6.8 Obstruction of Dredging Areas

1.6.9 Dredging Area Traffic

1.6.10 Condition of Beach Fill Areas

1.6.11 Oyster Grounds

1.7 PUMPING OF BILGES

1.8 FUEL OIL TRANSFER OPERATIONS

1.9 LAYOUT OF WORK AND SURVEYS

1.9.1 General

1.9.2 Datum and Bench Marks

1.9.3 Responsibility for Tide Measurements

1.9.4 Contractor Layout for Survey of Beach Requirements

1.10 CONTINUITY OF BEACH FILL WORK

1.11 CONTINUITY OF DREDGING

1.12 INSPECTION

1.12.1 General Inspection Requirements

1.13 SIGNAL LIGHTS

SECTION 01 14 00 Page 1

1.14 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.14.1 Costs

1.14.2 Rentals

1.14.3 Data

1.15 BRIDGE-TO-BRIDGE RADIO COMMUNICATION

1.15.1 Radio

1.16 SPECIAL COAST GUARD REQUIREMENTS

1.16.1 Local Notice To Mariners

1.16.2 Relocation of Navigation Aids

1.16.3 Use of Coast Guard Navigation Aid Structures

1.17 MISS UTILITY

1.18 ENVIRONMENTAL LITIGATION

1.18.1 Litigation

1.19 HISTORICAL AND ARCHAEOLOGICAL FINDS

1.20 PROFIT

1.20.1 Weighted Guidelines

1.20.2 Values

1.20.2.1 Degree of Risk

1.20.2.2 Relative Difficulty of Work

1.20.2.3 Size of Job

1.20.2.4 Periods of Performance

1.20.2.5 Contractor's Investment

1.20.2.6 Assistance by Government

1.20.2.7 Subcontracting

1.21 PARTNERING

1.22 SUBCONTRACTS AND WORK COORDINATION

1.23 ACCOMMODATIONS ABOARD DREDGE FOR CONSTRUCTION REPRESENTATIVES

1.23.1 Accommodations

1.23.2 Costs

1.24 PHOTOGRAPHS

1.25 CERF IMPLEMENTATION

1.26 SEAGOING BARGE ACT

PART 2 PRODUCTS (THIS PART NOT USED)

PART 3 EXECUTION (THIS PART NOT USED)

-- End of Section Table of Contents --

SECTION 01 14 00 Page 2

SECTION 01 14 00

SPECIAL WORK CONDITIONS

08/11

PART 1 GENERAL

The base scope of work consists of dredging within Atlantic Ocean Channel with transportation and placement at Dam Neck Ocean Disposal Site (DNODS).

The Contractor shall perform the scheduled work with Hopper or Mechanical dredges.

Optional beneficial use work, if awarded, consists of dredging suitable borrow and beach fill material from the Atlantic Ocean Channel. The Contractor shall perform the scheduled work with Hopper or Mechanical dredges. The material will be transported and placed at Resort Beach and Croatan Beach in Virginia Beach, or at Craney Island Dredged Material Management Area (CIDMMA). If dredged material is to be placed on Resort, Croatan Beach, or CIDMMA, the Contractor shall transport the material to a pumpout buoy to be provided by the Contractor. The material shall then be transported by hydraulic pipeline to the designated placement area segments as indicated and specified.

1.1 SUBMITTALS

The Contractor shall make submittals for the following listed reports and certificates as required by the specifications. The Contracting Officer may request submittals in addition to those specified when deemed necessary to adequately describe the work. Units of weights and measures used on all submittals shall be the same as those used in the contract drawings. Each submittal shall be complete and in sufficient detail to allow ready determination of compliance with contract requirements. Prior to submittal, all items shall be checked and approved by the Contractor's Quality Control (CQC) representative and each item shall be stamped, signed, and dated by the CQC representative indicating action taken in accordance with SECTION 01 45 00. Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction and Postconstruction Submittals

* Dredging Intent Notifications to the U.S. Coast Guard

Prior to commencement of dredging, submit a copy of Dredging Intent Notifications to Department of Environmental Quality and U.S. Coast Guard and at the same time to the Contracting Officer.

