UNCLASSIFIED\\FOR OFFICIAL USE ONLY
Bid Inquiry Report Closed Inquiries
Project: Ft. Lee - Training Support Facility Review: W91236-17-R-0002 (00001) (sorted by CommentID ) Displaying 130 inquiries.
Id Discipline Sheet Detail Spec
6713843 Structural Solicitation Section 00 22 11 - 6.2.2.2.1, b
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference is made to section 00 22 11 - 6.2.2.2.1, b of the Solicitation. A review of the design documents does not reflect concrete pile foundation elements in this project and would therefore require a revision to type / scope definition.
1-0
1-1 Government Response. Section 00 22 11, Paragraph 6.2.2.2.1.b will be amended to read as follows:
Constructed with structural steel framing, masonry exterior walls, and masonry and gypsum interior walls;
AND
An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6713845 General Solicitation Section 00 22 11 - 6.2.2.2.1, c
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference is made to section 00 22 11 - 6.2.2.2.1, c of the Solicitation. Please confirm that "meets" LEED Silver Certification means that the project was designed to meet LEED Silver or greater and the GC submitted all required paperwork to support the LEED certification should the Owner elect to obtain the certification.
1-0
1-1 Government Response. The word "meets" in the specific sub section regarding LEED Silver certification is correct as it applies to the Training Support Facility project and pertinent paperwork required by the GC.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6713858 General Section 00 11 00 - Solicitation, Offer & Award
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Clin Item 00001 - Construction Ft Lee Training Center FFP cost breakdown references "exclusive of item 0002 thru 0007". There isn't a Clin Item 0007 in this section. Please identify what Clin 0007 is to include.
1-0
Page 1 of 36ProjNet: Logged In User
11/22/2016https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicAdminClosed...
1-1 Government Response. Please disregard all references to CLIN 0007. It is no longer applicable under this contract.
An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6714466 Structural Solicitation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the solicitation description it says, "Special foundations will be required." Also, under the Tab B - Factor 1 Evaluation Criteria, Type/Scope item 6.2.2.2.1.b. it says, "Constructed with a concrete pile foundation." However, the structural drawings show a spread footing foundation and there is not a specification for any type of deep foundation.
Please verify if concrete pile foundations are required. If so, please provide specifications and revised drawings indicating so. If not, please revise section 6.2.2.2.1.b to reflect the foundation system present on this project.
1-0
1-1 Government Response. Section 00 22 11, Paragraph 6.2.2.2.1.b will be amended to read as follows:
Constructed with structural steel framing, masonry exterior walls, and masonry and gypsum interior walls;
AND
An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6714467 Site 31 00 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
In the Earthwork specification section 31 00 00, 1.1, d. - it says, "The site specific geotechnical report including the soil borings is included as an appendix to the project specifications." We cannot locate this appendix. Please provide the geotechnical report appendix.
1-0
2-0
2-1 Government Response. Please see attached Geotechnical report for the TSF project. Revised: April 2016.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6714470 Contracting Solicitation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The solicitation is currently due on Monday, November 28th. This is the Monday after a Federal holiday weekend. It will be very disadvantageous to the Government to keep the due date on the first day back from an extended holiday weekend, as most subcontractors and vendors will not be prepared to submit an offer (or their strongest offer) under
Page 2 of 36ProjNet: Logged In User these circumstances. Please consider moving the due date to later in the week to allow the bidding community time to prepare the best offer for this project (i.e. the 30th or December 1st).
1-0
1-1 Government Response. Submission date has been change to Monday, 05 Dec 2016.
See Amendment 0002 dated 16 Nov 2016
Current Request Status: Request Closed Information for this report is procurement sensitive.
6714488 General Section 01 35 26.00 50 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference is made to spec,. 01 35 26.00 50 – 1.5.1.2 – please confirm that a CIH is not required for the demolition work contemplated for this project.
1-0
1-1 Government Response. A Certified Industrial Hygienist will not be required during demolition activities for this project.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6714963 Structural SB103 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing SB103 appears to be missing 4 spread footings along column line C.8. There also appears to be one missing at column line C and 15 that is not shown or labeled. If they are required, please provide a revised drawing showing the footings.
1-0
1-1 Government Response. This appears to be a printing error with the graphics. This issue will be corrected and a revised Contract Document sheet submitted.
