This document provides specifications for chemical termite control services required for a training facility construction project at Fort Lee, Virginia. The specifications cover termite control products and application methods, quality control requirements, submittals, warranties, and closeout activities. Key details include requiring a five-year warranty against termite infestations, EPA-registered termiticides applied according to label instructions to form continuous soil barriers, quality control measures such as equipment calibration testing and government sampling, and submittal of documents including treatment plans, licenses and certifications.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B.01.02_OF 1419 - Abstract of Offers Seaport Embarkation.pdf | ||
| H.01.01_W91236170001 - SPOE Fort Lee - FA101 2021.09.07.pdf | ||
| 21B2040 Amend 5.pdf | ||
| H.01.01_W91236170001 - SPOE Fort Lee - M-001 2021.09.07.pdf | ||
| Site Visit Sign-in Ship Loading and Unloading Mock-up.pdf | ||
| H.01.04 Spec Section 01 45 00.00 10.pdf | ||
| W9123621B2040 Amendment 004.pdf | ||
| W9123621B2040 Amend 3.pdf | ||
| 21B2040 Amendment 2.pdf | ||
| A.07.24 Amendment 0001 to Solicitation W9123621B2040.pdf | ||
| H.01.01 SPOE Fort Lee RTA Submittal Drawings 07.28.2021.pdf | ||
| H.01.04 SPOE Fort Lee RTA Specifications 07.28.2021.pdf | ||
| W91236-21-B-2040 Solicitation.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPOE Training Facility Contract No. W91236-17-D-0001 Fort Lee, Virginia
SECTION 31 31 16
CHEMICAL TERMITE CONTROL
08/16
PART 1 GENERAL
1.1 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.
U.S. DEPARTMENT OF DEFENSE (DOD)
DODI 4150.07 (2019) DOD Pest Management Program
1.2 ADMINISTRATIVE REQUIREMENTS
Coordinate work related to final grades, landscape plantings, foundations, or any other alterations to finished construction which might alter the condition of treated soils with this specification.
1.3 SUBMITTALS
Government approval is required for submittals with a "G" or "S" classification. Submittals not having a "G" or "S" classification are for information only. When used, a code following the "G" classification identifies the office that will review the submittal for the Government.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
Termiticide Application Plan; G
SD-03 Product Data
Termiticides
SD-05 Design Data
Mixing Formulation
SD-06 Test Reports
Soil Moisture
Calibration Test
SD-07 Certificates
Qualifications; G
Foundation Exterior
Utilities and Vents
SECTION 31 31 16 Page 1
Crawl and Plenum Air Spaces
List of Equipment
SD-08 Manufacturer's Instructions
Termiticides
SD-11 Closeout Submittals
Verification of Measurement
Warranty
Pest Management Report
1.4 QUALITY CONTROL
1.4.1 Regulatory Requirements
Comply with DODI 4150.07 for requirements on Contractor's licensing, certification, and record keeping. Maintain daily records using the Pest Management Maintenance Record, DD Form 1532-1, or a computer generated equivalent, and submit copies of records when requested by the Contracting Officer. These forms may be obtained from the main web site:
http://www.dtic.mil/whs/directives/forms/eforms/dd1532-1.pdf
1.4.2 Qualifications
For the application of pesticides, use the services of an applicator whose principal business is pest control. The applicator must be commercially certified in the state where the work is to be performed as required by DODI 4150.07. Termiticide applicators must also be certified in the U.S. Environmental Protection Agency (EPA) pesticide applicator category which includes structural pest control. Submit a copy of the pest control business license and pesticide applicator certificates.
1.4.3 Safety Requirements
Formulate, treat, and dispose of termiticides and their containers in accordance with label directions. Draw water for formulating only from sites designated by the Contracting Officer, and fit the filling hose with a backflow preventer meeting local plumbing codes or standards. Perform filling operations under the direct and continuous observation of a contractor's representative to prevent overflow. Secure pesticides and related materials under lock and key when unattended. Ensure that proper protective clothing and equipment are worn and used during all phases of termiticide application. Dispose of used pesticide containers off Government property.
1.5 DELIVERY, STORAGE, AND HANDLING
1.5.1 Delivery
Deliver termiticide material to the site in the original unopened containers bearing legible labels indicating the EPA registration number, manufacturer's registered uses and in new or otherwise good condition as supplied by the manufacturer or formulator.
SECTION 31 31 16 Page 2
1.5.2 Inspection
Inspect termiticides upon arrival at the job site for conformity to type and quality in accordance with paragraph TERMITICIDES. Each label must bear evidence of registration under the Federal Insecticide, Fungicide, and Rodenticide Act (FIFRA), as amended or under appropriate regulations of the host county. Inspect other materials for conformance with specified requirements. Remove unacceptable materials from the job site.
