OYSTER CHANNEL
UPLAND PLACEMENT SITE
REHABILITATION
PLANS AND SPECIFICATIONS
NORTHAMPTON COUNTY, VIRGINIA
Oyster Channel Upland Placement Site Rehabilitation 2019OYSTERCHNELU
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS AND GEOTECHNICAL INFORMATION
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK FOR NORFOLK DISTRICT PROJECTS
01 14 00 WORK RESTRICTIONS
01 22 00 MEASUREMENT AND PAYMENT
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00 QUALITY CONTROL
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 20 ENVIRONMENTAL PROTECTION
01 57 23 TEMPORARY STORMWATER POLLUTION CONTROL
01 78 00 RECORD OF CONSTRUCTION DRAWINGS
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
31 05 19 GEOTEXTILE
31 11 10 CLEARING AND GRUBBING
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 92 19 SEEDING
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 1
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
SECTION 00 01 15
LIST OF DRAWINGS AND GEOTECHNICAL INFORMATION
01/07
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 Geotechnical Data
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
SECTION 00 01 15
LIST OF DRAWINGS AND GEOTECHNICAL INFORMATION
01/07
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET NO. TITLE NORFOLK DISTRICT FILE NO.
Plans for Oyster Channel Upland Placement Site Rehabilitation:
1 of 16 COVER SHEET OYU.2018-02-13.PS(1)
2 of 16 LOCATION MAP OYU.2018-02-13.PS(2)
3 of 16 GENERAL NOTES OYU.2018-02-13.PS(3)
4 of 16 EXISTING CONDITIONS OYU.2018-02-13.PS(4)
5 of 16 CLEAR AND GRUBBING PLAN OYU.2018-02-13.PS(5)
6 of 16 BORING LOCATIONS OYU.2018-02-13.PS(6)
7 of 16 DIKE LAYOUT PLAN OYU.2018-02-13.PS(7)
8 of 16 GRADING PLAN OYU.2018-02-13.PS(8)
9 of 16 DIKE CROSS-SECTIONS OYU.2018-02-13.PS(9)
10 of 16 SPILLBOX DETAIL OYU.2018-02-13.PS(10)
11 of 16 EROSION AND SEDIMENTATION
CONTROL PLAN OYU.2018-02-13.PS(11)
12 of 16 EROSION AND SEDIMENTATION
CONTROL PLAN DETAILS OYU.2018-02-13.PS(12)
13 of 16 SPILLBOX DETAIL OYU.2018-02-13.PS(13)
14 of 16 SPILLBOX DETAIL (CONT'D) OYU.2018-02-13.PS(14)
15 of 16 SPILLBOX DETAIL (CONT'D) OYU.2018-02-13.PS(15)
16 of 16 SPILLBOX DETAIL (CONT'D) OYU.2018-02-13.PS(16)
DOCUMENT 00 01 15 Page 2
UP
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
C O
VE
R
S H
EE
T
OYSTER CHANNEL
UPLAND PLACEMENT SITE REHABILITATION
NORTHAMPTON COUNTY, VIRGINIA
US Army Corps of Engineers Norfolk District
Sheet List Table Sheet Number Sheet Title
Michael L. Anderson Digitally signed by Michael L. Anderson Date: 2019.07.08 11:20:30 -04'00'
Digitally signed by Eric Legaspi Date: 2019.07.12 10:13:34 -04'00' Keith B Lockwood Digitally signed by Keith B Lockwood
Date: 2019.07.12 11:29:26 -04'00'
Keith B Lockwood Digitally signed by Keith B Lockwood Date: 2019.07.15 07:47:22 -04'00'
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
LO
C
AT
IO
N M
AP
VICINITY MAP
VIRGINIA
NORTHAMPTON COUNTY
LOCATION MAP
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
G
EN
ER
AL
N O
TE
S
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
LAYDOWN AREA
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
C
LE
AR
A
N D
G R
U
BB
IN
G
P
LA
N
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
BO
R
IN
G
L O
C
AT
IO
N
S
SHEET NOTES
SEE SECTION 00 01 15 PARAGRAPH 1.3 FOR GEOTECHNICAL DATA.1.
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
D
IK
E
LA
YO
U
T
PL
AN
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
G R
AD
IN
G P
LA
N
2 5
THE INFORMATION DEPICTED ON THIS MAP
REPRESENTS THE RESULTS OF SURVEYS MADE
ON THE DATE(S) INDICATED AND CAN ONLY
BE CONSIDERED AS INDICATING THE GENERAL
CONDITIONS EXISTING AT THAT TIME.
SHEET NOTES
EXISTING SPILLBOX TO BE DEMOLISH AND REPLACE
WITH NEW STRUCTURE. REFER TO SECTION 01 57 23
FOR DETAILS.
EXISTING DIKE TO BE RAISED AND WIDENED.
REFER TO TYPICAL DIKE SECTION ON SHEET 9.
PROVIDE OUTLET PROTECTION AT SPILLWAY.
REFER TO DETAIL 3, SHEET 12.
AREA TO BE EXCAVATED TO APPROX. ELEV 25.5'
FOR DIKE FILL MATERIAL. REFER TO TYPICAL
SECTION SHEET 9.
PROVIDE SILT FENCE. REFER TO DETAIL 1, SHEET
12.
PROVIDE NEW CONSTRUCTION ENTRANCE.
LOCATION IS SHOWN ON SHEET 3, ALSO REFER
TO DETAIL 2, SHEET 12.
DITCH CUT TO BE SEEDED AND
MULCHED WITH SEED APPROPRIATE
FOR SOIL TYPE AND TIME OF YEAR.
NO DISTURBED TURF AREAS SHALL
REMAIN BARE SOIL FOR MORE THAN
14 DAYS. PROVIDE ANCHORED
SEEDED MULCH WITH STABILIZATION
NETTING. REFER TO SPECIFICATION
SECTION 32 92 19 SEEDING.
CONTRACTOR SHALL UTILIZE EXISTING DREDGE MATERIAL
WITHIN UPLAND PLACEMENT SITE TO ACHIEVE PLANNED
GRADES. THE CONTRACTOR SHALL OBTAIN ADDITIONAL
MATERIAL FROM OFF-SITE SOURCES IF ON-SITE AVAILBLE
MATERIAL IS NOT SUFFICIENT TO COMPLTE THE JOB.
EROSION CONTROL MEASURES SHALL BE IN PLACE
PRIOR TO THE START OF ANY GRADING.
THE CONTRACTOR SHALL CLEAR ALL PHRAGMITES,
VEGETATION, SHRUBS, AND TREES FROM WITHIN THE
LIMITS OF CONSTRUCTION, AS DEPICTED ON THE SITE
MAP, AS WELL AS THE CREST AND INSIDE SLOPES OF
THE DIKES. REFER TO SECTION 31 11 10 CLEARING AND
GRUBBING FOR DETAILS.
CONTRACTOR SHALL EXPECT TO BLEND CLAY AND
SAND DEPOSITS WITH THE UPLAND DISPOSAL SITE TO
MEET THE REQUIREMENTS OF THE SUITABLE SOIL
PRIOR TO PLACEMENT.
CONTRACTOR SHALL VERIFY THAT BLENDED SOIL
MEETS THE REQUIREMENTS OF SUITABLE MATERIAL
EVERY 1,000 CY OR FRACTION THEREOF PRIOR TO
PLACEMENT.
SUITABLE FILL MATERIAL SHALL BE PROPERLY
BENCHED INTO EXISTING SLOPES. REFER TO BENCHING
DETAIL SHEET 12.
MATERIAL LOCATED WITHIN THE PLACEMENT SITE IS
DREDGED MATERIAL AND WAS PLACED
HYDRAULICALLY. CONTRACTOR SHALL ASSUME THAT
THE MATERIAL IS VERY LOOSE/SOFT AND WILL REQUIRE
CONSTRUCTION EQUIPMENT WITH LOW GROUND
PRESSURE TO FACILITATE WORK.
IT IS RECOMMENDED THAT ALL DIKE SLOPES BE
MONITORED FOR SIGNS OF SHALLOW SLOUGHING,
PRIMARILY WITHIN THE LOWER PORTION OF THE SLOPE.
MONITORING SHALL BE DONE BY A GEOTECHNICAL
ENGINEER WITH EXPERIENCE IN SPOTTING POTENTIAL
SLOPE INSTABILITY.
SEE SECTION 31 00 00 EARTHWORK FOR DETAILS.
ESTIMATED CUT/FILL VOLUME TO CONSTRUCT DIKE:
CUT: 1,900cy FILL: 49,700cy.
MAINTAIN A SLOPE AS SPECIFIED IN CROSS-SECTIONS
ON SHEET 9. IF CLEARING AND GRUBBING CAUSES A
STEEPER SLOPE THEN IT MUST BE FIXED BY THE ADDITION
AND COMPACTION OF MATERIAL TO THE REQUIRED
SLOPE WITHIN 48 HOURS.
REFER TO SHEET 3 FOR LAYDOWN AREA.
PROVIDE INLET PROTECTION AT SPILLBOX AND PIPES
AROUND THE FACILITY. REFER TO DETAIL F ON SHEET 10.
EARTHWORK NOTES INV.=27.18'
INV.=38.50
D
IK
E C
R O
SS
-S
EC
TI
O N
S
9 16
UP
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
SP
IL
LB
O
X D
ET
AI
L
SHEET NOTES
INSTALL 1 (ONE) 8FT SECTION ON 8FT CONCRETE BASE
AS SHOWN ON SHEET 13. SEE SHEETS 13 THRU 16 FOR ALL
SPILLBOX DETAILS.
SEE SHEET 12 FOR OUTLET PROTECTION DETAIL.
MINIMUM FILL OVER OUTLET PIPE AT SPILLBOX 2.0'.
CONTRACTOR SHALL FOLLOW EM 385-1-1 "SAFETY AND HEALTH
REQUIREMENTS" FOR EXCAVATION AND TRENCH SLOPES DURING
REMOVAL AND INSTALLATION OF OUTFALL PIPES.
DISCHARGE PIPING FOR THE NEW SPILLBOX SHALL BE INSTALLED
USING 24 INCH BITUMINOUS COATED CORRUGATED METAL PIPE (CMP),
SIMILAR OR EQUAL TO EXISTING CMP TO BE DEMOLISHED.
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N C
O N
TR
O
L
PL
AN
UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL
EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED
AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND
SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL
HANDBOOK (3RD EDITION, 1992).
THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY SOIL
STABILIZATION TO ALL DENUDED OR DISTURBED AREAS WITHIN 7 DAYS
AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL
STABILIZATION MUST ALSO BE APPLIED TO DENUDED OR DISTURBED
AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WHICH WILL REMAIN
UNDISTURBED FOR LONGER THAN 14 DAYS. SOIL STABILIZATION MEASURES
INCLUDE VEGETATIVE ESTABLISHMENT, MULCHING AND THE EARLY
APPLICATION OF GRAVEL BASE MATERIAL ON AREAS TO BE PAVED.
THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES
PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT.
ANY NECESSARY REPAIRS TO MAINTAIN THE EFFECTIVENESS OF THE
EROSION CONTROL DEVICES AND CLEANUP OF SEDIMENT ARE THE
RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE MADE IMMEDIATELY.
STOCK PILES OF SOIL AND OTHER ERODIBLE MATERIALS SHALL BE
STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE
CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND
PERMANENT STABILIZATION STOCKPILES ON SITE AS WELL AS FOR
MATERIALS TRANSPORTED FROM THE PROJECT SITE.
EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR
PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH,
AS REQUIRED BY THE CONTRACTING OFFICER’S REPRESENTATIVE AND
DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT
OFF-SITE PROPERTY OR STORM DRAINAGE SYSTEMS.
THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE
OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION
AND SEDIMENTATION AS DETERMINED NECESSARY BY THE CONTRACTING
OFFICER’S REPRESENTATIVE.
TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE
REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION
IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS.
TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED.
ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL
MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING
SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.
ALL EROSION AND SEDIMENT CONTROL MEASURES INDICATED ON THIS PLAN
ARE THE MINIMUM REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR THE
INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY
TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE
CONTRACTING OFFICER’S REPRESENTATIVE.
ALL SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP
SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY
LAND-DISTURBING ACTIVITY, AND SHALL BE MADE FUNCTIONAL PRIOR TO
UPLAND LAND DISTURBANCE.
TEMPORARY CONSTRUCTION ENTRANCES SHALL BE MAINTAINED TO MINIMIZE
THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO PAVED
SURFACES. WHERE SEDIMENT IS TRACKED ONTO PAVED SURFACES, THE
SEDIMENT SHALL BE REMOVED BY SHOVELING OR SWEEPING AND
TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.
CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO CONTROL DUST
INCLUDING (BUT NOT LIMITED TO) USE OF WATER, LIMITING THE NUMBER OF
VEHICLES ALLOWED ON SITE, MINIMIZING THE OPERATING SPEED OF ALL
VEHICLES, OR PROVIDING OTHER ACCEPTABLE CONTROL MEASURES.
PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL
A GROUND COVER IS ACHIEVED, THAT IN THE OPINION OF THE CONTRACTING
OFFICER, IS UNIFORM AND MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT
EROSION.
GENERAL NOTES
REFER TO SPECIFICATION SECTION 31 00 00 FOR
EARTHWORK AND COMPACTION REQUIREMENTS.
NO DISTURBED TURF AREAS SHALL REMAIN BARE
SOIL FOR MORE THAN 14 DAYS.
INVERTS OF THE DRAINAGE PIPE RUNNING UNDER
THE LANDFILL ROAD SHALL BE MAINTAINED AND
INLET/OUTLET SHALL BE KEPT FREE FROM
SEDIMENT AND DEBRIS.
THE INFORMATION DEPICTED ON THIS MAP
REPRESENTS THE RESULTS OF SURVEYS MADE
ON THE DATE(S) INDICATED AND CAN ONLY
BE CONSIDERED AS INDICATING THE GENERAL
CONDITIONS EXISTING AT THAT TIME.
1.
2.
3.
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
NI
A
ER
O
SI
O N
A N
D S
ED
IM
EN
TA
TI
O
N C
O N
TR
O
L
PL
AN
D
ET
AI
LS
13 16
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
14 16
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
15 16
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
16 16
LA
ND
P
LA
CE
M
EN
T
SI
TE
R
ES
TO
RA
TI
O N
PR
O
JE
CT
O
YS
TE
R
CH
AN
NE
L P
LA
NS
F O
R
CO
NS
TR
UC
TI
O N
SU
RV
EY
O
F
FE
BR
UA
RY
3T H
4T H
NO
RT
HA
M
PT
O
N
CO
UN
TY
, V
IR
GI
1.3 Geotechnical Data
While it is believed that the borings depicted accurately indicate subsurface conditions for boring locations on the date taken, the Government assumes no responsibility for actual conditions which may be encountered in the execution of the contract. Should the Contractor rely, for any purpose, upon the accuracy or completeness of said borings, or log thereof, they do so at their own risk. The geotechnical data included in the plans and specifications are for information only.
PART 2 PRODUCTS (Not Used)
PART 3 EXECUTION (Not Used)
-- End of Section --
DOCUMENT 00 01 15 Page 3
Enclosure 1. Soil Boring Logs
This page intentionally left blank
0.3
13.0
Topsoil Tan, fine to medium POORLY GRADED
SAND WITH SILT (SP-SM)
Tan, fine to coarse CLAYEY SAND (SC)
0' to 2'
2' to 4'
4' to 6'
6' to 8'
8' to 10'
13' to 15'
Start drilling @14:15. 4-5" of topsoil.
Offset 6' east
Sand - 91%; Fines - 9%; LL, PL, PI -non-plastic; MC - 6.8%
Groundwater level during drilling @ 9.5'
Sampler fell 12 inches under weight of hammer Sand - 62%; Fines - 38%; LL - 31; PL -
19; PI - 12; MC - 12.4%
2-2-3-5 N=5
1-2-3-3 N=5
1-1-1-1 N=2
1-1-1-2 N=2
1-2-2-5 N=4
0-0-2-1 N=2
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
Matt Schulze 0.0
50.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-1
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/29/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-1
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest East Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/29/2018
DRILLING LOG 3
Hole No. B-1
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-1PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
ENG FORM
18.0
Tan, fine to coarse CLAYEY SAND (SC) (continued)
Gray, fine to coarse POORLY GRADED SAND (SP) with a trace of silt 18' to 20'
23' to 25'
28' to 30'
Gravel - 1%; Sand - 98%; Fines - 1%;
LL, PL, PI - non-plastic; MC - 16.9%
2-3-3-5 N=6
3-8-10-11 N=18
7-10-14-15 N=24
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
3 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-1
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-1
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-11836-AJUN 67
33.0
38.0
50.0
Gray, fine to coarse POORLY GRADED SAND (SP) with a trace of silt (continued)
At 33', light gray
Light grayish-orange, fine to coarse POORLY GRADED SAND (SP) with a trace of silt
33' to 35'
38' to 40'
43' to 45'
48' to 50'
Gravel - 2%; Sand - 96%; Fines - 2%;
LL, PL, PI - non-plastic; MC - 15.3%
BOH @ 50'. Stop drilling @ 16:00.
Water level 20.7' @16:05 on 3/29/18.
Water level 16.9' @ 07:50 on 3/30/18.
Pull augers. Cave in depth 17'
4-7-14-15 N=21
3-7-8-9 N=15
8-9-9-19 N=18
4-7-10-10 N=17
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
3 SHEETS
PROJECT 3INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-1
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-1
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-11836-AJUN 67
4.0
8.0
9.0
10.0
Topsoil Gray with brown mottled SILT (ML), moist, roots
Gray with brown mottling FAT CLAY (CH), moist, roots
Brown and tan, fine to medium CLAYEY SAND (SC), moist
Orangish-brown and tan SAND WITH SILT (SP-SM), moist
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5a, SS-5b
8' to 10'
3 inches topsoil
Sampler fell 12 inches under weight of hammer. Low recovery. Dredge tailings
Sand - 13%; Fines - 87%; LL - 55; PL -
25; PI - 30; MC - 33.8%
Sampler fell 12 inches under weight of hammer.
At 7.5', Dark gray
Sampler fell 6 inches under weight of hammer. Natural ground.
BOH @ 10'. Groundwater not encountered. Cave-in depth 7.5'
0-0-1-2 N=1
2-2-2-4 N=4
2-3-4-4 N=7
0-0-2-3 N=2
0-3-5-8 N=8
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
10.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-2
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
4/1/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-2
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
4/1/2018
DRILLING LOG 1
Hole No. B-2
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-2PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
4.0
6.0
8.3 8.5
10.0
Topsoil
Gray with brown mottling SILT (ML), dry, roots
Gray with reddish brown mottling FAT CLAY (CH), moist, roots
At 6', color change to dark gray with reddish-brown mottling
Orangish-brown, fine to medium CLAYEY SAND (SC), moist to wet Orangish-brown to yellowish-brown fine to moist SAND WITH SILT (SP-SM), moist to wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
4 inches topsoil Sampler fell 6 inches under weight of hammer. Dredge tailings
Sand - 8%; Fines - 92%; LL - 73; PL -
32; PI - 41; MC - 39.6%
Sampler fell 6 inches under weight of hammer
Sampler fell 6 inches under weight of hammer. Natural Ground
BOH 10'. Groundwater not encountered during drilling. Cave-in depth 7.5'
0-1-1-2 N=2
1-3-3-3 N=6
2-2-3-3 N=5
0-1-1-3 N=2
0-1-3-5 N=4
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
10.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-3
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
4/1/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-3
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
4/1/2018
DRILLING LOG 1
Hole No. B-3
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-3PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
7.0
8.0
10.0
Topsoil Gray-brown FAT CLAY (CH), trace fine sand, moist, roots
Orangish-brown, fine to medium CLAYEY SAND (SC), moist
Orangish-brown, fine to medium SILTY SAND (SM), moist
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
3 inches topsoil.
Sampler dropped 18 inches under weight of hammer. Dredge tailings Sand - 9%; Fines - 91%; LL - 66; PL -
31; PI - 35; MC - 33.5%
Sampler dropped 6 inches under weight of hammer
Natural ground
At 8.5', root
BOH @ 10'. Groundwater not encountered. Cave-in depth @ 7'.
0-0-0-2 N=0
1-1-1-2 N=2
2-2-2-2 N=4
0-2-3-4 N=5
1-2-4-5 N=6
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
10.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-4
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
4/1/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-4
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
4/1/2018
DRILLING LOG 1
Hole No. B-4
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-4PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
2.0
7.0
8.0
8.5
12.0
13.0 13.2
14.0
Topsoil Gray with brown mottling LEAN CLAY (CL), moist, roots
Gray with orangish-brown mottling LEAN CLAY WITH SAND (CL), moist, roots
Black and brown fine to medium CLAYEY SAND (SC), with roots and shell fragments
Gray, fine to medium SAND WITH SILT(SP-SM), with shell fragments Yellowish-brown, fine to medium CLAYEY SAND (SC), moist
Tan, fine to coarse SAND (SP), wet
Gray, fine to medium SILTY SAND (SM), wet Tan, fine to coarse SAND (SP), wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
SS-6
10' to 12'
SS-7
12' to 14'
3 inches topsoil
Sampler dropped 18 inches under weight of hammer. Dredge tailings
Sand - 18%; Fines - 82%; LL - 31; PL -
22; PI - 9; MC - 25.1%
At 2.5', Large root
Sampler dropped 6 inches under weight of hammer
At 7', Tree root
Gravel - 1%; Sand - 70%; Fines - 29%;
LL - 24; PL - 14; PI - 10; MC - 14.4%
At 9', roots
Sampler dropped 6 inches under weight of hammer
At 11', yellowish-brown to gray
At 11.66', gray, moist to wet
Groundwater level during drilling @ 12' Sampler dropped 6 inches under weight of hammer
0-0-0-1 N=0
3-4-5-6 N=9
2-2-2-2 N=4
0-2-2-2 N=4
2-2-3-2 N=5
0-1-2-4 N=3
0-2-2-2 N=4
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
16.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-5
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
4/1/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-5
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
4/1/2018
DRILLING LOG 2
Hole No. B-5
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-5PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
16.0
Yellowish-brown POORLY GRADED SAND (SP), wet
SS-8
14' to 16'
Sand - 98%; Fines - 2%; LL, PL, PI -non-plastic; MC - 22.7% Natural ground
BOH @ 16'. Water level 11.5' before auger removal ahnd 7.9' after auger removal. Cave-in depth @ 8.5'.
4-7-9-11 N=16
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-5
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-5
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-51836-AJUN 67
0.2
4.0
8.5 8.8
10.0
Topsoil Gray with brown mottling SILT (ML), moist, roots
Gray with brown mottling LEAN CLAY (CL), moist, roots
Gray with brown mottling SANDY ELASTIC SILT (MH), moist, roots
Orangish-brown and tan fine to medium CLAYEY SAND(SC), moist Orangish-brown, fine to coarse SILTY SAND (SM), moist
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
2 inches topsoil
Sampler dropped 18 inches under weight of hammer. Low recovery. Dredge tailings
At 2'-4', sand caved in on top of sampler
At 4'-6', sand caved in on top of sampler.
Sampler dropped 18 inches under weight of hammer
Sampler dropped 12 inches under weight of hammer Gravel - 2%; Sand - 38%; Fines - 60%;
LL - 60; PL - 38; PI - 22; MC - 31.3%
Natural ground
BOH @ 10'. Groundwater not encountered. Cave-in depth 7.5'
0-0-0-2 N=0
2-3-2-3 N=5
0-0-0-3 N=0
0-0-3-6 N=3
4-6-7-9 N=13
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
10.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-6
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
4/1/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-6
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
4/1/2018
DRILLING LOG 1
Hole No. B-6
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-6PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
0.5
3.5
4.0
5.5
8.0
13.0
Topsoil
Orangish-brown, fine SILTY SAND (SM), moist, roots to 2'
At 0.5', fine to medium sand
Orangish-brown to tan, fine to medium SAND WITH SILT (SP-SM), moist Tan, fine to medium SILTY SAND (SM), moist
Orangish-brown and tan, fine to medium SILTY SAND (SM), moist
At 8', fine to coarse sand, moist to wet
Tan, fine to medium POORLY GRADED SAND (SP), wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
SS-6
13' to 15'
4 inches topsoil
Sand - 72%; Fines - 28%; LL, PL, PI -non-plastic; MC - 9.6%
At 6', some clay
Root @ 7.5'
Sand - 85%; Fines - 15%; LL, PL, PI -non-plastic; MC - 12.9%
At 9.5', clay lens
Groundwater during drilling @ 13' Sand - 99%; Fines - 1%; LL, PL, PI -non-plastic; MC - 21.0%
1-1-1-6 N=2
2-4-4-8 N=8
3-3-3-4 N=6
3-3-3-3 N=6
2-2-2-3 N=4
3-4-4-5 N=8
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
50.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-7
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/30/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-7
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest West Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/31/2018
DRILLING LOG 3
Hole No. B-7
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-7PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
23.0
Tan, fine to medium POORLY GRADED SAND (SP), wet (continued)
At 18', fine to coarse sand
At 23' fine to medium sand
SS-7
18' to 20'
SS-8
23' to 25'
SS-9
28' to 30'
3-7-9-12 N=16
6-9-12-14 N=21
5-8-9-14 N=17
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
3 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-7
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-7
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-71836-AJUN 67
48.0
50.0
At 23' fine to medium sand (continued)
Tan and orangish-brown, fine to coarse SAND WITH SILT (SP-SM), wet
Tan and orangish-brown, fine to medium POORLY GRADED SAND (SP), wet
At 48', color change to tan
SS-10
33' to 35'
SS-11
38' to 40'
SS-12
43' to 45'
SS-13
48' to 50'
Sampler dropped 6" under weight of hammer
Clay seam at 34.5'
Gravel - 1%; Sand - 97%; Fines - 2%;
LL, PL, PI - non-plastic; MC - 17.7%
BOH@ 50'. Water level 18.95' @ 10:21 on 3/31 before auger removal. Water level 12.9' after auger removal. Cave-in depth 13.5'
0-2-4-7 N=6
8-10-12-11 N=22
10-11-12-17 N=23
2-8-13-16 N=21
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
3 SHEETS
PROJECT 3INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-7
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-7
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-71836-AJUN 67
0.2
3.5
5.5
7.5
8.0
10.0
Topsoil Gray with brown mottling, SANDY SILTY CLAY (CL-ML), moist, sporadic roots, fine sand
Gray and brown, fine SILTY SAND (SM), moist, roots
Gray with reddish-brown mottling SANDY LEAN CLAY (CL), moist, roots
Orangish-brown, fine to medium CLAYEY SAND (SC), moist Orangish-brown, fine to medium SAND WITH SILT (SP-SM), moist, lower 2 inches wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
2 inches topsoil
Sampler dropped 18 inches under weight of hammer. Dredge tailings
Sand - 42%; Fines - 58%; LL - 26; PL -
19; PI - 7; MC - 24.9%
Sampler dropped 12 inches under weight of hammer
Sampler dropped 6 inches under weight of hammer Sand - 41%; Fines - 59%; LL - 32; PL -
17; PI - 15; MC - 18.2%
Natural ground
BOH @ 10'. Groundwater not encountered. Cave-in depth 6.5'.
0-0-0-1 N=0
1-2-3-4 N=5
0-0-2-3 N=2
0-1-2-5 N=3
2-2-3-4 N=5
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
10.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-9
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/31/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-9
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/31/2018
DRILLING LOG 1
Hole No. B-9
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-9PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
3.8 4.0
5.0
8.0
8.5
13.0
Dark Gray CLAY
Dark Gray fine to medium SAND (SP) with a trace of silt
Orangish-brown and tan, fine to medium CLAYEY SAND (SC), moist
Gray LEAN CLAY (CL), moist Brown and tan, fine to medium CLAYEY SAND (SC), moist
Gray with brown mottling ELASTIC SILT WITH SAND (MH), moist, fine sand
At 8', no sand
Orangish-brown and tan, fine to moist SILTY SAND (SM), moist
Orangish-brown and tan, fine to medium POORLY GRADED SAND (SP), moist to wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5a, SS-5b
8' to 10'
SS-6
13' to 15'
Start drilling @ 14:00
Sand - 23%; Fines - 77%; LL - 58; PL -
33; PI - 25; MC - 25.3%
Sample SS-5a from 8'-8.5', Sample SS-5b from 8.5'-10'
Gravel - 1%; Sand - 98%; Fines - 1%;
LL, PL, PI - non-plastic; MC - 20.1%
2-2-2-3 N=4
1-1-1-2 N=2
1-2-2-3 N=4
2-2-4-4 N=6
1-4-7-8 N=11
2-3-4-4 N=7
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
12.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-10
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/31/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-10
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Interior Fill
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
0.0
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/31/2018
DRILLING LOG 2
Hole No. B-10
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-10PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
25.0
Orangish-brown and tan, fine to medium POORLY GRADED SAND (SP), moist to wet (continued)
At 18', wet
Tan, fine to moist POORLY GRADED SAND (SP), wet
SS-7
18' to 20'
SS-8
23' to 25'
Groundwater level during drilling @ 15'
BOH @ 25'. Water level 17.78' before auger removal. Water level 13.6' after auger removal. Cave-in depth 13.6'.
4-3-5-8 N=8
8-9-12-12 N=21
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-10
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-10
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-101836-AJUN 67
2.1
3.6
6.0
7.8
10.0
11.5
12.0
Topsoil Gray with brown mottling LEAN CLAY (CL), moist, roots in entire sample, one large root in shoe
Orangish-brown, fine to medium SAND WITH SILT (SM-SP), moist to wet Gray and brown CLAYEY SAND (SC), moist, roots
Gray and brown, fine to medium SILTY SAND (SM), moist, roots
Gray with reddish-brown mottling LEAN CLAY (CL) with some fine sand, moist, roots
Orangish-brown, fine to medium CLAYEY SAND (SC), moist
Orangish-brown, fine to medium SAND WITH SILT (SP-SM), wet
Orangish-brown, fine to medium SILTY SAND (SM), moist
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
SS-6
10' to 12'
3 inches topsoil
Sampler dropped 18 inches under weight of hammer. Dredge tailings
Sand - 58%; Fines - 42%; LL - 55; PL -
28; PI - 27; MC - 20.6%
Sand - 53%; Fines - 47%; LL, PL, PI -non-plastic; MC - 22.1%
At 8', roots
Natural ground
BOH @ 12'. Groundwater not recorded before or after auger removal. Pull augers. Cave-in depth 9'.
0-0-0-1 N=0
3-2-2-2 N=4
2-2-2-2 N=4
2-6-8-9 N=14
2-2-2-4 N=4
2-2-2-3 N=4
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
25.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-11
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/30/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-11
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest South Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/30/2018
DRILLING LOG 1
Hole No. B-11
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-11PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
1.0
13.0
Fine to medium SAND WITH SILT (SP-SM)
Orange-tan, fine to medium SILTY CLAYEY
SAND (SC-SM)
Orange-tan POORLY GRADED SAND WITH
SILT (SP-SM),
0' to 2'
2' to 4'
4' to 6'
6' to 8'
8' to 10'
13' to 15'
Start drilling @9:05am
Sand - 80%; Fines - 20%; LL - 21; PL -
14; PI - 7; MC - 8.3%
Gravel - 1%; Sand - 88%; Fines - 11%;
LL, PL, PI - non-plastic; MC - 10.2%
1-1-3-3 N=4
5-5-4-4 N=9
2-2-2-3 N=4
3-9-4-4 N=13
2-2-2-2 N=4
2-2-3-3 N=5
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
Matt Schulze 0.0
50.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-12
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/30/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-12
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest South Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
0.0
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/30/2018
DRILLING LOG 3
Hole No. B-12
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-12PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
Orange-tan POORLY GRADED SAND WITH SILT (SP-SM), (continued)
Orange-tan, fine to medium POORLY GRADED SAND (SP) with a trace of silt
Tan/gray, fine to medium SAND with a trace of silt
18' to 20'
23' to 25'
28' to 30'
At 18', spoon wet
Gravel - 1%; Sand - 96%; Fines - 3%;
LL, PL, PI - non-plastic; MC - 20.7%
3-4-6-9 N=10
3-5-9-6 N=14
9-12-12-16 N=24
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
3 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-12
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-12
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-121836-AJUN 67
33.3
43.0
50.0
Tan/gray, fine to medium SAND with a trace of silt (continued)
Tan/gray, fine to course SAND with a litte fine gravel
Tan/gray, fine to coarse POORLY GRADED
SAND WITH SILT (SP-SM)
Tan/gray, fine to coarse SAND with a little fine gravel
33' to 35'
38' to 40'
43' to 45'
48' to 50'
Rain @ 11:00
Sand - 95%; Fines - 5%; LL, PL, PI -non-plastic; MC - 19.6%
BOH @ 50'. Groundwater level 22.9' before auger removal, 15.9' after auger removal. Cave-in depth 15'.
6-9-12-15 N=21
6-8-10-12 N=18
10-9-12-16 N=21
6-8-8-10 N=16
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
3 SHEETS
PROJECT 3INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-12
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-12
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-121836-AJUN 67
5.8
8.0
13.0
Clayey topsoil with roots
Brown, fine to medium CLAYEY SAND (SC), moist, some shell fragments
Gray/brown LEAN CLAY WITH SAND (CL), moist, shell fragments
Gray/brown FAT CLAY WITH SAND (CH), moist, shell fragments
Orangish-brown to yellowish-brown, fine to medium CLAYEY SAND (SC), moist to wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
SS-6
13' to 15'
6 inches topsoil Gravel - 13%; Sand - 46%; Fines -
41%; LL - 26; PL - 17; PI - 9; MC -
17.7%
Sampler dropped 12 inches under weight of hammer. Low recovery
Sampler dropped 12 inches under weight of hammer. Low recovery
Sampler dropped 6 inches under weight of hammer.
Gravel - 2%; Sand - 15%; Fines - 83%;
LL - 57; PL - 27; PI - 30; MC - 34.2%
Sand - 58%; Fines - 52%; LL - 29; PL -
17; PI - 12; MC - 12.1%
2-2-3-3 N=5
1-1-1-1 N=2
0-0-1-2 N=1
0-0-1-2 N=1
0-1-2-3 N=3
1-2-2-2 N=4
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
25.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-14
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/31/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-14
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest Spur Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
0.0
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/31/2018
DRILLING LOG 2
Hole No. B-14
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-14PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
25.0
Orangish-brown to yellowish-brown, fine to medium CLAYEY SAND (SC), moist to wet (continued)
Orangish-brown, fine to medium SAND WITH SILT (SP-SM), wet
Tan, fine to medium POORLY GRADED SAND (SP), wet
SS-7
18' to 20'
SS-8
23' to 25'
At 14.75 feet, black organics
Groundwater level during drilling at 18 feet
Sand - 97%; Fines - 3%; LL, PL, PI -non-plastic; MC - 21%
BOH@ 25'. Water level 20.8' before auger removal. Water level 14.35' after auger removal. Cave-in depth 15.4'.
1-2-6-7 N=8
3-5-8-10 N=13
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-14
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-14
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-141836-AJUN 67
4.0
6.0
8.0
13.0
Topsoil
Orangish-brown to reddish-brown, fine to medium SILTY SAND (SM), moist
At 2', orangish-brown to yellowish-brown
Orangish-brown to yellowish-brown, fine to medium CLAYEY SAND (SC), moist
Orangish-brown to yellowish brown, fine to medium SILTY SAND (SM), moist, some clay
At 8', moist to wet
Orangish-brown to yellowish-brown, fine to medium POORLY GRADED SAND (SP), wet
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
SS-6
13' to 15'
4 inches topsoil
Roots and grass to 8 inches
Gravel - 1%; Sand - 80%; Fines - 19%;
LL - 15; PL - 14; PI - 1; MC - 8.5%
Groundwater level during drilling @ 9.66'
Gravel - 1%; Sand - 95%; Fines - 4%;
LL, PL, PI - non-plastic; MC - 19.1%
1-3-2-4 N=5
1-4-5-5 N=9
2-2-4-5 N=6
3-5-6-5 N=11
1-2-2-3 N=4
1-3-4-4 N=7
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
55.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-16
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/25/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-16
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest North Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/25/2018
DRILLING LOG 4
Hole No. B-16
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-16PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
14.5
23.0
28.0
Tan, fine to medium POORLY GRADED SAND (SP), wet
At 18', tan and grayish brown
At 23', tan, mostly fine sand with a trace of medium sand
Tan, fine POORLY GRADED SAND WITH SILT (SP-SM), wet
SS-7
18' to 20'
SS-8
23' to 25'
SS-9
28' to 30'
Sand - 98%; Fines - 2%; LL, PL, PI -non-plastic; MC - 20.9%
Sand - 92%; Fines - 8%; LL, PL, PI -non-plastic; MC - 27.3%
2-3-6-8 N=9
6-7-8-13 N=15
9-10-11-14 N=21
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
4 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-16
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-16
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-161836-AJUN 67
34.5
38.0
41.5
44.5
48.0
Tan, fine POORLY GRADED SAND WITH SILT (SP-SM), wet (continued)
Orangish-brown and tan fine POORLY GRADED SAND (SP), wet
At 34.5', fine to medium sand
At 38', fine sand
At 43', tan, fine to coarse sand
At 44.5', tan and orangish-brown, fine to medium sand
At 48', fine to coarse sand
SS-10
33' to 35'
SS-11
38' to 40'
SS-12
43' to 45'
SS-13
48' to 50'
5-8-8-10 N=16
2-10-12-14 N=22
6-8-9-9 N=17
8-20-16-16 N=36
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
4 SHEETS
PROJECT 3INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-16
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-16
/3 /2
PROJECT HOLE NO.
53.0
54.8 55.0
At 48', fine to coarse sand (continued)
At 53', fine to medium sand
At 54.8', black and gray, fine sand
SS-14
53' to 55'
Chain in gear box broke. Boring terminated @ 55'. Water level 13.95 on 3/27/18 at 15:05.
11-10-13-17 N=23
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
4 SHEETS
PROJECT 4INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-16
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-16
/3 /2
PROJECT HOLE NO.
0.1
4.0
8.0
13.0
Topsoil Orangish-brown to yellowish-brown, fine to medium SILTY SAND (SM), moist, grass and roots to 2"
Orangish-brown to yellowish-brown, fine to coarse POOLY GRADED SAND WITH SILT (SP-SM), moist
At 4', fine to medium sand
Yellowish-brown and tan, fine to medium
POORLY GRADED SAND WITH SILT
(SP-SM), wet
At 13', tan, fine to coarse sand
SS-1
0' to 2'
SS-2
2' to 4'
SS-3
4' to 6'
SS-4
6' to 8'
SS-5
8' to 10'
SS-6
13' to 15'
1 inch topsoil
Gravel - 1%; Sand - 88%; Fines - 11%;
LL, PL, PI - non-plastic; MC - 6.7%
Groundwater level during drilling @ 8'
Gravel - 1%; Sand - 94%; Fines - 5%;
LL, PL, PI - non-plastic; MC - 21.8%
Sampler dropped 6 inches under weight of hammer
2-2-2-3 N=4
3-5-5-6 N=10
2-4-5-4 N=9
2-2-3-5 N=5
1-4-3-4 N=7
0-2-3-4 N=5
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
2 in SS
NAD
INSTALLATION SHEET
John Asken
J. Spitz 0.0
65.0
7. THICKNESS OF OVERBURDEN
8. DEPTH DRILLED INTO ROCK
9. TOTAL DEPTH OF HOLE
17. ELEVATION TOP OF HOLE
15. ELEVATION GROUND WATER
SHEETS
STARTED COMPLETED
Hole No. B-18
11. DATUM FOR ELEVATION SHOWN (TBM or MSL)
DISTURBED
1. PROJECT
NOS MLLW, 1983-2001
Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN
SAMPLES TAKEN
18. TOTAL CORE RECOVERY FOR BORING
3. DRILLING AGENCY
5. NAME OF DRILLER
6. DIRECTION OF HOLE
%0
DEG. FROM VERT.
4. HOLE NO. (As shown on drawing title and file number)
14. TOTAL NUMBER CORE BOXES
16. DATE HOLE
DIVISION
3/24/2018---
12. MANUFACTURER'S DESIGNATION OF DRILL
OF
B-18
10. SIZE AND TYPE OF BIT
Cheriton, Virginia Crest North Dike
2. LOCATION (Coordinates or Station)
19. GEOLOGIST
CME-550
VERTICAL INCLINED
Oyster Channel Dredge Disposal
3/24/2018
DRILLING LOG 4
Hole No. B-18
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-18PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71
28.0
At 13', tan, fine to coarse sand (continued)
Tan, fine to medium POORLY GRADED SAND (SP), wet
At 23', fine sand
At 28' fine to medium sand
SS-7
18' to 20'
SS-8
23' to 25'
SS-9
28' to 30'
Sand - 98%; Fines - 2%; LL, PL, PI -non-plastic; MC - 26.4%
3-6-8-10 N=14
5-10-12-14 N=22
1-5-9-13 N=14
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
4 SHEETS
PROJECT 2INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-18
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-18
/3 /2
PROJECT HOLE NO.
Oyster Channel Dredge Disposal B-181836-AJUN 67
34.7
38.0
44.0
At 28' fine to medium sand (continued)
At 33', trace clay
At 34.66, color change to tan and orangish-brown
Orangish-brown to yellowish-brown, fine to medium POORLY GRADED SAND WITH SILT (SP-SM), wet
Tan and orangish-brown, fine to coarse POORLY GRADED SAND (SP), wet
SS-10
33' to 35'
SS-11
38' to 40'
SS-12
43' to 45'
SS-13
48' to 50'
Low recovery
7-4-6-8 N=10
10-11-11-12 N=22
13-12-7-11 N=19
0-2-7-9 N=9
REMARKS
(Drilling time, water loss, depth weathering, etc., if significant)
LEGEND
CLASSIFICATION OF MATERIALS
(Description)
ELEVATION DEPTH
a fc eb gd
SAMPLE
DEPTH
(feet)
SAMPLE
BLOWS
4 SHEETS
PROJECT 3INSTALLATION
DRILLING LOG (Cont Sheet)
ELEVATION TOP OF HOLE
Hole No. B-18
Oyster Channel Dredge Disposal
SHEET
OF
Hole No. B-18
/3 /2
PROJECT HOLE NO.
54.6
59.5
63.0
65.0
Tan and orangish-brown, fine to coarse POORLY GRADED SAND (SP), wet (continued)
Black and gray, fine SILTY SAND (SM), wet
Black and gray, fine CLAYEY SAND (SC), wet
Black and gray, fine, SILTY SAND (SM), wet, some shell fragments
SS-14
53' to 55'
SS-15
58' to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.