H.01.01 SPOE Fort Lee RTA Submittal Drawings 07.28.2021.pdf
PDF 32 MB Posted
- Attached to
- Ship Loading and Unloading Mock-up, Fort Lee, VA
- Solicitation number
- W9123621B2040
About this file
This document provides details on a federal solicitation opportunity from the Department of the Army Corps of Engineers Engineering District Norfolk. Solicitation number W9123621B2040 seeks proposals for a Ship Loading and Unloading Mock-up facility to be constructed at Fort Lee, Virginia. Interested parties should submit proposals in response to the uploaded solicitation by the response deadline. The opportunity is for the construction of a mock-up facility to simulate ship loading and unloading operations for training purposes. The Department of the Army Corps of Engineers Engineering District Norfolk will award a contract and oversee the project. No further information is provided on pricing terms, set asides, incumbent contractors or award date.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S N
O R
F O
L K
D
IS
T R
IC
T
F
R O
N T
S T
N
O R
F O
L K
V
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
D A
T E
US Army Corps of Engineers ®
NAO FILE NO.:
CONTRACT NO.:
ISSUE DATE:
SUBMITTAL:
M A
R K
D E
S C
R
IP
T
IO
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
RTA SUBMITTAL
N A
O F
IL
E
N O
G-001
C O
V E
R S
H E
E T
F O
R T
L E
E V
IR
G
IN
IA
W S
P B
E N
D
IX
R D
S T
E
V
IR
G
IN
IA
B
E A
C H
V
A
J D
R A
K E
R M
IS
F
E L D
T
J D
R A
K E
J D
R A
K E
J U
L Y
W -1
-D
-0
S E
A P
O R
T O
F E
M B
A R
K A
T
IO
N T
R A
IN
IN
G F
A C
IL
IT
Y
W91236-17-D-0001
JULY 28, 2021
FORT LEE, VIRGINIA
SEAPORT OF EMBARKATION TRAINING FACILITY
R T
A S
U B
M
IT
T A
L J
U L Y
INDEX OF DRAWINGS
SHEET
NUMBER SHEET TITLE
G-001 COVER SHEET
GI001 LIFE SAFETY PLANS & CODE ANALYSIS
GI101 LIFE SAFETY FLOORS & SITE PLANS
GC101 HAUL ROUTE
C-001 GENERAL NOTES
C-002 EROSION AND SEDIMENT CONTROL NOTES
C-003 EROSION AND SEDIMENT CONTROL NOTES
C-004 GENERAL SWPPP NOTES
V-101 EXISTING CONDITIONS PLAN
V-102 EXISTING CONDITIONS PLAN
CD101 DEMOLITION PLAN
CS101 SITE PLAN
CS501 SITE DETAILS
CG101 GRADING PLAN
CG111 EROSION AND SEDIMENT CONTROL PLAN
CG501 EROSION AND SEDIMENT CONTROL DETAILS
CG502 EROSION AND SEDIMENT CONTROL DETAILS
CU101 UTILITY PLAN
CU102 DRAINAGE PLAN
CU201 STORMWATER PROFILES
CU202 WATER LINE PROFILE
CU501 DRAINAGE DETAILS
CU502 DRAINAGE DETAILS
CU503 DRAINAGE DETAILS
CU504 STORMWATER MANAGEMENT DETAILS
CU505 STORMWATER MANAGEMENT DETAILS
CU506 STORMWATER MANAGEMENT DETAILS
CU507 UTILITY DETAILS
CU508 UTILITY DETAILS
B-101 BORING AND TEST HOLE PLAN
BB601 BORING LOGS
S-001 GENERAL NOTES (1 OF 2)
S-002 GENERAL NOTES (2 OF 2) AND ABBREVIATIONS
SB101 FOUNDATION PLAN AND FINISH FLOOR PLAN
SF101 ROOF FRAMING PLAN
S-301 SECTIONS AND DETAILS
S-302 SECTIONS AND DETAILS - FOUNDATIONS
S-303 SECTIONS AND DETAILS - STEEL
S-304 SECTIONS AND DETAILS - WALLS
S-601 COLUMN SCHEDULE
A-001 LEGEND, NOTES AND ABBREVIATIONS
A-101 FLOOR AND ROOF PLANS
A-201 BUILDING ELEVATIONS
A-301 BUILDING SECTIONS
A-501 WALL SECTIONS
A-502 MISCELLANEOUS DETAILS
A-503 DOOR AND LOUVER DETAILS
FA101 FIRE ALARM LEGEND, PLANS, AND DETAILS
M-001 LEGEND, NOTES AND ABBREVIATIONS
M-101 DUCTWORK PLAN
E-001 LEGEND, NOTES AND ABBREVIATIONS
E-101 LIGHTING PLAN
E-102 POWER PLAN
E-501 DETAILS
E-601 RISER DIAGRAM
T-101 TELECOMMUNICATIONS LEGEND, SITE PLAN, AND
DETAILS
SPOE SITE
SPOE SITE
I-2
I-2
P E
T E
R S
B U
R G
FORT LEE
I-9
I-
HOPEWELL
PRINCE
GEORGE
C O
L O
N
IA
L
H E
IG
H
T S
FORT LEE
PETERSBURG
HOPEWELL
RICHMOND
I-
I-
I-64
TOANO
I-
VICINITY MAP LOCATION MAP
OCCUPANCY CLASSIFICATION
REQUIRED CODE REFERENCEPROVIDED
REQUIRED PROVIDED CODE REFERENCE
(CHAPTER 7, GENERAL)
DOORS : 33"/.2 = 165 PEOPLE
STAIRS : 44"/.3 = N/A
FIRE PROTECTION ENGINEER OF RECORD:
MARTING FORD PE, RCDD
SEE FLOOR PLAN THIS SHEET FOR BULDING OCCUPANT LOADS
[..OCCUPANT TYPES..]
AA = [ AT + (NS x IF)] AA = [23,000 + (23,000 x .75)]
AA = 23,000 + 17,250
ALLOWABLE AREA = 40,250 SQ. FEET
MINIMUM RATED SINGLE EXTINGUISHER
(UFC 3-600-01 - 9-17.2.1)
(NFPA 10 - TABLE 6.2.1.1)
MAXIMUM FLOOR AREA PER EXTINGUISHER
MAXIMUM TRAVEL DISTANCE TO EXTINGUISHER
2-A
11,250 SQ.FT
75 FT
4-A
TOTAL ACTUAL BUILDING AREA - 2,000 SQ. FEET
NFPA 101
LIFE SAFETY CODE
- FIRE/SMOKE PROTECTION FEATURES
(FIRE RATED CONSTRUCTION)
- MEANS OF EGRESS
- INTERIOR FINISH
- VERTICAL OPENINGS
UFC 1-200-01
DoD BUILDING CODE
(GENERAL BUILDING REQUIREMENTS)
- ALLOWABLE CONSTRUCTION TYPE
- BUILDING HEIGHT
- BUILDING AREA
- BUILDING SEPARATION DISTANCE
- OCCUPANCY SEPERATION
UFC 3-600-01
FIRE PROTECTION ENGINEERING FOR FACILITIESMIN. EXIT SEPARATION
DISTANCE
MIN. NUMBER OF EXITS
MIN. WIDTH OF EXIT DOORS
(CLEAR WIDTH)
MAX. TRAVEL DISTANCE
ILLUMINATION OF MEANS OF
EGRESS
EMERGENCY LIGHTING
EXIT LIGHTS
(MARKING OF MEANS OF EGRESS)
NOTES:
1) 10 FT-CANDLE FOR NEW STAIRS. 1 FT-CANDLE FOR WALKING SURFACES.
ASSEMBLY : 2 FT-CANDLE FORWALKING SURFACES
2) 50 OR MORE OCCUPANTS ABOVE LEVEL OF EXIT DISCHARGE - 1 1/2HRS REQUIRED AUTOMATIC
AFTER FAILURE OF NORMAL LIGHTING AVERAGE 1 FT-CANDLE
ARRANGEMENT OF EXITS (REMOTENESS) FROM EACH OTHER: IN BUILDINGS PROTECTED BY AN
APPROVED SUPERVISED AUTOMATIC SPRINKLER SYSTEM, THE MINIMUM SEPARATION DISTANCE
BETWEEN TWO EXITS, EXIT ACCESSES, OR EXIT DISCHARGES, MEASURED IN A STRAIGHT LINE BETWEEN
THE NEAREST EDGE OF THE EXITS, SHALL BE NOT LESS THAN ONE-THIRD THE LENGTH OF THE MAXIMUM
OVERALL DIAGONAL DIMENSION OF THE BUILDING OR AREA TO BE SERVED. (PARA 7.5.1.3.3)
ILLUMINATION REQUIREMENTS : (PARA 7.8.1.3) THE FLOORS AND OTHER WALKING SURFACES WITHIN AN
EXIT AND WITHIN THE PORTIONS OF THE EXIT ACCESS AND EXIT DISCHARGE SHALL BE ILLUMINATED AS
FOLLOWS:
-STAIRS - 10FT CANDLE (108 LUX), MEASURED AT THE WALKING SURFACE
-FLOORS AND OTHER WALKING SURFACES - 1-FT CANDLE (10.8 LUX) MEASURED AT THE FLOOR. - EMERGENCY LIGHTING (PARA 38.2.9.1) NOT IS REQUIRED. THE BUILDING DOES NOT HAVE MORE THAN 50
PERSONS ABOVE THE LEVEL OF EXIT DISCHARGE AND MORE THAN 300 PERSONS TOTAL. THE
FOLLOWING REQUIREMENTS ARE NOT NECESSARY:
-(PARA 7.9.2.1.1) - MINIMUM DURATION OF 1-1/2 HOURS AFTER NORMAL LIGHTING FAILURE.
-(PARA 7.9.2.1.1) - PROVIDE INITIAL ILLUMINATION THAT IS NOT LESS THAN AN AVERAGE OF 1-FT CANDLE
(10.8 LUX) AND, AT ANY POINT, NOT LESS THAN 0.1FT-CANDLE (1.1 LUX), MEASURED ALONG THE PATH OF
EGRESS AT FLOOR LEVEL. -(PARA 7.9.2.1.2) - LEVELS AFTER 1-1/2 HOURS MAY DECLINE TO AN AVERAGE
OF .6FT-CANDLE (6.5 LUX) AND .06 FT-CANDLE (0.65 LUX) AT ANY POINT.
-(PARA 7.9.2.3) - LIGHTING SHALL AUTOMATICALLY BE PROVIDED FOR SUCH EVENTS AS FAILURE OF THE
PUBLIC UTILITY, OPENING OF A CIRCUIT BREAKER, OR A MANUAL ACT INCLUDING ACCIDENTAL OPENING
OF A SWITCH CONTROLLING THE NORMAL LIGHTING FACILITIES.