1.5.3 Storage
Storage of pesticides on the installation will not be permitted unless it is written into the contract.
1.5.4 Handling
Handle and mix termiticides in accordance with the manufacturer's label and SDS, preventing contamination by dirt, water, and organic material.
Protect termiticides from weather elements as recommended by the manufacturer's label and SDS. Spill kits must be maintained on pest control vehicles and must be available at the mixing site. Conduct termiticide mixing in an area with adequate spill containment.
1.6 SITE CONDITIONS
The following site conditions determine the acceptable time of application.
1.6.1 Soil Moisture
Test soils to be treated immediately before application. Test soil moisture content to a minimum depth of 3 inches. The soil moisture must be as recommended by the termiticide manufacturer. Application of thetermiticide is not permitted when soil moisture content exceeds manufacturer's recommendations.
1.6.2 Runoff and Wind Drift
Application of termiticide will not be permitted during or immediately following heavy rains, when conditions may allow runoff, or create an environmental hazard or when average wind speed exceeds 10 miles per hour. Termiticide is not permitted to enter water systems, aquifers, or endanger humans or animals.
1.7 WARRANTY
Provide a 5 year written warranty against infestations or reinfestations by subterranean termites of the buildings or building additions constructed under this contract. Include in the warranty annual inspections of the buildings or building additions during the warranty period. If live subterranean termite infestation or subterranean termite damage is discovered during the warranty period, and the soil and building conditions have not been altered in the interim:
a. Retreat the site and perform other treatment as may be necessary for elimination of subterranean termite infestation;
b. Repair damage caused by termite infestation; and
c. Reinspect the building approximately 180 days after the re-treatment.
SECTION 31 31 16 Page 3
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Chemical termite control uses liquid termiticide treatments applied to the soil to form a continuous chemical barrier in the soil around both sides of the foundation. The application can be surface applied or rodded and trenched. This barrier prevents foraging termites from reaching the foundation and piers. Only the soil adjacent to these foundation elements is treated. For slab construction (including foundations, patios and garages), the entire soil (or gravel) surface is treated before the vapor barrier is installed and the slab poured over it. Soil treatment is coordinated with all building activities from foundation construction through final grading of the soil around the building's exterior. In order for the treatment to be effective, the final phase of the application must be done after final grading and sometimes after landscaping is completed so that the treated soil is not disturbed.
2.2 MATERIALS
2.2.1 Termiticides
Provide termiticides currently registered by the EPA or approved for such use by the appropriate agency of the host county and as approved by the Contracting Officer. Select non-repellant termiticides for maximum effectiveness and duration after application. Select a termiticide that is suitable for the soil and climatic conditions at the project site and apply at the highest labeled rate. Submit manufacturer's label and Safety Data Sheet (SDS) for termiticides proposed for use.
PART 3 EXECUTION
3.1 PREPARATION
Eliminate food sources by removing debris from clearing and grubbing and post construction wood scraps such as ground stakes, form boards, and scrap lumber from the site, before termiticide application begins.
3.1.1 Verification
Before work starts, verify that final grades are as indicated and smooth grading has been completed in accordance with Section 31 00 00 EARTHWORK.
Finely grade soil and remove particles larger than 1 inch. Compact soil particles to eliminate soil movement.
3.1.2 Foundation Exterior
If the exterior perimeter treatment is applied when the horizontal barrier is applied it will be damaged or removed before construction is completed. The exterior foundation perimeter treatment will have to occur in phases when any pads, porches, aprons, sidewalks, final grading or landscape planting are simultaneously involved adjacent to the building foundation. This treatment area should be coordinated after all major construction but before any pads, porches, or other items requiring special consideration are poured adjacent to the foundation walls. Submit written verification that final grading, landscape planting and other items adjacent to the foundation will not disturb treatment of the soil on the exterior sides of foundation walls, grade beams, and similar
SECTION 31 31 16 Page 4 structures.
3.1.3 Utilities and Vents
Turn off and block HVAC ducts and vents located in treatment area prior to application, to protect people and animals from termiticide. Submit written verification that the HVAC ducts and vents, water and sewer lines, and plumbing have been turned off or blocked prior to applying termiticide.
3.1.4 Crawl and Plenum Air Spaces
Submit written verification that crawl and plenum air spaces have been located and identified prior to applying termiticide.
3.1.5 Application Plan
Prior to commencing application of termiticide, submit a Termiticide Application Plan addressing the following items:
a. proposed sequence of treatment work including dates and times of application
b. termiticide trade name
c. EPA registration number
d. chemical composition
e. concentration of original and diluted material
f. formulation
g. manufacturer's recommended application rates
h. regional requirements
i. application rate of active ingredients
j. method of application
k. area or volume to be treated
l. amount to be applied
m. copy of the pest control business license
n. copy of the pesticide applicator certificates
3.2 APPLICATION
For areas to be treated, establish complete and unbroken vertical and horizontal soil poison barriers between the soil and all portions of the intended structure which may allow termite access to wood and wood related products. Make applications to crawl spaces in accordance with label directions. Applications to crawl space areas that are used as plenum air spaces will not be permitted.
