H.08.02_Amended Submittal Register 06232021.pdf

PDF 548 KB Posted

Attached to
US Army Corps of Engineers (USACE) Norfolk District's Craney Island Dredged Bulkhead Refurbishment Project in Portsmouth, Virginia
Solicitation number
W9123621B5005
Issued by

About this file

This submittal register outlines the required submissions for the Craney Island Bulkhead Refurbishment project in Portsmouth, Virginia. The scope of work includes demolition, concrete work, structural steel, fender installation, and environmental protection. Key submittals include a project schedule, safety plan, quality control plan, shop drawings, test reports, certificates, record drawings, warranties and waste disposal documentation. The contractor must provide submissions for review and approval related to concrete mix designs and placement, rebar layout, welding procedures, fabrication drawings, product data sheets, testing results, personnel qualifications and manufacturer instructions. The solicitation was issued by the US Army Corps of Engineers Norfolk District for the refurbishment of the dredged bulkhead at Craney Island in accordance with specifications. The opportunity closes on an undisclosed date with award expected shortly thereafter.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 9 PAGES

CRANEY ISLAND BULKHEAD REFURBISHMENT

01 14 00 SD-01 Preconstruction Submittals 1.9.1.1List of Contact Personnel

1.9.3 GSafety And Lighting Plan

01 22 00.00 10 SD-01 Preconstruction Submittals

1.3 GSchedule Of Values

01 30 00 SD-01 Preconstruction Submittals

1.3 GView Location Map

1.4 GProgress and Completion

Pictures

1.10 GList Of Subcontractors

01 32 01.00 10 SD-01 Preconstruction Submittals

3.6.1 GPreliminary Project Schedule

3.6.2 GInitial Project Schedule

3.8.2 GPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.8 GSubmittal Register

01 35 26 SD-01 Preconstruction Submittals

1.7 GAccident Prevention Plan (APP)

SD-06 Test Reports 1.4Monthly Exposure Reports 1.12Notifications and Reports

1.12.2 GAccident Reports

1.12.5LHE Inspection Reports

SD-07 Certificates 1.6.1.3Crane Operators/Riggers

1.7.2.2 GStandard Lift Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 9 PAGES

01 35 26 1.7.2.3 GCritical Lift Plan 1.8Activity Hazard Analysis (AHA) 1.9.1Confined Space Entry Permit 1.12.6Certificate of Compliance

01 45 00.10 20 SD-01 Preconstruction Submittals

1.6 GQC Plan

01 50 00 SD-01 Preconstruction Submittals

1.5 GConstruction Site Plan

01 57 19 SD-01 Preconstruction Submittals 1.9.1Preconstruction Survey

1.13 GSolid Waste Management Permit

1.10 GEnvironmental Protection Plan

3.2.1 GErosion and Sediment Control

Plan SD-06 Test Reports

1.13.1 GMonthly Solid Waste Disposal

Report

3.7.2.1 GMonthly Solid Waste Disposal

Report

SD-11 Closeout Submittals

3.7.3.5 GDisposal Documentation for

Hazardous and Regulated Waste

3.7.3.1 GHazardous Waste/Debris

Management 01 57 19.01 20 SD-07 Certificates

Certificate Of Disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 9 PAGES

01 74 19 SD-01 Preconstruction Submittals

1.5 GConstruction Waste Management

Plan SD-11 Closeout Submittals

1.6Records 01 78 00 SD-11 Closeout Submittals

3.1 GAs-Built Drawings

3.3 GRecord Drawings

3.6As-Built Record of Equipment and Materials

3.4 GFinal Approved Shop Drawings

3.5 GConstruction Contract

Specifications GInterim DD FORM 1354 GChecklist for DD FORM 1354

2.3Warranty Information 02 41 00 SD-01 Preconstruction Submittals

1.4.2 GDemolition Plan

1.10Existing Conditions

SD-07 Certificates

1.8 GNotification

03 31 30 SD-01 Preconstruction Submittals 1.8.2.1Curing Concrete Elements 1.8.2.3Form Removal Schedule 1.8.2.4Concrete Placement And

Compaction

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 9 PAGES

03 31 30 1.8.2.2Concrete Curing Plan

1.7.4 GConcrete Qualification Program

1.6.2 GLaboratory Qualifications

1.6.1 GQuality Control Personnel

1.6 GConcrete Quality Control

Program SD-02 Shop Drawings

3.2.8 GExpansion Joints

1.8.1.1Formwork

1.6.1.2 GReinforcing Steel

SD-03 Product Data 2.8.4Joint Filler 2.8.5Joint Sealants 2.8.2Materials for Curing Concrete 2.5Non-Shrink Grout 3.2.8Preformed Joint Filler