32 IN.
CHAPTER 7 - (7.5.1.3.3)
CHAPTER 38 - (38.2.4.3)
CHAPTER 7 - (7.2.1.2.3.2)
CHAPTER 7 - (7.8.1.3) 1
CHAPTER 38.2.9.1 2
CHAPTER 7 - (7.10) & UFC 3-600-01 - (10-2)
34 IN.
100 FT. 81 FT-7 IN
YES
NO
YES
MEANS OF EGRESS
FIRE EXTINGUISHER SIZE AND PLACEMENT FOR CLASS A HAZARDS
CRITERIA
LIGHT HAZARD
OCCUPANCY
ORDINARY HAZARD
OCCUPANCY
EXTRA HAZARD
OCCUPANCY
FIRE EXTINGUISHER REQUIREMENTS
PER NFPA 10: 6.2.1.2.1 - THE MINIMUM NUMBER OF FIRE EXTINGUISHERS FOR CLASS 'A' HAZARDS FOR EACH FLOOR OF A BUILDING SHALL BE DETERMINED BY DIVIDING THE TOTAL FLOOR AREA BY THE MAXIMUM AREA TO
BE PROTECTED PER EXTINGUISHER AS DETERMINED BY TABLE 6.2.1.1.
6.2.1.2.2- FIRE EXTINGUISHERS SHALL BE LOCATED SO THAT THE MAXIMUM TRAVEL DISTANCES SHALL NOT
EXCEED 75FT, EXCEPT AS MODIFIED BY 6.2.1.4.
6.2.1.2.3 - WHERE THE QUANTITY OF EXTINGUISHERS REQUIRED TO SATISFY 6.2.1.2.2 EXCEEDSTHE NUMBER
CALCULATED IN 6.2.1.2.1 ADDITIONAL EXTINGUISHERS SHALL BE INSTALLED.
CODE NUMBER CODE TITLE / LATEST VERSION
REFERENCE CODES & STANDARDS
IBC . . . . . . . . . . . . INTERNATIONAL BUILDING CODE - 2018
NFPA 1. . . . . . . . . FIRE CODE - 2018
NFPA 10 . . . . . . . STANDARD FOR PORTABLE FIRE EXTINGUISHERS - 2018
NFPA 13 . . . . . . . STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS - 2019
NFPA 70 . . . . . . . NATIONAL ELECTRIC CODE - 2017
NFPA 72 . . . . . . . NATIONAL FIRE ALARM CODE - 2019
NFPA 101 . . . . . . LIFE SAFETY CODE - 2018
UFC 3-600-01 . . . UNIFIED FACILITIES CRITERIA 'FIRE PROTECTION ENGINEERING FOR
FACILITIES' - CHG 6, 06 MAY 2021
UFC 4-010-01 . . . DoD MINIMUM ANTI-TERRORISM STANDARDS FOR BUILDINGS -
CHG 1, 19 AUG 2020
UFC 4-021-01 . . . DESIGN AND O&M MASS NOTIFICATION SYSTEMS - CHG 1, JAN 2010
UFC 1-200-01 . . . DoD BUILDING CODE - 08 OCT 2019
UFAS . . . . . . . . . . UNIFORM FEDERAL ACCESSIBILITY STANDARDS
ADAAG . . . . . . . . ACCESSIBILITY GUIDELINES FOR ADA COMPLIANCE
FC-1-300-09N . . . NAVY AND MARINE CORPS DESIGN PROCEDURES, WITH CHG 4 - 14 JUN 2018
FIRE PROTECTION ( CHAPTER 9)
MANUAL FIRE
EXTINGUISHERS
FIRE ALARM
MASS NOTIFICATION
FIRE SPRINKLER SYSTEM
LSC PARA 38.3.5
LSC PARA 38.3.4.1
UFC - 4-021-01, UFC 4-010-01
NFPA 13 AND UFC - 3-600-01 (PARA 9-7.2.1.2)NO
OCCUPANCY PER IBCFLR LEVELOCCUPANCY PER NFPA 101
IBC
INTERNATIONAL BUILDING CODE
CODE REFERENCE
IBC TABLE 601, 602
IBC TABLE 601, 602
IBC TABLE 601, 602
IBC TABLE 601
REQUIRED
RATING ( HOURS)
BUILDING ELEMENT OR AREA
STRUCTURAL FRAME (STEEL)
EXTERIOR WALLS - NON BEARING (STEEL)
EXTERIOR WALLS - BEARING (STEEL)
ROOF CONSTRUCTION (STEEL)
FIRE RESISTANCE RATINGS
EXISTING
BUILDING DESCRIPTION
TYPE OF
CONSTRUCTION
NUMBER OF STORIES
OVERALL HEIGHT
(TO MIDPOINT OF ROOF)
PROPOSED BUILDING USAGE
OCCUPANCY SEPARATION
PARTITIONS AND BARRIERS
16 FT.
IIB MINIMUM (NON-COMBUSTIBLE, UNPROTECTED) *
TRAINING ( LOADING AND UNLOADING)
N/A
N/A
16 FT
55 FT
ACTUAL
ALLOWABLE
HEIGHT (PER IBC TABLE 504.3)
TOTAL CALCULATED OCCUPANT LOAD = 14
FLOOR
TOTAL GROSS
FLOOR AREA
OCCUPANT
TYPE PRESENT
FLOOR AREA
PER TYPE
OCCUPANTS
OCCUPANT LOAD & EGRESS CAPACITY
2,000 SQFT
CODE REFERENCE TABLE 7.3.1.2
BUSINESS
1NEW BUSINESS (CHAP. 38) (B) BUSINESS
2-A
75 FT 75 FT
ALLOWABLE HEIGHT AND AREA (CHAPTER 5)
AREA (PER IBC TABLE 506.2 AND 506.2.3)
NUMBER OF STORIES
(PER IBC TABLE 504.4)
ACTUAL
ALLOWABLE
YES
YES
YES
OCCUPANT LOAD
FACTORS :
OCCUPANT
FACTOR
EGRESS CAPACITY
PROVIDED
EGRESS LIMITING
FACTOR
11,250 SQ.FT 11,250 SQ.FT
BUSINESS
MAX. COMMON PATH OF TRAVEL 75 FT. 74 FT. TABLE A.7.6
CHAPTER 38 (38.2.4.3)
N/A N/A
2,000 150 14
NO
NO
NO
YES YES
YES
YES
IBC TABLE 6010 0FLOOR CONSTRUCTION (CONCRETE)
*NOTE:
BUILDING IS TO BE CONSTRUCTED OF A SOLID CONCRETE BASE WITH STEEL FOR THE WALLS AND TOP. THE
BASE STRUCTURE IS 3-4 FEET ABOVE FINISHED GRADE.
A I
N I
G
RI
VFOHTLAE
W
N O
M M
O C
P R
O F
E
SS I ONAL ENG
I N E
E R
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S N
O R
F O
L K
D
IS
T R
IC
T
F
R O
N T
S T
N
O R
F O
L K
V
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
KEITH J. NEUBERT
Lic. No. 048062
07/28/2021
W S
P B
E N
D
IX
R D
S T
E
V
IR
G
IN
IA
B
E A
C H
V
A
#20127
N A
O F
IL
E
N O
GI001
L
IF
E S
A F
E T
Y P
L A
N
C O
D E
A N
A L Y
S
IS
F O
R T
L E
E V
IR
G
IN
IA
M .F
O R
D
C .R
O D
R
IG
U E
Z
M .F
O R
D
J U
L Y
W
6-
-D
-0
S E
A P
O R
T O
F E
M B
A R
K A
T
IO
N T
R A
IN
IN
G F
A C
IL
IT
Y
R T
A S
U B
M
IT
T A
L J
U L Y
TRAINING
B 150 14
EXIT
.02
T D
T D
T D
TDTDTDTD
TRAVEL DISTANCE = 75'
CP CP CP CP CP
C P
C P
COMMON PATH = 74'
FE
HYD
HYDHYD
24'-0"
B. AVE
3R D
S T
R E
E T
2N D
S T
R E
E T
C. AVE
DISTANCE = 270'4
DISTANCE = 195' 4
DISTANCE = 285'4
FIRE TRUCK
33'-0"
80'0' 1"=40'
40' 160'120' 200'
XXXX
XXXX
XX XXXX
ROOM LABEL
SQUARE FOOTAGE
PERSONS PER SPACE
OCCUPANCY LOAD FACTOR
OCCUPANCY TYPE
XXXX
XXXX
XXXX
XXXX
XXXX
EGRESS ELEMENT
EGRESS WIDTH
EGRESS WIDTH PER PERSON (IN.)
CAPACITY (PEOPLE)
ACTUAL PEOPLE
TRAVEL DISTANCE TO EXITTD
BUILDING EXIT
FE FIRE EXTINGUISHER
COMMON PATH OF TRAVELCP
1 THERE ARE NO EXPOSURES FROM OTHER BUILDINGS ON THIS SITE.
SEE FIRE SEPERATION DISTANCE NOTE THIS SHEET.
UFC 3-600-01 (PARA 9-1.1) STATES THAT BUILDINGS MUST HAVE HAVE
LEAST ONE MEANS OF ALL-WEATHER GROUND ACCESS TO THE
FACILITY. ACCESS MUST BE PAVED, START FROM THE ROAD, AND
TERMINATE NO FURTHER THAN 33 FEET FROM AN EXTERIOR DOOR
ACCESSIBLE FOR FIRE DEPARTMENT INGRESS. SINCE BUILDING IS
UNDER 5,000 SQ. FT AND DOES NOT HAVE A SECOND FLOOR, THIS
REQUIREMENT DOES NOT APPLY.
UFC 3-600-01 STATES THAT THE FIRE DEPARTMENT ACCESS ROADS
(EXISTING TO REMAIN) CONNECTING TO THE ROADWAYS SHALL BE
PROVIDED WITH CURB CUTS EXTENDING AT LEAST 2 FEET BEYOND
EACH EDGE OF THE FIRE LANE. ACCESS ROAD SHALL HAVE AN
UNOBSTRUCTED WIDTH OF NOT LESS THAN 20 FEET AND
UNOBSTRUCTED VERTICAL CLEARANCE OF NOT LESS THAN 13 FEET 6
INCHES. THE TURNING RADIUS OF A FIRE DEPARTMENT ACCESS ROAD
SHALL BE AS APPROVED BY THE AHJ.
ACCORDING TO UFC 3-600-01 (PARA 9-3.5.8.20), ALL PARTS OF THE
FACILITY MUST BE WITHIN 350 FEET OF A HYDRANT WITH
CONSIDERATION GIVEN TO ACCESSIBILITY AND OBSTRUCTIONS.
FIRE SEPARATION DISTANCE
TABLE 602 - FIRE SEPARATION DISTANCE IS DEFINED AS THE
DISTANCE FROM THE BUILDING FACE TO ONE OF THE
FOLLOWING:
1) THE CLOSEST INTERIOR LOT LINE.