3.2.1 Equipment Calibration and Tank Measurement
Submit a list of equipment to be used. Conduct calibration test on the application equipment to be used immediately prior to commencement of termiticide application. Measure the volume and contents of the application tank. Testing must confirm that the application equipment is operating within the manufacturer's specifications and meets the specified requirements. Submit written certification of the equipment calibration test results within 1 week of testing. Where results from the equipment calibration and tank measurements tests are unsatisfactory, re-treatment will be required.
3.2.2 Mixing and Application
Perform all work related to formulating, mixing, and application in the presence of the Contracting Officer and a DOD certified pesticide
SECTION 31 31 16 Page 5 applicator, Pest Management QAE/PAR, or Integrated Pest Management Coordinator. Submit mixing formulation:
a. Quantity of pesticide used.
b. Rate of dispersion.
c. Percent of use.
d. Total amount used.
A closed system is recommended as it prevents the termiticide from coming into contact with the applicator or other persons. Only use water from designated locations. Fit filling hoses with a backflow preventer meeting local plumbing codes or standards. Prevent overflow during the filling operation. Spill kits must be maintained on pest control vehicles and must be available at the mixing site. Termiticide mixing must be conducted in an area that has been designated by the Government representative and that has adequate spill containment. Inspect the application equipment for applying termiticides prior to each day of use for leaks, clogging, wear, or damage. Immediately perform repairs on the application equipment to prevent or eliminate leaks and clogging.
3.2.2.1 Application Method
3.2.2.1.1 Surface Application
Use surface application for establishing horizontal barriers. Apply surface applicants as a coarse spray and provide uniform distribution over the soil surface. Termiticide must penetrate a minimum of 1 inch into the soil, or as recommended by the manufacturer. If soils are treated to a depth less than specified or approved, repeat work performed to the depth specified at no additional cost to the Government.
3.2.3 Sampling
The Contracting Officer may draw samples for analysis, at any time and without prior notice, from stocks at the job site to determine if the amount of active ingredient specified on the label is being applied. When analysis, performed by the Government, indicates samples contain less than the amount of active ingredient specified on the label, repeat work performed with pesticides conforming to this specification at no additional cost to the Government.
3.2.4 Vapor Barriers and Waterproof Membranes
Apply termiticide prior to placement of a vapor barrier or waterproof membrane.
3.2.5 Placement of Concrete
Place concrete covering treated soils as soon as the termiticide has reached maximum penetration into the soil as recommended by the manufacturer.
3.2.6 Clean Up, Disposal, And Protection
Once application has been completed, proceed with clean up and protection of the site without delay.
SECTION 31 31 16 Page 6
3.2.6.1 Clean Up
Clean the site of all material associated with the treatment measures, according to label instructions, and as indicated. Remove and dispose of excess and waste material off Government property.
3.2.6.2 Disposal of Termiticide
Dispose of residual termiticides and containers off Government property, and in accordance with label instructions and EPA criteria.
3.3 FIELD QUALITY CONTROL
3.3.1 Verification of Measurement
Once termiticide application has been completed, measure tank contents to determine the remaining volume. The total volume measurement of used contents for the application must equal the application rate established in the application plan. Submit written verification that the volume of termiticide used meets the application rate established in the application plan.
3.3.2 Inspection
3.3.2.1 Technical Representative
Provide a technical representative who is a DOD certified pesticide applicator or Pest Management Quality Assurance Evaluator (QAE)/Performance Assessment Representative (PAR). The technical representative must be present at all meetings concerning treatment measures for subterranean termites and during treatment application.
Contact the Integrated Pest Management Coordinator prior to starting work.
3.4 CLOSEOUT ACTIVITIES
Upon completion of this work, submit the Pest Management Report DD Form 1532, or an equivalent computer product, to the Integrated Pest Management Coordinator. This form identifies the target pest, type of operation, brand name and manufacturer of pesticide, formulation, concentration or rate of application used.
3.5 PROTECTION
3.5.1 Protection of Treated Area
Immediately after the application, protect the area from other use by erecting barricades as directed by the Contracting Officer. Provide signage as directed by the Contracting Officer. Place signage inside the entrances to crawl spaces and identify the space as treated with termiticide and not safe for children or animals. Cover treated areas with plastic if slab is not to be poured immediately following termiticide application.
3.5.2 Disturbance of Treated Soils
Re-treat soil and fill material disturbed after treatment before placement of slabs or other covering structures.
SECTION 31 31 16 Page 7
-- End of Section --