* Marine Plant Anchorage and Equipment Working Area Plan; G

Prior to commencement of dredging, submit a Plan indicating all work activities proposed for marine plant anchorage, storage, maintenance, refueling, and routine or major repairs to marine plant and equipment that cannot be performed from the beachfront during this contract and planned use of the City Dredge Operations Facility (CDOF), Lake Rudee or Croatan Point.

SECTION 01 14 00 Page 3

* Dredging Plan; G

The contractor shall submit a plan indicating all work activities proposed for the dredging of beach fill material from Atlantic Ocean Channel.

Base Line Drawing Showing All Offsets, Elevations, Reference Lines, And Range Line Locations; G

A Borrow Area Material Removal Plan; G

Standard Form 1411, "Contract Pricing Proposal Cover Sheet"; G

U.S. Coast Guard Certificate Of Inspection; G

SD-10 Operation and Maintenance Data

AnExecuted Fuel Oil Transfer (Declaration) Form Signed By The Tanker Operator

1.2 CONTRACTOR'S NOTIFICATIONS

A Dredging Intent Notification shall be prepared and sent to the agencies identified below identifying the dredging locations, placement areas, and dates the Contractor intends to start and complete dredging. When the Contractor sends a Notification to an agency, proper signatures as required in the Permit shall be affixed. A copy of all Notifications furnished shall at the same time be provided to the Contracting Officer.

The Contractor shall include the Virginia Water Protection (VWP) Permit Number on all Notifications sent to an agency.

1.2.1 Dredging Intent Notification to the U.S. Coast Guard and the National Marine Fisheries Service (NMFS)

a. The Contractor shall notify the Commander, Fifth Coast Guard District of his intended operations to dredge and request that it be published in the Local Notice to Mariners. This Dredging Intent Notification to U.S.

Coast Guard must be given in sufficient time so that it appears in the Notice to Mariners at least 21 calendar days prior to the commencement of this contract.

b. The Contractor shall notify NMFS by email (Incidental.Take@noaa.gov) within 3 days of the commencement of dredging and again within 3 days of the completion of dredging activity.

1.3 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

COAST GUARD, DEPARTMENT OF TRANSPORTATION

CFR PART 156.120 OIL AND HAZARDOUS MATERIAL TRANSFER

OPERATIONS - Requirements for Transfer

SECTION 01 14 00 Page 4

1.4 CONTRACTOR WORK REQUIREMENTS

The dredging and placement areas are accessible to the general public; the Government will not undertake to exclude the public or restrict public access to the dredging or placement areas during the work. The Contractor shall be solely responsible for protection of the public at all times for the duration of work performed as a part of the contract and fully comply with the provisions of OSHA safe working practices and the Safety and Accident Prevention requirements of these specifications. The Contractor shall employ the use of signs, barricades, barriers, flagmen, and any other devices and measures required to ensure public and worker safety at the dredging and placement areas at all times. Unless directed otherwise, the Contractor may perform the scheduled dredging and material placement work 24 hours a day, 7 days a week; however, the Contractor will not be allowed to operate plant or equipment within 150 feet of the boardwalk or private residence, housing and other occupied beachfront areas from 11:00pm to 7:00am. During actual dredging and material placement operations, the Contractor shall ensure adequate monitoring of operations by competent employees at the placement areas and contact with the dredge by monitoring personnel is maintained at all times.

1.4.1 Order of Work - Beach Placement

The Contractor shall perform all required beach fill placement operations as indicated in the plans.

1.4.2 Hopper Dredge Seasonal Restriction

Seasonal restrictions of dredging operations will apply for this contract.

No hopper dredging shall occur between the dates of 01 September and 14 November.

