A.07.24_Amendment_1_W912DS19R0022.pdf
PDF 878 KB Posted
- Attached to
- DoDEA Preventative Maintenance & Repair (Campbell/Knox) Federal contract opportunity
- Solicitation number
- W9123619R0022
About this file
SF30
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| A.07.24_Amendment_4_W912DS19R0022.pdf | ||
| A.07.24_Amendment_3_W912DS19R0022.pdf | ||
| A.07.24_Amendment_2_W912DS19R0022.pdf | ||
| Revised_Bid_Schedule.xlsx | XLSX spreadsheet | |
| Section_J_Location_Specifications.xlsx | XLSX spreadsheet | |
| A.07.23_Solicitation_W912DS19R0022.pdf | ||
| Price_Proposal_Worksheet_(Bid_Schedule).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W9123619R0022
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Amendment 0001 Incorporates w age rates and revisions to the Scope of Work, Sections L and M, minor clause revisions, and provides bidder inquiry key for projnet for submission of offeror RFIS. It also incorporates separate attachments Section J, providing location details, and revised bid schedule.. The Government DOES NOT extend the suspense for proposal submission at this time. All inquiries from the time of amendment publication should be submitted through the ProjNet information provided. Any inquiries submitted to date through email not addressed by this amendment w ill be incorporated by the Government and need not be resubmitted.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 119
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 04-Jul-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123619R0022
X 9B. DATED (SEE ITEM 11)
25-Jun-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION
NO. 0001
5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
04-Jul-2019
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
PROJNET
OFFEROR QUESTIONS AND COMMENTS
All questions and/or comments should reach the above referenced Contracting Office via ProjNet no later than 17 July 2019, in order that they may be given consideration or actions taken prior to receipt of offers.
Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet. To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue. From this page you may view all bidder inquiries or add inquiry. Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
The Solicitation Number is: W9123619B0022 The Bidder Inquiry Key is: 3I2ZCW-H83QF7
The Bidder Inquiry System will be unavailable for new inquires after 2:00 pm EST on 17 July, 2019 in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
The following have been modified:
SOW
PERFORMANCE WORK STATEMENT
for
PREVENTATIVE MAINTENANCE AND REPAIR
SERVICES
for
DEPARTMENT of DEFENSE EDUCATION ACTIVITY
AMERICAS
at
FORT CAMPBELL, KENTUCKY
SECTION C-1
GENERAL
1. GENERAL
The Department of Defense Education Activity (DoDEA), DoDEA Americas, provides a comprehensive education program, grades Pre-Kindergarten (Pre-K) up to and including High School in some areas for eligible dependent children of Department of Defense personnel. The scope of the contract shall include all requisite preventative maintenance and demand maintenance and repair services, as defined more fully in this Performance Work Statement (PWS). Also, the contract shall include the ability to order on demand maintenance or repair services for requirements for any amount for those “Maintenance Sections” indicated by a “no” in J-1 or to add Sections in their entirety, or portions thereof, for requisite preventive maintenance. Those on demand requirements or “Maintenance Sections” not included in the initial solicitation shall be added by way of bilateral task order or modification.
An initial contract comprised of an indefinite delivery-indefinite quantity (IDIQ) ordering period for preventative maintenance and demand requirements will be awarded to the successful offeror. The minimum guarantee will be satisfied through the concurrent award of the seed project, which includes preventative maintenance and repair under the $20,000 limit of liability for the duration of the ordering period, after which additional Task Orders or modifications may be negotiated to add additional services. This Contract cannot be used for constructing new facilities, additions to existing facilities, or performance of major renovations.
The Contractor shall provide (through a combination of in-house and subcontractors) all necessary labor, materials, tools, plant and equipment to execute the scope of services as indicated in approved Work Requests. The Contractor will procure all materials and equipment (except those specifically referred to as "U.S. Government Furnished"). The Contractor may also be requested to perform specific preventative maintenance regimes for the facilities included in this contract. In addition, the Contractor will provide transportation, mobile communications, and supervision of Contractor employees and subcontractors involved with the maintenance, repair, and minor construction at the DODEA AMERICAS facilities presented herein.
All work shall be accomplished in a timely and workmanlike manner by journeymen or under the immediate supervision of journeymen and in compliance with the terms of the latest applicable standards and provisions for maintenance and repair work, U.S. regulations, technical manuals and federal specifications as referenced in various sections of these specifications, and specific DODEA AMERICAS criteria.
