This document outlines a federal contract opportunity for road reconstruction work at Arlington National Cemetery. The U.S. Army Corps of Engineers-Norfolk District will issue an Invitation for Bid for the ANC McPherson Area Road Reconstruction in Arlington, Virginia, with an estimated value between $10-25 million. The project scope involves replacing roads, curbs, gutters, drainage infrastructure, and installing conduits and handholes for a future WiFi system. The contract will be awarded on a 100% small business set-aside basis, with a completion date of 365 calendar days after notice to proceed. The IFB and supporting documents will be posted to beta.sam.gov on February 7, 2020. Prospective bidders must register in SAM and monitor the site for solicitation details and amendments.

View the file

Other files

File Type Posted
W9123620C001900002 - NTP.docx DOCX document
Contract W9123620C0019P00002 - NTP.pdf PDF
B.01.02 OF 1419A 2of 4.pdf PDF
Abstract for KO Signature 3.pdf PDF
B.01.02 OF 1419A 3 of 4.pdf PDF
Abstract for KO Signature 3.pdf PDF
W9123620B0019 Amendment 6.pdf PDF
W9123620B0019 Amendment 5.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad2.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad1.pdf PDF
AMDT_004_CS_Sheets1.pdf PDF
AMDT_004_CS-401.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad.pdf PDF
AMDT_004_CS_Sheets.pdf PDF
W9123620B00190004 (Amendment 4).pdf PDF
Attachment 3 - ProjNet Inquiries and Answers.pdf PDF
AMDT_004_CS-401.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad.pdf PDF
AMDT_004_CS_Sheets.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad1.pdf PDF
AMDT_0004_Yard_Hydrant_and_Concrete_Pad2.pdf PDF
AMDT_004_CS_Sheets1.pdf PDF
W9123620B00190003 (Amendment 3).pdf PDF
ANC Pre-Bid Site Visit Sign-in.pdf PDF
ANC - Pre-Proposal Site Visit Sign-in.pdf PDF
20-B-0019 Amendment 2.pdf PDF
W9123620B0019U0001.pdf PDF
20-B-0019.pdf PDF
RTA SUBMITTAL DRAWINGS_DEQ.pdf PDF
RTA SUBMITTAL SPECIFICATIONS.pdf PDF
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

CONTINUATION SHEET

1. SOLICITATION NUMBER PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)2. PROJECT TITLE

NO.: NO.: NO.: NO.:

A. OFFEROR A. OFFEROR A. OFFEROR A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

B.

ESTIMATED

QUANTITY

C.

UNIT D. UNIT

PRICE

E. ESTIMATED

AMOUNT

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is usable

OPTIONAL FORM 1419A (11-88)

ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET

1. SOLICITATION NUMBER

PAGE OF

PAGES

INSTRUCTIONS Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 13 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419's for contract items in excess of 13 and attach additional continuation Sheets (OF 1419A) as needed.

4. OFFERS (Continued)

2. PROJECT TITLE

NO.:

NO.:

NO.:

NO.:

A. OFFEROR

A. OFFEROR

A. OFFEROR

A. OFFEROR

B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount) B. BID SECURITY (Type and amount)

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A. ITEM NO.

B. ESTIMATED QUANTITY

C. UNIT

D. UNIT PRICE

E. ESTIMATED AMOUNT

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

E. ESTIMATED AMOUNT

D. UNIT PRICE

AUTHORIZED FOR LOCAL REPRODUCTION Previous edition is usable

OPTIONAL FORM 1419A (11-88)

8.2.1.3144.1.471865.466429

1. SOLICITATION NUMBER: W91236-20-B-0019
2. PROJECT TITLE: McPherson Road
4B. OFFERS (Continued) BID SECURITY (Type and amount): 20
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4B. OFFERS (Continued) BID SECURITY (Type and amount):
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.: Y
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:
4C. OFFERORS (Continued) AMENDMENTS ACKNOWLEDGED.:
4C. OFFERS (Continued) AMENDMENTS ACKNOWLEDGED.:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 1 of 13.: 1.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13:
3B. ESTIMATED QUANTITY:
4D. OFFERS (Continued) UNIT PRICE. Line 13 of 13.:
3C. CONTRACT ITEMS. UNIT:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 13 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13:
4E. OFFERS (Continued) ESTIMATED.: 11535800.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 12 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 12 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 11 of 13.:
3C. CONTRACT ITEMS. UNIT:
3B. ESTIMATED QUANTITY:
3A. CONTRACT ITEMS. ITEM NUMBER. Line 11 of 13.:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13:
4E. OFFERS (Continued) ESTIMATED.: 175800.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 10 of 13.: 300.00000000
3C. CONTRACT ITEMS. UNIT: In Ft
3B. ESTIMATED QUANTITY: 586.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 10 of 13.: 10.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13:
4E. OFFERS (Continued) ESTIMATED.: 675000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 9 of 13.: 135.00000000
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 5000.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 9 of 13.: 9.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13:
4E. OFFERS (Continued) ESTIMATED.: 2200000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 8 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 8 of 13.: 8.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13:
4E. OFFERS (Continued) ESTIMATED.: 2030000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 7 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 7 of 13.: 7.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13:
4E. OFFERS (Continued) ESTIMATED.: 1045000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 6 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 6 of 13.: 6.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13:
4E. OFFERS (Continued) ESTIMATED.: 315000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 5 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 5 of 13.: 5.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13:
4E. OFFERS (Continued) ESTIMATED.: 550000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 4 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 4 of 13.: 4.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13:
4E. OFFERS (Continued) ESTIMATED.: 1095000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 3 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 3 of 13.: 3.00000000
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13:
4E. OFFERS (Continued) ESTIMATED.: 3035000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 2 of 13.:
3C. CONTRACT ITEMS. UNIT: Job
3B. ESTIMATED QUANTITY: 1.00000000
3A. CONTRACT ITEMS. ITEM NUMBER. Line 2 of 13.: 2.00000000
3B. ESTIMATED QUANTITY: 1.00000000
3C. CONTRACT ITEMS. UNIT: Job
4D. OFFERS (Continued) UNIT PRICE. Line 1 Of 13.:
4E. OFFERS (Continued) ESTIMATED.: 415000.00000000
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
4D. OFFERS (Continued) UNIT PRICE. Line 1 of 13:
4E. OFFERS (Continued) ESTIMATED.:
PAGE OF: 4.00000000
PAGES: 4.00000000
Offeror number. Column 1 of 4.: 11
Offeror number. Column 2 of 4.:
Offeror number. Column 3 of 4.:
Offeror number. Column 4 of 4.:
A. OFFEROR: Civil Construction LLC
A. OFFEROR:
A. OFFEROR:
A. OFFEROR: