W91236-17-R-0002_Training_Support_Facility_Ft._Lee.pdf
PDF 317 KB Posted
- Attached to
- Training Support Facility, Fort Lee, VA Federal contract opportunity
- Solicitation number
- W91236-17-R-0002
About this file
Solicitation W91236-17-R-0002
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation No. W91236-17-R-0002 for Training Support Facility, Fort Lee, Virginia
The Training Support Facility includes 120,214 square feet of classrooms, administrative areas, rest rooms, arms storage vault, and consolidated entry and reception area. The facility also includes climate controlled high-bay material storage and standard height material storage areas. Special foundations w ill be required. Supporting facilities include site development, utility connections, lighting, paving, parking, w alks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning w ill be provided by self-contained system. Project w ill comply w ith anti-terrorism and force protection requirements per Unified Facilities Criteria at Fort Lee, Virginia.
The magnitude of construction is betw een $25,000,000.00 and $100,000,000.00.
THIS IS AN UNRESTRICTED PROCUREMENT
Contracting POC: Jaime C. Scott How ard, 757-201-7158, jaime.c.scott@usace.army.mil.
JOY M WRIGHT 757-201-7145
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
12-Oct-2016
(RFP)
(IFB)
X
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________540 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________28 Nov 2016 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______120 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
757-201-7183FAX:TEL: TEL: FAX:
W91236-17-R-0002 78
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
Section 00 11 00 - Solicitation, Offer & Award
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Job Construct Ft Lee Training Support
FFP
Construct Ft Lee Training Support Facility, Project Number 80851, complete as shown on the drawings and specified, exclusive of item 0002 thru 0007.
FOB: Destination
NET AMT
0002 Job Sitework Ft Lee Training Support
FFP
Sitework associated with Ft Lee Training Support Facility, complete as shown on the drawings and specified, exclusive of items 0001 and 0003 thru 0007.
0003 Job OPTION Wetland Mitigation Credit
FFP
All cost associated with wetland mitigation credit, complete as shown on the drawings and specified, exclusive of items 0001 thru 0002 and 0004 thru 0007. Options for Separately Priced Line Items may be exercised at the discretion of the Contracting Officer. Period of Performance: 180 days from contract award, if option is exercised.
0004 Job OPTION Mobile Storage Shelving-Recessed Rails
FFP
All cost associated with providing the Mobile Storage Shelving – Recessed Rails, complete as shown on the drawings and specified, exclusive of items 0001 thru 0003 and 0005 thru 0007. Options for Separately Priced Line Items may be exercised at the discretion of the Contracting Officer. Period of Performance: 180 days from contract award, if option is exercised.
0005 Job OPTION Mobile Storage Shelving - Carriages
FFP
All cost associated with providing the Mobile Storage Shelving - Carriages, complete as shown on the drawings and specified, exclusive of items 0001 thru 0004 and 0006 thru 0007. Options for Separately Priced Line Items may be exercised at the discretion of the Contracting Officer. Period of Performance: 180 days from contract award, if option is exercised.
0006 Job OPTION Building Security
FFP
All cost associated with providing the building security, complete as shown on the drawings and specified, exclusive of items 0001 thru 0005 and 0007. Options for Separately Priced Line Items may be exercised at the discretion of the Contracting Officer. Period of Performance: 180 days from contract award, if option is exercised.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 N/A N/A N/A Government 0002 N/A N/A N/A Government 0003 N/A N/A N/A Government 0004 N/A N/A N/A Government 0005 N/A N/A N/A Government 0006 N/A N/A N/A Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 N/A N/A N/A N/A
0002 N/A N/A N/A N/A
0003 N/A N/A N/A N/A
0004 N/A N/A N/A N/A
0005 N/A N/A N/A N/A
0006 N/A N/A N/A N/A
Exhibit/Attachment Table of Contents
DOCUMENT TYPE DESCRIPTION PAGES DATE
Attachment 1 Installation Access
Form_FL FORM 190-2
1 01-JUN-2015
Attachment 2 Ft. Lee Specs Vol 1 844 01-SEP-2016 Attachment 3 Ft. Lee Specs Vol 2 762 01-SEP-2016 Attachment 4 Ft. Lee Specs Vol 3 623 01-SEP-2016 Attachment 5 Lee_TSF_Final RTA
Submittal_Vol 1
Attachment 6 Lee_TSF_Final RTA Submittal_Vol 2
Section 00 21 00 - Instructions, Conditions & Notices to Offerors
1. BID SCHEDULE DESCRIPTIONS
CLIN 0002: CLIN 0002 includes all work defined within the solicitation drawings to include all clearing and grubbing requirements for the site. The Merchantable timber is being removed by others prior to construction contract award. The timber harvester will leave all stumps, including some limbs and tree tops. There may also be some trees approximately 4 inches in diameter and smaller that will be left standing. The grubbing of the site is still the responsibility of the construction contractor, as well as the removal of any limbs, tree tops and small trees felt on site.
CLIN 0003: Optional CLIN 0003, may be exercised at time of award, includes the payment of wetland mitigation credits into an approved wetland mitigation credit bank. It is the intent to have the Joint Permit Application for wetland mitigation processed by the time of award and the funding available to exercise the CLIN at time of award. If the permit application is approved prior to contract award the Government may choose to pay the mitigation credits in lieu of exercising this optional CLIN. Land disturbance within the delineated wetlands, as indicated on the drawings, is not permitted until the permit application for wetland mitigation has been approved and the wetland mitigation credits have been purchased.
2.OFFEROR'S QUESTIONS AND COMMENTS
Note: All questions and/or comments should reach the above referenced Contracting Office via ProjNet no later than 16 November 2016 in order that they may be given consideration or actions taken prior to receipt of offers.
ProjNet will close at 8am EST on 16 November 2016.
1.5.1 Bidder Inquiry
1.5.1.1 Technical inquiries and questions relating to proposal procedures or bonds are to be submitted via Bidder Inquiry in ProjNet at http://www.projnet.org/projnet.
1.5.1.1.1 To submit and review bid inquiry items, bidders will need to be a current registered user or self-register into system. To self-register go to web page, click BID tab select Bidder Inquiry, select agency USACE, enter Key for this solicitation listed below, and your e-mail address, click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.
1.5.1.1.2 From this page you may view all bidder inquiries or add inquiry.
1.5.1.1.3 Bidders will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.
1.5.1.1.4 The Solicitation Number is : W91236-17-R-0002
1.5.1.1.5 The Bidder Inquiry Key is: 6V9RDV-WW8Y29
1.5.1.2 The Bidder Inquiry System will be unavailable for new inquires 10 days prior to proposal submission in order to ensure adequate time is allotted to form an appropriate response and amend the solicitation, if necessary.
1.5.1.3 Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.
1.5.1.4 The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone (Chicago). The telephone number for the Call Center is 800-428-HELP.
1.5.1.5 Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of proposals.
3. AWARD TO RESPONSIBLE OFFEROR
Responsibility will be determined by the Contracting Officer prior to award in accordance with FAR Part 9.1. A pre-award survey will be performed. The prospective awardee will be required to show adequate financial resources to perform the contract; ability to comply with the required performance schedule; a satisfactory performance record; a satisfactory record of integrity and business ethics; the necessary organization, experience, accounting and operational controls and technical skills, or the ability to obtain them; the necessary production, construction and technical equipment; be otherwise qualified and eligible to receive award under applicable laws and regulations.
4. EVIDENCE OF AUTHORITY TO SIGN OFFERS
Evidence of the authority of individuals signing offers to submit firm offers on behalf of the offeror is required except where the offer is signed, and shows that it is so signed, by: the President, Vice-President, or Secretary of an incorporated offeror; a partner in the case of a partnership; or the owner in the case of a sole proprietorship. Failure to submit with the offer satisfactory evidence of the authority of all other persons may be cause for rejection of the offer as invalid or nonresponsive.
5. PREAWARD SAFETY CONFERENCE
a. All offerors must provide notice and description of any and all accidents incurred during performance of contracts during the previous three-year period from the date of this solicitation.
b. Where an apparent lowest Priced, technicaally acceptable offeror, in performance of contracts during the previous three-year period, incurred one or more accidents, or where, in the opinion of the Contracting Officer, there is any question regarding this compliance with any safety or accident prevention requirement, such offeror, on request of the Contracting Officer prior to any award under this solicitation, shall attend a conference with representatives of the Contracting Officer to discuss any such accidents or non-compliance, the reason for their occurrence, and measures which will be taken to preclude any recurrence thereof.
c. Information elicited at this conference will be used by the Contracting Officer, in conjunction with other information obtained in a preaward survey, in determining the offeror's responsibility.
d. The items discussed, the preventive measures considered, and any conclusions reached in this conference shall be recorded in minutes of the meeting, which shall be authenticated by the signatures of representatives of the offeror and the Contracting Officer, and any procedures noted therein as agreed upon shall become an obligation of the offeror, along with all other safety and accident prevention requirements of the contract, if award is made to him.
6. INSPECTION OF THE SITE
Prospective bidders are invited to visit the site of the work in order to acquaint themselves as to site conditions and other problems incident to the prosecution of the work. Arrangements for inspection of the site shall be made through the Office the Area Engineer identified in the clause 52.236-27 Alt I, entitled "SITE VISIT
(CONSTRUCTION)."
7. MAGNITUDE OF CONSTRUCTION PROJECT
The estimated contract price of the work for this project is between $25,000,000.00 and $100,000,000.00.
8. INCURRING COSTS
The Government is not liable for any costs incurred by the offeror submitting an offer in response to this solicitation.
9. AGENTS
Offers signed by an Agent must be made in the name of the Principal and must be accompanied by evidence of said Agent’s authority to act on behalf of its Principal.
10. UNBALANCED BIDS
Any offer which is materially unbalanced as to prices for the Base Items and the Optional Items may be rejected as non-responsive or otherwise not considered for award. An unbalanced offer is one which is based on prices significantly less than cost for some work and prices which are significantly overstated for other work.
11. UNAUTHORIZED INSTRUCTIONS FROM GOVERNMENT OR OTHER PERSONNEL
The contractor shall not accept instructions issued by any person, employed by the U.S. Government or otherwise, other than the Contracting Officer or the Authorized Representative of the Contracting Officer acting within the limits of his/her authority as defined in the Designation of Authority letter. A copy of the Designation of Authority letter will be furnished to the contractor at time of contract award.
12. SUBCONTRACTING PLAN (CONSTRUCTION)
If the offeror is a large business and the offer amount exceeds $1,500,000.00, he shall submit a subcontracting plan with proposal in accordance with FAR provision 52.219-9 Alt II. The subcontracting plan shall be reviewed and approved by the Contracting Officer prior to award.
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management JUL 2013 52.207-1 Notice Of Standard Competition MAY 2006 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.236-28 Preparation of Proposals--Construction OCT 1997 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.215-7008 Only One Offer OCT 2013
CLAUSES INCORPORATED BY FULL TEXT
52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)
(a) Definitions. As used in this provision--
“Discussions” are negotiations that occur after establishment of the competitive range that may, at the Contracting Officer's discretion, result in the offeror being allowed to revise its proposal.
“In writing or written” means any worded or numbered expression which can be read, reproduced, and later communicated, and includes electronically transmitted and stored information.
“Proposal modification” is a change made to a proposal before the solicitation's closing date and time, or made in response to an amendment, or made to correct a mistake at any time before award.
“Proposal revision” is a change to a proposal made after the solicitation closing date, at the request of or as allowed by a Contracting Officer as the result of negotiations.
“Time”, if stated as a number of days, is calculated using calendar days, unless otherwise specified, and will include Saturdays, Sundays, and legal holidays. However, if the last day falls on a Saturday, Sunday, or legal holiday, then the period shall include the next working day.
(b) Amendments to solicitations. If this solicitation is amended, all terms and conditions that are not amended remain unchanged. Offerors shall acknowledge receipt of any amendment to this solicitation by the date and time specified in the amendment(s).
