A.01.29_FY19_Oyster_Channel_Upland_Site_Rehab_FINAL_PLANS_and_SPECS_29JULY2019.pdf

PDF 7 MB Posted

Attached to
Upland Placement Site Refurbishment at Oyster Channel located in Northhamton County, VA
Solicitation number
W9123619B0025
Issued by

About this file

Oyster Channel Plans and Specs

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OYSTER CHANNEL

UPLAND PLACEMENT SITE

REHABILITATION

PLANS AND SPECIFICATIONS

NORTHAMPTON COUNTY, VIRGINIA

Oyster Channel Upland Placement Site Rehabilitation 2019OYSTERCHNELU

PROJECT TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 15 LIST OF DRAWINGS AND GEOTECHNICAL INFORMATION

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK FOR NORFOLK DISTRICT PROJECTS

01 14 00 WORK RESTRICTIONS

01 22 00 MEASUREMENT AND PAYMENT

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00 QUALITY CONTROL

01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS

01 57 20 ENVIRONMENTAL PROTECTION

01 57 23 TEMPORARY STORMWATER POLLUTION CONTROL

01 78 00 RECORD OF CONSTRUCTION DRAWINGS

DIVISION 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 19 GEOTEXTILE

31 11 10 CLEARING AND GRUBBING

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 92 19 SEEDING

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

SECTION 00 01 15

LIST OF DRAWINGS AND GEOTECHNICAL INFORMATION

01/07

PART 1 GENERAL

1.1 SUMMARY

1.2 CONTRACT DRAWINGS

1.3 Geotechnical Data

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section Table of Contents --

DOCUMENT 00 01 15 Page 1

SECTION 00 01 15

LIST OF DRAWINGS AND GEOTECHNICAL INFORMATION

01/07

PART 1 GENERAL

1.1 SUMMARY

This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."

1.2 CONTRACT DRAWINGS

Contract drawings are as follows:

SHEET NO. TITLE NORFOLK DISTRICT FILE NO.

Plans for Oyster Channel Upland Placement Site Rehabilitation:

1 of 16 COVER SHEET OYU.2018-02-13.PS(1)

2 of 16 LOCATION MAP OYU.2018-02-13.PS(2)

3 of 16 GENERAL NOTES OYU.2018-02-13.PS(3)

4 of 16 EXISTING CONDITIONS OYU.2018-02-13.PS(4)

5 of 16 CLEAR AND GRUBBING PLAN OYU.2018-02-13.PS(5)

6 of 16 BORING LOCATIONS OYU.2018-02-13.PS(6)

7 of 16 DIKE LAYOUT PLAN OYU.2018-02-13.PS(7)

8 of 16 GRADING PLAN OYU.2018-02-13.PS(8)

9 of 16 DIKE CROSS-SECTIONS OYU.2018-02-13.PS(9)

10 of 16 SPILLBOX DETAIL OYU.2018-02-13.PS(10)

11 of 16 EROSION AND SEDIMENTATION

CONTROL PLAN OYU.2018-02-13.PS(11)

12 of 16 EROSION AND SEDIMENTATION

CONTROL PLAN DETAILS OYU.2018-02-13.PS(12)

13 of 16 SPILLBOX DETAIL OYU.2018-02-13.PS(13)

14 of 16 SPILLBOX DETAIL (CONT'D) OYU.2018-02-13.PS(14)

15 of 16 SPILLBOX DETAIL (CONT'D) OYU.2018-02-13.PS(15)

16 of 16 SPILLBOX DETAIL (CONT'D) OYU.2018-02-13.PS(16)

DOCUMENT 00 01 15 Page 2

UP

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

C O

VE

R

S H

EE

T

OYSTER CHANNEL

UPLAND PLACEMENT SITE REHABILITATION

NORTHAMPTON COUNTY, VIRGINIA

US Army Corps of Engineers Norfolk District

Sheet List Table Sheet Number Sheet Title

Michael L. Anderson Digitally signed by Michael L. Anderson Date: 2019.07.08 11:20:30 -04'00'

Digitally signed by Eric Legaspi Date: 2019.07.12 10:13:34 -04'00' Keith B Lockwood Digitally signed by Keith B Lockwood

Date: 2019.07.12 11:29:26 -04'00'

Keith B Lockwood Digitally signed by Keith B Lockwood Date: 2019.07.15 07:47:22 -04'00'

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

LO

C

AT

IO

N M

AP

VICINITY MAP

VIRGINIA

NORTHAMPTON COUNTY

LOCATION MAP

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

G

EN

ER

AL

N O

TE

S

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

LAYDOWN AREA

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

C

LE

AR

A

N D

G R

U

BB

IN

G

P

LA

N

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

BO

R

IN

G

L O

C

AT

IO

N

S

SHEET NOTES

SEE SECTION 00 01 15 PARAGRAPH 1.3 FOR GEOTECHNICAL DATA.1.

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

D

IK

E

LA

YO

U

T

PL

AN

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

G R

AD

IN

G P

LA

N

2 5

THE INFORMATION DEPICTED ON THIS MAP

REPRESENTS THE RESULTS OF SURVEYS MADE

ON THE DATE(S) INDICATED AND CAN ONLY

BE CONSIDERED AS INDICATING THE GENERAL

CONDITIONS EXISTING AT THAT TIME.

SHEET NOTES

EXISTING SPILLBOX TO BE DEMOLISH AND REPLACE

WITH NEW STRUCTURE. REFER TO SECTION 01 57 23

FOR DETAILS.

EXISTING DIKE TO BE RAISED AND WIDENED.

REFER TO TYPICAL DIKE SECTION ON SHEET 9.

PROVIDE OUTLET PROTECTION AT SPILLWAY.

REFER TO DETAIL 3, SHEET 12.

AREA TO BE EXCAVATED TO APPROX. ELEV 25.5'

FOR DIKE FILL MATERIAL. REFER TO TYPICAL

SECTION SHEET 9.

PROVIDE SILT FENCE. REFER TO DETAIL 1, SHEET

12.

PROVIDE NEW CONSTRUCTION ENTRANCE.

LOCATION IS SHOWN ON SHEET 3, ALSO REFER

TO DETAIL 2, SHEET 12.

DITCH CUT TO BE SEEDED AND

MULCHED WITH SEED APPROPRIATE

FOR SOIL TYPE AND TIME OF YEAR.

NO DISTURBED TURF AREAS SHALL

REMAIN BARE SOIL FOR MORE THAN

14 DAYS. PROVIDE ANCHORED

SEEDED MULCH WITH STABILIZATION

NETTING. REFER TO SPECIFICATION

SECTION 32 92 19 SEEDING.

CONTRACTOR SHALL UTILIZE EXISTING DREDGE MATERIAL

WITHIN UPLAND PLACEMENT SITE TO ACHIEVE PLANNED

GRADES. THE CONTRACTOR SHALL OBTAIN ADDITIONAL

MATERIAL FROM OFF-SITE SOURCES IF ON-SITE AVAILBLE

MATERIAL IS NOT SUFFICIENT TO COMPLTE THE JOB.

EROSION CONTROL MEASURES SHALL BE IN PLACE

PRIOR TO THE START OF ANY GRADING.

THE CONTRACTOR SHALL CLEAR ALL PHRAGMITES,

VEGETATION, SHRUBS, AND TREES FROM WITHIN THE

LIMITS OF CONSTRUCTION, AS DEPICTED ON THE SITE

MAP, AS WELL AS THE CREST AND INSIDE SLOPES OF

THE DIKES. REFER TO SECTION 31 11 10 CLEARING AND

GRUBBING FOR DETAILS.

CONTRACTOR SHALL EXPECT TO BLEND CLAY AND

SAND DEPOSITS WITH THE UPLAND DISPOSAL SITE TO

MEET THE REQUIREMENTS OF THE SUITABLE SOIL

PRIOR TO PLACEMENT.

CONTRACTOR SHALL VERIFY THAT BLENDED SOIL

MEETS THE REQUIREMENTS OF SUITABLE MATERIAL

EVERY 1,000 CY OR FRACTION THEREOF PRIOR TO

PLACEMENT.

SUITABLE FILL MATERIAL SHALL BE PROPERLY

BENCHED INTO EXISTING SLOPES. REFER TO BENCHING

DETAIL SHEET 12.

MATERIAL LOCATED WITHIN THE PLACEMENT SITE IS

DREDGED MATERIAL AND WAS PLACED

HYDRAULICALLY. CONTRACTOR SHALL ASSUME THAT

THE MATERIAL IS VERY LOOSE/SOFT AND WILL REQUIRE

CONSTRUCTION EQUIPMENT WITH LOW GROUND

PRESSURE TO FACILITATE WORK.

IT IS RECOMMENDED THAT ALL DIKE SLOPES BE

MONITORED FOR SIGNS OF SHALLOW SLOUGHING,

PRIMARILY WITHIN THE LOWER PORTION OF THE SLOPE.

MONITORING SHALL BE DONE BY A GEOTECHNICAL

ENGINEER WITH EXPERIENCE IN SPOTTING POTENTIAL

SLOPE INSTABILITY.

SEE SECTION 31 00 00 EARTHWORK FOR DETAILS.

ESTIMATED CUT/FILL VOLUME TO CONSTRUCT DIKE:

CUT: 1,900cy FILL: 49,700cy.

MAINTAIN A SLOPE AS SPECIFIED IN CROSS-SECTIONS

ON SHEET 9. IF CLEARING AND GRUBBING CAUSES A

STEEPER SLOPE THEN IT MUST BE FIXED BY THE ADDITION

AND COMPACTION OF MATERIAL TO THE REQUIRED

SLOPE WITHIN 48 HOURS.

REFER TO SHEET 3 FOR LAYDOWN AREA.

PROVIDE INLET PROTECTION AT SPILLBOX AND PIPES

AROUND THE FACILITY. REFER TO DETAIL F ON SHEET 10.

EARTHWORK NOTES INV.=27.18'

INV.=38.50

D

IK

E C

R O

SS

-S

EC

TI

O N

S

9 16

UP

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

SP

IL

LB

O

X D

ET

AI

L

SHEET NOTES

INSTALL 1 (ONE) 8FT SECTION ON 8FT CONCRETE BASE

AS SHOWN ON SHEET 13. SEE SHEETS 13 THRU 16 FOR ALL

SPILLBOX DETAILS.

SEE SHEET 12 FOR OUTLET PROTECTION DETAIL.

MINIMUM FILL OVER OUTLET PIPE AT SPILLBOX 2.0'.

CONTRACTOR SHALL FOLLOW EM 385-1-1 "SAFETY AND HEALTH

REQUIREMENTS" FOR EXCAVATION AND TRENCH SLOPES DURING

REMOVAL AND INSTALLATION OF OUTFALL PIPES.

DISCHARGE PIPING FOR THE NEW SPILLBOX SHALL BE INSTALLED

USING 24 INCH BITUMINOUS COATED CORRUGATED METAL PIPE (CMP),

SIMILAR OR EQUAL TO EXISTING CMP TO BE DEMOLISHED.

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

ER

O

SI

O N

A N

D S

ED

IM

EN

TA

TI

O

N C

O N

TR

O

L

PL

AN

UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND STRUCTURAL

EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE CONSTRUCTED

AND MAINTAINED ACCORDING TO MINIMUM STANDARDS AND

SPECIFICATIONS OF THE VIRGINIA EROSION AND SEDIMENT CONTROL

HANDBOOK (3RD EDITION, 1992).