THE MINIMUM GARAUNTEE WHICH SHALL INCLUDE THE BASE PERIOD INCLUDES
SERVICES AS IDENTIFIED IN THE FOLLOWING SECTIONS FOR A PERIOD OF SIX (6)
MONTHS:
FOR FACILITIES LOCATED AT FORTS CAMPBELL, KENTUCY & TENNESSEE (INCLUDING
FACILITIES LISTED IN SECTION J-1 THE FACILITIES LIST)
SECTION C-3, MECHANICAL SYSTEMS INSPECTION, PREVENTATIVE MAINTENANCE, AND
REPAIR REQUIREMENTS
SECTION C-4, DIRECT DIGITAL CONTROL (DDC) SYSTEMS INSPECTION, PREVENTATIVE
MAINTENANCE, AND REPAIR REQUIREMENTS
SECTION C-5, PLUMBING SYSTEMS INSPECTION, PREVENTIVE MAINTENANCE, AND
SECTION C-6, ELECTRICAL SYSTEMS INSPECTION, PREVENTIVE MAINTENANCE, AND
SECTION C-7, KITCHEN EQUIPMENT INSPECTION, PREVENTATIVE MAINTENANCE, AND
SECTION C-8, ROOF SYSTEMS AND SITES AND SITE EQUIPMENT INSPECTION,
PREVENTIVE MAINTENANCE, AND REPAIR REQUIREMENTS
SECTION C-9, BUILDING SYSTEMS INSPECTION, PREVENTIVE
SECTION C-10, FIRE ALARM AND SUPPRESSION SYSTEMS INSPECTION, PREVENTATIVE
SECTION C-11, PLAYGROUNDS INSPECTION, PREVENTATIVE MAINTENANCE, AND
The sections above are the Preventative & Demand Maintenance below the Limit of Liability (LoL) services included in the contract as outlined by the Bid Schedule base and option years (CLINS 0001 thru 0005). The Government reserves the right to issue Demand Maintenance Task Orders for any section in accordance with the process outlined in Section C-1.9. Additionally, the Government may also elect to add sections not included above by way of a bilateral modification to the contract.
1.1 Scope of Services
Except where otherwise stated, the Contractor shall furnish all labor, supervision, management, tools, materials, equipment, facilities, transportation, incidental engineering and other items necessary to provide facilities support services included in this Performance Work Statement (PWS) at the location(s) listed in C-1, paragraph 1 by means of a contract that includes a firm-fixed price (FFP) for preventive maintenance and demand maintenance and/or repair up to the limit of liability and an indefinite delivery-indefinite quantity (IDIQ) ordering period for demand requirements in excess of the limit of liability. The provided services shall be in accordance with federal, state, installation, local laws, regulations and DOD Directives. Specific maintenance and repair areas required in this PWS are provided in C-3 through C-11.
1.2 Additional Services Required
There may be a requirement to do work in addition to that described herein. If work not included in this document is required, the Government will prepare a Statement of Work which will describe the scope and any special requirements that must be considered. The Contractor will be requested to provide a proposal for additional services based on this scope provided. If accepted by the COR, a task order will be issued for additional services that will be within the overall scope of this contract. These services may be a single task or an ongoing effort required by the Contractor.
1.3 Services Not Included In This Contract
The following services are excluded from the Maintenance Contract:
Repairs to personal property Custodial services Grounds Maintenance Pest Control New Construction
2. PREVENTIVE MAINTENANCE
2.1 Performance Objective
Provide preventive maintenance for systems identified in Section C-3 through C-11 (section noted when not included) to increase the life, maintainability, operating capability and efficiency of equipment or systems included in this PWS. Provide preventive maintenance in accordance with manufacturer’s recommendations or recommended industry association standards.
Preventative maintenance of systems shall not interfere with school operations. Any maintenance on systems within classrooms, cafeterias, kitchens, or other areas that will interfere with school operations shall be performed after hours, during weekends or holidays, other times when locations are not being used, or in such a manner that does not interfere with school operations.
2.1.1 Acceptable Performance
Completion of identified requirements within the identified schedule with a quality so that missed completion dates or defects identified are equal to or less than the Acceptable Quality Level (AQL).
2.1.2 Unacceptable Performance
When the quantity of Preventive Maintenance work orders not completed within 10 days of schedule is greater than the AQL, when the number of defects identified by the Government is greater than the AQL or when the number of work orders in which work is not fully completed is greater than the AQL.
2.1.3 Criteria for Acceptance/Rejection
Government inspections will be made according to the surveillance method(s) used, to compare Contractor's performance to Contract and industrial accepted standards.
2.1.3.1 Acceptance
Preventive maintenance is acceptable when Contractor fully completes work orders in a manner which meets contract provisions, standards and specifications as described herein and all requirements of the work order are completed.
2.1.3.2 Rejection
When Contractor's performance does not meet contract provisions or is not performed in accordance with the approved work plan or is not performed in accordance with the standard/specification or was not performed within the allowed time frame or is not completed in its entirety, it will be considered to be defective and will be rejected.