Footing C.8-19 is the F6 & P6 designation shown on plan.
Footing C.8-18 is the F6 & P5 designation shown on plan.
Footing C.8-16 is the F6 & P5 designation shown on plan.
Combined Footing C.7/C.8-15 is the F6 & P4 designation shown on plan.
Page 3 of 36ProjNet: Logged In User
Combined Footing D-14/D.1-15 is the F11 & P3 designation shown on plan.
An amendment will be forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6717194 Structural SB102 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing SB102 shows a continuous footing along CL 15, but there are 4 columns along this line at F, E.2, D.8 and D.5 line. 3 columns are labeled to have footings, but the footing isn't shown. Please provide a revised drawing showing the spread footings and also please provide the footing type at column line D.8 and 15.
1-0
1-1 Government Response. This appears to be a printing error with the graphics. This issue will be corrected and a revised Contract Document sheet submitted.
Footing D.5-15 is the F7 & P2 designation shown on plan.
Footing D.8-15 is the F8 & P2 designation.
Footing E.2-15 is the F8 & P2 designation shown on plan.
Footing F-15 is the F7 & P1 designation shown on plan.
Combined Footing D-14/D.1-15 is the F11 & P3 designation shown on plan.
An amendment will be forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6717196 Structural SB103 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing SB103 has two details called out for thickened slabs (5/SB208) west of CL 16 between B and C.5, but there are no lines shown for locations of walls. Please provide.
1-0
1-1 Government Response. This appears to be a printing error with the graphics. This issue will be corrected and a revised Contract Document sheet submitted. See the corresponding architectural plan sheet for the extents of the cmu wall supported by thickened slab.
An amendment will be forthcoming.
Page 4 of 36ProjNet: Logged In User
Current Request Status: Request Closed Information for this report is procurement sensitive.
6717201 Structural SB103 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is a recessed slab needed on SB103 in the area of CL C to B, between CL 17 and CL 15? There are dashed lines shown, but no hatching or depths are given. Please clarify.
1-0
1-1 Government Response. There is no depressed slab at the location in question. This appears to be a stray element that appeared during printing. The referenced dashed lines will be removed from the Contract Documents at the next printing.
An amendment will be forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6720880 Security 00 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide specifications for the electronic security in regards to Bid Item No. 0006 (Building Security) as described in Specification Section 00 11 00.
1-0
1-1 Government Response. Please refer to security plans. Design were for a conduit only system No specs for security were provided.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6720883 Architectural AE301 and AE601 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Partition types 11 and 11A show the CMU going just above Ceiling, but the partitions go to underside of structure per detail A on AE301. Please verify the CMU is to go to underside of deck.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6720887 Architectural AE201-AE211 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Notes say "For Signage See AF606" for more details on the signage. AF606 does not exist (the drawings stop at page AF604). Please providepage AF606 or details on the signage.
1-0
Page 5 of 36ProjNet: Logged In User
1-1 Government Response. An amendment is forthcoming.
Information for this report is procurement sensitive.
6720888 Architectural 08 41 13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
This projected does not appear to be located within a wind-borne debris region and hurricane impact protection does not appear in spec sections 081116, 084400, or 088100. Can ASTM E1886 be deleted from spec section 084113?
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6720890 Architectural 08 44 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Spec sections 081116 & 084113 call for an anodized finish to match color schedule; section 084400 calls for medium bronze anodized, and the exterior color schedule sheet AE608 calls for gloss finish to match "Status Bronze," which would seem to be a painted finish. Please clarify the aluminum frame finish?
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6720891 Architectural AE205 08 44 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Elevation 1 on drawing AE205 calls our for a W2 window system, but it appears to be a W1. Please verify which window type these are to be.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6720892 Architectural AE603 08 70 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On drawing AE603, the door schedule does not call out a hardware set for door number 015. Please verify the door hardware set to be used on door number 015.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
Page 6 of 36ProjNet: Logged In User
6721839 Architectural A-0004 Legend Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Legend indicates AED Automated External Defibrillator, of which are shown on the Fire Resistive Diagram drawings.
Are these to be furnished and installed by the Contractor, and if so is there a specification for these?
1-0
2-0
2-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721840 Architectural AE603 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Door Schedule: Shouldn't doors marked #1006A and 107A located in CMU walls have H6 & J6 head and jamb details?
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721842 ATM AE603
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Door Schedule: Door marked #106A is indicated as 1 hour rated, but is shown with 2' x 2' louver. Louver can not be rated 1 hour. Is the door to be non-rated or should we not include the louver?
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721844 Architectural AE603 08 71 000 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Door hardware Sets #015 & 932 do not appear on the Door Schedule. Are they not used on the project?
1-0
2-0
2-1 Government Response. No, they are not used on the project. Bid as shown.
Current Request Status: Request Closed
Page 7 of 36ProjNet: Logged In User
6721847 Architectural AO603 & AO605 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Door Schedule: Doors marked #010E & F show as elevation 6 would indicate a overall height of 9'-1"; window type W10 on A)605, detail W10 shows a height of 8'-10". Which is correct?
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721848 Architectural AO208 & AO607 1/AE208 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Elevation 1/AE208 indicates louver L-15 that is not shown on the louver schedule drawing AE607. Please add to the louver schedule.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721850 Architectural AE204 1/AE204 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Elevation 1/AE204 shows louver type L-4, but is shown as L-20 on HVAC drawing MH109. Please make correction.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721852 Architectural AO208 1/AO208 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Elevation EO208 indicates louver L-5 but MH109 shows at as L-20. Please make correction.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721854 Architectural AO603 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 8 of 36ProjNet: Logged In User
Door Schedule: Elevation type 7 door frame for custom access panel not found on the Architectural drawings. Where are these required?
1-0
1-1 Government Response. See AE510. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721856 Architectural AE403, 404 & 405 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SNTD Sanitary Napkin & Tampon Disposer not show on Toilet Room floor plans. Please indicate location to verify quantity required.
1-0
2-0
2-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721859 ATM AE404 & 405 5/E405
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
SMHD Heavy Duty Metal Shelving for Janitor's Closet is not shown on plans. Pleas indicate location to verify quantity.
1-0
2-0
2-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721866 Architectural AE103 & AE605 W8/AE605 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The two (2) Aluminum framed Window Type WE with low-E insulated safety glass is located in a 1 hour rated wall. In order for these windows to be 1 hour fire rated, they would to be fire rated aluminum frames with fire lite glass.
Please provide redesign for 1 hour rated aluminum widow opening.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
Page 9 of 36ProjNet: Logged In User
6721868 Architectural IN104, 105 & 106 10 56 26
Are all Mobile Storage Shelving Units, fixed and mobile, to be included in the Clin 0006 options? Or just the mobile units with the fixed units included in Clin 0001?
1-0
1-1 Government Response. See drawing notes. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721870 Civil CS101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference is made to Civil Site plan CS101, there are three (3) locations around the building perimeter annotated with diagonal lines that do not appear to be tied to a note or a legend symbol for the diagonal line designation.
Please provide clarification for these three (3) areas. We were able to determine that the herringbone pattern areas on this same plan should have note 28 applied that is missing as well.
1-0
1-1 Government Response. The hatch pattern for gravel as shown on C001 is incorrect and should be diagonal as it appears on CS101 in the three locations in question. Note #28 applies to all herringbone pattern locations on CS101.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721873 Architectural AE130 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Reference is made to architectural drawing AE130, please clarify whether ceilings along column line "C" are GWB type X or exposed to structure as both are indicated I same room in numerous cases. We presume finish schedule governs ?
1-0
1-1 Government Response. See detail 5 on AE506 and detail 3 on AE505. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6721908 Other RFP - FAR 52.236-27 N/A Site Visit Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
FAR 52.236-27 Site Visit lists the site visit as Thursday 9 November 2016 at 10:00 a.m. November the 9th is a Wednesday. Will the site visit be held on Wednesday 9 November 2016 or Thursday 10 November, 2016?
1-0
Page 10 of 36ProjNet: Logged In User
1-1 Government Response. Site Visit will be on Wednesday, 09 Nov 2016 at 10:00 a.m.(EST). Please see Amendment 0001 (i.e. Site Visit Updated), posted to Federal Business Opportunities (FBO)on 01 November 2016.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6723039 General 01 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 1.1.1.1 notes the Gov't will be installing (3) 40'x15'x10' ARMAG structures after project completion. Door 100D is only 14'x18'. Is the Gov't confident it can maneuver 71,500 pound structures with that small of clearance, or should the contractor plan on these (3) items being set before the structure is complete and having to work around them similar to the items in 1.1.1.2?
1-0
1-1 Government Response. The three ARMAGS will not be located in the TSF building. The Government will be responsible for the relocation of the ARMAGS to the site and placement on the concrete foundation as shown on CS101.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6723071 Construction Management 01 30 00.10 50 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 1.4.1.h.3 notes the C/O will provide a designated parking area for construction workers. It reads the parking may or may not be with-in walking distance, and the contractor may need to provide transportation to the site.
Section 01 50 02.00 50, 1.3 notes that employee parking will be provided within a reasonable walking distance of the site. Please confirm a designated parking area will be provided within walking distance of the project site.
1-0
1-1 Government Response. The designated parking area/staging area is located adjacent to the TSF site and is within walking distance. Please see V102, CD102, or ES102.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6723076 LEED 01 33 29
Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 1.4.3.a references a TPC Checklist at the end of section 01 33 29 (as Attachment 2). We cannot locate this attachment. Section 1.5.3.2 has a link to a checklist, but it is just a generic LEED checklist, not one filled out for this project. Please provide the LEED checklist for this project.
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6723092 Construction Management 01 45 04.00 50
Page 11 of 36ProjNet: Logged In User
Section 3.4.5 reads to maintain the CQC staff at Full Strength at all times. Section 3.4.3 reads that only the Civil CQC Staff needs to be maintained by the Contractor first tier, and only during work on their areas. 1. Please confirm the only CQC staff in 3.4.3 required to be directly employed by the Contractor is the Civil scope. 2. Please confirm all of the CQC specialists only need to be present during their scope of work on the project.
1-0
1-1 Government Response. The specification requires that only the Civil CQC staff member be employed directly by the Prime Contractor. All CQC specialists need to be present for their related work.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6723095 Construction Management 01 45 04.00 50 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Attachment No. 1 lists numerous unrelated specification sections to this project (i.e. Drilled Pile Foundation, Theater Chairs, Swimming Pools, etc.). There is a note for the contractor to modify as necessary, but please confirm that the sections listed are just a generic template and have not been selected to reflect the work on this project.
1-0
1-1 Government Response. Confirmed that Attachment No. 1 is a generic guide to be modified by the Contractor Current Request Status: Request Closed
Information for this report is procurement sensitive.
6723113 LEED Fort Lee Env Spec Cnd Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 1.8.1 of the Ft. Lee Env. Spec. Cond. report reads that the goal of the project is LEED Silver, but LEED certification is not required. Section 01 33 29 reads that the Contractor must obtain the LEED Certification for the project. Please confirm the contractor is to obtain LEED certification for this project.
1-0
1-1 Government Response. Confirmed. The contractor is to obtain LEED certification for this TSF project, per Section 01 33 29.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6723115 Risk Assessment 01 57 19.00 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraph 3.11 reads that disturbed items will contain asbestos on this project. Please clarify what asbestos the contractor is expected to remove as part of this contract.
1-0
1-1 Government Response. The Ft. Lee Special Environmental Conditions document is a broad based blanket document delineating policies procedures. We do not anticipate encountering any asbestos
Page 12 of 36ProjNet: Logged In User requiring abatement during the execution of this project.
Information for this report is procurement sensitive.
6723122 Commissioning 01 78 23.00 50 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Paragraph 1.1.4 reads that the CxC is the Govt's Commissioning Authority, and it will be Kellie Jones. Section 01 91 00.80, 1.5.a reads the Commissioning Firm is to be retained by and paid for by the Contractor. The Draft Commissioning Plan also lists Kellie Jones as the Commissioning Authority, but reads in 4.2 that the CxC will be hired by the GC. Please confirm if Kellie Jones is the CxC (per 01 78 23.00 50) or the CxG. If Kellie is the CxG, please confirm the contractor still needs to retain and pay for a CxC.
1-0
1-1 Government Response. Paragraph 1.1.4, section 01 78 23.00 50, Operation and Maintenance Data, the designation CXC should reflect CXG.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6723697 Architectural AF601 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Finish Schedule: Room 105 Shop show with finish 6. What is finish 6?
1-0
1-1 Government Response. An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6723703 Architectural AF601 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Finish Schedule: Room 112 Storage show with finish CH-1 / CH-2. Does this room get both finishes, and if so where would the line be drawn between the two finishes?
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6723708 Architectural AF601 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Finish Schedule: Room 128 Storage. Most storage rooms have a finish of CH-1, but the Storage room has a finish of CH-2. Is this correct, or should the floor finish be CH-1?
1-0
Page 13 of 36ProjNet: Logged In User
1-1 Government Response. An amendment is forthcoming.
Information for this report is procurement sensitive.
6723716 Architectural AE520 A/AE520 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
AE520 Rail Plan indicates the limits of the CH-2 and CH-3 floor finishes for this area along column line G. Are we to assume that that these limits of floor finishes continue along column line G all the way down the building to column line 3? Or do they end at column line 8 at the end of the embedded rail area?
1-0
1-1 Government Response. Finish is shown in detail A on sheet AE502 to extend past column line 8. Finish does extend to column line 3 as seen on AE101. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724042 Equipment 11 13 20 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing IN101 calls out a loading dock leveler, drawing AE106 calls out a fixed scissor lift and spec 111320 calls for a fixed type industrial dock lift. Please confirm the type of equipment required.
1-0
1-1 Government Response. Any reference in the drawings to "LOADING DOCK SCISSOR LIFT," "FIXED SCISSOR LIFT," and "LOADING DOCK LEVELERS" refers to "Loading Dock Scissor Lift" as described in specification section 11 13 20.13.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724043 Communications T-503 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Details for the telecommunications ductbank provided on Drawing T-503 do not appear to indicate the size of conduit required. Please provide the conduit size required for the Telecommunications ductbank.
1-0
1-1 Government Response. Conduit sizes and quantity indicated on TS101, TS102.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724044 Electrical ES101 26 56 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 14 of 36ProjNet: Logged In User
Drawings EL201 & ES101 state Type L light fixtures are to be provided & Installed by DVP. Specification 26 56 00 indicates Aluminum & steel light poles. Please confirm the light poles and bases are to be provided and installed by DVP for these light fixtures. If not, please provide a detail for the concrete pole bases.
1-0
1-1 Government Response. Confirmed. Light poles and bases will be provided and installed by DVP.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724047 Electrical ES201 26 56 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing ES201 states the exterior Type L light is to be provided & installed by DVP. However, Specification Section 26 56 00 appears to indicate the exterior pole mounted lighting fixtures are to be furnished & installed by the awarded contractor. Please confirm the exterior pole mounted light fixtures are to be provided and installed by DVP.
1-0
1-1 Government Response. Exterior poles and bases are being provided and installed by DVP.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724073 General 00 11 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The period of performance for Options 0004, 0005, and 0006 are listed as 180 days from Contract Award. It would be extremely difficult, if not impossible, to have the building security system and storage shelving installed in the first 180 days of this project. Please confirm if the period of performance for all three can be changed to 540 CD, so the systems are completed at the same time as the overall building.
1-0
1-1 Government Response. Period of Performance is 180 days from contract award, if option is exercised.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724083 General 00 22 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 4.6.2 is asking for a CD ROM version of the pricing proposal at bid time. Please confirm if the CLIN/pricing line items on this CD copy can be left blank, with the numbers being hand written on the two hard copies only. If acceptable, a PDF version of the CLIN schedule with the numbers filled in could be submitted with the bid break-down due no less than 3 days after the bid submission.
1-0
1-1 Government Response. Confirmed. The CLIN/pricing line items on the CD copy can be left blank, with the numbers being hand written on the two hard copies only. Acceptable, a PDF version of the CLIN schedule with the numbers filled in can be submitted with the bid break-down due no less than 3 days after the bid submission.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
Page 15 of 36ProjNet: Logged In User
6724193 General 00 45 00
Please confirm if section 52.204-8 (Annual Reps & Certs) is required to be completed and submitted in Tab C of Volume 2.
1-0
1-1 Government Response. Confirmed. Section 52.204-8 (Annual Reps & Certs) is required to be completed and submitted in Tab C of Volume 2.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6724212 Contracting 00 72 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
FAR Clauses 52.222-33 and 52.222-34 are included in this solicitation, which require the contractor to enter into a Project Labor Agreement, and to submit a copy of the PLA with the bid. We believe these clauses may have been included by accident. Please confirm if a PLA is required on this bid.
1-0
1-1 Government Response. FAR Clauses 52.222-33 and 52.222-34 will be removed within an amendment.
Confirmed, a Project Labor Agreement (PLA) is not required on this bid.
Amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6725591 Civil CD102 CD102 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing CD102, bottom center of page has notes referencing Optional CLIN 0007 referring to Construction Contractor removal of merchantable trees for the project site as a bid option. Bid Schedule Description for CLIN 0002 indicates "The Merchantable timber is being removed by others prior to construction contract award." Please clarify which is correct.
1-0
1-1 Government Response. CLIN 0007 is removed from the bid schedule. Please ignore all references to
CLIN 0007.
An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6725592 General Solicitation Solicitation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please consider moving the solicitation due date from Monday November 28th. As this is the Monday after a Federal holiday weekend most subcontractors and vendors will not be prepared to provide complete and accurate bid proposals. A postponement of a few days would provide a better opportunity for the Government.
Page 16 of 36ProjNet: Logged In User
1-1 Government Response. Submission date has been change to Monday, 05 Dec 2016.
See Amendment 0002 dated 16 Nov 2016.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6725593 General Solicitation Solicitation Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please reconsider the request to submit a CD version of the pricing proposal at bid time. We would respectfully request to be allowed to submit the CD version properly filled out with the bid day pricing along with the bid break down required to be submitted no less than 3 days after bid submission.
1-0
1-1 Government Response. The CLIN/pricing line items on the CD copy can be left blank, with the numbers being hand written on the two hard copies only. Acceptable, a PDF version of the CLIN schedule with the numbers filled in can be submitted with the bid break-down due no less than 3 days after the bid submission.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6725628 General 001100 001100 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 00 11 00 – Solicitation, Offer & Award; Bid Form - Each CLIN item description makes reference to CLIN items 0001 through 0007 but only items 0001 through 0006 are shown. Is there a CLIN item 0007?
1-0
1-1 Government Response. No, CLIN 0007 has been deleted. Please ignore all references to CLIN 0007.
An amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727303 Civil LP101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the landscaping areas outside of the building that are not labeled on Sheet LP101. It is not clear what the final landscaping condition should be for these areas.
1-0
1-1 Government Response. The Hatched "area of reflection" shall be sodded. All other disturbed will be seeded. Please see amended drawing.
Page 17 of 36ProjNet: Logged In User
Amendment is forthcoming. By: Jaime Howard; CENAO-CT Contracting Office; (7572017158) On: Nov 15 Current Request Status: Request Closed
Information for this report is procurement sensitive.
6727304 Civil CS101 2/CS502 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Note 26 Concrete Curb references detail 6/CS502, however detail 6 on CS502 is a light duty asphalt pavement detail. Please provide detail for concrete curb.
1-0
1-1 Government Response. Note #26 on CS101 shall be revised to reflect the correct reference, i.e.
Detail4/CS501. See amended drawing.
Amendment is forthcoming.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727305 Civil CS101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Provide detail for Permeable Pavement on Sheet CS101. The hatch pattern does not have a legend callout nor a detail associated with it.
1-0
1-1 Government Response. Detail of permeable pavement is included provided as detail 1/CS509. Hatch pattern for permeable pavement is included on sheet C001.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727306 Civil CS101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There is a hatch pattern on Sheet CS101 that is not labeled in the legend. The pattern is to the north of the admin building , near the crane pad and around the equipment pad. Please provide legend call out and detail for this hatched area.
1-0
1-1 Government Response. Hatched pattern for the three areas on sheet CS101 are a gravel surface area.
Note 34 has been added to the drawing along with detail 6/CS510 to define the gravel surface requirements.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6727307 Civil CU101
Page 18 of 36ProjNet: Logged In User
Please provided profile including inverts and tops information for all storm sewers that are the responsibility of the Contractor to install.
1-0
1-1 Government Response. Sufficient information (i.e. rims, tops, inverts, slopes, and pipe lengths) are shown on CG101.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6727308 Mechanical M-507 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
M-507 Detail 'Air Terminal with Man Bars'- This detail is the only reference to man bars. There is no reference anywhere else to man bars in specs or drawings. Do man bars need to be installed on all Terminal Devices or all Registers, Grilles, Diffusers?
1-0
1-1 Government Response. Sheet MH106 note 2 indicates the terminal devices that the detail applies to.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727309 Mechanical M-304 Detail 1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
M-304 Detail 1: shows air temperature sensors for the glass curtain wall radiant heaters, mounted on the glass.
Please provide detail for mounting temperature sensors to glass on glass curtain wall?
1-0
1-1 Government Response. Temperature sensors shall be installed per manufacturer requirements for mounting to glass. Typically the sensors for this use have a self-adhesive. A detail is not required.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727310 Mechanical M-402 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
M-402 shows ductwork from a Dust Collection Unit (DCU-1) going into the shop room where their looks to be owner provided equipment. Who makes the final connections from Dust Collection unit duct work in shop area to the owner provided shop equipment?
1-0
1-1
Page 19 of 36ProjNet: Logged In User
Government Response. Per sheet IN101 note 1 & 4 shop equipment is not in contract. Final connections shall be made by the tenant.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727311 Mechanical Div 23 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
We did not find a specification for the pipe material for condensate piping? Is condensate piping Sch 40 PVC or L-Copper?
1-0
1-1 Government Response. Specification 23 00 00 section 2.16.4 refers to Specification 22 00 00 for condensate drains.
Current Request Status: Request Closed
Information for this report is procurement sensitive.
6727328 General Section 00 22 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section II - Solicitation Provisions Section 00 22 11: 7.4 Tab D - Subcontracting Plan, 7.4.1.2. lists 14% for Service- Disabled Veteran-Owned Small Business and 4% for Veteran-Owned Small Business. This seems to be backwards.
Since SDVSB also qualifies as a VSB, shouldn't the SDVSB be the 4% and the VDB be the 14% requirement?
1-0
1-1 Government Response. The requirements posted in the solicitation are firm.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6727418 General 00 22 11 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Section 6.3.1.2 indicates that a Past Performance Questionnaire (PPQ) shall be submitted to obtain client's observations on the Offeror's past performance. Please advise whether a Construction Contractor Appraisal Support System (CCASS) Evaluation will suffice in lieu of a PPQ.
1-0
1-1 Government Response. Past Performance Questionnaire (PPQ) is required.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6728208 Security Dv 28 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Is DAQ Electronics hard specified for the security integration option or are substitutes allowed.
1-0
Page 20 of 36ProjNet: Logged In User
1-1 Government Response. Required security equipment must be compatible with the current security system at Fort Lee. The current system is (ICIDS-IV).
1) Reference TM 5-6350-300-13&P, OPERATOR AND FIELD MAINTENANCE MANUAL INCLUDING REPAIR PARTS AND SPECIAL TOOLS LIST FOR INTEGRATED COMMERCIAL INTRUSION DETECTION
SYSTEM-IV (ICIDS-IV).
2) Select all IDS equipment from the Part Number Index in TM 5-6350-300-13&P.
3) Installation, programming, and acceptance testing of StarWatch Interior Remote Area Data Collectors (RADCs) must be performed by a manufacturer-certified technician.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729571 Contracting EL102 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide schedules for 32 relay lighting panel and the five (5) remote low voltage input panels shown on drawing EL102.
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729572 Contracting T-501 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please provide conduit requirements for voice and data outlets shown on drawing T-501.
1-0
2-0
2-1 Government Response. Provide 1-inch conduit stubbed above accessible ceiling in finished areas and in exposed areas route from backbox to Telecom Room.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729573 Contracting E-001 Note 17 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
General Note 17 on drawing E-001 calls for "Double Neutrals" on branch circuits run from receptacle panels.
Receptacle panel schedules indicate full size neutrals. Please clarify.
Page 21 of 36ProjNet: Logged In User
1-1 Government Response. See Amendment
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729574 Contracting E-001 Note 30 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
General Note 30 on drawing E-001 calls for plywood on walls of electrical and telephone rooms. Details on drawing T-401 indicate plywood required for the telephone rooms, however, details on drawing EP-501 do not indicate plywood in the electrical rooms. Please clarify.
1-0
1-1 Government Response. Comment addressed by Amendment #3 posted to FBO on 21 NOV 16.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729575 Contracting T-601 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Public Address System riser on drawing T-601 does not specify conduit size or where it is required. Also, mounting height for wall speakers is needed.
1-0
2-0
2-1 Government Response. Install all speaker wiring in conduit per 275116 3.2.1. Provide 3/4-inch conduit for all speaker wiring. Wall speaker height is indicated on T-001 under General Telecom Notes.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729580 General Div 01 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Bid Inquiry Contractor Report references Amendment will be forthcoming 11/08/2016, 11/10/2016 & 11/15/2016, but document site does not show any amendments past #1 dated 11/1/2016. Nor has the Geotechnical Report been attached as indicated in the Report. When could we expect these to be posted so we can get them out to the subcontractor community? At this time due of the Thanksgiving Holiday, subcontractor's only have a week to review and adjust their proposals if the bid remains on 11/28/2016.
1-0
1-1 Government Response. See Amendment 0002 dated 16 Nov 2016 on FBO.gov
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729725 Architectural 10 26 13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Page 22 of 36ProjNet: Logged In User
There does not seem to be any Corner Guards in the drawings even though they are in the specs. Please verify where the corner guards are in this building.
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729727 Electrical E Series Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Drawings do not appear to provide the locations for connections, control & Safety Switches for Mechanical Equipment. Please provide a layout on the power drawings for this equipment.
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729729 Electrical EP-401 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Mechanical Equipment Schedule provided on Drawing EP-401 does not appear to include a starter, disconnect & VFD schedule. Please provide this equipment to the schedule.
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729731 Electrical E Series Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Documents provided do not appear to provide a specification or a riser diagram for the Dimming Panels. Please provide a specification & riser for the Dimming Panels.
1-0
1-1 Government Response. Bid as shown.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729733 Electrical E Series Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Electrical Specifications do not appear to provide information on the Generator Termination Box. Please provide a specification for the Generator Termination Box.
1-0
Page 23 of 36ProjNet: Logged In User
1-1 Government Response. Bid as shown.
Information for this report is procurement sensitive.
6729734 Electrical 26 00 00 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Electrical Specifications do not appear to provide information on the Surge Protection Devices. Please provide a specification for the Surge Protection Devices.
1-0
1-1 Government Response. See specification 26 20 00 p. 2.24
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729735 Electrical EP-701 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Some Panels shown on Drawings EP-701 through EP-704 indicate 200% neutrals. However, the feeders do not increase in size or quantity of neutrals. Please confirm if we are to provide as shown.
1-0
2-0
2-1 Government Response. Bid as shown
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729736 Electrical EP-601 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
The Riser Diagram provided on Drawing EP601 appears to be missing disconnect switches ahead of Transformers T2,T3, T4 and T5. Please confirm if the disconnect switches are not needed as shown.
1-0
1-1 Government Response. See Amendment.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729738 Electrical EP101 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please identify Note 4 shown on Drawing EP101 in Classroom 010A as this does not appear to be described on the General or Drawing Notes of this sheet.
1-0
1-1
Page 24 of 36ProjNet: Logged In User
Government Response. See amendment. Note 4 was left off in error.
Information for this report is procurement sensitive.
6729740 Electrical EP-103 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
On Drawing EP103, Rooms 145 & 146 do not indicate any receptacles in either room. Please confirm that receptacles are not to be installed in Rooms 145 & 146.
1-0
1-1 Government Response. Rooms 145 and 146 have receptacles they are shown on the callouts identified on sheet EP103. Please refer to details 3 and 4 on sheet EP501.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729742 Electrical EP-109 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Drawing EP109, Rooms 138 & 139 do not indicate any receptacles in either room. Please confirm that receptacles are not to be installed in Rooms 138 & 139.
1-0
1-1 Government Response. Rooms 138 and 139 have receptacles that are shown on the callouts identified.
Please refer to details 7 and 8 on sheet EP501.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729745 Electrical EP-107 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please identify Note 1 shown on Drawing EP107 in Classroom 010A as this does not appear to be described on the General or Drawing Notes of this sheet.
1-0
1-1 Government Response. Question is unclear. EP1-7 does not show classroom 010A.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729748 Electrical T Series Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
Please clarify the "S in Square" symbol as shown on the T Series Drawings.
1-0
1-1
Page 25 of 36ProjNet: Logged In User
Government Response. The symbol with the 'S' inside the square are wall mounted speakers. The 'S' is missing off the symbol on the symbols sheet.
Current Request Status: Request Closed Information for this report is procurement sensitive.
6729749 Communications T-401 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)
There appear…