THE CONTRACTOR SHALL APPLY PERMANENT OR TEMPORARY SOIL

STABILIZATION TO ALL DENUDED OR DISTURBED AREAS WITHIN 7 DAYS

AFTER FINAL GRADE IS REACHED ON ANY PORTION OF THE SITE. SOIL

STABILIZATION MUST ALSO BE APPLIED TO DENUDED OR DISTURBED

AREAS WHICH MAY NOT BE AT FINAL GRADE BUT WHICH WILL REMAIN

UNDISTURBED FOR LONGER THAN 14 DAYS. SOIL STABILIZATION MEASURES

INCLUDE VEGETATIVE ESTABLISHMENT, MULCHING AND THE EARLY

APPLICATION OF GRAVEL BASE MATERIAL ON AREAS TO BE PAVED.

THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL MEASURES

PERIODICALLY AND AFTER EACH RUNOFF PRODUCING RAINFALL EVENT.

ANY NECESSARY REPAIRS TO MAINTAIN THE EFFECTIVENESS OF THE

EROSION CONTROL DEVICES AND CLEANUP OF SEDIMENT ARE THE

RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE MADE IMMEDIATELY.

STOCK PILES OF SOIL AND OTHER ERODIBLE MATERIALS SHALL BE

STABILIZED OR PROTECTED WITH SEDIMENT TRAPPING MEASURES. THE

CONTRACTOR IS RESPONSIBLE FOR THE TEMPORARY PROTECTION AND

PERMANENT STABILIZATION STOCKPILES ON SITE AS WELL AS FOR

MATERIALS TRANSPORTED FROM THE PROJECT SITE.

EFFLUENT FROM DEWATERING OPERATIONS SHALL BE FILTERED OR

PASSED THROUGH AN APPROVED SEDIMENT TRAPPING DEVICE, OR BOTH,

AS REQUIRED BY THE CONTRACTING OFFICER’S REPRESENTATIVE AND

DISCHARGED IN A MANNER THAT DOES NOT ADVERSELY AFFECT

OFF-SITE PROPERTY OR STORM DRAINAGE SYSTEMS.

THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION AND MAINTENANCE

OF ANY ADDITIONAL CONTROL MEASURES NECESSARY TO PREVENT EROSION

AND SEDIMENTATION AS DETERMINED NECESSARY BY THE CONTRACTING

OFFICER’S REPRESENTATIVE.

TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES ARE NOT TO BE

REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION

IS COMPLETE, ALL MEASURES SHALL BE REMOVED WITHIN 30 DAYS.

TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED.

ALL DISTURBED AREAS SHALL DRAIN TO APPROVED SEDIMENT CONTROL

MEASURES AT ALL TIMES DURING LAND DISTURBING ACTIVITIES AND DURING

SITE DEVELOPMENT UNTIL FINAL STABILIZATION IS ACHIEVED.

ALL EROSION AND SEDIMENT CONTROL MEASURES INDICATED ON THIS PLAN

ARE THE MINIMUM REQUIRED. THE CONTRACTOR IS RESPONSIBLE FOR THE

INSTALLATION OF ANY ADDITIONAL EROSION CONTROL MEASURES NECESSARY

TO PREVENT EROSION AND SEDIMENTATION AS DETERMINED BY THE

CONTRACTING OFFICER’S REPRESENTATIVE.

ALL SEDIMENT BARRIERS AND OTHER MEASURES INTENDED TO TRAP

SEDIMENT SHALL BE CONSTRUCTED AS A FIRST STEP IN ANY

LAND-DISTURBING ACTIVITY, AND SHALL BE MADE FUNCTIONAL PRIOR TO

UPLAND LAND DISTURBANCE.

TEMPORARY CONSTRUCTION ENTRANCES SHALL BE MAINTAINED TO MINIMIZE

THE TRANSPORT OF SEDIMENT BY VEHICULAR TRACKING ONTO PAVED

SURFACES. WHERE SEDIMENT IS TRACKED ONTO PAVED SURFACES, THE

SEDIMENT SHALL BE REMOVED BY SHOVELING OR SWEEPING AND

TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA.

CONTRACTOR SHALL MONITOR AND TAKE PRECAUTIONS TO CONTROL DUST

INCLUDING (BUT NOT LIMITED TO) USE OF WATER, LIMITING THE NUMBER OF

VEHICLES ALLOWED ON SITE, MINIMIZING THE OPERATING SPEED OF ALL

VEHICLES, OR PROVIDING OTHER ACCEPTABLE CONTROL MEASURES.

PERMANENT VEGETATION SHALL NOT BE CONSIDERED ESTABLISHED UNTIL

A GROUND COVER IS ACHIEVED, THAT IN THE OPINION OF THE CONTRACTING

OFFICER, IS UNIFORM AND MATURE ENOUGH TO SURVIVE, AND WILL INHIBIT

EROSION.

GENERAL NOTES

REFER TO SPECIFICATION SECTION 31 00 00 FOR

EARTHWORK AND COMPACTION REQUIREMENTS.

NO DISTURBED TURF AREAS SHALL REMAIN BARE

SOIL FOR MORE THAN 14 DAYS.

INVERTS OF THE DRAINAGE PIPE RUNNING UNDER

THE LANDFILL ROAD SHALL BE MAINTAINED AND

INLET/OUTLET SHALL BE KEPT FREE FROM

SEDIMENT AND DEBRIS.

THE INFORMATION DEPICTED ON THIS MAP

REPRESENTS THE RESULTS OF SURVEYS MADE

ON THE DATE(S) INDICATED AND CAN ONLY

BE CONSIDERED AS INDICATING THE GENERAL

CONDITIONS EXISTING AT THAT TIME.

1.

2.

3.