(c) Submission, modification, revision, and withdrawal of proposals. (1) Unless other methods (e.g., electronic commerce or facsimile) are permitted in the solicitation, proposals and modifications to proposals shall be submitted in paper media in sealed envelopes or packages (i) addressed to the office specified in the solicitation, and (ii) showing the time and date specified for receipt, the solicitation number, and the name and address of the offeror.
Offerors using commercial carriers should ensure that the proposal is marked on the outermost wrapper with the information in paragraphs (c)(1)(i) and (c)(1)(ii) of this provision.
(2) The first page of the proposal must show--
(i) The solicitation number;
(ii) The name, address, and telephone and facsimile numbers of the offeror (and electronic address if available);
(iii) A statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation and agreement to furnish any or all items upon which prices are offered at the price set opposite each item;
(iv) Names, titles, and telephone and facsimile numbers (and electronic addresses if available) of persons authorized to negotiate on the offeror's behalf with the Government in connection with this solicitation; and
(v) Name, title, and signature of person authorized to sign the proposal. Proposals signed by an agent shall be accompanied by evidence of that agent's authority, unless that evidence has been previously furnished to the issuing office.
(3) Submission, modification, or revision, of proposals.
(i) Offerors are responsible for submitting proposals, and any modifications, or revisions, so as to reach the Government office designated in the solicitation by the time specified in the solicitation. If no time is specified in the solicitation, the time for receipt is 4:30 p.m., local time, for the designated Government office on the date that proposal or revision is due.
(ii)(A) Any proposal, modification, or revision received at the Government office designated in the solicitation after the exact time specified for receipt of offers is “late” and will not be considered unless it is received before award is made, the Contracting Officer determines that accepting the late offer would not unduly delay the acquisition; and--
(1) If it was transmitted through an electronic commerce method authorized by the solicitation, it was received at the initial point of entry to the Government infrastructure not later than 5:00 p.m. one working day prior to the date specified for receipt of proposals; or
(2) There is acceptable evidence to establish that it was received at the Government installation designated for receipt of offers and was under the Government's control prior to the time set for receipt of offers; or
(3) It is the only proposal received.
(B) However, a late modification of an otherwise successful proposal that makes its terms more favorable to the Government, will be considered at any time it is received and may be accepted.
(iii) Acceptable evidence to establish the time of receipt at the Government installation includes the time/date stamp of that installation on the proposal wrapper, other documentary evidence of receipt maintained by the installation, or oral testimony or statements of Government personnel.
(iv) If an emergency or unanticipated event interrupts normal Government processes so that proposals cannot be received at the office designated for receipt of proposals by the exact time specified in the solicitation, and urgent Government requirements preclude amendment of the solicitation, the time specified for receipt of proposals will be deemed to be extended to the same time of day specified in the solicitation on the first work day on which normal Government processes resume.
(v) Proposals may be withdrawn by written notice received at any time before award. Oral proposals in response to oral solicitations may be withdrawn orally. If the solicitation authorizes facsimile proposals, proposals may be withdrawn via facsimile received at any time before award, subject to the conditions specified in the provision at 52.215-5, Facsimile Proposals. Proposals may be withdrawn in person by an offeror or an authorized representative, if the identity of the person requesting withdrawal is established and the person signs a receipt for the proposal before award.
(4) Unless otherwise specified in the solicitation, the offeror may propose to provide any item or combination of items.
(5) Offerors shall submit proposals in response to this solicitation in English, unless otherwise permitted by the solicitation, and in U.S. dollars, unless the provision at FAR 52.225-17, Evaluation of Foreign Currency Offers, is included in the solicitation.
(6) Offerors may submit modifications to their proposals at any time before the solicitation closing date and time, and may submit modifications in response to an amendment, or to correct a mistake at any time before award.
(7) Offerors may submit revised proposals only if requested or allowed by the Contracting Officer.
(8) Proposals may be withdrawn at any time before award. Withdrawals are effective upon receipt of notice by the Contracting Officer.
(d) Offer expiration date. Proposals in response to this solicitation will be valid for the number of days specified on the solicitation cover sheet (unless a different period is proposed by the offeror).