1.4.3 Access to Work Site

The Virginia Beach Resort Beach is served by an all weather surfaced road network. The Contractor's equipment and vehicular access into the work area between Atlantic Avenue and the beachfront will be available through the concrete ramp public right-of-ways at 2nd Street, 14th Street, 20th Street, 37th Street, and 57th Street and the unimproved public right-of-ways at 68th Street and 79th Street. The area in the vicinity of 37th Street and 57th Street is authorized as a location of a secured lay down and office/storage area for the Contractor subject to government approval; however, other areas as noted may be used for access-egress of the Contractor's plant. The Contractor shall prepare, as a part of the Progress Schedule and Safety Plan, the proposed methods for gaining access to the workplace by these rights-of-way that do not unnecessarily impact convenient and safe access to and from the beach by the public. Access and egress to the work area is the responsibility of the Contractor and are subject to permit approvals required by the City of Virginia Beach. All roads approved for the Contractor's use shall be maintained throughout construction and restored to as good condition as existed prior to their use. The Contractor shall keep all roads free of mud and other debris resulting from his operations. The Contractor's vehicles shall pull off the road and come to a complete stop when meeting emergency vehicles and vehicles with flashing lights. All temporary construction shall be removed and the affected area restored to its original condition.

All costs for the use of existing transportation facilities, for the construction of temporary facilities, and for maintenance, repair, removal

SECTION 01 14 00 Page 5 and restoration shall be borne by the Contractor.

1.4.4 Access-Egress Restrictions and Beach Activities for Special Events

The Contractor shall confirm beach activity dates with the City of Virginia Beach. The following activities may impact contractor work to the extent specified:

a. Holiday of Lights. The Holiday of Lights celebration and displays on the boardwalk and beach will start approximately a week before Thanksgiving and run to December 30. Vehicles will enter the boardwalk on 2nd Street and exit the display at 34th Street. Numerous lighted displays will be on the beach and near the boardwalk. Related wiring and anchorage for the displays will be in the work areas, but also near the boardwalk. These locations will be clearly identified and must be avoided by the Contractor during the scheduled work. Vehicular traffic will be on the boardwalk and the general public may be in proximity to the lighted displays on the beach; accordingly, the Contractor's work and saftey plans shall clearly address these hazards and method(s) for protecting the public during the work. While the work area will be reduced, it is expected that beach placement may continue in this area during the Holiday of Lights. The Contractor shall work closely with the Holiday of Lights presenter to minimize impacts to both beach placement and Holiday of Lights displays.

b. 2024 Polar Plunge. This activity involves large groups of persons swimming for charity. The exact dates have not been set, however; it is anticipated for the month of February. This activity occurs south of the beach placement area (2nd to 8th street), however, expect crowds on the Boardwalk and traffic in the resort area to be larger than normal.

c. Yuengling Shamrock Marathon, March 15 to 17. This activity involves the internationally known Yuengling Shamrock Marathon 2024 to be run on 17 March with other races occurring 16 and 17 March. There will be live bands and entertainment throughout the weekend. Races occur on the Boardwalk and City streets and should have relatively little direct impact to work areas. Some tents may occur on the Beach in the vicinity of 28th to 33rd street, however; activities should be confined to areas adjacent to the boardwalk. While the work area may be reduced, it is expected that beach placement may continue in this area during the weekend. The Contractor shall work closely with the City to minimize impacts to both beach placement and Yuengling Shamrock Marathon. Expect large crowds on the Boardwalk and some street closings; traffic in the resort area will be much larger than normal.

1.4.5 Contracting Officer Directed Stand By Time

During the contract period, the Government reserves the right to issue stand by orders to the Contractor at a cost and in a number as bid by the Contractor on the Base Bid Schedule Item for this requirement. If the Contracting Officer directs that work be placed in a standby status, the Contractor shall cease all dredging, beach fill operations, and CIDMMA placement activities and secure the dredge plant in a mooring location acceptable to the Contracting Officer and beach plant and equipment off the beach in the approved Staging Area. The Contracting Officer will give the Contractor a minimum 72 hour notice before work is to be placed on standby status. When in standby status, work will not be moved from the

SECTION 01 14 00 Page 6 designated location unless approved by the Contracting Officer.

1.4.6 Designated Marine Plant Anchorage and Equipment Working Area Restrictions

The City Dredge Operations Facility (CDOF), Lake Rudee and Croatan Point are designated for marine plant anchorage, storage, maintenance, refueling, and routine or major repairs to marine plant and equipment that cannot be performed from the beachfront during this contract. The Contractor shall submit a Marine Plant Anchorage and Equipment Working Area Plan for approval, indicating all proposed plant anchorage and other scheduled activities at the CDOF, Lake Rudee or Croatan Point. The Plan shall be coordinated with the CDOF and include the proposed plant and scheduled activities and be coordinated with the Activity Hazard Analysis and Safety Plan. The Contractor must comply with all rules and regulations governing use of the CDOF and all costs for use of the facility are the responsibility of the Contractor.