2) TO THE CENTERLINE OF A STREET, AN ALLEY, OR PUBLIC WAY.
3) TO AN IMAGINARY LINE BETWEEN TWO BUILDINGS ON THE LOT.
ALL FOUR SIDES ARE GREATER THAN 30 FEET FROM ANY OTHER
EXPOSURES AND THEREFORE NO FIRE RESISTANCE RATING IS
REQUIRED ON THE WALLS.
A I
N I
G
RI
VFOHTLAE
W
N O
M M
O C
P R
O F
E
SS I ONAL ENG
I N E
E R
1/8" = 1'-0" 5'0'5' 10' 20'
US Army Corps of Engineers ®
SHEET ID
U S
A R
M Y
C O
R P
S O
F E
N G
IN
E
E R
S N
O R
F O
L K
D
IS
T R
IC
T
F
R O
N T
S T
N
O R
F O
L K
V
A
D R
A W
N B
Y
D E
S
IG
N E
D B
Y
S U
B M
IT
T
E D
B Y
S
IZ
E
C H
E C
K E
D B
Y
A N
S I D
IS
S
U E
D A
T E
C O
N T
R A
C T
N O
S O
L
IC
IT
A
T
IO
N N
O
D A
T E
M A
R K
D E
S C
R
IP
T
IO
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEALGRAPHIC SCALES
PLAN
NORTH
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
KEITH J. NEUBERT
Lic. No. 048062
07/28/2021
W S
P B
E N
D
IX
R D
S T
E
V
IR
G
IN
IA
B
E A
C H
V
A
#20127
N A
O F
IL
E
N O
GI101
L
IF
E S
A F
E T
Y F
L O
O R
S
IT
E
P L A
N S
F O
R T
L E
E V
IR
G
IN
IA
D e s ig n e r
A u th o r
C h e c k e r
J U
L Y
W
6-
-D
-0
S E
A P
O R
T O
F E
M B
A R
K A
T
IO
N T
R A
IN
IN
G F
A C
IL
IT
Y
R T
A S
U B
M
IT
T A
L J
U L Y
SCALE: 1/8" = 1'-0"
LIFE SAFETY FLOOR PLAN
SCALE: 1" = 40'-0"
LIFE SAFETY SITE PLAN
D1 D12
LIFE SAFETY LEGEND
NOTES THIS SHEET
7/28/2021 3:18 PM
USCW678308
T:\188820-USACE-2017-IDIQ\Task 15 - SPOE Fort Lee\CAD_BIM\05_Civil\_Sheets\W91236-C-SP-GC101.dwg
GC101
S E
A P
O R
T
O
F
E
M B
A R
K A
T I O
N
T
R A
I N
I N
G
F
A C
I L I T
Y
F O
R T
E
V
I R
G I N
I A
H A
U
O U
T E
C
W
O O
D S
S
B
E A
L E
C
M
O O
R E
J
D
R A
K E
W D
W S
P
B
E N
D I X
D
S
V I R
G I N
A
B
A
C H
V
A
US Army Corps of Engineers ®
SHEET ID
S
M
Y
C
O R
P
F
E
N G
I N
E E
R S
N O
R F
O L
K
D
I S
T R
I C
T
F
R O
N
N
O R
F O
L K
V
A
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
C
S O
L I C
I T
A T
I O
N
N
O
D A
T E
M A
R K
D E
S C
R I P
T I O
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEALGRAPHIC SCALES
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
R T
A
S
U B
M I T
T A
L
J U
Y
J U
N A
O
F
I L
E
N
O
SHEET NOTES
HAUL ROUTE
A1
SCALE: 1" = 200'
200' 400'0
SCALE: 1" = 200'
PLAN
NORTH
ALTERNATE MATERIAL HAUL ROUTE AND
CONTRACTOR ACCESS ENTRANCE
SPOE SITE
O
A
K
L
A
V
D
SPOE SITE
ENTRANCE
LEGEND
PRIMARY HAUL ROUTE
(VIA SHOP RD GATE)
1. SEE GENERAL NOTES ON SHEET C-001.
2. CONTRACTOR TO USE SHOP ROAD GATE AS THE PRIMARY
HAUL ROUTE BETWEEN THE HOURS OF 0600 TO 1400
HOURS DAILY. THE SISISKY BLVD GATE WILL BE USED AS
THE ALTERNATIVE HAUL ROUTE ONLY WHEN THE SHOP
ROAD GATE IS CLOSED.
PRIMARY MATERIAL HAUL ROUTE AND
CONTRACTOR ACCESS ENTRANCE
ALTERNATIVE HAUL ROUTE
(VIA SISISKY BLVD GATE)
SEE SHEET NOTE 2
T:\188820-USACE-2017-IDIQ\Task 15 - SPOE Fort Lee\CAD_BIM\05_Civil\_Sheets\W91236-C-SP-C-001.dwg
C-001
S E
A P
O R
T
O
F
E
M B
A R
K A
T I O
N
T
R A
I N
I N
G
F
A C
I L I T
Y
F O
E
V
I R
G I N
I A
G E
N E
R A
L
N
O T
E S
C
W
O O
D S
S
B
E A
L E
C
M
O O
R E
J
D
R A
K E
W D
W S
P
B
E N
D
S
V I R
G I N
A
C H
V
A
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N O
R F
O L
K
D
I S
T R
I C
T
F
R O
N
O R
F O
L K
V
A
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
D A
T E
M A
R K
D E
S C
R I P
T I O
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
R T
A
S
U B
M I T
T A
L
J U
J U
N A
O
F
I L
E
N
O
GENERAL NOTES
1. THIS PROJECT PROVIDES FOR CONSTRUCTION OF A NEW SEAPORT EMBARKATION (SPOE) TRAINING FACILITY AT FORT
LEE. VA.SITE IMPROVEMENTS INCLUDE REMOVAL OF B AVE, CONCRETE FLUME, CONSTRUCTION OF DRIVE THRU TRAINING
FACILITY TWO RAMPS AND GRAVEL HARDSTAND.
2. CONTRACTOR'S ACCESS TO THE ACTIVITY WILL BE VIA SHOP ROAD GATE AS INDICATED ON SHEET GC101.
3. HAUL ROUTES WILL BE AS INDICATED ON SHEET GC101.
4. ALL SOIL LEAVING THE SITE MUST BE DISPOSED OF AT A PERMITTED FACILITY. UNPERMITTED OFFSITE AREAS MUST NOT
BE UTILIZED UNTIL THE APPROPRIATE PLAN MODIFICATIONS AND PERMIT COVERAGE HAVE BEEN OBTAINED.
5. CONTRACTOR WILL BE PROVIDED A LAYDOWN AREA FOR USE DURING THE PROJECT. ACTUAL LOCATION MUST BE
REQUESTED AND COORDINATED THROUGH THE COR TO THE INSTALLATION PROJECT MANAGER.IF LOCATED OUTSIDE THE
PROJECT LIMITS OF DISTURBANCE (LOD), ANY LAND DISTURBANCE ASSOCIATED WITH THIS LAYDOWN AREA SHALL BE
PERMITTED SEPARATELY AT THE CONTRACTOR'S EXPENSE. IF AN OFF-SITE AREA IS TO BE UTILIZED, CONTACT THE DEQ
INSPECTOR PRIOR TO USE.
6. CONTRACTOR'S LAYDOWN AREA DOES NOT INCLUDE READILY AVAILABLE UTILITY CONNECTIONS. CONTRACTOR MUST
COORDINATE WITH THE COR TO DETERMINE UTILITY AVAILABILITY AND CONNECTION REQUIREMENTS.
7. UPON COMPLETION OF PROJECT, THE LAYDOWN AREA MUST BE BE RESTORED TO ITS EXISTING CONDITION. CONTRACTOR
WILL BE RESPONSIBLE FOR PROVIDING TO THE COR PHOTOGRAPHIC EVIDENCE OF EXISTING SITE CONDITIONS PRIOR TO
START OF ANY WORK.
8. CONTRACTOR WILL BE REQUIRED TO PROVIDE AND MAINTAIN CONSTRUCTION SIGNAGE AND MARKINGS TO CLEARLY
IDENTIFY ONGOING WORK AND TRAFFIC MOVEMENT AREAS. TRAFFIC MANAGEMENT SHALL BE IN ACCORDANCE WITH
SECTION 512 - "MAINTAINING TRAFFIC", OF THE VIRGINIA DEPARTMENT OF TRANSPORTATION 2020 ROAD AND BRIDGE
SPECIFICATIONS. CONTRACTOR SHALL PROVIDE TRAINED CERTIFIED FLAGGERS AND CONSTRUCTION SIGNAGE TO
CONTROL VEHICULAR MOVEMENTS AROUND WORK SITE.
9. CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT HAUL ROUTES REMAIN CLEAR OF CONSTRUCTION DEBRIS AT
ALL TIMES. CONTRACTING OFFICER MAY REQUIRE CONTRACTOR TO PROVIDE VACUUM SWEEPERS, AT CONTRACTOR'S
EXPENSE, TO REMOVE DEBRIS.
10. EXISTING TURF AREAS DISTURBED BY CONSTRUCTION ACTIVITIES SHALL BE RE-ESTABLISHED AND SEEDED IN
ACCORDANCE WITH SECTION 32 92 19 SEEDING.
11. CONTRACTOR SHALL MAINTAIN, WATER, AND MOW ALL SEEDED AREAS WITHIN THE PROJECT LIMITS WHEN HEIGHT
EXCEEDS 6 INCHES UNTIL FINAL ACCEPTANCE BY THE GOVERNMENT. NO MORE THAN 1/3 OF THE LEAF BLADE SHALL BE
REMOVED IN A SINGLE CUT. GRASS SHALL NOT BE CUT BELOW 3.5 INCHES. OTHER VEGETATION SHALL BE BY
SPECIFICATION.
12. THE CONTRACTOR IS RESPONSIBLE TO OBTAIN ALL PERMITS NECESSARY.
13. VEHICULAR AND PEDESTRIAN ACCESS TO ALL WAREHOUSES, BUILDINGS, BRIDGES, GATES, AND CELL PHONE TOWERS
SHALL BE MAINTAINED AT ALL TIMES. THIS INCLUDES TRACTOR TRAILER SIZE VEHICLES.
14. PROPER FLAGGING AND/OR TRAFFIC CONTROL OPERATIONS SHALL BE ACCOMPLISHED AT ALL TIMES.
15. CONTRACTOR TO VERIFY EXACT LOCATION OF ALL SITE FEATURES FOR THIS PROJECT PRIOR TO BEGINNING WORK.
16. RIM ELEVATIONS FOR ALL IN PAVEMENT STRUCTURES SHALL BE ADJUSTED TO 1/4 INCH BELOW NEW FINISHED SURFACE.
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO ENSURE ALL TOP ELEVATIONS OF GRATES, INLETS, MANHOLE TOPS, GAS VALVES, WATER VALVE BOX TOPS, SAMPLING WELL TOPS, OR ANY OTHER APPURTENANCES SHALL BE LOCATED, PROTECTED, AND ADJUSTED TO 1/4 INCH BELOW NEW FINISHED SURFACE.
