Q&A Responses
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amend_0002_IMG_0194.JPG | JPG image | |
| Amend_0002_Q&A_2_Response_docx.pdf | ||
| Amend_1_Atlanta_MEPS_Graphics_BID_SCHEDULE_as_of_7.2.18.pdf | ||
| FBO_BINDED_FLOOR_PLAN,_TECH_SPECS,_AND_PHOTOS.pdf | ||
| FBO_Atlanta_MEPS_Graphics_Bid_Schedule_as_of_6.26.18.pdf | ||
| FBO_Atlanta_Graphics_SOW_and_RFQ_as_of_8.16.2018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q1. Can you supply the bid schedule in excel format:
A1. Yes
Q2. Bid schedule does not contain the following cells which are on previous MEP RFQ
1.Product Sub Total______
2.Site Visit ______
3.Graphic Design _______
4.Shipping / Delivery ________
5.Installation ___________
6. Grand Total ____________ A2. The excel version does.
Q3. Line EX1…is listed on Bid Schedule but NOT listed on Technical Spec Sheet A3. EX1 is not required for this project.
Q4. . Line V5…is listed on Technical Spec Sheet but NOT listed on Bid Schedule.
A4. It is included in the excel sheet
Q5. Line EX1…Exterior signs…please confirm this is to be included in quote.
A5. EX1 is not required for this project.
Q6. Line V5…Vinyl window film…please confirm quantities and if this is to be included in the quote.
A6. This quantity is included in the excel spreadsheet for the bid schedule.
Q7. Does the Combined Synopsis/Solicitation posted as solicitation number W9123618Q0025 on FBO contain requirements similar to a existing contract or will this be a new requirement?
A7. New requirement