Lake Wesley (inside Rudee Inlet to the Southeast of Lake Rudee) will not be allowed for storage, maintenance, refueling, or repairs to marine plant and equipment, or for any other non-emergency purpose.

The use of Lake Wesley will only be allowed for anchorage of plant that, due to size and height restrictions, cannot reasonably be stored at the CDOF, Lake Rudee or Croatan Point. If it becomes necessary for the Contractor to request anchorage of plant or to perform other non-emergency functions in Lake Wesley, the Contractor must verify the CDOF, Lake Rudee and Croatan Point are unavailable or otherwise unsuitable for use and shall obtain written permission from the Contracting Officer's Representative at least 48 hours in advance of the use of Lake Wesley.

Prior to commencement of dredging, submit a Marine Plant Anchorage and Equipment Working Area Plan indicating all work activities proposed for marine plant anchorage, storage, maintenance, refueling, and routine or major repairs to marine plant and equipment that cannot be performed from the beachfront during this contract.

1.4.7 Noise Control and Abatement

The Contractor shall employ the use of properly installed and maintained mufflers, silencers, and manufacturer's recommended sound suppressors on all plant, machinery, and equipment used on this work. The use of sound signals such as whistles, horns, or bells shall not be used if two-way radio communication can accomplish the required function. During the time between 11:00pm and 7:00am, the Contractor shall plan and schedule work to minimize operations of plant and equipment on the beach and in the vicinity of the boardwalk, in Lake Wesley, and in other waterways near populated areas. Auditory alarms from the backward use of plant on the beach during this period will not be allowed except to meet safe working practices as prescribed by OSHA. Accordingly, the Contractor shall operate plant in a forward mode and limit beach fill operations to the maximum extent practical during this time. The Contractor shall not use sound signals, with the exception of those signals required for vessel operations by the U.S. Coast Guard, during the time between sunset and sunrise.

1.4.8 Beach Lighting

When night work is performed, all on-beach lighting associated with the

SECTION 01 14 00 Page 7 project shall be limited to the immediate area of active construction only. Such lighting shall be shielded, low-pressure sodium vapor lights directed to the maximum extent practical away from populated areas where applicable and to avoid excessive illumination of the water.

From May 1 through November 15, orange or yellow filters shall be placed over vehicle headlights of the Contractor's plant and equipment used on the beach at night to the extent that it does not conflict with OSHA and USACE Occupational Health and Safety regulations, standards, or technical guidance or otherwise jeopardize or threaten human safety.

1.4.9 Protected Species Surveys

Depending on funding availability and the time of year, a survey vessel conducting side scan sonar for the presence of protected species may be on site collecting data within 100 meters of the dredge and/or relocation trawler. USACE staff will notify the Contractor when the survey vessel is intended to be on site.

1.4.10 Early Morning Sea Turtle Nest Surveys

From May 1 through November 15, early morning crawl surveys for sea turtle nesting activity will be performed by Back Bay National Wildlife Refuge (on Sandbridge Beach) or the Virginia Aquarium (VAQ) Stranding Response Program (on Virginia Beach). The Contractor shall coordinate and allow safe, unimpeded egress within the active construction zone, and construction equipment work will be briefly halted within the immediate area of an active early morning crawl survey as the surveyor(s) pass.

1.4.11 Coordination with Other Contractors

During the period of this contract, other contracts may be in force for the construction of other features of work on or adjacent to the work being accomplished under this contract. The Contractor shall arrange his plant, and shall schedule and perform this work, so as to effectively cooperate with all other contractors and Government agencies. It shall be the responsibility of the Contractor on this contract to be fully informed of the extent of the limits of work to be performed by other contractors.

Should there be any conflict between these limits, the Contractor shall immediately notify the Contracting Officer of the conflict, and the Contracting Officer's decision shall be final.