17. CONTRACTOR SHALL MAINTAIN POSITIVE SLOPE TO ALL STORM DRAIN INLETS.
18. ANY DAMAGE TO EXISTING STRUCTURES SHALL BE REPAIRED BY CONTRACTOR AT NO ADDITIONAL EXPENSE TO THE
GOVERNMENT.
19. CONTRACTOR SHALL MAINTAIN AT LEAST ONE LANE OF TRAFFIC FOR ALL WORK AREAS AT ALL TIMES FOR
NON-CONTRACTOR VEHICLES TO INCLUDE EMERGENCY RESPONSE VEHICLES. ANY LANE CLOSURE OR ACTIVITY THAT
IMPACTS TRAFFIC OR TRAVEL REQUIRES NOTIFICATION AND APPROVAL TWO WEEKS IN ADVANCE. REQUEST FOR
CLOSURE SHALL INCLUDE COMPLETE DETAILS OF ALTERNATE ROUTE TO INCLUDE ELECTRONICALLY SUBMITTED
DRAWING. IF APPROVED, PROPER ROUTING, SIGNAGE, AND TRAFFIC CONTROL WILL BE PROVIDED AT CONTRACTOR'S
EXPENSE.
20. CONTRACTOR SHALL NOTIFY CONTRACTING OFFICER PRIOR TO ANY EXCAVATION. A DIG PERMIT REQUEST SHALL BE
SUBMITTED PRIOR TO BEGINNING ANY EXCAVATION ACTIVITIES ON THIS PROJECT. CONTRACTOR SHOULD ALLOW AT
LEAST TWO WEEKS FOR APPROVAL PROCESS. FORT LEE CHIEF OF UTILITIES WILL MARK EXISTING UTILITIES. ONCE
UTILITIES ARE MARKED, CLEARANCE WILL BE GRANTED FOR EXCAVATION.
21. CONTRACTOR MUST OBTAIN WRITTEN PERMIT FROM THE FORT LEE FIRE DIVISION PRIOR TO PERFORMING ANY "HOT
WORK". "HOT WORK" MAY INCLUDE WELDING OR ELECTRICAL WORK. CONTRACTOR MUST COORDINATE/REQUEST ALL HOT
WORK WITH THE PERMIT AUTHORIZING INDIVIDUAL (PAI) MINIMUM OF 24 HOURS IN ADVANCE.
22. CONTRACTOR SHALL BE RESPONSIBLE FOR BARRICADES AND TEMPORARY SIGNAGE. ALL SHALL BE PROPERLY INSTALLED
AND MAINTAINED AT ALL TIMES TO INCLUDE BUT NOT LIMITED TO DETOUR ROUTES, CONSTRUCTION WARNING SIGNS AND
LIGHTING, ROAD CONDITION SIGNAGE, ROAD CLOSURE SIGNAGE, WORK SITE BARRICADING AND FENCING, ETC.
23. ALL WORK SHALL BE SCHEDULED 14 DAYS IN ADVANCE THROUGH THE COR AND THE PROJECT MANAGER AND SHALL LIMIT
IMPACT TO THE FORT LEE WORK FORCE, EVENTS ON BASE, AND MUST BE APPROVED BY THE FORT LEE PROJECT
MANAGER PRIOR TO THE COMMENCEMENT OF WORK.
24. ANY DAMAGE BY THE CONTRACTOR SHALL BE REPAIRED BY THE CONTRACTOR TO ORIGINAL OR BETTER CONDITIONS AT
NO ADDITIONAL COST TO THE GOVERNMENT.
25. CONTRACTOR IS ADVISED THAT HAND WORK ADJACENT TO IN-PAVEMENT STRUCTURES SUCH AS MANHOLES, DRAINAGE
INLETS, AND VALVE BOXES MAY BE REQUIRED TO MEET PROJECT REQUIREMENTS.
26. CONTRACTOR IS REQUIRED TO COORDINATE ALL ASPECTS OF THE WORK WITH THE COR AND THE FORT LEE PROJECT
MANAGER.
27. CONTRACTOR SHALL WARP AND SWALE SURFACES TO MEET DRAINAGE STRUCTURES AND TO PROVIDE POSITIVE
DRAINAGE.
28. CONTRACTOR IS REQUIRED TO COORDINATE ALL WORK WITH ADJACENT PROJECTS.
29. THE CONTRACTOR SHALL VERIFY THE EXACT LOCATION OF ALL SITE FEATURES AND ALL DIMENSIONS AS SHOWN ON THE
DRAWINGS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES SHALL BE BROUGHT IMMEDIATELY TO THE
ATTENTION OF THE CONTRACTOR OFFICER.
ADDITIONAL GENERAL NOTES
1. SHOP DRAWINGS AND SUBMITTALS - MATERIALS AND PROCEDURES REQUIRING SUBMITTALS ARE INCLUDED IN THE
SPECIFICATIONS.
2. STORM DRAINAGE SHALL BE MAINTAINED IN ACCORDANCE WITH THE LATEST EDITION OF THE VIRGINIA EROSION
AND SEDIMENT CONTROL HANDBOOK DISTRIBUTED BY VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY.
3. FOLLOWING PAVEMENT ROUGH GRADING OPERATIONS, THE EXPOSED SUBGRADE SHALL BE OBSERVED UNDER
PROOF ROLLING. THIS PROOF ROLLING SHALL BE ACCOMPLISHED WITH A FULLY LOADED DUMP TRUCK OR 7 TO 10
TON DRUM ROLLER TO CHECK FOR POCKETS OF SOFT MATERIAL HIDDEN BENEATH A THIN CRUST OF BETTER SOIL.
ANY UNSUITABLE MATERIALS THUS EXPOSED SHALL BE REMOVED AND REPLACED WITH A WELL-COMPACTED
MATERIAL.
4. ALL MATERIALS CAPABLE OF RECYCLE THAT ARE REMOVED/DEMOLISHED UNDER THE PROJECT SHALL BE
RECYCLED. REPORT(S) IDENTIFYING TYPE OF MATERIAL, QUANTITIES, AND WEIGHTS OF RECYCLED MATERIAL
SHALL BE ACCURATELY MAINTAINED AND PROVIDED TO THE COR FOR SUBMISSION TO FORT LEE AT COMPLETION
OF THE PROJECT.
DEMOLITION NOTES
1. UNLESS OTHERWISE NOTED, ALL DEMOLITION WORK SHALL BE CONFINED WITHIN THE PROJECT LIMITS INDICATED.
2. PROJECT LIMITS SHOWN ARE APPROXIMATE. EXISTING GROUND FEATURES AND ROADWAYS SHALL BE USED AS A
DEMARCATION FOR THE PROJECT LIMITS, I.E., EDGE OF PAVEMENT, EDGE OF ROADWAY, EXISTING CHAIN-LINK
FENCE, ETC.
3. EXISTING PAVEMENT WITHIN THE PROJECT LIMITS SHALL BE DEMOLISHED AND REMOVED, UNLESS OTHERWISE
INDICATED.
4. WATER, SEWER, STORMWATER, AND DECK DRAIN LINES WITHIN THE PROJECT LIMITS SHALL NOT BE REMOVED, UNLESS OTHERWISE INDICATED.
5. ALL UTILITIES, STRUCTURES AND/OR IMPROVEMENTS IDENTIFIED TO REMAIN SHALL BE MAINTAINED IN GOOD
CONDITION TO RECEIVE THE PROPOSED UTILITIES, STRUCTURES AND/OR IMPROVEMENTS. SHOULD THESE ITEMS
BECOME DAMAGED DUE TO CONTRACTOR'S NEGLIGENCE OR CONSTRUCTION OPERATIONS, THE CONTRACTOR
SHALL RESTORE THESE ITEMS TO THEIR ORIGINAL OR BETTER CONDITION AT NO ADDITIONAL COST TO THE
GOVERNMENT AND TO THE SATISFACTION OF THE CONTRACTING OFFICER.
UTILITY NOTES
1. THE EXISTENCE AND LOCATION OF UNDERGROUND UTILITIES, APPURTENANCES AND STRUCTURES SHOWN ARE
BASED ON THE TOPOGRAPHIC SURVEY. AVAILABLE RECORDS AND APPLICABLE UTILITY MAPS WERE VERIFIED
WHENEVER POSSIBLE BY FIELD SURVEYS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE
LOCATIONS, SIZES, AND INVERTS OF ALL EXISTING UTILITIES AND SHALL PROTECT ALL SUCH UTILITIES AT ALL
TIMES. UNLESS OTHERWISE INDICATED. EXISTING UTILITIES, WHETHER SHOWN ON THE DRAWINGS OR NOT, WHICH
HAVE BEEN DAMAGED AS A RESULT OF THE CONSTRUCTION WORK, SHALL BE RESTORED IMMEDIATELY TO ITS
ORIGINAL OR BETTER CONDITION AND SHALL BE PAID FOR BY THE CONTRACTOR.
2. WHENEVER CONNECTIONS TO EXISTING UTILITIES OR WHERE NEW UTILITIES CROSS EXISTING UTILITIES ARE
SHOWN, THE CONTRACTOR SHALL CAREFULLY EXPOSE THE UTILITY BY HAND EXCAVATION TO VERIFY ITS
LOCATION AND DEPTH PRIOR TO EXCAVATING TRENCHES FOR THE NEW UTILITY LINES.
3. WHENEVER ANY CHANGE IN ALIGNMENT OR GRADE FOR THE PROPOSED UTILITIES ARE REQUIRED DUE TO
UNFORESEEN CONFLICT WITH OTHER UTILITIES, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE
CONTRACTING OFFICER FOR REMEDIAL ACTION.
4. INTERRUPTION OF UTILITY SERVICE AND/OR OPERATIONS OF ADJACENT FACILITIES SHALL BE KEPT TO A MINIMUM.
ANY INTERRUPTION OF UTILITY SERVICE AND/OR OPERATIONS REQUIRES TWO WEEK NOTIFICATION AND
APPROVAL AND SHALL BE COORDINATED WITH THE CONTRACTING OFFICER AND THE AFFECTED USING AGENCIES.
5. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL WATER LINES DURING CONSTRUCTION.
THE CONTRACTOR SHALL BE ESPECIALLY CAREFUL WHEN EXCAVATING ALONGSIDE WATER LINES, TEES AND
BENDS WHERE THERE IS A POSSIBILITY OF WATER LINE MOVEMENT DUE TO REMOVAL OF THE SUPPORTING EARTH
BEYOND THE EXISTING REACTION BLOCKS. THE CONTRACTOR SHALL TAKE WHATEVER MEASURES NECESSARY TO
PROTECT THE WATER LINE, SUCH AS CONSTRUCTING SPECIAL REACTION BLOCKS AND/OR MODIFYING THEIR
CONSTRUCTION METHOD, WITH THE APPROVAL OF THE CONTRACTING OFFICER.