2.7.1 GReinforcing Bars

3.2.2Reinforcement Supports 2.8.3Sealer-Hardener 2.8.1Waterstops

3.2.6 GEpoxy Coatings

1.8.2.8Material Safety Data Sheets

(Msds) SD-05 Design Data

1.8.2.9Mixture Designs

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 9 PAGES

03 31 30 1.7.5 GMass Concrete Temperature Control Plans

SD-06 Test Reports 1.7.5Mass Concrete Mock-up 2.4.1Air Entraining 1.8.5.4Aggregates 1.8.5.5Admixtures 1.8.5.6Cement 1.7.1Concrete Mixture Proportions 1.8.5Concrete Test Reports 1.7.4.1Fresh Concrete Properties 1.7.4.2Hardened Concrete Properties 2.7.2Mechanical Reinforcing Bar

Connectors 2.7.1Reinforcing Bars 2.7.1.1Reinforcement and Protective

Coating 1.8.5.3Silica Fume 1.8.5.2Supplementary Cementing

Materials 2.3Water

SD-07 Certificates 1.8.5.5Admixtures 2.1Cementitious Materials 1.8.3.1Cementitious Material Mill

Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r) e4ecejyc Cross-Out e4ecejyc Cross-Out e4ecejyc Cross-Out

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 9 PAGES

03 31 30 1.6.1.2Field Testing Technician and Testing Agency

SD-08 Manufacturer’s Instructions 1.8.2.6Coatings

SD-11 Closeout Submittals 1.8.3.1Aggregate Moisture Content 1.8.3.1Aggregate Sampling 1.8.5Concrete Test Reports 1.8.4.3Quality Control Charts 1.8.4.1Daily Inspection Reports 1.8.4.4Quality Team Meetings 1.8.4.2Sampling Logs

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification 1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports 3.3Nondestructive Testing 3.2Weld Inspection Log

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 9 PAGES

05 05 23.16 1.3.1Certified Welding Procedure Specifications (WPS)

1.3.1Certified Brazing Procedure Specifications (BPS)

1.3.1Certified Procedure Qualification Records (PQR)

1.3.1Certified Welder Performance Qualifications (WPQ)

1.3.1Certified Brazer Performance Qualifications (BPQ)

1.3.5Certified Welding Inspector 1.3.5Nondestructive Testing

Personnel 05 12 00 SD-01 Preconstruction Submittals

1.5.1.1 GErection and Erection Bracing

Drawings

3.4 GWelding Procedure Specifications

(Wps)

SD-02 Shop Drawings

1.5.2 GFabrication Drawings

SD-03 Product Data 2.4.1Welding Electrodes and Rods

SD-06 Test Reports 2.3Bolts, Nuts, and Washers 2.7.2Class B Coating

SD-07 Certificates

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 9 PAGES

05 12 00 2.2Steel 2.3Bolts, Nuts, and Washers 2.6Galvanizing 1.5.3.1Welding Procedures and

Qualifications 3.6.1.1Certified Welding Inspector 1.3Aisc Structural Steel Erector

Quality Certification 1.3Aisc Structural Steel Fabricator

Quality Certification 31 00 00 SD-01 Preconstruction Submittals

3.2 GWork Plan

SD-06 Test Reports

3.15Testing 3.15Borrow Site Testing

SD-07 Certificates 3.15Testing

35 59 13.19 SD-03 Product Data 2.1Fender 2.3Hardware

2.3.4 GGalvanized Steel Hardware

2.3.5 GRestraint Chains

SD-05 Design Data 2.4.1curve 2.1Dimension 2.1Fender

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 9 PAGES

35 59 13.19 2.1Design SD-06 Test Reports

2.2Minimum Tensile Strength 2.2Shore Hardness (Durometer) 2.2Modulus at 400 Percent

Elongation 2.2Maximum Compression Set 2.2Tear Resistance 2.2Minimum Elongation 2.2Ozone Resistance 2.2Low Temperature Impact

Resistance 2.2Water Absorption 2.2Heat Resistance 2.2Compression Deflection

Resistance 2.4.1Fender Compression Test 2.4.2Angular Fender Compression

Test SD-08 Manufacturer’s Instructions

3.1Installation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

01 11 00
PROJECT
01 14 00
01 22 00.00 10
01 30 00
01 32 01.00 10
01 33 00
01 35 26
01 42 00
01 45 00.10 20
01 45 00.15 10
01 50 00
01 57 19.01 20
01 57 19
01 74 19
01 78 00
02 41 00
03 31 30
05 05 23.16
05 12 00
31 00 00
35 59 13.19

File details come from the government source that posted it. Updated .