1.5 Notification Of Beach Fill Operations

The Contractor shall maintain a current register of planned beach fill operations indicating where the beach fill operations will be on a given day, including street locations for the beach fill operations and the pump out facility, and their daily projected locations along the beach fill placement area for the duration of the contract. The register shall be updated daily and provided with the Daily Report of Operations in a format approved by the Contracting Officer for ready release to the public.

1.6 PHYSICAL DATA

1.6.1 Physical Conditions Information

The physical conditions indicated on the drawings and in the specifications are the result of site investigations and surveys.

Information and data furnished or referred to below is furnished for the

SECTION 01 14 00 Page 8

Contractor's information; however, it shall be expressly understood that the Government will not be responsible for any interpretation or conclusion drawn from this information or data by the Contractor.

1.6.2 Site Related Weather Conditions

The locations of the work are in open ocean waters and along the Virginia Beach oceanfront; accordingly, the Contractor shall anticipate that severe weather conditions may occasionally interfere with the progress of work.

The area is tidal with a mean range of tide of approximately 3.42 feet based on NOS observations at the Virginia Beach Fishing Center. Currents are normally not of a sufficient velocity to interfere with dredging operations; however, offshore winds and other natural weather events may lead to shoaling hazards. The Contractor is responsible for understanding the hazards likely to arise from the weather conditions during the dredging period. Complete weather forecasts, records and reports may be obtained from the National Weather Service in Wakefield, Virginia, telephone (757) 899-4200, Menu selection service or operator assisted as applicable.

1.6.3 Time Extensions For Unusually Severe Weather

This provision specifies the procedure for the determination of time extensions for unusually severe weather in accordance with the Contract Clause entitled "Default: (Fixed Price Construction)". In order for the Contracting Officer to award a time extension under this clause, the following conditions must be satisfied:

a. The weather experienced at the project site during the contract period must be found to be unusually severe, that is, more severe than the adverse weather anticipated for the project location during any given month.

b. The unusually severe weather must actually cause a delay to the completion of the project. The delay must be beyond the control and without the fault or negligence of the Contractor.

1.6.4 Schedule

The following schedule of monthly anticipated adverse weather delays is based on National Oceanic and Atmospheric Administration (NOAA) or similar data for the project location and will constitute the base line for monthly weather time evaluations. The Contractor's progress schedule must reflect these anticipated adverse weather delays in all weather dependent activities.

MONTHLY ANTICIPATED ADVERSE WEATHER DELAY WORK DAYS

BASED ON (5) DAY WORK WEEK

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

10 9 8 6 7 7 9 6 5 5 6 9

1.6.5 Additional Information for Local Physical Conditions

The Contractor shall consult the following publications for additional information on local conditions:

SECTION 01 14 00 Page 9

a. United States Coast Pilot 3, Atlantic Coast, Sandy Hook to Cape Henry, published annually by the National Ocean Service.

b. Tide Tables, High and Low Water Predictions, East Coast of North and South America, published annually by the National Ocean Service.

c. Tide Current Tables, Atlantic Coast of North America, published annually by the National Ocean Service.

d. Local Notice to Mariners, published by the 5th U.S. Coast Guard District and the broadcast local notice to mariners.

1.6.6 Responsibility

The Contractor shall hold and save harmless the United States, its officers, and employees from all claims that may arise as a result of the Contractor's negligence in connection with the work performed under the contract, from noncompliance by the Contractor with the provisions of the contract drawings and specifications, or from the instruction of the Contracting Officer.

1.6.7 Condition of Dredging Areas

The plans for dredging show the condition of the offshore dredging area at the time of the most recent survey. There are no known pipes, bridges, or tunnels that cross the area to be dredged.

1.6.8 Obstruction of Dredging Areas

The Government will not undertake to keep the dredging areas free from vessels or other obstructions, except to the extent of such regulations, if any, as may be prescribed by the Secretary of the Army, in accordance with the provisions of Section 7 of the River and Harbor Act, approved 3 August 1917. The Contractor will be required to conduct the work in such manner as to obstruct navigation as little as possible, and in case the Contractor's plant so obstructs the water way as to make difficult or endanger the passage of vessels, said plant shall be promptly moved on the approach of any vessel to such an extent as may be necessary to afford a practicable passage. Upon the completion of the work, the Contractor shall promptly remove the plant, including ranges, buoys, piles, and other marks placed under this contract in navigable water or on shore.