GRADING NOTES
1. FINISH GRADES ALONG AGGREGATE AREAS AS SHOWN ON THE DRAWINGS ARE TOP OF AGGREGATE ELEVATIONS, UNLESS OTHERWISE INDICATED. ADJUSTMENTS MAY BE REQUIRED AT CONNECTION OF NEW WORK TO EXISTING
PAVED OR UNPAVED AREAS TO PROVIDE A SMOOTH RIDING CONNECTION.
2. THE CONTRACTOR SHALL REMOVE ALL SILT AND DEBRIS RESULTING FROM THEIR WORK AND DEPOSITED IN
DRAINAGE FACILITIES, ROADWAYS AND OTHER AREAS, AT NO ADDITIONAL COST TO THE GOVERNMENT.
3. THE CONTRACTOR SHALL CLEAN ALL EXISTING DRAINAGE AND SEWER LINES TO REMAIN WITHIN THE PROJECT
LIMITS.
T:\188820-USACE-2017-IDIQ\Task 15 - SPOE Fort Lee\CAD_BIM\05_Civil\_Sheets\W91236-C-SP-C-002.dwg
C-002
S E
A P
O R
T
O
F
E
M B
A R
K A
T I O
N
T
R A
I N
I N
G
F
A C
I L I T
Y
F O
E
V
I R
G I N
I A
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
T
E S
C
W
O O
D S
S
B
E A
L E
C
M
O O
R E
J
D
R A
K E
W D
W S
P
B
E N
D
S
V I R
G I N
A
C H
V
A
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N O
R F
O L
K
D
I S
T R
I C
T
F
R O
N
O R
F O
L K
V
A
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
D A
T E
M A
R K
D E
S C
R I P
T I O
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
R T
A
S
U B
M I T
T A
L
J U
J U
N A
O
F
I L
E
N
O
VESCH MINIMUM STANDARDS (MS-19)
THIS SECTION PRESENTS THE GUIDELINES & REQUIREMENTS IDENTIFIED IN CHAPTER 6 OF THE VIRGINIA
EROSION & SEDIMENT CONTROL REGULATIONS HANDBOOK. ALL APPLICABLE MINIMUM STANDARDS
(FROM VIRGINIA EROSION & SEDIMENT CONTROL REGULATIONS, MS-1 - MS-19) MUST BE ADDRESSED.
1.PERMANENT OR TEMPORARY SOIL
STABILIZATION SHALL BE APPLIED TO
DENUDED AREAS WITHIN SEVEN (7) DAYS IF
THEY WILL REMAIN DORMANT FOR MORE
THAN 14 DAYS.
2.DURING CONSTRUCTION OF THE PROJECT,
SOIL STOCKPILES AND BORROW AREAS
SHALL BE STABILIZED OR PROTECTED WITH
SEDIMENT TRAPPING MEASURES.
TEMPORARY PROTECTION AND PERMANENT
STABILIZATION SHALL BE APPLIED TO ALL
SOIL STOCKPILES ON SITE AND BORROW
AREAS OR SOIL INTENTIONALLY
TRANSFERRED OFF SITE.
3.PERMANENT VEGETATIVE COVER SHALL BE
ESTABLISHED ON DENUDED AREAS NOT
OTHERWISE PERMANENTLY STABILIZED.
PERMANENT VEGETATION SHALL NOT BE
CONSIDERED ESTABLISHED UNTIL A
GROUND COVER IS ACHIEVED THAT IS
UNIFORM, MATURE ENOUGH TO SURVIVE,
AND WILL INHIBIT EROSION.
4.SEDIMENT BASINS AND TRAPS, PERIMETER
DIKES, SEDIMENT BARRIERS AND OTHER
MEASURES INTENDED TO TRAP SEDIMENT
SHALL BE CONSTRUCTED AS A FIRST STEP IN
ANY LAND-DISTURBING ACTIVITY AND SHALL
BE MADE FUNCTIONAL BEFORE UPSLOPE
LAND DISTURBANCE TAKES PLACE.
5.STABILIZATION MEASURES SHALL BE
APPLIED TO EARTHEN STRUCTURES SUCH
AS DAMS, DIKES, AND DIVERSIONS
IMMEDIATELY AFTER INSTALLATION.
6.SEDIMENT TRAPS AND SEDIMENT BASINS
SHALL BE DESIGNED AND CONSTRUCTED
BASED UPON THE TOTAL DRAINAGE AREA TO
BE SERVED BY THE TRAP OR BASIN.
SEDIMENT TRAPS SHALL BE CONSTRUCTED
TO CONTROL DRAINAGE AREAS LESS THAN
THREE ACRES WITH MINIMUM STORAGE
CAPACITY OF 134 CUBIC YARDS/ACRE OF
DRAINAGE AREA. SEDIMENT BASINS SHALL
BE CONSTRUCTED TO CONTROL DRAINAGE
AREAS GREATER THAN THREE ACRES WITH
MINIMUM STORAGE CAPACITY OF 134 CUBIC
YARDS/ACRE OF DRAINAGE AREA. THE
OUTFALL SYSTEM SHALL AT A MINIMUM
MAINTAIN THE STRUCTURAL INTEGRITY OF
THE BASIN DURING A 25-YEAR STORM OF
24-HOUR DURATION.
7.CUT AND FILL SLOPES SHALL BE DESIGNED
AND CONSTRUCTED IN A MANNER THAT WILL
MINIMIZE EROSION. SLOPES THAT ARE
FOUND TO BE ERODING EXCESSIVELY
WITHIN ONE YEAR OF PERMANENT
STABILIZATION SHALL BE PROVIDED WITH
ADDITIONAL SLOPE STABILIZING MEASURES
UNTIL THE PROBLEM IS CORRECTED.
N/A
N/A
ALL CUT AND FILL SLOPES SHALL NOT
CAUSE EROSION. IF AT ANY TIME THE
SLOPES ARE FOUND TO BE ERODING
EXCESSIVELY WITHIN ONE YEAR OF
PERMANENT STABILIZATION, THE SLOPES
SHALL BE PROVIDED WITH ADDITIONAL
SLOPE STABILIZATION MEASURES.
REQUIREMENT
CONTRACTOR SHALL INSTALL TEMPORARY
SILT FENCE AROUND ALL STOCKPILES.
EXCAVATED SOIL SHALL EITHER BE STORED
IN STOCKPILES CONTAINED COMPLETELY
WITHIN THE PHASE'S LIMITS OF
DISTURBANCE OR HAULED OFF SITE TO
PERMITTED FACILITY.
CONTRACTOR SHALL INSTALL SILT FENCE
AND INLET PROTECTION AS SHOWN ON PLAN
SHEET CG111 PRIOR TO ANY LAND
DISTURBANCE.
CONTRACTOR SHALL SCHEDULE AND APPLY
TEMPORARY SEEDING AND MULCHING IN
ACCORDANCE WITH TEMPORARY SEEDING
CRITERIA ON SHEET CG501 AND MS 3.31 AND
MS 3.35 WITHIN DENUDED AREAS
FOLLOWING INITIAL DISTURBANCE WITHIN
THE TIME FRAME SPECIFIED.
CONTRACTOR SHALL PROVIDE PERMANENT
SEEDING IN ACCORDANCE WITH SHEET
CG501 AND MS 3.32 WITHIN DENUDED AREAS
OF THE SITE THAT ARE AT FINAL GRADE OR
AREAS NOT AT FINAL GRADE BUT WILL
REMAIN DORMANT FOR MORE THAN ONE (1)
YEAR.
8.CONCENTRATED RUNOFF SHALL NOT
FLOW DOWN CUT OR FILL SLOPES UNLESS
CONTAINED WITHIN AN ADEQUATE
TEMPORARY OR PERMANENT CHANNEL,
FLUME, OR SLOPE DRAIN STRUCTURE.
9.WHENEVER WATER SEEPS FROM A SLOPE
FACE, ADEQUATE DRAINAGE OR OTHER
PROTECTION SHALL BE PROVIDED.
10.ALL STORM SEWER INLETS THAT ARE
MADE OPERABLE DURING CONSTRUCTION
SHALL BE PROTECTED SO THAT
SEDIMENT-LADEN WATER CANNOT ENTER
THE CONVEYANCE SYSTEM WITHOUT FIRST
BEING FILTERED OR OTHERWISE TREATED
TO REMOVE SEDIMENT.
N/A
N/A
CONTRACTOR SHALL PROVIDE INLET
PROTECTION ON ANY PROPOSED INLET TO
FILTER SEDIMENT-LADEN WATER BEFORE
ENTERING THE CONVEYANCE SYSTEM. SEE
SHEET SHEET CG111 FOR INLET LOCATIONS
AND SHEET CG501 FOR DETAILS.
NOTES FOR UTLITIY CONSTRUCTION
PROVIDED ON SHEET CG501
THE CONTRACTOR SHALL NOT HAVE MORE
THAN 500 LINEAR FEET OF TRENCH OPEN AT
ONE TIME.
THE CONTRACTOR SHALL NOT LEAVE
EXCAVATED MATERIAL ON THE DOWNHILL
SIDE OF TRENCHES AND SHALL EITHER
CONTAIN MATERIAL IN A PROTECTED
STOCKPILE WITHIN THE PROJECT AREA OR
IMMEDIATELY HAUL OFF THE SITE.
THE CONTRACTOR SHALL EITHER FILTER OR
PASS EFFLUENT FROM DEWATERING
OPERATIONS THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH, AND
DISCHARGE IN A MANNER THAT DOES NOT
ADVERSELY AFFECT THE RECEIVING BODY
OF WATER OR ANY OFF SITE PROPERTY.
THE CONTRACTOR SHALL ENSURE
BACKFILLED TRENCHES ARE COMPACTED IN
ACCORDANCE WITH SPECIFICATIONS,
SECTION 31 00 00 EARTHWORK AND
SECTION 33 40 00 STORM DRAINAGE
UTILITIES
RE-STABILIZATION SHALL BE
ACCOMPLISHED IN ACCORDANCE WITH
THESE REGULATIONS.
THE CONTRACTOR SHALL COMPLY WITH
ALL SAFETY REGULATIONS IN
ACCOMPLISHING THIS WORK.
THE CONTRACTOR SHALL MINIMIZE THE
AMOUNT OF SEDIMENT TRANSPORTED
ONTO PAVED SURFACES. ANY SEDIMENT
TRANSPORTED ONTO PAVED SURFACES
SHALL BE REMOVED BY SWEEPING OR
SHOVELING AT THE END OF EACH DAY AT
A MINIMUM AND TRANSPORTED TO A
SEDIMENT CONTROL DISPOSAL AREA.