2.2 Reference Information
Work orders for preventive maintenance work will be initiated by SchoolDude automatically, by the Contractor, or by School Facilities Personnel. Preventive Maintenance work which will in any way impact educational activities are to be scheduled in advance with a minimum of 24 hour notice to school administration. Maintenance calls shall not adversely impact special events or testing at schools.
The Contractor shall correct any problems identified during preventive maintenance calls within 4 working days of the need being identified. The Contractor shall notify and obtain the COR’s approval for any service call that may require more than 4 working days to complete. The COR shall be notified why the work is not to be completed within the required time (e.g. availability of material or specialized equipment). Those services not completed in a timely fashion shall be included on the Aged Service Call Report.
2.3 Performance Standard
When Contractor’s failure to complete all work requirements, meet time requirements, and quality requirements is less than the AQL.
2.4 Inspection Method
Government inspections will be made according to the surveillance method(s) used, to compare Contractor's performance to Contract and industrial accepted standards. Both scheduled and unscheduled surveillance will be used to look at total or parts of the work. The Quality Assurance samples may or may not include samples evaluated as part of the Contractor’s QC program at the discretion of the Government. The methods of surveillance that may be used are listed below:
Random Sampling 100% Inspection Work Request Audit Unscheduled Inspection Customer Complaints
2.5 Acceptance
Preventive maintenance will be considered acceptable when the number of defectives found during Contract surveillance does not exceed the Acceptable Quality Level (AQL). Work Requests completed are subject to an AQL of 5%.
2.1.2 Acceptable Performance
Completion of work orders initiated for Demand Maintenance/Repair within the identified schedule with a quality so that missed completion dates or defects identified are equal to or less than the Acceptable Quality Level (AQL).
3. DEMAND MAINTENANCE AND REPAIR
3.1 Performance Objective
Provide Demand Maintenance and Repair for systems identified in Section C-3 through C-11 (section noted when not included) to make system operable, more efficient, increase operating capability and efficiency of equipment or systems included in this PWS. Provide Demand Maintenance in accordance with manufacturer’s recommendations or recommended industry association standards using replacement parts with a quality equal to or better than presently used. Any maintenance on systems within classrooms, cafeterias, kitchens, or other that may affect school operations shall be performed after hours, during weekends or holidays, other times when locations are not being used, or in such a manner that does not interfere with school operations.
3.1.2 Unacceptable Performance
When the quantity of Demand Maintenance/Repair work orders not completed within the schedule specified is greater than the AQL, when the number of defects identified by the Government is greater than the AQL or when the number of work orders in which work is not fully completed is greater than the AQL.
3.1.3 Criteria for Acceptance/Rejection
3.1.3.1 Acceptance
Demand Maintenance is acceptable when Contractor fully completes work orders in a manner which meets contract provisions, standards and specifications as described herein and all requirements of the work order are completed.
3.1.3.2 Rejection
performed in accordance with the approved work plan or is not performed in accordance with the standard/specification or was not performed within the
3.1 Reference Information
Work orders for Demand Maintenance may be initiated by the Contractor, by School Facilities Personnel, by Installation Personnel or by the School Administration. Each will be entered into the SchoolDude CMMS program by the Contractor. Demand Maintenance work orders under the limit of liability will be scheduled and completed by the Contractor. Demand Maintenance work orders greater than the limit of liability will be priced and submitted to the COR for approval and funding but will not be scheduled until notified by the Contracting Officer, or their local representative. Once approval has been obtained, a schedule is to be established in SchoolDude based on a time line agreed to by the COR. Demand Maintenance work which will in any way impact educational activities are to be scheduled in advance with a minimum of 24 hour notice to school administration. Maintenance calls shall not adversely impact special events or testing at the schools.
The Contractor shall be responsible for providing temporary heating, cooling, water heating or power as required to provide a facility acceptable for students and faculty if delays in getting systems operational are due to:
Contractor caused failure Delay of repair completion because the Contractor provided equipment is incorrect for the installation Delay in material or equipment delivery caused by the Contractor
3.2 Rehabilitation Of Equipment and Facilities
It will be the Contractor’s responsibility to evaluate requirements to bring all equipment, systems and facilities included in this Contract to the APAA “Level of Performance Two – Comprehensive Stewardship” which includes pre-existing conditions. Within 90 days of establishment of Contract facilities on-site, the Contractor shall provide a list of required repairs, replacements and modifications required to bring equipment, systems and facilities to this level of performance. Descriptions of required work shall be in enough detail to allow those evaluating and prioritizing these efforts to fully understand what is required. List shall include an estimated budget cost for each item which will not be used as a quotation. This list shall be reviewed with the COR to determine priorities for the work on the list which is likely be included in the budget for completion within a reasonable time frame. The Contractor shall commence to work on all work that falls under the Limit of Liability as noted in paragraph C-1.9. For work above the Limit of Liability, the Contractor shall provide proposals for that which may be funded in accordance with paragraph C-1.9.1. The priority list shall be maintained so that as funds become available, additional work can be completed.
