Amend_0002_Q&A_2_Response_docx.pdf

PDF 48 KB Posted

Attached to
Atlanta MEPS Graphics Procure and Install Federal contract opportunity
Solicitation number
W9123618Q0025
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Q&A Response

View the file

Other files for this federal contract opportunity

Other files attached to Atlanta MEPS Graphics Procure and Install, newest first.
File Type Posted
Amend_0002_IMG_0194.JPG JPG image
Amend_1_Atlanta_MEPS_Graphics_BID_SCHEDULE_as_of_7.2.18.pdf PDF
Amend_1_Q_&_A_Responses_Atlanta_MEPS_Graphics.pdf PDF
FBO_BINDED_FLOOR_PLAN,_TECH_SPECS,_AND_PHOTOS.pdf PDF
FBO_Atlanta_MEPS_Graphics_Bid_Schedule_as_of_6.26.18.pdf PDF
FBO_Atlanta_Graphics_SOW_and_RFQ_as_of_8.16.2018.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1. WC7 - WALLCOVERING 48" X 9'0" - WRAP A 30" WIDE COLUMN AND CONTINUE ON BOTH SIDES TO HE EDGE OF THE WINDOW FRAMES - Provide and install a custom designed, digital printed wall covering (approximately 34'0" x 9'0"); Theme shall be "FREEDOM IS NOT FREE"; Wall covering shall completely cover wall from corner to corner. Wall covering shall run from top of wall base to ceiling grid. Walls shall be prepped and primed to accept wall covering. Final wall graphic shall be protected with a sealed coating applied over the wall covering. Coating shall be a water based polyurethane applied in two coats using a back rolling method with a mohair roller or a comparable product which will prevent from excessive abuse or equal. - 3 A1. See photo of applicant dining with columns that are to be wrapped in wall covering. The front of the column is approximately 30" wide and 9'0 high. The additional 12" ( to equal the 48" is allowed to wrap the column to the window frame. The measurement of "approximately 34'0" x 9'0" is incorrect above. There are a total of three columns located in two locations which will receive this treatment (Applicant Dining X2;Briefing Room X1)

Q2. Is line M3 a duplicate of line L4? Please clarify the difference.

A2. These are two different items.

Q3. Are the lines under M3 items to be estimated or part of M3 or L4?

A3. Item M3 is made of three line items - A. The Lettering for chain of command, B. 14 Framed photos, and C. 14 plaques- one to be installed under each frame.

Q4. Can the response due date be extended in lieu of receiving the recent addendums on 9/4 and the response to the above the question clarifications A4. Extension to be granted by Contracting Specialist, Garland Cooper.

File details come from the government source that posted it.