THE CONTRACTOR SHALL REMOVE
TEMPORARY EROSION AND SEDIMENT
CONTROL MEASURES WITHIN 30 DAYS
AFTER FINAL SITE STABILIZATION AND AS
APPROVED BY THE COR. TRAPPED
SEDIMENT SHALL BE PERMANENTLY
STABILIZED TO PREVENT FURTHER
EROSION OR TRANSPORT OF SEDIMENT.
11.BEFORE NEWLY CONSTRUCTED
STORMWATER CONVEYANCE CHANNELS OR
PIPES ARE MADE OPERATIONAL, ADEQUATE
OUTLET PROTECTION AND ANY REQUIRED
TEMPORARY OR PERMANENT CHANNEL
LINING SHALL BE INSTALLED IN BOTH THE
CONVEYANCE CHANNEL AND RECEIVING
CHANNEL.
12.WHEN WORK IN A LIVE WATERCOURSE IS
PERFORMED, PRECAUTIONS SHALL BE
TAKEN TO MINIMIZE ENCROACHMENT,
CONTROL SEDIMENT TRANSPORT, AND
STABILIZE THE WORK AREA TO THE
GREATEST EXTENT POSSIBLE DURING
CONSTRUCTION. NON-ERODIBLE MATERIAL
SHALL BE USED FOR THE CONSTRUCTION
OF CAUSEWAYS AND COFFERDAMS.
EARTHEN FILL MAY BE USED FOR THESES
STRUCTURES IF ARMORED BY
NON-ERODIBLE COVER MATERIALS.
13.WHEN A LIVE WATERCOURSE MUST BE
CROSSED BY CONSTRUCTION VEHICLES
MORE THAN TWICE IN ANY SIX-MONTH
PERIOD, A TEMPORARY VEHICULAR STREAM
CROSSING CONSTRUCTED OF
NON-ERODIBLE MATERIAL SHALL BE
PROVIDED.
14.ALL APPLICABLE FEDERAL, STATE, AND
LOCAL REGULATIONS PERTAINING TO
WORKING IN OR CROSSING LIVE
WATERCOURSES SHALL BE MET.
15.THE BED AND BANKS OF A
WATERCOURSE SHALL BE STABILIZED
IMMEDIATELY AFTER WORK IN THE
WATERCOURSE IS COMPLETED.
16.UNDERGROUND UTILITY LINES SHALL BE
INSTALLED IN ACCORDANCE WITH THE
FOLLOWING STANDARDS IN ADDITION TO
OTHER APPLICABLE CRITERIA:
A. NO MORE THAN 500 LINEAR FEET OF
TRENCH MAY BE OPENED AT ONE TIME.
B. EXCAVATED MATERIAL SHALL BE PLACED
ON THE UPHILL SIDE OF TRENCHES.
C. EFFLUENT FROM DEWATERING
OPERATIONS SHALL BE FILTERED OR
PASSED THROUGH AN APPROVED
SEDIMENT TRAPPING DEVICE, OR BOTH,
AND DISCHARGED IN A MANNER THAT DOES
NOT ADVERSELY AFFECT FLOWING
STREAMS OR OFF-SITE PROPERTY.
D. MATERIAL USED FOR BACKFILLING
TRENCHES SHALL BE PROPERLY
COMPACTED IN ORDER TO MINIMIZE
EROSION AND PROMOTE STABILIZATION.
E. RE-STABILIZATION SHALL BE
ACCOMPLISHED IN ACCORDANCE WITH
THESE REGULATIONS.
F. APPLICABLE SAFETY REGULATIONS
SHALL BE COMPLIED WITH.
17.WHERE CONSTRUCTION VEHICLE ACCESS
ROUTES INTERSECT PAVED OR PUBLIC ROADS,
PROVISIONS SHALL BE MADE TO MINIMIZE THE
TRANSPORT OF SEDIMENT BY VEHICULAR
TRACKING ONTO THE PAVED SURFACE. WHERE
SEDIMENT IS TRANSPORTED ONTO A PAVED OR
PUBLIC ROAD SURFACE, THE ROAD SURFACE
SHALL BE CLEANED THOROUGHLY AT THE END
OF THE DAY. SEDIMENT SHALL BE REMOVED
FROM THE ROADS BY SHOVELING OR SWEEPING
AND TRANSPORTED TO A SEDIMENT CONTROL
DISPOSAL AREA. STREET WASHING SHALL BE
ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN
THIS MANNER. THIS PROVISION SHALL APPLY TO
INDIVIDUAL DEVELOPMENT LOTS AS WELL AS TO
LARGER LAND-DISTURBING ACTIVITIES.
18.ALL TEMPORARY EROSION AND SEDIMENT
CONTROL MEASURES SHALL BE REMOVED
WITHIN 30 DAYS AFTER FINAL SITE
STABILIZATION OR AFTER THE TEMPORARY
MEASURES ARE NO LONGER NEEDED, UNLESS
OTHERWISE AUTHORIZED BY THE LOCAL
PROGRAM AUTHORITY. TRAPPED SEDIMENT AND
THE DISTURBED SOIL AREAS RESULTING FROM
THE DISPOSITION OF TEMPORARY MEASURES
SHALL BE PERMANENTLY STABILIZED TO
PREVENT FURTHER EROSION AND
SEDIMENTATION.
19.PROPERTIES AND WATERWAYS
DOWNSTREAM FROM DEVELOPMENT SITES
SHALL BE PROTECTED FROM THE SEDIMENT
DEPOSITION, EROSION AND DAMAGE DUE TO
INCREASES IN VOLUME, VELOCITY AND PEAK
FLOW RATE OF STORMWATER RUNOFF FOR
THE STATED FREQUENCY STORM OF
24-HOUR DURATION IN ACCORDANCE WITH
THE FOLLOWING STANDARDS AND CRITERIA.
CONCENTRATED STORMWATER RUNOFF
LEAVING A DEVELOPMENT SITE SHALL BE
DISCHARGED DIRECTLY INTO ADEQUATE
NATURAL OR MAN-MADE RECEIVING
CHANNEL, PIPE, OR STORM SEWER SYSTEM.
FOR THOSE SITES, DOWNSTREAM STABILITY
ANALYSES AT THE OUTFALL OF THE PIPE OR
PIPE SYSTEM SHALL BE PERFORMED.
THE CONTRACTOR SHALL COMPLY WITH
THE REQUIREMENTS OF THE PLANS AND
PERMITS TO ENSURE THE PROTECTION OF
PROPERTIES AND WATERWAYS
DOWNSTREAM OF THE PROJECT.
CALCULATIONS PROVIDED IN THE
STORMWATER MANAGMENT REPORT (SMR)
VERIFY COMPLIANCE WITH WATER
QUANTITY MINIMUM STANDARDS SET
FORTH IN SECTION 4VAC25-870-66 OF THE
VIRGINIA STORMWATER MANAGEMENT
PROGRAM (VSMP) PERMIT REGULATIONS.
N/A
N/A
N/A
ALL PROPOSED OUTFALL DEVICES DRAIN TO
EXISTING CONCRETE STRUCTURES NO
OUTLET PROTECTION REQUIRED.
N/A
VESCH MINIMUM STANDARDS (MS-19), CONT'D. VESCH MINIMUM STANDARDS (MS-19), CONT'D.
P O
E
SSIONAL ENG
IN
E
E R
C O
M O
EAL O
M
W
TH FV
I
G
IN
IA
R F
Lic. No.055840
AMITY B. DEWEY
07/28/21
T:\188820-USACE-2017-IDIQ\Task 15 - SPOE Fort Lee\CAD_BIM\05_Civil\_Sheets\W91236-C-SP-C-003.dwg
C-003
S E
A P
O R
T
O
F
E
M B
A R
K A
T I O
N
T
R A
I N
I N
G
F
A C
I L I T
Y
F O
E
V
I R
G I N
I A
E R
O S
I O
N
A
D
I M
E N
T
C
O N
T R
T
E S
C
W
O O
D S
S
B
E A
L E
C
M
O O
R E
J
D
R A
K E
W D
W S
P
B
E N
D
S
V I R
G I N
A
C H
V
A
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N O
R F
O L
K
D
I S
T R
I C
T
F
R O
N
O R
F O
L K
V
A
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
D A
T E
M A
R K
D E
S C
R I P
T I O
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
R T
A
S
U B
M I T
T A
L
J U
J U
N A
O
F
I L
E
N
O
EROSION AND SEDIMENT CONTROL NARRATIVE - SPOE TRAINING FACILITY
PROJECT DESCRIPTION
THIS PROJECT IS LOCATED AT FORT LEE, PRINCE GEORGE COUNTY, VIRGINIA. THE PROJECT SITE IS
BOUNDED BY B AVENUE TO THE NORTH, C AVENUE TO THE SOUTH, 2ND STREET TO THE EAST AND 3RD
STREET TO THE WEST. THE PURPOSE OF THIS PROJECT IS TO CONSTRUCT A NEW SEAPORT OF
EMBARKATION (SPOE) TRAINING FACILITY WITH A REPLICA OF A CARGO SHIP WITH TWO RAMPS TO
ACCOMMODATE ROLL-ON/ROLL-OFF CAPABILITIES FOR VEHICLES. TREE CLEARING, AND DEMOLITION
OF EXISTING INFRASTRUCTURE, INCLUDING APPROXIMATELY 100 FEET OF A 10-FEET WIDE BY 3-FEET
DEEP CONCRETE CHANNEL AND AN EXISTING STORMWATER MANAGEMENT FACILITY, WILL BE
REQUIRED.
EXISTING SITE CONDITIONS
THE PROJECT SITE IS ENCLOSED ON THREE SIDES BY A PERMANENT CHAIN LINK FENCE TOPPED BY
THREE ROWS OF BARBED WIRE THAT SECURES THE ENTIRE MULTI-MODAL TRAINING FACILITY. THE
FENCE INCLUDES ONE GATE AT B-AVENUE AND 2ND STREET. THE EXISTING PERMANENT FENCE
BLOCKS ACCESS TO B AVENUE FROM 3RD STREET. THE MARSHALLING AREA IS ADJACENT TO THE
NORTH EDGE OF THE SPOE SITE AND IS CURRENTLY AT LEAST 2-FEET TO 3-FEET HIGHER THAN B
AVENUE. THE EAST HALF OF THE SITE SLOPES FROM 2ND STREET WESTWARD WITH A GRADE OF
APPROXIMATELY 4 TO 5 PERCENT. THE SURFACE OF THE SLOPING GROUND IS MOSTLY GRAVEL
PARKING, WHICH EXHIBITS SIGNS OF EROSION WHERE RUNOFF CONCENTRATES AS IT FLOWS WEST
TOWARD THE WOODS AND CONCRETE CHANNEL.