(e) Restriction on disclosure and use of data. Offerors that include in their proposals data that they do not want disclosed to the public for any purpose, or used by the Government except for evaluation purposes, shall--
(1) Mark the title page with the following legend: This proposal includes data that shall not be disclosed outside the Government and shall not be duplicated, used, or disclosed--in whole or in part--for any purpose other than to evaluate this proposal. If, however, a contract is awarded to this offeror as a result of--or in connection with-- the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting contract. This restriction does not limit the Government's right to use information contained in this data if it is obtained from another source without restriction. The data subject to this restriction are contained in sheets [insert numbers or other identification of sheets]; and
(2) Mark each sheet of data it wishes to restrict with the following legend: Use or disclosure of data contained on this sheet is subject to the restriction on the title page of this proposal.
(f) Contract award. (1) The Government intends to award a contract or contracts resulting from this solicitation to the responsible offeror(s) whose proposal(s) represents the best value after evaluation in accordance with the factors and subfactors in the solicitation.
(2) The Government may reject any or all proposals if such action is in the Government's interest.
(3) The Government may waive informalities and minor irregularities in proposals received.
(4) The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR 15.306(a)). Therefore, the offeror's initial proposal should contain the offeror's best terms from a cost or price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
(5) The Government reserves the right to make an award on any item for a quantity less than the quantity offered, at the unit cost or prices offered, unless the offeror specifies otherwise in the proposal.
(6) The Government reserves the right to make multiple awards if, after considering the additional administrative costs, it is in the Government's best interest to do so.
(7) Exchanges with offerors after receipt of a proposal do not constitute a rejection or counteroffer by the Government.
(8) The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.
(9) If a cost realism analysis is performed, cost realism may be considered by the source selection authority in evaluating performance or schedule risk.
(10) A written award or acceptance of proposal mailed or otherwise furnished to the successful offeror within the time specified in the proposal shall result in a binding contract without further action by either party.
(11) If a post-award debriefing is given to requesting offerors, the Government shall disclose the following information, if applicable:
(i) The agency's evaluation of the significant weak or deficient factors in the debriefed offeror's offer.
(ii) The overall evaluated cost or price and technical rating of the successful and the debriefed offeror and past performance information on the debriefed offeror.
(iii) The overall ranking of all offerors, when any ranking was developed by the agency during source selection.
(iv) A summary of the rationale for award.
(v) For acquisitions of commercial items, the make and model of the item to be delivered by the successful offeror.
(vi) Reasonable responses to relevant questions posed by the debriefed offeror as to whether source-selection procedures set forth in the solicitation, applicable regulations, and other applicable authorities were followed by the agency.
(End of provision)
52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA OR INFORMATION OTHER
THAN CERTIFIED COST OR PRICING DATA (OCT 2010)—ALTERNATE IV (OCT 2010)
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below:
The Government requests a price breakdown of labor, equipment, and materials by CLIN as backup to the total pricing provided in the CLIN Schedule. The breakdown shall set forth a summary of the total estimate costs by cost element and major subcontractor for the propose costs for each CLIN separately, including all direct and indirect charges and fees. The breakdown shall be submitted in Excel format in a sealed envelope marked “Price Breakdown
Information.” The price breakdown is required to be submitted no later than three (3) working days following the proposal due date. This information is required for the initial price proposal and, if requested, for any revised proposals. This request is not an opportunity for the Offeror to revise its non-price or price proposal.
52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm Fixed Price contract resulting from this solicitation.
52.217-5 EVALUATION OF OPTIONS (JUL 1990)
Except when it is determined in accordance with FAR 17.206(b) not to be in the Government's best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the option(s).
52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS--SECONDARY SITE OF THE WORK (MAY
2014)
(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements,of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL
EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
Goals for female participation for each trade
28% 6.9%
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction,'' and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the --
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Training Support Facility, Fort Lee, VA..
52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT-- CONSTRUCTION MATERIALS UNDER
TRADE AGREEMENTS (MAY 2014)
(a) Definitions. “Commercially available off-the-shelf (COTS) item,” “construction material,” “designated country construction material,” “domestic construction material,” and “foreign construction material,” as used in this provision, are defined in the clause of this solicitation entitled “Buy American -- Construction Materials Under Trade Agreements” (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material, other than designated country construction material, that is not listed by the Government in this solicitation in paragraph (b)(3) of FAR clause 52.225-11, the offeror also may submit an alternate offer based on use of equivalent domestic or designated country construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of FAR clause 52.225-11 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of FAR clause 52.225-11 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic or designated country construction material, and the offeror shall be required to furnish such domestic or designated country construction material. An offer based on use of the foreign construction material for which an exception was requested-- (i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.-
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
52.233-2 SERVICE OF PROTEST (SEP 2006)
(a) Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from U.S. Army Corps of Engineers, Norfolk District, Contracting Officer, 803 Front Street, Norfolk, VA 23510-1011..
(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.
52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) – ALTERNATE I (FEB 1995)
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.
(b) An organized site visit has been scheduled for-- Thursday, 9 November 2016 at 10:00AM (EST)
An Installation access form have to be filled out and submitted to the Resident office no later than 02 Nov 2016. The Forms can be emailed to Anthony Weaver at the following email address:
Anthony.j.weaver@usace.army.mil
The Resident Office will process the forms with Installation security and passes will be waiting at the Visitor Center located at the Lee Avenue gate the morning of the site visit.
(c) Participants will meet at-- Corner of Shop Road and 22nd Street, Fort Lee, VA. This parking lot is located on the project site.
52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil/vffara.htm
Section 00 22 11 - Proposal Submission Requirements, Evaluation Criteria and Basis of Award
SECTION II - SOLICITATION PROVISIONS
Section 00 22 11
1. OVERVIEW
This is a Best Value Lowest Price Technically Acceptable (LPTA) solicitation for the construction of the Training Support Facility at Fort Lee, Virginia.
2. BASIS FOR AWARD
The Contracting Officer/Source Section Authority will award a firm fixed-price contract based on the best overall (i.e., best value) proposal that is determined to be technically acceptable to the Government in accordance with LPTA evaluation procedures and has the lowest evaluated price. To be considered technically acceptable and receive consideration for award, a rating of no less than “Acceptable” must be achieved for Factor 1 - Specialized Experience and Factor 2 - Past Performance. The Government will not award a contract to an Offeror whose proposal contains a deficiency, as defined in FAR 15.001. Factor 3 – Price will not be rated or scored, but will be evaluated for fairness and reasonableness through use of a price analysis.
3. FACTORS TO BE EVALUATED
3.1 Proposal Evaluation: The proposal will be evaluated on an “Acceptable” / “Unacceptable” basis using the following factors:
3.1.1 Factor 1: Specialized Experience: Each Offeror’s documented specialized experience will be reviewed to determine if the Offeror’s team demonstrates recent and relevant specialized experience meeting or exceeding the minimum requirements and criteria set out in the solicitation.
3.1.2 Factor 2: Past Performance: Each Offeror’s past performance will be reviewed to determine if the contractor’s performance record supports a reasonable expectation that the Offeror will successfully perform the required effort.
3.1.3 Factor 3: Price: The resulting award will be a firm fixed-price contract. Price reasonableness will be utilized in the evaluation of the Firm-Fixed Price effort.
3.2 Price Proposal Evaluation: The LPTA procedure is applied to known firm requirements, usually readily available in the commercial marketplace, where a fair and reasonable price determination is based on adequate competition. Therefore, price analysis will normally be used to determine the total evaluated price to support the selection of the lowest price, technically acceptable offeror. Although in exceptional cases when the determination of a fair and reasonable price requires additional information, the Contracting Officer may conduct a cost analysis to support the determination of whether the proposed price is fair and reasonable.
W91236-17-R-0002
3.3 Source Selection Decision: The award will be made to the lowest price Offeror who submits a proposal that is otherwise “acceptable” when reviewed against all of the evaluation factors outlined in the RFP.