APPA Level Two Definition: Comprehensive Stewardship – “Maintenance activities appear organized with direction. Equipment and building components are usually functional and in operating condition. Service and maintenance calls are responded to in a timely manner.”
3.4 Performance Standard
When Contractor’s failure to complete all work requirements, meet time requirements and quality requirements is less than the AQL.
3.5 Inspection Method
Government inspections will be made according to the surveillance method(s) used, to compare Contractor's performance to Contract and industrial accepted standards. Both scheduled and unscheduled surveillance will be used to look at total or parts of the work. The Quality Assurance samples may or may not include samples evaluated as part of the Contractor’s QC program at the discretion of the Government. The methods of surveillance that may be used are listed below:
Random Sampling 100% Inspection Work Request Audit Unscheduled Inspection Customer Complaints
3.6 Acceptance
Demand Maintenance will be considered acceptable when the number of defectives found during Contract surveillance does not exceed the Acceptable Quality Level (AQL). Work Requests completed are subject to an AQL of 5%.
4. FACILITY INSPECTIONS AND EVALUATIONS
4.1 Performance Objective
Provide Facility Inspections and Evaluations for systems, structures and components identified in Sections C-3 through C-11 (section noted when not included) so that repair, replacement or maintenance needs are identified prior to failures or accidents. Provide Facility Inspections and Evaluations based on industry, manufacturer, Government provided or Contractor developed check lists.
4.1.1 Acceptable Performance
Initiation of inspections required will be initiated by a SchoolDude work order.
Completion of inspection check lists within 10 days of the identified schedule with a report of findings to the COR within 10 days of inspection completion. Acceptable performance will have been accomplished when the number of completion dates missed and the number of inspection forms not fully completed are equal to or less than the Acceptable Quality Level (AQL).
4.1.2 Unacceptable Performance
Unacceptable performance will result from the number of completion dates missed and the number of inspection forms not fully completed being greater than the Acceptable Quality Level (AQL).
4.1.3 Criteria for Acceptance/Rejection
4.1.3.1 Acceptance
Facility Inspections and Evaluations are acceptable when Contractor fully completes work inspection forms and reports in the time allocated.
4.1.3.2 Rejection
performed in accordance with the approved work plan or is not performed in accordance with the standard/specification or was not performed within the
4.2 Reference Information
Each Inspection Check List provided by Contractor will be entered into the SchoolDude CMMS program by the Contractor with an inspection interval identified and agreed to by the COR.
SchoolDude will initiate a work order which identifies inspections to be made. Inspection work which will in any way impact educational activities are to be scheduled in advance with a minimum of 24 hour notice to school administration. Inspections shall not adversely impact special events or testing at the schools.
4.3 Performance Standard
When the Contractor fails to complete all work requirements, meet time requirements, and report requirements is less than the AQL.
4.4 Inspection Method
Government inspections will be made according to the surveillance method(s) used, to compare Contractor's performance to Contract and industrial accepted standards. Both scheduled and unscheduled surveillance will be used to look at total or parts of the work. The Quality Assurance samples may or may not include samples evaluated as part of the Contractor’s QC program at the discretion of the Government. The methods of surveillance that may be used are listed below:
Random Sampling 100% Inspection Work Request Audit Unscheduled Inspection Customer Complaints
4.5 Acceptance
Inspection Requirements will be considered acceptable when the number of defectives found during Contract surveillance does not exceed the Acceptable Quality Level (AQL). Work Requests completed are subject to an AQL of 5%.
5. REPAIR PARTS, MATERIALS, AND EQUIPMENT
5.1 Repair Quality Level
The quality level of materials used in Contractor operations shall equal or exceed that being replaced or repaired. Work Requests shall be completed with an indication of the materials proposed for use as appropriate and will be concurred with by the COR. The Contractor shall develop a recommended spare and repair parts list for maintaining equipment identified.
Reasonable access to spare parts, so that preventive maintenance or minor demand maintenance is not delayed, is required of the Contractor. Access may be through on-site inventory or utilizing inventories of suppliers with whom the Contractor deals.
Refrigerant(s) required for the air conditioning systems shall be regarded as a replacement part and shall be included in the spare parts inventory. Refrigerant utilized during maintenance, repair or replacement of equipment shall be considered a spare part except in instances where the repair is over the LoL at which time it will be in the overall cost proposal and will not be subject to the LoL requirement. The Contractor shall extend to the Government the manufacturer's commercial warranty on all repair of equipment including parts and labor. Parts which fail during the warranty period shall be replaced as are other spare and repair parts.