B AVENUE IS A WEATHERED ASPHALT SURFACE. THE EAST HALF OF THE SITE CONSISTS OF GRAVEL
PARKING. THE GRAVEL PARKING AREA IS BISECTED BY THE PERMANENT CHAIN LINK FENCE. THE WEST
HALF OF THE SITE IS A COMBINATION OF WOODS AND MEADOW WITH A STORMWATER MANAGEMENT
FACILITY AND A 10-FEET WIDE BY 3-FEET DEEP CONCRETE CHANNEL THAT EXTENDS DIAGONALLY
THROUGH THE WEST HALF OF THE SITE. THE FACILITY DISCHARGES TO THE CONCRETE CHANNEL. THE
CONCRETE CHANNEL DISCHARGES TO A 60"X21" BOX CULVERTS BENEATH C-AVENUE AND CONTINUES
OFF-SITE TO THE SOUTH AND CONVEYS RUNOFF FROM THE MARSHALLING AREA AND THE MULTI-MODAL
AREA.
GAS, WATER, AND SEWER LINES EXIST THROUGHOUT THE PROJECT AREA. CONTRACTOR TO VERIFY
LOCATION PRIOR TO CONSTRUCTION. IF ANY UTILITY SERVICE IS TO BE IMPACTED DURING
CONSTRUCTION, THE CONTRACTOR MUST NOTIFY THE COR IN WRITING FOR APPROVAL PRIOR TO THE
DISRUPTION.
ADJACENT AREAS
THIS PROJECT IS LOCATED WITHIN FORT LEE, THE FORT'S APPROXIMATE TOTAL AREA IS 8.4 SQUARE
MILES. THE PROJECT SITE IS LOCATED EAST OF THE HAZMAT SCHOOL, WEST OF THE FORT LEE
COURTHOUSE, SOUTH OF TA10 DISTRIBUTION CENTER, AND APPROXIMATELY 930 FEET NORTH OF
BAILEY CREEK. THE SITE DRAINS TO A CONCRETE CHANNEL WHICH FLOWS SOUTH UNDER C AVENUE, OUTFALLING TO BAILEY CREEK, THE JAMES RIVER, AND ULTIMATELY CHESAPEAKE BAY.
OFFSITE AREAS
NO OFFSITE AREAS ARE PROPOSED TO BE DISTURBED WITH THE CONSTRUCTION OF THIS PROJECT.
SOILS
GENERAL SUBSURFACE EXPLORATION WAS ACCOMPLISHED USING FOUR, 15-FOOT DEEP, STANDARD
PENETRATION TEST (SPT) BORINGS LOCATED WITHIN THE VICINITY OF THE SPOE STRUCTURE AND SWM
FACILITY. GROUNDWATER WAS NOT ENCOUNTERED AT THE BORING LOCATIONS WITHIN THE DEPTHS
EXPLORED. IT IS NOTED HOWEVER THAT SOME OF THE SOILS ENCOUNTERED AT THE BORING
LOCATIONS CONSISTED OF MATERIAL THAT WOULD EXHIBIT A LOW PERMEABILITY. AS SUCH, PERCHED
WATER CONDITIONS COULD BE ENCOUNTERED ON THIS SITE, PARTICULARLY FOLLOWING SIGNIFICANT
RAIN EVENTS. SEE REPORT OF SUBSURFACE EXPLORATION AND GEOTECHNICAL ENGINEERING
SERVICES FOR ADDITIONAL INFORMATION ON EXISTING SOIL CONDITIONS.
CRITICAL EROSION AREAS
CRITICAL AREAS LOCATED ON SITE ARE PROPOSED FILTER ROW AND CHAMBER SYSTEM STORMWATER
MANAGEMENT FACILITY, EXISTING DOWNSTREAM CONCRETE CHANNEL, AND A WOODED AREA
IMMEDIATELY SOUTH OF THE SITE. CONSTRUCTION SEQUENCING WILL BE SCHEDULE SO THAT
SEDIMENT LADEN RUNOFF WILL NOT BE DIRECTED TO THE PROPOSE SWMFS AT ANY TIME. A
TEMPORARY PIPE WILL BE INSTALLED TO BYPASS PROPOSED UPSTREAM DRAINAGE, AND SITE RUNOFF
INTO THE PROPOSE BOX CULVERT DURING CONSTRUCTION. IN ADDITION, THE PROPOSED SWMFS WILL
NOT GO ONLINE UNTIL ALL UPSTREAM DRAINAGE AREAS ARE STABILIZED, AND THE TEMPORARY PIPE
REMOVED. PROPOSED AND EXISTING STORM INLETS WILL BE PROTECTED WITH INLET PROTECTION
AND THE DOWNSTREAM END OF THE PROPOSED BOX CULVERTS WILL BE MONITORED FOR SEDIMENT
LADEN RUNOFF. SILT FENCE IS PROPOSED ON THE SOUTHERN BOUNDARY OF THE SITE TO PREVENT
SEDIMENT AND CONSTRUCTION RELATED ACTIVITIES FROM IMPACTING THE ADJACENT WOODED AREA.
EROSION AND SEDIMENT CONTROL MEASURES
ONE PHASE OF EROSION AND SEDIMENT CONTROL IS PROVIDED FOR THE SITE. EROSION AND
SEDIMENT CONTROLS MUST BE MAINTAINED BY THE CONTRACTOR.
ESC MEASURES ARE IMPLEMENTED TO PROTECT THE DOWNSTREAM SYSTEMS FROM SEDIMENT
DEPOSITION DURING CONSTRUCTION ESC PLAN DETAILS ARE PROVIDED ON SHEETS CG501 TO CG502.
PROVIDED PRACTICES FOR THIS PHASE ARE AS FOLLOWS:
STRUCTURAL PRACTICES
1. TEMPORARY CONSTRUCTION ENTRANCE - 3.02
A TEMPORARY STONE CONSTRUCTION ENTRANCE IS LOCATED ON THE NORTHEASTERN END OF
THE PROJECT, WHICH EGRESS AND INGRESS TO 2
ND
STREET. THE TEMPORARY CONSTRUCTION
ENTRANCE WILL BE FIT WITH A WASH RACK WHERE THE ENTRANCE MEETS 2
ND
STREET.
CONSTRUCTION EQUIPMENT AND VEHICLES WILL BE REQUIRED TO WASH THEIR WHEELS BEFORE
ACCESSING 2
ND
STREET.
2. SILT FENCE - 3.05
A TEMPORARY SEDIMENT BARRIER IS CONSTRUCTED OF POSTS AND FILTER FABRIC, TO INTERCEPT
AND DETAIN SEDIMENT AND DECREASE FLOW VELOCITIES FROM DRAINAGE AREAS OF LIMITED
SIZE. SILT FENCE SEDIMENT BARRIERS WILL BE PROVIDED ALONG THE PERIMETER OF THE SITE
SEDIMENT LADE WATER FROM DISCHARGING OFFSITE.
3. STORM DRAIN INLET PROTECTION - 3.07
STORM-SEWER INLETS LOCATED ON AND ADJACENT TO THE PROJECT SITE MUST BE PROTECTED
DURING CONSTRUCTION.
4. CULVERT INLET PROTECTION - 3.08
LOCATE CULVERT INLET PROTECTION AT THE INLET OF STORM SEWER CULVERTS WITHIN THE
PROJECT LIMITS AND ADJACENT TO THE SITE. CULVERT INLET PROTECTION WILL PREVENT
SEDIMENT FROM ENTERING AND ACCUMULATING IN THE CULVERT.
VEGETATIVE PRACTICES
1. TEMPORARY SEEDING - 3.31
TEMPORARY SEEDING MUST BE APPLIED TO DISTURBED AREAS THAT WILL NOT BE BROUGHT TO
FINAL GRADE FOR MORE THAN 30 DAYS, OR WHERE WEATHER CONDITIONS MAY PRECLUDE THE
USE OF PERMANENT SEED.
2. PERMANENT SEEDING - 3.32
PERMANENT SEEDING MUST BE AN APPLIED IMMEDIATELY FOLLOWING GRADED AREAS THAT
REACH FINAL GRADING OR AREAS THAT WILL NEED TO BE STABILIZED FOR MORE THAN 1-YEAR .
3. TOPSOIL - 3.30
TOPSOIL MUST BE APPLIED TO FINE-GRADED AREAS IMMEDIATELY FOLLOWING FINAL GRADING TO
PROVIDE A SUITABLE GROWTH MEDIUM FOR FINAL SITE STABILIZATION WITH VEGETATION WHERE
APPLICABLE.
PERMANENT STABILIZATION
CONTRACTOR MUST REMOVE TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES WITHIN 30
DAYS AFTER FINAL SITE STABILIZATION AND AS APPROVED BY THE COR. PRIOR TO REMOVAL OF ALL
EROSION AND SEDIMENT CONTROL MEASURES, CONTACT THE DEQ INSPECTOR FOR APPROVAL.
PERMANENT SEEDING MUST BE IMPLEMENTED WITHIN DENUDED AREAS OF THE SITE THAT ARE AT
FINAL GRADE OR AREAS NOT AT FINAL GRADE BUT WILL REMAIN DORMANT FOR MORE THAN ONE (1)
YEAR.
MAINTENANCE OF ESC MEASURES
SILT FENCE (3.05)
1. SILT FENCES MUST BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND AT LEAST DAILY
DURING PROLONGED RAINFALL. ANY REQUIRED REPAIRS MUST BE MADE IMMEDIATELY.
2. CLOSE ATTENTION MUST BE PAID TO THE REPAIR OF DAMAGED SILT FENCE RESULTING FROM END
RUNS AND UNDERCUTTING.
3. SHOULD THE FABRIC ON A SILT FENCE DECOMPOSE OR BECOME INEFFECTIVE PRIOR TO THE END
OF THE EXPECTED USABLE LIFE AND THE BARRIER STILL BE NECESSARY, THE FABRIC MUST BE
REPLACED PROMPTLY.
4. SEDIMENT DEPOSITS MUST BE REMOVED AFTER EACH STORM EVENT. THEY MUST BE REMOVED
WHEN DEPOSITS REACH APPROXIMATELY ONE-HALF THE HEIGHT OF THE BARRIER.
5. ANY SEDIMENT DEPOSITS REMAINING IN PLACE AFTER THE SILT FENCE IS NO LONGER REQUIRED
MUST BE DRESSED TO CONFORM WITH THE EXISTING GRADE, PREPARED AND SEEDED.
TEMPORARY CONSTRUCTION ENTRANCE (3.02)
1. THE ENTRANCE MUST BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOW
OF MUD ONTO PUBLIC RIGHTS-OF-WAY. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH
ADDITIONAL STONE OR THE WASHING AND REWORKING OF EXISTING STONE AS CONDITIONS
DEMAND AND REPAIR AND/OR CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT.