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

NI

A

ER

O

SI

O N

A N

D S

ED

IM

EN

TA

TI

O

N C

O N

TR

O

L

PL

AN

D

ET

AI

LS

13 16

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

14 16

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

15 16

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

16 16

LA

ND

P

LA

CE

M

EN

T

SI

TE

R

ES

TO

RA

TI

O N

PR

O

JE

CT

O

YS

TE

R

CH

AN

NE

L P

LA

NS

F O

R

CO

NS

TR

UC

TI

O N

SU

RV

EY

O

F

FE

BR

UA

RY

3T H

4T H

NO

RT

HA

M

PT

O

N

CO

UN

TY

, V

IR

GI

1.3 Geotechnical Data

While it is believed that the borings depicted accurately indicate subsurface conditions for boring locations on the date taken, the Government assumes no responsibility for actual conditions which may be encountered in the execution of the contract. Should the Contractor rely, for any purpose, upon the accuracy or completeness of said borings, or log thereof, they do so at their own risk. The geotechnical data included in the plans and specifications are for information only.

PART 2 PRODUCTS (Not Used)

PART 3 EXECUTION (Not Used)

-- End of Section --

DOCUMENT 00 01 15 Page 3

Enclosure 1. Soil Boring Logs

This page intentionally left blank

0.3

13.0

Topsoil Tan, fine to medium POORLY GRADED

SAND WITH SILT (SP-SM)

Tan, fine to coarse CLAYEY SAND (SC)

0' to 2'

2' to 4'

4' to 6'

6' to 8'

8' to 10'

13' to 15'

Start drilling @14:15. 4-5" of topsoil.

Offset 6' east

Sand - 91%; Fines - 9%; LL, PL, PI -non-plastic; MC - 6.8%

Groundwater level during drilling @ 9.5'

Sampler fell 12 inches under weight of hammer Sand - 62%; Fines - 38%; LL - 31; PL -

19; PI - 12; MC - 12.4%

2-2-3-5 N=5

1-2-3-3 N=5

1-1-1-1 N=2

1-1-1-2 N=2

1-2-2-5 N=4

0-0-2-1 N=2

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

Matt Schulze 0.0

50.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-1

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/29/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-1

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest East Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/29/2018

DRILLING LOG 3

Hole No. B-1

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-1PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

ENG FORM

18.0

Tan, fine to coarse CLAYEY SAND (SC) (continued)

Gray, fine to coarse POORLY GRADED SAND (SP) with a trace of silt 18' to 20'

23' to 25'

28' to 30'

Gravel - 1%; Sand - 98%; Fines - 1%;

LL, PL, PI - non-plastic; MC - 16.9%

2-3-3-5 N=6

3-8-10-11 N=18

7-10-14-15 N=24

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

3 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-1

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-1

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-11836-AJUN 67

33.0

38.0

50.0

Gray, fine to coarse POORLY GRADED SAND (SP) with a trace of silt (continued)

At 33', light gray

Light grayish-orange, fine to coarse POORLY GRADED SAND (SP) with a trace of silt

33' to 35'

38' to 40'

43' to 45'

48' to 50'

Gravel - 2%; Sand - 96%; Fines - 2%;

LL, PL, PI - non-plastic; MC - 15.3%

BOH @ 50'. Stop drilling @ 16:00.

Water level 20.7' @16:05 on 3/29/18.

Water level 16.9' @ 07:50 on 3/30/18.

Pull augers. Cave in depth 17'

4-7-14-15 N=21

3-7-8-9 N=15

8-9-9-19 N=18

4-7-10-10 N=17

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

3 SHEETS

PROJECT 3INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-1

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-1

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-11836-AJUN 67

4.0

8.0

9.0

10.0

Topsoil Gray with brown mottled SILT (ML), moist, roots

Gray with brown mottling FAT CLAY (CH), moist, roots

Brown and tan, fine to medium CLAYEY SAND (SC), moist

Orangish-brown and tan SAND WITH SILT (SP-SM), moist

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5a, SS-5b

8' to 10'

3 inches topsoil

Sampler fell 12 inches under weight of hammer. Low recovery. Dredge tailings

Sand - 13%; Fines - 87%; LL - 55; PL -

25; PI - 30; MC - 33.8%

Sampler fell 12 inches under weight of hammer.

At 7.5', Dark gray

Sampler fell 6 inches under weight of hammer. Natural ground.

BOH @ 10'. Groundwater not encountered. Cave-in depth 7.5'

0-0-1-2 N=1

2-2-2-4 N=4

2-3-4-4 N=7

0-0-2-3 N=2

0-3-5-8 N=8

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

10.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-2

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

4/1/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-2

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

4/1/2018

DRILLING LOG 1

Hole No. B-2

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-2PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

4.0

6.0

8.3 8.5

10.0

Topsoil

Gray with brown mottling SILT (ML), dry, roots

Gray with reddish brown mottling FAT CLAY (CH), moist, roots

At 6', color change to dark gray with reddish-brown mottling

Orangish-brown, fine to medium CLAYEY SAND (SC), moist to wet Orangish-brown to yellowish-brown fine to moist SAND WITH SILT (SP-SM), moist to wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

4 inches topsoil Sampler fell 6 inches under weight of hammer. Dredge tailings

Sand - 8%; Fines - 92%; LL - 73; PL -

32; PI - 41; MC - 39.6%

Sampler fell 6 inches under weight of hammer

Sampler fell 6 inches under weight of hammer. Natural Ground

BOH 10'. Groundwater not encountered during drilling. Cave-in depth 7.5'

0-1-1-2 N=2

1-3-3-3 N=6

2-2-3-3 N=5

0-1-1-3 N=2

0-1-3-5 N=4

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

10.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-3

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

4/1/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-3

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

4/1/2018

DRILLING LOG 1

Hole No. B-3

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-3PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

7.0

8.0

10.0

Topsoil Gray-brown FAT CLAY (CH), trace fine sand, moist, roots

Orangish-brown, fine to medium CLAYEY SAND (SC), moist

Orangish-brown, fine to medium SILTY SAND (SM), moist

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

3 inches topsoil.

Sampler dropped 18 inches under weight of hammer. Dredge tailings Sand - 9%; Fines - 91%; LL - 66; PL -

31; PI - 35; MC - 33.5%

Sampler dropped 6 inches under weight of hammer

Natural ground

At 8.5', root

BOH @ 10'. Groundwater not encountered. Cave-in depth @ 7'.