5.2 Warranties
The Contractor shall make maximum use of the provisions of the manufacturer’s and construction warranties for Government property. The Contractor shall maintain a file(s) of warranties on equipment under warranty and under the management of this contract. These files shall identify the item, (part and model numbers, etc.), the nature and expiration date of the warranty, and the name and address of the firm to contact concerning the Government's entitlement under the warranty.
5.2.1 Warranty Enforcement
In the event of an equipment failure or other problem covered by the warranty, the Contractor shall vigorously pursue enforcement of the warranty on behalf of the Government.
5.2.2 Warranty Repairs on Critical Systems
The Contractor shall make the necessary repairs or replacements in a time of the essence manner in the event of any of the following:
An equipment failure results in a priority 1, emergency condition that prevents operation of the schools (as determined by the Government).
The failure results from abuse or improper or inadequate maintenance by the Contractor.
The warranty subcontractor cannot or does not respond within a time limit that insures continued equipment availability for school operation.
5.2.3 Payment for Warranty Repairs Required of Contractor
The Contractor shall pursue receiving payment from the responsible party for critical warranty repairs. If, after due diligence and approval of the COR, the Contractor is unable to obtain remuneration from the responsible party for work completed, the warranty repairs required of the Contractor will be paid by the Government as a demand work order with no LoL.
6. DOCUMENTS
6.1 Contractor Compliance
The Contractor shall follow and adhere to the entire documents, listed herein or to specific paragraphs in instances where only a portion of the document is referenced. Supplements or amendments to required publications shall be considered to be in full force and effective upon receipt by the Contractor. Wherever documents listed have an alternative to that written in this performance work statement, the most rigorous shall apply.
6.2 Applicable Documents
Many Government publications can be obtained free of charge when downloaded from the internet. Not all the following documents shall apply to each location. However, it is recommended that the Contractor obtain them and be familiar with those portions which do apply. Those documents which do not apply to work being done need not be obtained. The latest edition (version) of all documents shall be utilized.
6.2.1 Government Publications
AR 385-40 Accident Reporting and Records EM 385-1-1 Safety and Health Requirements Manual EM 1110-1-4006 Removal of Underground Storage Tanks (USTs) TM 5-610 Preventive Maintenance for Facilities Engineering, Buildings and
Structures TM 5-617 Maintenance and Repair of Roofs TM 5-618 Paints and Protective Coatings TM 5-620 Maintenance and Repair of Architectural and Structural Elements of
Buildings and Structures TM 5-623 Pavement Maintenance Management TM 5-624 Maintenance and Repair of Surface Areas TM 5-682 Electrical Facilities Safety TM 5-822-9 Repair of Rigid Pavements Using Epoxy Resin Grouts, Mortars and
Concretes TM 5-822-11 Standard Practice for Sealing Joints and Cracks in Rigid and Flexible
Pavements
6.2.2 Non-Government Publications
ASHRAE 90.1 Energy Efficient Design of New Buildings except Low-Rise Residential Buildings 2007 ASHRAE Handbook – HVAC Applications Americans with Disabilities Act (ADA) BOMA International – Preventive Maintenance and Building Operation Efficiency (2003) Environmental Protection Agency (EPA) U.S. Consumer Product Safety Commission; “Handbook for Public Playground Safety” Underwriters Laboratories, Inc. (UL) National Electric Code (NEC) National Fire Protection Association (NFPA) NFPA 70B Recommended Practice for Electrical Equipment Maintenance Code of Federal Regulations (C.F.R) SchoolDude.com – On-line Instructions for use of modules Standard Educational Specifications
6.2.3 Forms
ENG Form 3394: US Army Corps of Engineers Accident Investigation Report ENG O-4784: Safety and Occupational Health Office – Serious Accident Notification
6.3 Contractor Furnished Documents
None of the publications referenced herein will be provided to the Contractor by the Government.
The Contractor shall be thoroughly familiar with the mentioned publications which apply, and shall fully comply with all requirements defined therein. These documents may be obtained by the Contractor at his own expense from the Government if desired and will remain the Contractors property at completion or termination of this contract. Failure to comply with the requirements of these documents due to lack of knowledge or understanding shall not be considered good cause for the Contractor to reduce any service or performance, or be acceptable reason not to comply with any contract term or condition.
6.4 Section F Delivery Requirements
In Section F of this document a list of required plans, documents, etc… required for full project implementation, training requirements and reports are listed with a completion date requirement.
Dates of completion are critical for these items and will be included in the AQL evaluation process. Only if approved by the COR or Contracting Officer shall dates be extended without being considered a deficiency when calculating the AQL for a specific period.
7. COMPUTERIZED MAINTENANCE MANAGEMENT SYSTEM (CMMS)
7.1 Work Flow Notification/Assignment/Approval
7.1.1 CMMS Program to be Utilized
DODEA AMERICAS utilizes a CMMS program called SchoolDude. The Contractor will be fully responsible for the management and maintenance of the SchoolDude program.