MATERIALS SPILLED, DROPPED, WASHED, OR TRACKED FROM VEHICLES ONTO ROADWAYS OR INTO
STORM DRAINS MUST BE REMOVED IMMEDIATELY. THE USE OF WATER TRUCKS TO REMOVE
MATERIALS DROPPED, WASHING, OR TRACKED ONTO ROADWAYS WILL NOT BE PERMITTED UNDER
ANY CIRCUMSTANCES.
INLET PROTECTION (3.07)
1. THE STRUCTURE MUST BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED.
2. SEDIMENT MUST BE REMOVED AND THE TRAP RESTORED TO ITS ORIGINAL DIMENSIONS WHEN THE
SEDIMENT HAS ACCUMULATED TO ONE HALF THE DESIGN DEPTH OF THE TRAP. REMOVE SEDIMENT
MUST BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE.
3. STRUCTURES MUST BE REMOVED AND THE AREA STABILIZED WHEN THE REMAINING DRAINAGE
AREA HAS BEEN PROPERLY STABILIZED.
CULVERT INLET PROTECTION (3.08)
1. THE STRUCTURE MUST BE INSPECTED AFTER EACH RAIN AND REPAIRS MADE AS NEEDED.
2. AGGREGATE MUST BE REPLACED OR CLEANED WHEN INSPECTION REVEALS THAT CLOGGED VOIDS
ARE CAUSING PONDING PROBLEMS WHICH INTERFERE WITH ONSITE CONSTRUCTION.
3. SEDIMENT MUST BE REMOVED AND THE IMPOUNDMENT RESTORED TO ITS ORIGINAL DIMENSIONS
WHEN SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH. REMOVED SEDIMENT MUST
BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE AND CAUSE
SEDIMENTATION PROBLEMS.
4. TEMPORARY STRUCTURES MUST BE REMOVED WHEN THEY HAVE SERVED THEIR USEFUL
PURPOSE, BUT NOT BEFORE THE UPSLOPE AREA HAS BEEN PERMANENTLY STABILIZED.
STORMWATER RUNOFF CONSIDERATIONS
THE EAST PORTION OF THE SITE SHEET FLOWS FROM EAST TO WEST AND IS COLLECTED BY THE
EXISTING CONCRETE CHANNEL WHICH ALSO CONVEYS OFFSITE DRAINAGE THROUGH THE SITE. THE
WEST PORTION SHEET FLOWS TO THE EXISTING STORMWATER MANAGEMENT FACILITY WHICH
DISCHARGES TO THE CONCRETE CHANNEL JUST DOWNSTREAM OF THE PROJECT SITE. THE EXISTING
SWMF WAS DESIGNED TO SATISFY WATER QUANTITY REQUIREMENTS FROM PREVIOUS DEVELOPMENT
OF THE TA10 DISTRIBUTION CENTER LOCATED IMMEDIATELY UPSTREAM OF THE PROJECT SITE. SMALL
ROADSIDE DITCHES AND CULVERTS COLLECT RUNOFF FROM B AVENUE AND DRAIN SOUTH DOWN 2ND
STREET. AN EXISTING DRAINAGE AREA MAP IS PROVIDED IN STORMWATER REPORT. TEMPORARY
DRAINAGE SHALL BE PROVIDED AS SHOWN ON THE PLANS.
EROSION AND SEDIMENT CONTROL CALCULATIONS
THE TEMPORARY 21” HDPE PIPE WAS CALCULATED USING THE MANNING'S EQUATION FOR PIPE FLOW. AN
UPSTREAM OFFSITE CONTRIBUTING FLOW OF 7.89 CFS WAS PROVIDED FROM THE PCSWMM MODELS. THE
RATIONAL METHOD WAS USED TO CALCULATE THE FLOW COMING TO THE INLET DURING THE ESC PHASE WITH
AN ASSUMED TIME OF CONCENTRATION OF 5 MINUTES. THE PIPE WAS SIZED TO CONTAIN THE FLOW FROM A
10-YEAR STORM. THE COMPLETE PIPE CALCULATION IS PROVIDED IN THE STORMWATER MANAGEMENT REPORT.
SEQUENCE OF CONSTRUCTION
1. OBTAIN ALL PERMITS AND APPROVALS
2. INSTALL THE STONE CONSTRUCTION ENTRANCE, SILT FENCE AND INLET PROTECTION PER SHEET
CG111 PRIOR TO BEGINNING CONSTRUCTION ACTIVITIES
3. CLEAR AND GRUB WOODED AREA IN THE SOUTHERN PORTION OF THE SITE AS INDICATED ON SHEET
CD101.
4. INSTALL BOX CULVERTS AND TEMPORARY PIPE AND REMOVE SILT FENCE LOCATED IMMEDIATELY
ADJACENT TO THE EXISTING CONCRETE CHANNEL.
5. EXCAVATE AND INSTALL NEW STORMWATER PIPES, INLETS, DOWNSTREAM TO UPSTREAM PER THE
PROJECT DRAWINGS AND SPECIFICATIONS. BACKFILL AND STABILIZE IN ACCORDANCE WITH THE
REQUIREMENTS OF THE VESCH MINIMUM STANDARDS (MS-19) PROVIDED ON THE REQUIREMENTS
TABLE ON SHEET C-002. INSTALL INLET PROTECTION ON NEW INLETS.
6. CHAMBER SYSTEM AND FILTER ROW INSTALLATION MAY BEGIN IN ACCORDANCE WITH
CONSTRUCTION DETAILS ON SHEET CG504 - CG506 FOLLOWING ADEQUATE INSTALLATION AND
FUNCTION OF ALL NEW STORM SEWER SYSTEMS, AND APPROVAL FROM COR. THE CONTRACTOR
SHALL CONDUCT A PREINSTALLATION MEETING WITH THE COR AND MANFACTURER'S
REPRESENTATIVE 10 DAYS PRIOR TO BEGINNING SYSTEM INSTALLATION. FILTER ROW AND
CHAMBER SYSTEM MUST BE INSTALLED OFFLINE FROM ADJACENT STORM SYSTEMS, AND MAY NOT
BE ACTIVATED UNTIL APPROVAL OF COR. THIS CONSTRUCTION SEQUENCE STEP IS NOT REQUIRED
TO BE COMPLETED TO CONTINUE WITH THE CONSTRUCTION SEQUENCE ON SITE.
7. DEMOLISH EXISTING PARKING LOT AND CONCRETE FLUME AND DISPOSE OF AT A PERMITTED
OFF-SITE FACILITY. DEMOLITION MUST NOT BEGIN UNTIL THE EROSION AND SEDIMENT CONTROLS
ARE INSTALLED.
8. IF NEEDED, ESTABLISH STOCKPILES AND STABILIZE IN ACCORDANCE WITH MS-19.
9. GRADE AND CONSTRUCT NEW TRAINING FACILITY AND SIDEWALKS. FINAL GRADE ALL VEGETATED
AREAS AND ESTABLISH PERMANENT VEGETATIVE COVER.
10. AFTER PERMANENT STABILIZATION HAS BEEN ACHIEVED THROUGHOUT THE SITE AND APPROVED BY
THE COR INSPECTOR, REMOVE ANY SEDIMENT FROM THE BOX CULVERT, CHAMBER SYSTEM AND
FILTER ROW. EXCAVATE AND REMOVE TEMPORARY PIPE. REMOVE ALL EROSION AND SEDIMENT
CONTROL DEVICES.
11. PERFORM AS-BUILT SURVEY OF ALL STORMWATER MANAGEMENT FACILITIES AFTER WORK IS
ACCEPTED BY THE COR.
12. IMPLEMENT THE POST-CONSTRUCTION INSPECTION AND MAINTENANCE PROGRAM AFTER THE WORK
IS COMPLETE AND CONSTRUCTION IS CLOSED-OUT BY THE COR.
P O
E
SSIONAL ENG
IN
E
E R
C O
M O
W
TH FV
I
G
IN
IA
R F
Lic. No.055840
T:\188820-USACE-2017-IDIQ\Task 15 - SPOE Fort Lee\CAD_BIM\05_Civil\_Sheets\W91236-C-SP-C-003.dwg
C-004
S E
A P
O R
T
O
F
E
M B
A R
K A
T I O
N
T
R A
I N
I N
G
F
A C
I L I T
Y
F O
E
V
I R
G I N
I A
G E
N E
R A
L
S
W P
T
E S
C
W
O O
D S
S
B
E A
L E
C
M
O O
R E
J
D
R A
K E
W D
W S
P
B
E N
D
S
V I R
G I N
A
C H
V
A
US Army Corps of Engineers ®
SHEET ID
M
Y
C
O R
E
N G
I N
E E
R S
N O
R F
O L
K
D
I S
T R
I C
T
F
R O
N
O R
F O
L K
V
A
D R
A W
N
B
Y
D E
S I G
N E
D
B
Y
S U
B M
I T
T E
D
B
Y
S I Z
E
C H
E C
K E
D
B
Y
A N
S I
D
I S
S U
E
D
A T
E
C O
N T
R A
S O
L I C
I T
A T
I O
N
N
O
D A
T E
M A
R K
D E
S C
R I P
T I O
N
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
P
N
M
L
K
J
H
G
F
E
D
C
B
A
SEAL
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
R T
A
S
U B
M I T
T A
L
J U
J U
N A
O
F
I L
E
N
O
BMP - BEST MANAGEMENT PRACTICE
COR - CONTRACTING OFFICER'S REPRESENTATIVE
VDEQ - VIRGINIA DEPARTMENT OF ENVIRONMENTAL QUALITY
EPA - U.S. ENVIRONMENTAL PROTECTION AGENCY
ESC - EROSION AND SEDIMENT CONTROL
MTD - MANUFACTURED TREATMENT DEVICE
RLD - RESPONSIBLE LAND DISTURBER
SWM - STORMWATER MANAGEMENT
SWMF - STORMWATER MANAGEMENT FACILITY
SWPPP - STORMWATER POLLUTION PREVENTION PLAN
TMDL - TOTAL MAXIMUM DAILY LOAD
USACE - UNITED STATES ARMY CORPS OF ENGINEERS
VPDES - VIRGINIA POLLUTANT DISCHARGE ELIMINATION SYSTEM
VSMP - VIRGINIA STORMWATER MANAGEMENT PROGRAM
VESCP - VIRGINIA EROSION AND SEDIMENT CONTROL PROGRAM
ACRONYMS
STATE
HYDROLOGIC
UNIT CODE (VAHU6)
INSTALLED SWMF INFORMATION
TABLE A
(FORT LEE OWNED/OPERATED)
LOCATION
(4)
LATITUDE/LONGITUDE
(1)
LAT LONG
RECEIVING STREAM NAME
(2)
SWMF TYPE ACRES TREATED PER SWMF
(3)
IMPERVIOUS
PERVIOUS
( ) SEE NOTE REFERENCED…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .