Amendment 0003_W91236-17-R-0002 Training Support Facility
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-17-R-0002, Training Support Facility, Fort Lee, Virginia
The purpose of this amendment is to attached the package (i.e. NAB technical amendment items 11.18.2016 and NAB compiled Amd. #2) uploaded to FBO on 21 Nov 2016 and provide the ProjNet Inquiry Report.
See continuation page.
Contracting POC: Jaime Scott How ard, Jaime.C.Scott@usace.army.mil, 757-201-7158.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 4
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Nov-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-17-R-0002
X 9B. DATED (SEE ITEM 11)
12-Oct-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Nov-2016
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91236-17-R-0002
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00 11 00 - SOLICITATION, OFFER & AWARD
The Table of Contents has changed from:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Installation Access
Form_FL FORM 190-2
1 01-JUN-2015
Attachment 10 Revised drawings 25 Attachment 2 Ft. Lee Specs Vol 1 844 01-SEP-2016 Attachment 3 Ft. Lee Specs Vol 2 762 01-SEP-2016 Attachment 4 Ft. Lee Specs Vol 3 623 01-SEP-2016 Attachment 5 Lee_TSF_Final RTA
Submittal_Vol 1
Attachment 6 Lee_TSF_Final RTA Submittal_Vol 2
Attachment 7 FtLee_TSF_Geotech_Rep ort
315 01-APR-2016
Attachment 8 Site Visit Participants 2 09-NOV-2016 Attachment 9 LEED-NC 2009
(V3)_Scorecard_TSF 20161110
1 10-NOV-2016
to:
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Installation Access
Form_FL FORM 190-2
1 01-JUN-2015
Attachment 10 Revised drawings 25 Attachment 11 NAB technical amendment items
2 18-NOV-2016
Attachment 12 NAB Compiled Amd #2 10 Attachment 13 ProjNet
Inquiries_W91236-17-R- 0002_TSF_Ft. Lee
36 22-NOV-2016
Attachment 2 Ft. Lee Specs Vol 1 844 01-SEP-2016 Attachment 3 Ft. Lee Specs Vol 2 762 01-SEP-2016 Attachment 4 Ft. Lee Specs Vol 3 623 01-SEP-2016 Attachment 5 Lee_TSF_Final RTA
Submittal_Vol 1
Attachment 6 Lee_TSF_Final RTA Submittal_Vol 2
Attachment 7 FtLee_TSF_Geotech_Rep ort
315 01-APR-2016
Attachment 8 Site Visit Participants 2 09-NOV-2016 Attachment 9 LEED-NC 2009
(V3)_Scorecard_TSF 20161110
1 10-NOV-2016
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been added by full text:
SPECIFICATIONS:
Specification as identified may be found in attached file: NAB_technical_amendment_items_11.18.2016
Section 10 56 26 MOBILE STORAGE SHELVING UNITS, paragraph 1.11:
Replace this paragraph of text:
“Provide written warranties, executed by Manufacturer, Contractor, and Installer, agreeing to repair or replace units that fail in materials or workmanship within the specified warranty period. Warrant coverage to include parts, equipment, and labor for repairs necessary to attain specified requirements. Warranty shall be in addition to, and not a limitation of, rights the Owner may have against Contractor under Contract Documents. Warranty duration shall begin on the date of acceptance by Contracting Officer (Government). Provide warranty for each system installed in specified locations.”
With this paragraph of text:
“Provide written warranties, executed by Manufacturer and Installer, agreeing to repair or replace units that fail in materials or workmanship within the specified warranty period. Warrant coverage to include parts, equipment, and labor for repairs necessary to attain specified requirements. Warranty duration shall begin on the date of acceptance by Contracting Officer (Government). Provide warranty for each system installed in specified locations.”
Section 23 00 00, paragraph 2.10.8.1 Acoustical Duct Liner:
Replace paragraph in its entirety with below:
“Use flexible elastomeric duct liner for lining ductwork and conforming to the requirements of ASTM C1071, Type I and II. Provide uniform density, graduated density, or dual density liner composition, as standard with the manufacturer. Provide not less than 1 inch thick coated lining. Where acoustical duct liner is used, provide the thermal equivalent of the insulation specified in Section 23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS for liner or combination of liner and insulation applied to the exterior of the ductwork. Increase duct sizes shown to compensate for the thickness of the lining used. In lieu of sheet metal duct with field-applied acoustical lining, provide acoustically equivalent lengths of elastomeric duct liner or factory fabricated double-walled internally insulated duct with perforated liner.”
Section 23 00 00, paragraph 2.11.2 COILS:
Replace paragraph in its entirety with below:
“Provide fin-and-tube type coils constructed of seamless copper tubes and aluminum or copper fins mechanically bonded or soldered to the tubes. Provide copper tube wall thickness that is a minimum of 0.016 inches. Provide aluminum fins that are at least 0.0055 inch minimum thickness. Provide copper fins that are at least 0.0045 inch minimum thickness. Provide casing and tube support sheets that are not lighter than 16 gauge galvanized steel, formed to provide structural strength. When required, provide multiple tube supports to prevent tube sag. Test each coil at the factory under water at not less than 400 psi air pressure and make suitable for 200 psi working pressure and 300 degrees F operating temperature unless otherwise stated. Mount coils for counterflow service. Rate and certify coils to meet the requirements of AHRI 410. Coils shall be circuited for counter-flow heat transfer.”
DRAWINGS:
All drawings as identified may be found in attached file: NAB_Compiled_Amd__2
Sheet AF601: Delete as originally issued and substitute therefor the attached like numbered sheet dated 11/16/2016.
Sheet AF602: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/16/2016.
Sheet E000: Delete as originally issued and substitute therefor the attached like numbered sheet dated 11/17/2016.
Sheet EP101: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/17/2016.
Sheet EP107: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/18/2016.
Sheet EP601: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/18/2016.
Sheet EP702: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/18/2016.
Sheet EP703: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/18/2016.
Sheet EP704: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/18/2016.
Sheet MI709: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/16/2016.
Sheet MI712: Delete as original issued and substitute therefor the attached like numbered sheet dated 11/16/2016.
(End of Summary of Changes)