Licensing of this program will be provided by the Government. The Contractor shall manage facility sustainment data within SchoolDude in accordance with SchoolDude instructions and capabilities.
The Contractor is required to provide and staff a Service Order Desk at the Contractor’s facility on the Installation where service is being provided. If the COR determines that the distance to the Contractor’s facilities is too far, and can provide space for the Service Order Desk, this activity may be required to be housed at a school facility. The desk shall be staffed by a minimum of one person trained in the utilization of SchoolDude and responsible for inputting data and providing information as needed during all normal working hours. This person(s) shall maintain SchoolDude records, input all workorders which are requested, track work order progress and provide reports indicated in this Contract, and as requested from the Contractor Administration, the COR or the Contracting Officer.
All workorders, whether to be completed by the Contractor or not, shall be initiated by the person at the Contractor’s Service Order Desk. Workorders which are not the Contractor’s responsibility shall be routed to the COR or COR’s designated alternate for assignment.
7.1.2 Work Order Initiation/Assignment/Approval
Preventive maintenance work orders may or may not exist in the SchoolDude system for schools under this Contract. If not in SchoolDude presently, it will be the Contractor’s responsibility to incorporate all equipment included in this Contract into SchoolDude. If in SchoolDude, the Contractor shall evaluate existing data and determine if modification is proposed or necessary to provide proper PM for equipment included. Workorders for preventive maintenance will automatically be generated by the SchoolDude program for implementation by Contractor’s work force.
Work requests for Demand Maintenance or service call requests may be received by phone, email, FAX or in person. The Contactor shall enter the request in SchoolDude within two hours of receipt during regular working hours. Work requests received during non-work hours shall be entered within 3 hours of the start of the next regular work day.
Work requests shall be prioritized and labeled based on classifications specified elsewhere in this Contract. Work orders other than those specified as Emergency, PM or DM below the LoL shall be approved by the COR prior to the work being performed. All work orders generated from requests shall be reviewed for accuracy and applicability, and be assigned to an appropriate technician or laborer within one business day of receipt. It is recommended that the Project Manager work closely with the COR to prioritize all DM work orders initially so that those types of work order which are a priority can be recognized.
7.1.3 SchoolDude Work Order Documentation
It is the responsibility of the Contractor to maintain accurate records in SchoolDude when completing PM and DM work orders. Time required by classification with labor cost shall be indicated on each completed work order. Also, required parts and material with costs shall be included. This will allow the Government to more accurately project costs for types of work in the future. It will also aid in determining the types of repairs required for specific equipment so that an effective time for equipment replacement can be projected.
7.1.4 SchoolDude System Maintenance
The Contractor shall maintain records within SchoolDude at all times and shall update all work orders within one normal work day of completion.
7.1.5 SchoolDude Training
The Contractor shall provide training for all technicians, office personnel and management which will utilize SchoolDude prior to implementation of personnel at the installation. This training is available on-line or in person from SchoolDude. Costs for this training, if any, will be the responsibility of the Contractor.
7.1.6 Work Progress Reports
The Contractor shall submit the following reports on a monthly basis to the COR for review and approval. Reports directly generated from the SchoolDude CMMS program are acceptable. In addition, some or all of these reports shall be forwarded to DODEA AMERICAS Area Service Center personnel as directed by the COR.
Monthly Preventive Maintenance Report: This report shall indicate completed work orders, work order backlog and work orders waiting material to be delivered. Information on this report shall be reported by individual school or support facility.
Aged Service Call Report: The Contractor shall submit a monthly report which indicates those work orders which have not been completed within 4 days of request. This report shall include the work order identification number, requester, description of work to be done, date requested, technician to which it is assigned and reason why it has not been completed.
Other reports as requested by the COR or Contracting Officer to determine effectiveness, Contract status or reports to aid the Government in making evaluations. Wherever possible, it is intended to utilize reporting capabilities of SchoolDude and not generate reports manually.
7.1.7 SchoolDude Inventory Module
The SchoolDude program includes an inventory module which is called “Inventory Direct”. This module is available to the Contractor and it utilization is encouraged.
Stocking levels can be maintained and usage levels monitored using this module. At some locations another Government department at the schools may be utilizing this program. If this is the case, the Contractor shall coordinate their efforts which the Government. SchoolDude will assist the Contractor in determining the most effective way to coordinate these efforts.