0-0-0-2 N=0

1-1-1-2 N=2

2-2-2-2 N=4

0-2-3-4 N=5

1-2-4-5 N=6

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

10.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-4

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

4/1/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-4

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

4/1/2018

DRILLING LOG 1

Hole No. B-4

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-4PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

2.0

7.0

8.0

8.5

12.0

13.0 13.2

14.0

Topsoil Gray with brown mottling LEAN CLAY (CL), moist, roots

Gray with orangish-brown mottling LEAN CLAY WITH SAND (CL), moist, roots

Black and brown fine to medium CLAYEY SAND (SC), with roots and shell fragments

Gray, fine to medium SAND WITH SILT(SP-SM), with shell fragments Yellowish-brown, fine to medium CLAYEY SAND (SC), moist

Tan, fine to coarse SAND (SP), wet

Gray, fine to medium SILTY SAND (SM), wet Tan, fine to coarse SAND (SP), wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

SS-6

10' to 12'

SS-7

12' to 14'

3 inches topsoil

Sampler dropped 18 inches under weight of hammer. Dredge tailings

Sand - 18%; Fines - 82%; LL - 31; PL -

22; PI - 9; MC - 25.1%

At 2.5', Large root

Sampler dropped 6 inches under weight of hammer

At 7', Tree root

Gravel - 1%; Sand - 70%; Fines - 29%;

LL - 24; PL - 14; PI - 10; MC - 14.4%

At 9', roots

Sampler dropped 6 inches under weight of hammer

At 11', yellowish-brown to gray

At 11.66', gray, moist to wet

Groundwater level during drilling @ 12' Sampler dropped 6 inches under weight of hammer

0-0-0-1 N=0

3-4-5-6 N=9

2-2-2-2 N=4

0-2-2-2 N=4

2-2-3-2 N=5

0-1-2-4 N=3

0-2-2-2 N=4

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

16.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-5

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

4/1/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-5

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

4/1/2018

DRILLING LOG 2

Hole No. B-5

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-5PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

16.0

Yellowish-brown POORLY GRADED SAND (SP), wet

SS-8

14' to 16'

Sand - 98%; Fines - 2%; LL, PL, PI -non-plastic; MC - 22.7% Natural ground

BOH @ 16'. Water level 11.5' before auger removal ahnd 7.9' after auger removal. Cave-in depth @ 8.5'.

4-7-9-11 N=16

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-5

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-5

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-51836-AJUN 67

0.2

4.0

8.5 8.8

10.0

Topsoil Gray with brown mottling SILT (ML), moist, roots

Gray with brown mottling LEAN CLAY (CL), moist, roots

Gray with brown mottling SANDY ELASTIC SILT (MH), moist, roots

Orangish-brown and tan fine to medium CLAYEY SAND(SC), moist Orangish-brown, fine to coarse SILTY SAND (SM), moist

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

2 inches topsoil

Sampler dropped 18 inches under weight of hammer. Low recovery. Dredge tailings

At 2'-4', sand caved in on top of sampler

At 4'-6', sand caved in on top of sampler.

Sampler dropped 18 inches under weight of hammer

Sampler dropped 12 inches under weight of hammer Gravel - 2%; Sand - 38%; Fines - 60%;

LL - 60; PL - 38; PI - 22; MC - 31.3%

Natural ground

BOH @ 10'. Groundwater not encountered. Cave-in depth 7.5'

0-0-0-2 N=0

2-3-2-3 N=5

0-0-0-3 N=0

0-0-3-6 N=3

4-6-7-9 N=13

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

10.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-6

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

4/1/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-6

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

4/1/2018

DRILLING LOG 1

Hole No. B-6

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-6PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

0.5

3.5

4.0

5.5

8.0

13.0

Topsoil

Orangish-brown, fine SILTY SAND (SM), moist, roots to 2'

At 0.5', fine to medium sand

Orangish-brown to tan, fine to medium SAND WITH SILT (SP-SM), moist Tan, fine to medium SILTY SAND (SM), moist

Orangish-brown and tan, fine to medium SILTY SAND (SM), moist

At 8', fine to coarse sand, moist to wet

Tan, fine to medium POORLY GRADED SAND (SP), wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

SS-6

13' to 15'

4 inches topsoil

Sand - 72%; Fines - 28%; LL, PL, PI -non-plastic; MC - 9.6%

At 6', some clay

Root @ 7.5'

Sand - 85%; Fines - 15%; LL, PL, PI -non-plastic; MC - 12.9%

At 9.5', clay lens

Groundwater during drilling @ 13' Sand - 99%; Fines - 1%; LL, PL, PI -non-plastic; MC - 21.0%

1-1-1-6 N=2

2-4-4-8 N=8

3-3-3-4 N=6

3-3-3-3 N=6

2-2-2-3 N=4

3-4-4-5 N=8

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

50.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-7

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/30/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-7

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest West Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/31/2018

DRILLING LOG 3

Hole No. B-7

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-7PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

23.0

Tan, fine to medium POORLY GRADED SAND (SP), wet (continued)

At 18', fine to coarse sand

At 23' fine to medium sand

SS-7

18' to 20'

SS-8

23' to 25'

SS-9

28' to 30'

3-7-9-12 N=16

6-9-12-14 N=21

5-8-9-14 N=17

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

3 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-7

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-7

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-71836-AJUN 67

48.0

50.0

At 23' fine to medium sand (continued)

Tan and orangish-brown, fine to coarse SAND WITH SILT (SP-SM), wet

Tan and orangish-brown, fine to medium POORLY GRADED SAND (SP), wet

At 48', color change to tan

SS-10

33' to 35'

SS-11

38' to 40'

SS-12

43' to 45'

SS-13

48' to 50'

Sampler dropped 6" under weight of hammer

Clay seam at 34.5'

Gravel - 1%; Sand - 97%; Fines - 2%;

LL, PL, PI - non-plastic; MC - 17.7%

BOH@ 50'. Water level 18.95' @ 10:21 on 3/31 before auger removal. Water level 12.9' after auger removal. Cave-in depth 13.5'

0-2-4-7 N=6

8-10-12-11 N=22

10-11-12-17 N=23

2-8-13-16 N=21

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

3 SHEETS

PROJECT 3INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-7

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-7

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-71836-AJUN 67

0.2

3.5

5.5

7.5

8.0

10.0

Topsoil Gray with brown mottling, SANDY SILTY CLAY (CL-ML), moist, sporadic roots, fine sand

Gray and brown, fine SILTY SAND (SM), moist, roots

Gray with reddish-brown mottling SANDY LEAN CLAY (CL), moist, roots

Orangish-brown, fine to medium CLAYEY SAND (SC), moist Orangish-brown, fine to medium SAND WITH SILT (SP-SM), moist, lower 2 inches wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

2 inches topsoil

Sampler dropped 18 inches under weight of hammer. Dredge tailings

Sand - 42%; Fines - 58%; LL - 26; PL -

19; PI - 7; MC - 24.9%

Sampler dropped 12 inches under weight of hammer

Sampler dropped 6 inches under weight of hammer Sand - 41%; Fines - 59%; LL - 32; PL -

17; PI - 15; MC - 18.2%

Natural ground

BOH @ 10'. Groundwater not encountered. Cave-in depth 6.5'.

0-0-0-1 N=0

1-2-3-4 N=5

0-0-2-3 N=2

0-1-2-5 N=3

2-2-3-4 N=5

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

10.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-9

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/31/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-9

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/31/2018

DRILLING LOG 1

Hole No. B-9

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-9PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

3.8 4.0

5.0

8.0

8.5

13.0

Dark Gray CLAY

Dark Gray fine to medium SAND (SP) with a trace of silt

Orangish-brown and tan, fine to medium CLAYEY SAND (SC), moist

Gray LEAN CLAY (CL), moist Brown and tan, fine to medium CLAYEY SAND (SC), moist

Gray with brown mottling ELASTIC SILT WITH SAND (MH), moist, fine sand

At 8', no sand

Orangish-brown and tan, fine to moist SILTY SAND (SM), moist

Orangish-brown and tan, fine to medium POORLY GRADED SAND (SP), moist to wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5a, SS-5b

8' to 10'

SS-6

13' to 15'

Start drilling @ 14:00

Sand - 23%; Fines - 77%; LL - 58; PL -

33; PI - 25; MC - 25.3%

Sample SS-5a from 8'-8.5', Sample SS-5b from 8.5'-10'

Gravel - 1%; Sand - 98%; Fines - 1%;

LL, PL, PI - non-plastic; MC - 20.1%

2-2-2-3 N=4

1-1-1-2 N=2

1-2-2-3 N=4

2-2-4-4 N=6

1-4-7-8 N=11

2-3-4-4 N=7

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

12.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-10

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/31/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-10

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Interior Fill

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

0.0

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/31/2018

DRILLING LOG 2

Hole No. B-10

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-10PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

25.0

Orangish-brown and tan, fine to medium POORLY GRADED SAND (SP), moist to wet (continued)

At 18', wet

Tan, fine to moist POORLY GRADED SAND (SP), wet

SS-7

18' to 20'

SS-8

23' to 25'

Groundwater level during drilling @ 15'

BOH @ 25'. Water level 17.78' before auger removal. Water level 13.6' after auger removal. Cave-in depth 13.6'.

4-3-5-8 N=8

8-9-12-12 N=21

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-10

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-10

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-101836-AJUN 67

2.1

3.6

6.0

7.8

10.0

11.5

12.0

Topsoil Gray with brown mottling LEAN CLAY (CL), moist, roots in entire sample, one large root in shoe

Orangish-brown, fine to medium SAND WITH SILT (SM-SP), moist to wet Gray and brown CLAYEY SAND (SC), moist, roots

Gray and brown, fine to medium SILTY SAND (SM), moist, roots

Gray with reddish-brown mottling LEAN CLAY (CL) with some fine sand, moist, roots

Orangish-brown, fine to medium CLAYEY SAND (SC), moist

Orangish-brown, fine to medium SAND WITH SILT (SP-SM), wet

Orangish-brown, fine to medium SILTY SAND (SM), moist

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

SS-6

10' to 12'

3 inches topsoil

Sampler dropped 18 inches under weight of hammer. Dredge tailings

Sand - 58%; Fines - 42%; LL - 55; PL -

28; PI - 27; MC - 20.6%

Sand - 53%; Fines - 47%; LL, PL, PI -non-plastic; MC - 22.1%

At 8', roots

Natural ground

BOH @ 12'. Groundwater not recorded before or after auger removal. Pull augers. Cave-in depth 9'.

0-0-0-1 N=0

3-2-2-2 N=4

2-2-2-2 N=4

2-6-8-9 N=14

2-2-2-4 N=4

2-2-2-3 N=4

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

25.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-11

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/30/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-11

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest South Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/30/2018

DRILLING LOG 1

Hole No. B-11

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-11PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

1.0

13.0

Fine to medium SAND WITH SILT (SP-SM)

Orange-tan, fine to medium SILTY CLAYEY

SAND (SC-SM)

Orange-tan POORLY GRADED SAND WITH

SILT (SP-SM),

0' to 2'

2' to 4'

4' to 6'

6' to 8'

8' to 10'

13' to 15'

Start drilling @9:05am

Sand - 80%; Fines - 20%; LL - 21; PL -

14; PI - 7; MC - 8.3%

Gravel - 1%; Sand - 88%; Fines - 11%;

LL, PL, PI - non-plastic; MC - 10.2%

1-1-3-3 N=4

5-5-4-4 N=9

2-2-2-3 N=4

3-9-4-4 N=13

2-2-2-2 N=4

2-2-3-3 N=5

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

Matt Schulze 0.0

50.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-12

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/30/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-12

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest South Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

0.0

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/30/2018

DRILLING LOG 3

Hole No. B-12

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-12PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

Orange-tan POORLY GRADED SAND WITH SILT (SP-SM), (continued)

Orange-tan, fine to medium POORLY GRADED SAND (SP) with a trace of silt

Tan/gray, fine to medium SAND with a trace of silt

18' to 20'

23' to 25'

28' to 30'

At 18', spoon wet

Gravel - 1%; Sand - 96%; Fines - 3%;

LL, PL, PI - non-plastic; MC - 20.7%

3-4-6-9 N=10

3-5-9-6 N=14

9-12-12-16 N=24

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

3 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-12

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-12

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-121836-AJUN 67

33.3

43.0

50.0

Tan/gray, fine to medium SAND with a trace of silt (continued)

Tan/gray, fine to course SAND with a litte fine gravel

Tan/gray, fine to coarse POORLY GRADED

SAND WITH SILT (SP-SM)

Tan/gray, fine to coarse SAND with a little fine gravel

33' to 35'

38' to 40'

43' to 45'

48' to 50'

Rain @ 11:00

Sand - 95%; Fines - 5%; LL, PL, PI -non-plastic; MC - 19.6%

BOH @ 50'. Groundwater level 22.9' before auger removal, 15.9' after auger removal. Cave-in depth 15'.

6-9-12-15 N=21

6-8-10-12 N=18

10-9-12-16 N=21

6-8-8-10 N=16

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

3 SHEETS

PROJECT 3INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-12

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-12

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-121836-AJUN 67

5.8

8.0

13.0

Clayey topsoil with roots

Brown, fine to medium CLAYEY SAND (SC), moist, some shell fragments

Gray/brown LEAN CLAY WITH SAND (CL), moist, shell fragments

Gray/brown FAT CLAY WITH SAND (CH), moist, shell fragments

Orangish-brown to yellowish-brown, fine to medium CLAYEY SAND (SC), moist to wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

SS-6

13' to 15'

6 inches topsoil Gravel - 13%; Sand - 46%; Fines -

41%; LL - 26; PL - 17; PI - 9; MC -

17.7%

Sampler dropped 12 inches under weight of hammer. Low recovery

Sampler dropped 12 inches under weight of hammer. Low recovery

Sampler dropped 6 inches under weight of hammer.

Gravel - 2%; Sand - 15%; Fines - 83%;

LL - 57; PL - 27; PI - 30; MC - 34.2%

Sand - 58%; Fines - 52%; LL - 29; PL -

17; PI - 12; MC - 12.1%

2-2-3-3 N=5

1-1-1-1 N=2

0-0-1-2 N=1

0-0-1-2 N=1

0-1-2-3 N=3

1-2-2-2 N=4

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

25.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-14

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/31/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-14

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest Spur Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

0.0

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/31/2018

DRILLING LOG 2

Hole No. B-14

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-14PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

25.0

Orangish-brown to yellowish-brown, fine to medium CLAYEY SAND (SC), moist to wet (continued)

Orangish-brown, fine to medium SAND WITH SILT (SP-SM), wet

Tan, fine to medium POORLY GRADED SAND (SP), wet

SS-7

18' to 20'

SS-8

23' to 25'

At 14.75 feet, black organics

Groundwater level during drilling at 18 feet

Sand - 97%; Fines - 3%; LL, PL, PI -non-plastic; MC - 21%

BOH@ 25'. Water level 20.8' before auger removal. Water level 14.35' after auger removal. Cave-in depth 15.4'.

1-2-6-7 N=8

3-5-8-10 N=13

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-14

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-14

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-141836-AJUN 67

4.0

6.0

8.0

13.0

Topsoil

Orangish-brown to reddish-brown, fine to medium SILTY SAND (SM), moist

At 2', orangish-brown to yellowish-brown

Orangish-brown to yellowish-brown, fine to medium CLAYEY SAND (SC), moist

Orangish-brown to yellowish brown, fine to medium SILTY SAND (SM), moist, some clay

At 8', moist to wet

Orangish-brown to yellowish-brown, fine to medium POORLY GRADED SAND (SP), wet

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

SS-6

13' to 15'

4 inches topsoil

Roots and grass to 8 inches

Gravel - 1%; Sand - 80%; Fines - 19%;

LL - 15; PL - 14; PI - 1; MC - 8.5%

Groundwater level during drilling @ 9.66'

Gravel - 1%; Sand - 95%; Fines - 4%;

LL, PL, PI - non-plastic; MC - 19.1%

1-3-2-4 N=5

1-4-5-5 N=9

2-2-4-5 N=6

3-5-6-5 N=11

1-2-2-3 N=4

1-3-4-4 N=7

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

55.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-16

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/25/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-16

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest North Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/25/2018

DRILLING LOG 4

Hole No. B-16

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-16PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

14.5

23.0

28.0

Tan, fine to medium POORLY GRADED SAND (SP), wet

At 18', tan and grayish brown

At 23', tan, mostly fine sand with a trace of medium sand

Tan, fine POORLY GRADED SAND WITH SILT (SP-SM), wet

SS-7

18' to 20'

SS-8

23' to 25'

SS-9

28' to 30'

Sand - 98%; Fines - 2%; LL, PL, PI -non-plastic; MC - 20.9%

Sand - 92%; Fines - 8%; LL, PL, PI -non-plastic; MC - 27.3%

2-3-6-8 N=9

6-7-8-13 N=15

9-10-11-14 N=21

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

4 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-16

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-16

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-161836-AJUN 67

34.5

38.0

41.5

44.5

48.0

Tan, fine POORLY GRADED SAND WITH SILT (SP-SM), wet (continued)

Orangish-brown and tan fine POORLY GRADED SAND (SP), wet

At 34.5', fine to medium sand

At 38', fine sand

At 43', tan, fine to coarse sand

At 44.5', tan and orangish-brown, fine to medium sand

At 48', fine to coarse sand

SS-10

33' to 35'

SS-11

38' to 40'

SS-12

43' to 45'

SS-13

48' to 50'

5-8-8-10 N=16

2-10-12-14 N=22

6-8-9-9 N=17

8-20-16-16 N=36

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

4 SHEETS

PROJECT 3INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-16

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-16

/3 /2

PROJECT HOLE NO.

