ANC McPherson Area Road Reconstruction (Amendment 6) Federal contract opportunity
Solicitation number
W9123620B0019
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

This document contains an amendment to a federal solicitation and the related solicitation details. The amendment modifies clauses around physical data, general conditions, and supplementary conditions. It updates applicable wage rates and makes revisions to clauses around drawings and specifications, performance of work, and contract drawings.

The federal contract opportunity is for the ANC McPherson Area Road Reconstruction project in Arlington, Virginia. Work includes replacing curbs, gutters, roadways, drainage infrastructure, and installing conduit and hand holes for future Wi-Fi. The estimated value is between $10-25 million. The solicitation will be issued on or around February 7, 2020 as a 100% small business set-aside conducted under FAR Part 14 for sealed bidding. The requirement is for road reconstruction at Arlington National Cemetery with an estimated completion date of 365 days.

View the file

Other files for this federal contract opportunity

Other files attached to ANC McPherson Area Road Reconstruction (Amendment 6), newest first.
File Type Posted
W9123620C001900002 - NTP.docx DOCX document
Contract W9123620C0019P00002 - NTP.pdf PDF
B.01.02 OF 1419A 4 of 4.pdf PDF
B.01.02 OF 1419A 2of 4.pdf PDF
B.01.02 OF 1419A 3 of 4.pdf PDF
Abstract for KO Signature 3.pdf PDF
Abstract for KO Signature 3.pdf PDF
W9123620B0019 Amendment 6.pdf PDF
W9123620B0019 Amendment 5.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad2.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad1.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad.pdf PDF
AMDT_004_CS_Sheets1.pdf PDF
AMDT_004_CS-401.pdf PDF
AMDT_004_CS_Sheets.pdf PDF
AMDT_004_CS-401.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad.pdf PDF
W9123620B00190004 (Amendment 4).pdf PDF
AMDT_004_CS_Sheets1.pdf PDF
Attachment 3 - ProjNet Inquiries and Answers.pdf PDF
AMDT_004_CS_Sheets.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad1.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad2.pdf PDF
W9123620B00190003 (Amendment 3).pdf PDF
ANC Pre-Bid Site Visit Sign-in.pdf PDF
ANC - Pre-Proposal Site Visit Sign-in.pdf PDF
20-B-0019 Amendment 2.pdf PDF
RTA SUBMITTAL SPECIFICATIONS.pdf PDF
20-B-0019.pdf PDF
RTA SUBMITTAL DRAWINGS_DEQ.pdf PDF
Show all 30

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to complete the follow ing:

1. Update the follow ing clause: 52.236-4, 252.236-7001, 52.236-1.

2. Update the WAGE RATE w ith the most current publication.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 9

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Mar-2020

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123620B0019

X 9B. DATED (SEE ITEM 11)

19-Mar-2020

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Mar-2020

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123620B0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 10 00 - SOLICITATION

The Issued By organization below has been added:

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510

SECTION 00 72 00 - GENERAL CONDITIONS

The following have been modified:

52.236-4 PHYSICAL DATA (APR 1984)

Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

(a) The indications of physical conditions on the drawings and in the specifications are the result of site investigations by . . . . . . . . .See Appendix B- Geotechnical Report

(b) Weather conditions . . . . . . . . . See Spec Section 01 30 00.00 10

(c) Transportation facilities . . . . . . . . . N/A

(End of clause)

SECTION 00 73 00 - SUPPLEMENTARY CONDITIONS

The following have been added by full text:

WAGE RATE

"General Decision Number: VA20200035 02/14/2020

Superseded General Decision Number: VA20190035

State: Virginia

Construction Types: Heavy (Heavy and Sewer and Water Line)

Counties: Alexandria*, Arlington, Clarke, Culpeper, Frederick, Fredericksburg*, Spotsylvania and Winchester* Counties in Virginia.

*INDEPENDENT CITIES

HEAVY CONSTRUCTION PROJECTS (Including Sewer and Water Lines)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 01/03/2020 1 02/07/2020 2 02/14/2020

BRVA0001-003 04/28/2019

Rates Fringes

MASON - STONE....................$ 38.81 18.29

CARP0177-012 05/01/2017

Rates Fringes

CARPENTER, Includes Form Work....$ 28.36 11.53

ELEC0026-023 11/04/2019

ARLINGTON COUNTY, Cities of Alexandria and Fredericksburg

Rates Fringes

ELECTRICIAN......................$ 46.85 19.45+a

a. PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thaksgiving Day, the day after Thanksgiving and Christmas Day.

ELEC0026-024 11/04/2019

CLARKE, CULPEPER, FREDERICK COUNTIES, SPOTSYLVANIA COUNTY

(Excluding the City of Fredericksburg), City of Winchester

ELECTRICIAN......................$ 32.02 18.50+a

a. PAID HOLIDAYS: New Year's Day, Inauguration Day, Martin Luther King Jr.'s Birthday, Memorial Day, Independence Day, Labor Day, Veterans' Day, Thaksgiving Day, the day after Thanksgiving and Christmas Day.

ENGI0077-019 05/01/2019

Rates Fringes

POWER EQUIPMENT OPERATOR:

35 ton Cranes and Above.....$ 38.44 9.50+a Cranes Below 35 tons........$ 36.14 9.50+a Mechanic....................$ 38.44 9.50+a Tower and Climbing Cranes...$ 40.40 9.50+a Tower Cranes and Cranes 100 tons and Over...........$ 40.40 9.50+a a.PAID HOLIDAYS: New Year's Day, Inaugural Day, Decoration Day, Independence Day, Labor Day, Martin Luther King's Birthday, Veterans' Day, Thanksgiving Day, Friday after Thanksgiving and Christmas Day.

b. PREMIUM PAY:

Tower crane and cranes 100-ton and over to receive $1.00 per hour premium.

LABO0011-010 06/01/2019

Rates Fringes

LABORER: Pipelayer..............$ 26.89 8.52

PAIN0051-014 06/01/2018

GLAZIER

Glazing Contracts $2 million and under...........$ 26.07 12.15 Glazing Contracts over $2 million.....................$ 30.31 12.15

* PLAS0891-006 02/01/2020

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 28.82 11.68

SUVA2010-036 09/01/2010

Rates Fringes

DIVER TENDER.....................$ 22.53 3.98

DIVER............................$ 23.73 4.21

IRONWORKER, REINFORCING..........$ 22.45 11.85

IRONWORKER, STRUCTURAL...........$ 20.55 8.25

LABORERS

Common or General...........$ 11.24 1.32 Flagger.....................$ 7.39 0.20 Landscape...................$ 10.00

POWER EQUIPMENT OPERATOR:

Backhoe.....................$ 18.47 0.75 Bobcat/Skid Loader..........$ 11.40 Bulldozer...................$ 17.54 Excavator...................$ 17.79 Loader......................$ 18.99 0.75 Trackhoe....................$ 12.75 1.24 Tugboat.....................$ 19.00

TRUCK DRIVER, Includes All Dump Trucks......................$ 12.14 0.75

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

The following have been modified:

52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least above 12 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

RTA SUBMITTAL DRAWINGS_DEQ.pdf dated January 22, 2020- 78 Sheets RTA SUBMITTAL SPECIFICATIONS.pdf dated January 2020 - 613 pages

(End of Summary of Changes)