8. WORK ORDER PRIORITIES
Contractor Required Response – Response requirements of the Contractor will vary depending on the impact of school activities or threat to life safety. Response time requirements are as follows:
8.1 Preventive Maintenance, Facility Inspections and Evaluations (Scheduled) Work will be initiated by SchoolDude automatically. The Contractor shall correct any problems identified during preventive maintenance calls within 4 working days of the need being identified. The Contractor shall notify and obtain the COR’s approval for any service call that may require more than 4 working days to complete. The COR shall be notified why the work is not to be completed within the required time (e.g. availability of material or specialized equipment). Those services not completed in a timely fashion shall be included on the Aged Service Call Report.
8.2 Demand Maintenance
Normal on-site demand maintenance and repair services shall be provided during the Contractor's normal business hours. Work Requests will be generated when facilities require work. Work Requests will receive concurrence by the COR and will be assigned a priority as described herein prior to being assigned to the Contractor.
Work Requests generated by the Contractor will be submitted to the COR and will be verified for contract validity, concurred with and assigned a priority status or declined. The Contractor is not to perform work until COR concurrence and prioritization is received. Prioritization is as follows:
Priority 1 (Emergency) – Defined as any work or task required that is of such pressing nature that generation of and concurrence with, a Work Request would result in continued damage to the facility or increasing occupant life safety or health risks. Emergency work is exempt from the usual concurrence and prioritization process.
The Contractor shall provide the Contracting Officer's Representative with the names, and local or long distance telephone numbers with reverse charges, as applicable, that is answered 24 hours per day, 7 days per week, including holidays, at which the Contractor can be notified of emergency work. The Government shall not be expected to place more than one phone call in order to solicit response from the Contractor or his designated representative. Only authorized personnel designated by the Contracting Officer will called for emergency maintenance. The Contractor shall respond within thirty (30) minutes by telephone and report to the job site within a maximum of one (1) hour to failures in:
Imminent fire hazard.
Failure of major utility system.
Ruptured, leaking, or overflowing interior water lines or sanitary/sewer lines, including overflowing toilet and plumbing fixtures.
Leaking gas lines.
Emergency power generation failures.
Failures of building structural or envelope components Other situations that directly cause damage to the facility or are deemed to cause life safety/death risk to facility occupants.
The Contractor shall diagnose problem or equipment failure and perform maintenance. Situations of emergency nature shall not require concurrence of the demand Work Request. A Work Request Form, however, must be filed with the COR by 0900 of the next normal working day.
When the Contractor is called for emergency maintenance, immediate action shall be taken to perform maintenance on such equipment/items, on a time is of the essence basis. The Contractor shall find the necessary repair parts or perform the required actions to stabilize the system. The Contractor will stay at the job site and maintain continuous effort until the repairs are completed and the failed system is operating satisfactorily or the situation is sufficiently stabilized to prevent further damage to the facility or continue to be a safety threat or hazard to the building occupants or such that normal school operations may be facilitated at the commencement of the following regular school day. Priority 1 tasks may necessitate “off-duty” working hours to complete the task satisfactorily. Authorization for such hours is not required.
Priority 2 (Safety) – Defined as any work which does not fall within the context of “Priority 1 - Emergency”, but may potentially jeopardize the normal safe operation of the school facility.
Contractor response time to Priority 2 calls during normal work hours shall not exceed 24 hours.
Priority 2 items shall be completed within 7 working days from initial notification. Priority 2 tasks, therefore, may necessitate the authorization of “off-duty” or other than normal working hours to complete the task satisfactorily to the terms and intent of this contract. Examples could include broken windows, roof leaks, stopped up toilets, sinks or floor drains, nonfunctioning gutters/downspouts, broken door hardware, etc.
Priority 3 (High) – Defined as any situation which is not critical to the normal operation of the school mission, but which, if continued unarrested, could potentially result in permanent damage to the facility or could threaten the safety of the building occupants. Response to Priority 3 requests shall not exceed 2 regular duty days. Priority 3 tasks should be completed within 15 working days of the issuance of the Work Request. Priority 2 tasks are not considered authorization for other than normal working hours pay rates.
Priority 4 (Medium) – Defined as work which should be handled on a first come, first serve basis. Priority 3 tasks are not considered authorization for other than normal working hours pay rates. Examples could include ceiling, floor or wall repair, lighting lamp or ballast replacement, window covering adjustment, lock rekeying, sprinkler system repair, PA system repair, etc. Tasks shall be completed within 30 working days.
Priority 5 (Low) – Items not deemed important enough to the school mission may be deferred until their importance forces reevaluation of priority.
a. Work requests submitted by the Contractor shall include Contractor’s estimate of work effort required by the applicable schedule bid labor category and an estimate of the materials and equipment required. The intent is to allow the Government the ability to manage available funds and to prioritize accordingly. Requests generated by the Government will be submitted to the Contractor for the purposes of said estimate prior to concurrence. Reference the Sample Work Request Form in Section J.
b. The Government will notify the Contractor's Contract Manager of the work required in the form of concurred, prioritized Work Requests. The Contracting Officer or his representative must concur with the request’s validity, prioritize and schedule any Work Requests other than Emergency Maintenance to be accomplished by the Contractor. Contractor is instructed to perform the work outlined in the Work Request. It shall not be assumed that all Work Requests will be prioritized for completion.
c. If at any time, the Contractor recognizes that for whatever reason, the actual cost will succeed the estimated cost by 10% or more, the Contractor shall notify the Contracting Officer’s Representative immediately to obtain further instruction.
9. LIMIT OF LIABILITY
The Contractor’s limit of liability (LoL) for material and labor costs associated with any single event in the maintenance, repair or replacement of any single piece of equipment is $20,000 up to 4 incidents per contract year. This requirement can be based on findings during preventive maintenance, routine maintenance work orders, or failure of equipment as identified by Government or Contractor’s employees. Repairs or replacement exceeding this amount shall be processed as indicated below. Work orders cannot be delayed or combined to increase the cost of repair above the Limit of Liability. Failures due to lack of continued maintenance will not be subject to the limit of liability and will be solely the responsibility of the Contractor. When a work order exceeds the LoL, the total cost of the work will be due the Contract once all approvals are obtained and work is completed to the satisfaction of the COR.
9.1 Performance of Repairs or Replacement above Limit of Liability If a work requirement is identified or a work order is initiated for which the Contractor believes the cost of work required is greater than the limit of liability, the Contractor shall,
9.1.1 Notification
Contractor shall notify the COR no later than 11 AM the following normal work day that it is anticipated that a work order requiring work above the limit of liability is anticipated.
9.1.2 Statement of Work
Contractor shall develop a statement of work for the anticipated work required and send it to the COR for verification of need.
In the event that the matter giving rise to the Notification could be resolved with more than one potential repair and/or maintenance option, and the projected costs of the various options are both above and below the LoL, the Contractor shall describe each approach and provide a rough order of magnitude cost to the COR. The Government shall have the right to elect the option, or combination of options, that it determines to be in the best interest of the Government, including selecting options within the LoL.
9.1.3 Request for Proposal
Should the COR determine the requirement is needed and funding is available they will request the Contracting Officer (KO) issue a Request for Proposal (RFP). The Contracting Officer will issue an RFP to the Contractor with a PWS and associated documentation dictating the requirements of the work. While most of the work above the LoL may be identified by the Contractor and verified by the Government, the Government may also elect to initiate work as well.
9.1.4 Cost Proposal
The Contractor is normally offered 14 working days to submit their proposal however due to the urgent need of some work shorter durations may be required. The Contractor shall submit a cost proposal within time required of the RFP but is welcome to submit prior to the deadline. The Contractor’s proposal shall include a complete breakdown of associated costs for material, labor and equipment. The cost proposal shall include an itemized list of equipment or parts required for the work with associated costs, the cost of associated labor by trade. If any parts are not immediately available and work cannot be immediately completed, a schedule for completion of work once notice to proceed is received shall be included. The Government will be responsible for all costs associated with repair or replacement workorders greater than the Limit of Liability.
9.1.5 Commencement of Work
No demand maintenance work shall commence until approval and funding have been obtained from the COR in writing. If, upon review, the COR agrees the work is beyond the applicable limit of liability, the work order will be placed in an awaiting funding status until a task order is issued by the Contracting Officer and authorization is given to proceed accordingly.
If the Contracting Officer identifies that the work does not exceed the applicable limit of liability, the Contractor will be provided direction for work completion. The work order in question shall be completed within 4 days from the original receipt by the Contractor, plus the amount of time the work authorization form was held by the Contracting Officer, or his/her representative, for determination unless a different schedule is approved in writing by the Contracting Officer, or his/her representative. The Government reserves the right to reject a cost proposal, obtain additional cost proposals from other parties, and obtain the repairs by other methods.
The following flow chart demonstrates the approval requirements for work orders above the Limit of Liability:
10. WORKMANSHIP
All work shall be performed by competent appropriately qualified personnel and in accordance with recognized standards of the trade. Work shall be accomplished in accordance with Technical Manuals, Technical Bulletins and Technical Exhibits as referenced in the contract.
Contractor shall make every attempt to utilize the most cost effective, yet appropriately qualified level of expertise possible to perform all Work requested by the contract.
10.1 Cleanup and Disposal
At the close of each workday, the Contractor shall leave the job site in a clean manner. All waste generated during the performance of this contract shall be disposed of in accordance with current Local, State and Federal and installation regulations. Debris shall not be allowed to spread unnecessarily into adjacent areas nor accumulate in the work area itself.
Items or equipment such as desks, chairs, kitchen equipment, etc… relocated to allow work to be completed on equipment shall be replaced in the original location and shall be operational as…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.