53.0

54.8 55.0

At 48', fine to coarse sand (continued)

At 53', fine to medium sand

At 54.8', black and gray, fine sand

SS-14

53' to 55'

Chain in gear box broke. Boring terminated @ 55'. Water level 13.95 on 3/27/18 at 15:05.

11-10-13-17 N=23

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

4 SHEETS

PROJECT 4INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-16

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-16

/3 /2

PROJECT HOLE NO.

0.1

4.0

8.0

13.0

Topsoil Orangish-brown to yellowish-brown, fine to medium SILTY SAND (SM), moist, grass and roots to 2"

Orangish-brown to yellowish-brown, fine to coarse POOLY GRADED SAND WITH SILT (SP-SM), moist

At 4', fine to medium sand

Yellowish-brown and tan, fine to medium

POORLY GRADED SAND WITH SILT

(SP-SM), wet

At 13', tan, fine to coarse sand

SS-1

0' to 2'

SS-2

2' to 4'

SS-3

4' to 6'

SS-4

6' to 8'

SS-5

8' to 10'

SS-6

13' to 15'

1 inch topsoil

Gravel - 1%; Sand - 88%; Fines - 11%;

LL, PL, PI - non-plastic; MC - 6.7%

Groundwater level during drilling @ 8'

Gravel - 1%; Sand - 94%; Fines - 5%;

LL, PL, PI - non-plastic; MC - 21.8%

Sampler dropped 6 inches under weight of hammer

2-2-2-3 N=4

3-5-5-6 N=10

2-4-5-4 N=9

2-2-3-5 N=5

1-4-3-4 N=7

0-2-3-4 N=5

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

2 in SS

NAD

INSTALLATION SHEET

John Asken

J. Spitz 0.0

65.0

7. THICKNESS OF OVERBURDEN

8. DEPTH DRILLED INTO ROCK

9. TOTAL DEPTH OF HOLE

17. ELEVATION TOP OF HOLE

15. ELEVATION GROUND WATER

SHEETS

STARTED COMPLETED

Hole No. B-18

11. DATUM FOR ELEVATION SHOWN (TBM or MSL)

DISTURBED

1. PROJECT

NOS MLLW, 1983-2001

Savannah District UNDISTURBED13. TOTAL NO. OF OVERBURDEN

SAMPLES TAKEN

18. TOTAL CORE RECOVERY FOR BORING

3. DRILLING AGENCY

5. NAME OF DRILLER

6. DIRECTION OF HOLE

%0

DEG. FROM VERT.

4. HOLE NO. (As shown on drawing title and file number)

14. TOTAL NUMBER CORE BOXES

16. DATE HOLE

DIVISION

3/24/2018---

12. MANUFACTURER'S DESIGNATION OF DRILL

OF

B-18

10. SIZE AND TYPE OF BIT

Cheriton, Virginia Crest North Dike

2. LOCATION (Coordinates or Station)

19. GEOLOGIST

CME-550

VERTICAL INCLINED

Oyster Channel Dredge Disposal

3/24/2018

DRILLING LOG 4

Hole No. B-18

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-18PREVIOUS EDITIONS ARE OBSOLETE.1836MAR 71

28.0

At 13', tan, fine to coarse sand (continued)

Tan, fine to medium POORLY GRADED SAND (SP), wet

At 23', fine sand

At 28' fine to medium sand

SS-7

18' to 20'

SS-8

23' to 25'

SS-9

28' to 30'

Sand - 98%; Fines - 2%; LL, PL, PI -non-plastic; MC - 26.4%

3-6-8-10 N=14

5-10-12-14 N=22

1-5-9-13 N=14

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

4 SHEETS

PROJECT 2INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-18

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-18

/3 /2

PROJECT HOLE NO.

Oyster Channel Dredge Disposal B-181836-AJUN 67

34.7

38.0

44.0

At 28' fine to medium sand (continued)

At 33', trace clay

At 34.66, color change to tan and orangish-brown

Orangish-brown to yellowish-brown, fine to medium POORLY GRADED SAND WITH SILT (SP-SM), wet

Tan and orangish-brown, fine to coarse POORLY GRADED SAND (SP), wet

SS-10

33' to 35'

SS-11

38' to 40'

SS-12

43' to 45'

SS-13

48' to 50'

Low recovery

7-4-6-8 N=10

10-11-11-12 N=22

13-12-7-11 N=19

0-2-7-9 N=9

REMARKS

(Drilling time, water loss, depth weathering, etc., if significant)

LEGEND

CLASSIFICATION OF MATERIALS

(Description)

ELEVATION DEPTH

a fc eb gd

SAMPLE

DEPTH

(feet)

SAMPLE

BLOWS

4 SHEETS

PROJECT 3INSTALLATION

DRILLING LOG (Cont Sheet)

ELEVATION TOP OF HOLE

Hole No. B-18

Oyster Channel Dredge Disposal

SHEET

OF

Hole No. B-18

/3 /2

PROJECT HOLE NO.

54.6

59.5

63.0

65.0

Tan and orangish-brown, fine to coarse POORLY GRADED SAND (SP), wet (continued)

Black and gray, fine SILTY SAND (SM), wet

Black and gray, fine CLAYEY SAND (SC), wet

Black and gray, fine, SILTY SAND (SM), wet, some shell fragments

SS-14

53' to 55'

SS-15

58' to…