1.6.9 Dredging Area Traffic

The vessel traffic in the dredging areas consists of a wide variety of types and sizes of vessels, including large deep-draft commercial bulk carriers, tankers, container vessels, and Naval vessels. Hampton Roads is also the home base for shallow and medium draft commercial seafood vessels, barges, tugs, pleasure crafts, and various other crafts. The Contractor shall expect that the vessel traffic will cause periodic delays and interruptions of his operations.

1.6.10 Condition of Beach Fill Areas

The required beach fill areas and quantity estimates specified are based on the condition of the beach at the time of the most recent surveys as indicated. The conditions shown by the surveys and the required beach fill quantities specified are subject to change due to the constantly changing

SECTION 01 14 00 Page 10 shoreline and the natural forces of wind and waves acting on the beach. The actual quantities to be placed and paid for in each respective beach fill segment will be determined by the Contracting Officer from the surveys and volume computations to be performed by the independent surveyor or engineer as specified immediately before the Contractor commences fill operations in a respective beach fill section. The Contracting Officer may make alterations in the plan dimensions, grade of slopes, or volume of fill per cubic foot in a respective beach fill segment in order to increase or decrease the volume of fill placed along the beach. The Contractor is allowed to use the slope compensation method. The Contractor shall work closely with the Contracting Officer to ensure that the total quantity of sand allowed under this contract is uniformly distributed along the entire length of the beach fill area in a manner to construct a finished beach berm of constant dimensions along the entire project length. Please refer to SECTION 35 20 24 BEACH FILL for beach fill construction dimensions and tolerances.

1.6.11 Oyster Grounds

There are no known oyster grounds in the vicinity of the channel dredging areas or placement area.

1.7 PUMPING OF BILGES

Contractors are warned that pumping oil or bilge water containing oil into navigable waters, or into areas which would permit the oil to flow into such waters, is prohibited by Section 13 of the River and Harbor Act of 1899, approved 3 March 1899 (30 Stat. 1152; 33 U.S.C. 407). Violation of this prohibition is subject to the penalties under the referenced Acts.

1.8 FUEL OIL TRANSFER OPERATIONS

In accordance with U.S. Coast Guard regulations CFR PART 156.120 , couplings used in fuel oil transfer operations on any vessel with a capacity of 250 or more barrels of oil shall be either a bolted or full-threaded connection; or a quick-connect coupling approved by the Commandant; or an automatic back-pressure shutoff nozzle used to fuel the vessel. An executed fuel oil transfer (Declaration) form signed by the tanker operator shall be submitted to the Contracting Officer for each refueling operation.

1.9 LAYOUT OF WORK AND SURVEYS

1.9.1 General

The Contractor shall be responsible for the expense and layout of all work.

When the Contractor's work methods require physical markings to be placed for the purpose of dredged material placement control, including all placement area and easement control points and all range markers and buoys indicated or that otherwise are required to accomplish the work, shall beplaced in the field and marked by a licensed Professional Engineer or Surveyor currently licensed in the Commonwealth of Virginia. The licensed Professional Engineer or Surveyor shall have coastal topographic and hydrographic surveying experience. All hydrographic survey techniques shall be in accordance with EM 1110-2-1003. All topographic survey techniques shall be in accordance with EM 1110-1-1005. The markings shall be minimum 1 inch diameter steel pipe marked with orange flagging and orange paint, placed in the immediate work areas only and shall be removed once a work area has been accepted. The Government reserves the right to verify all in-place markings before dredging and placement operations commence, and at

SECTION 01 14 00 Page 11 any time during the contract.

1.9.2 Datum and Bench Marks

The plane of reference for the beach fill placement work is NAVD 88, North American Vertical Datum as indicated. The plane of reference for dredging is MLLW (NOS) as established by the National Ocean Service. The bench mark elevations are shown on the drawings for the respective work areas. The government will furnish monument descriptions for these bench marks at the Preconstruction Conference.

1.9.3 Responsibility for Tide Measurements

It shall be the responsibility of the Contractor to obtain tide level measurements and predictions as required to conduct his dredging operations for the duration of the work.

1.9.4 Contractor Layout for Survey of Beach Requirements

The Contractor shall submit for approval a base line drawing showing all offsets, elevations, reference lines, and range line locations to be utilized for the entire project prior to performing any surveying. This drawing shall be prepared and stamped by the independent Professional Engineer or Surveyor employed as specified above. The Contractor shall use the construction base line as shown in the contract drawings.

1.10 CONTINUITY OF BEACH FILL WORK

Placement of the beach fill shall proceed in an orderly and consecutive manner. No payment will be made for work done in any acceptance section of the beach designated by the Contracting Officer until the entire acceptance section is brought to the shape and grade indicated and specified. Payment will not be made unless each beach acceptance section is contiguous to the last section that was placed.

1.11 CONTINUITY OF DREDGING

The dredging plan shall be submitted by the Contractor for approval by the Government. The plan shall indicate the operations and procedures the Contractor intends to perform in the dredging area, work methods to be employed that will result in efficient hydraulic placement of the required amount of materials within the beach fill section, and the proposed station locations where material is to be removed. The material removal operations shall be performed to the maximum extent practical in contiguous sections that do not result in the creation of deep pits or holes in the dredging area.

1.12 INSPECTION

1.12.1 General Inspection Requirements

The presence of the construction representative shall not relieve the Contractor of responsibility for the proper execution of the work in accordance with the specifications. The Contractor will be required:

a. To furnish, on the request of the Contracting Officer or any construction representative, the use of such boats, boatmen, laborers, and material forming a part of the ordinary and usual equipment and crew of the dredging plant as may be reasonably necessary in

SECTION 01 14 00 Page 12 inspecting and supervising the dredging.

b. To furnish, on the request of the Contracting Officer or any construction representative, suitable transportation from all points within the placement area, to and from the various pieces of plant and the staging areas, and within the material placement area as may be reasonably necessary in inspecting and supervising the work. Should the Contractor refuse, neglect, or delay compliance with these requirements, the transportation may be furnished and maintained by the Contracting Officer, and any resultant cost incurred by the government will be deducted from any amounts due or to become due the Contractor.

1.13 SIGNAL LIGHTS

The Contractor shall display signal lights and conduct his operations in accordance with the General Regulations of the Department of the Army and of the Coast Guard governing lights and day signals to be displayed by towing vessels with tows on which no signals can be displayed, vessels working on wrecks, dredges, and vessels engaged in laying cables or pipe or in submarine or bank protection operations, lights to be displayed on dredge pipe lines, and day signals to be displayed by vessels of more than 65-feet in length moored or anchored in a fairway or channel, and the passing by other vessels of floating plant working in navigable channels, as approved by the Secretary of the Army and the Commandant, U. S. Coast Guard.

1.14 EQUIPMENT OWNERSHIP AND OPERATING EXPENSE SCHEDULE

1.14.1 Costs

Allowable cost for construction and marine plant and equipment in sound workable condition owned or controlled and furnished by a Contractor or subcontractor at any tier shall be based on actual cost data when the Government can determine both ownership and operating costs for each piece of equipment or equipment groups of similar serial and series from the Contractor's accounting records. When both ownership and operating costs cannot be determined from the Contractor's accounting records, equipment costs shall be based upon the applicable provisions of EP 1110-1-8, "Construction Equipment Ownership and Operating Expense Schedule", Region II. Working conditions shall be considered to be average for determining equipment rates using the schedule unless specified otherwise by the Contracting Officer. For equipment not included in the schedule, rates for comparable pieces of equipment may be used or a rate may be developed using the formula provided in the schedule. For forward pricing, the schedule in effect at the time of negotiations shall apply. For retrospective pricing, the schedule in effect at the time the work was performed shall apply.

1.14.2 Rentals

Equipment rental costs are allowable, subject to the provisions of FAR 31.105(d)(ii) and FAR 31.205-36 substantiated by certified copies of paid invoices. Rates for equipment rented from an organization under common control, lease-purchase or sale-leaseback arrangements will be determined using the schedule except that rental costs leased from an organization under common control that has an established practice of leasing the same or similar equipment to unaffiliated lessees are allowable. Costs for major repairs and overhaul are unallowable.

SECTION 01 14 00 Page 13

1.14.3 Data

When actual equipment costs are proposed and the total amount of the pricing action is over $25,000, cost or pricing data shall be submitted on the Standard Form 1411, "Contract Pricing Proposal Cover Sheet". By submitting cost or pricing data, the Contractor grants to the Contracting Officer or an authorizing representative the right to examine those books, records, documents and other supporting data that will permit evaluation of the proposed equipment costs. After price agreement the Contractor shall certify that the equipment costs or pricing data submitted are accurate, complete and current.

1.15 BRIDGE-TO-BRIDGE RADIO COMMUNICATION

In order that radio communication may be made with passing vessels, all dredges engaged in work under this contract shall be equipped with bridge-to-bridge radio telephone equipment in accordance with 33 USC CHAPTER 24 , as applicable. The radio telephone equipment shall operate on a single channel very high frequency (VHF), FM, on a frequency of

156.65 megahertz (Channel 13 and 16) with low power output having a communication range of approximately ten miles. The Federal Communications Commission has approved the frequency.

1.15.1 Radio

The Contractor shall provide the Government construction representative a portable radio capable of communicating with the dredge for the duration of work under this contract. The Contractor shall maintain the radio in good working order.

1.16 SPECIAL COAST GUARD REQUIREMENTS

1.16.1 Local Notice To Mariners

The Local Notice To Mariners (LNM) for the Fifth Coast Guard District is available by phone at (757) 398-6367. Additionally, LNM are located on the Internet at the following address:

http://www.navcen.uscg.gov/?pageName=lnmDistrict&region=5 and e-mail address: D5Local@LANTD5.uscg.mil.

The LNM is the primary means for disseminating information concerning aids to navigation, hazards to navigation, and other items of marine information of interest to mariners on the waters of the United States, its territories, and possessions. These notices are essential to all navigators for the purpose of keeping their charts, light lists, Coast Pilots and other nautical publications up-to-date. These notices are published weekly. They may be obtained free of charge, by making application to the Fifth Coast Guard District, Federal Building, 431 Crawford Street, Portsmouth, Virginia 23704. If the Contractor encounters any objects on the channel bottom during dredging operations or transport of his plant that could be a hazard to navigation, he shall notify the Coast Guard immediately as to location and at the same time notify the Contracting Officer.

1.16.2 Relocation of Navigation Aids

The Contractor shall not relocate or move any aids to navigation that have

SECTION 01 14 00 Page 14 been established by the U.S. Coast Guard. If it becomes necessary to have any aid to navigation moved in order to complete dredging operations under this contract, the Contractor shall notify the U.S. Coast Guard in writing at the address above with a copy to the Contracting Officer not less than 15 calendar days prior to such need for movement. The Contractor shall notify the U.S. Coast Guard of the approximate time the navigation aid may be relocated to its original position. All notifications to the U.S. Coast Guard shall at the same time be provided to the Contracting Officer and recorded in the Daily Report of Operations. In the event that the Contractor disturbs or damages any navigation aid during work operations, which includes during mobilization or demobilization of his plant, the Contractor shall immediately stop the activity which disturbed or damaged the navigation aid, take immediate corrective action to prevent further disturbances or damage, and shall notify the Coast Guard immediately as to location, and at the same time notify the Contracting Officer.

1.16.3 Use of Coast Guard Navigation Aid Structures

The Commander, Fifth Coast Guard District, has authorized the Norfolk District, Corps of Engineers, and its Contractors to use fixed Federal aids to navigation structures, established and maintained by the U. S.

Coast Guard, for support of temporary dredging tide gauges when performing Federal dredging operations. If a Contractor chooses to use navigation aid structures for this purpose, he shall abide by the following requirements:

a. The Contractor shall advise the Commander, Fifth Coast Guard District, Aids to Navigation Branch, Federal Building, 431 Crawford Street, Portsmouth, Virginia 23704, in writing, of his intention to attach tide gauges to navigation aid and structures, prior to commencing a dredging project. This notice shall include the name of each aid to navigation to which tide gauges are to be attached, and the anticipated dates the gauges will be attached and removed. A copy of this notice shall be furnished at this time to the Contracting Officer.

b. The…

This is the start of the file's text. The full file is on GovTribe.