4.0 PROPOSAL SUBMISSION
4.1 Any legally organized Offeror who agrees to follow the conditions of the RFP may submit a proposal.
4.2 Do not submit any materials not required by this solicitation (such as company brochures, etc).
4.3 Offerors shall submit their proposal packages to US Army Corps of Engineers, Norfolk District at the address shown in Block 7 of the Standard Form 1442. Proposals must be received in the Norfolk District not later than the time and date specified in Block 13 of Standard Form 1442.
4.4 The Government is not liable for any costs incurred by the Offerors submitting an offer in response to this solicitation.
4.5 Offerors are cautioned that “parroting” of the requirements with a statement of intent to perform does not reflect an understanding of the requirement or capability to perform. Offerors are responsible for including sufficient details to permit a complete and accurate evaluation of each proposal. Failure to provide sufficient detail may result in an unacceptable rating. Proposals received will be considered proprietary information and shall be clearly marked as such by the Offeror.
4.6 Proposal Submission Requirements:
4.6.1 The Offeror’s proposal shall consist of two (2) volumes. They are Volume I – Performance Capability and Volume II – Price and Pro Forma Information. The proposal shall not contain classified data. The use of hyperlinks in proposals is prohibited.
4.6.2 Each volume shall be submitted in a separate three-ring binder with a table of contents and tabbed section dividers in accordance with paragraphs 5.1 and 5.2. The cover of each volume shall be labeled with the project name, installation name, solicitation number, volume number, and the Offeror’s name. Submit one (1) original plus three (3) copies of Volume 1 and submit one (1) original and one (1) copy of Volume 2. The original hardcopy of each volume shall be clearly marked “Original” and the original signatures shall be in blue ink. Copies of each volume shall be clearly marked as “COPY XX of XX”. In addition to the hard copy proposals, submit one (1) electronic, non-editable, copy of each volume on a separate CD ROM labeled to match its respective hard copy volume.
4.6.3 The proposal shall be submitted in an 8-½ inch x 11 inch format (except that tables and graphic representations may be submitted on folded 11 inch x 17 inch pages). Pages may be single-sided or double-sided and shall be numbered. Text shall have a minimum twelve (12) point Arial or Times New Roman font.
No proposal information may be included by reference. The page count is at the discretion of the Offeror.
4.6.4 Any pages that are changed (as a result of negotiations or proposal revisions) should be of a different color and have changed information clearly marked by a vertical line in the right margin of the page. The revised pages shall be dated.
4.6.5 All pages of each volume shall be appropriately numbered and identified by the complete project name, installation name, solicitation number, and the Offeror’s name in the header and/or footer. A Table of Contents should be created using the Table of Content feature in MS Word. MS Word (doc) files shall use the following page setup parameters:
Margins – Top, Bottom, Left, Right – 1”
Gutter – 0”
From Edge – Header, Footer 0.5”
Page Size, Width – 8.5”
Page Size, Height – 11”
NOTE: 11 inch X17 inch folded pages are acceptable for tables/graphic representations.
The following additional restrictions apply:
a. File Packaging. PDF Files shall be submitted in read-only format. All price breakdown information shall be submitted in Microsoft Office Excel Read/Write format and viewable in Microsoft Excel 2007 to aide in the cost/price evaluation. Each Offeror is responsible for ensuring that the hardcopy is consistent with the electronic copy of the proposal. In the event of any conflict between the electronic and hard copy submissions, the hard copy submission will govern and will be the material upon which the Government will base its evaluation and ultimately, its decision.
b. Content Requirement. All information shall be confined to the appropriate volume. The Offeror shall confine submissions to essential matters, sufficient to define the proposal in a concise manner and to permit a complete and accurate evaluation.
5.0 PROPOSAL INFORMATION AND RELATED EVALUATION FACTORS
5.1 VOLUME 1 – PERFORMANCE CAPABILITY
Factor Location Description
TAB A
SF 1442 and Proposal Data Sheet (Included at Attachment 1, Section 00 22 11)
Factor 1 TAB B Specialized Experience
Factor 2 TAB C Past Performance
5.2 VOLUME 2 – PRICE AND PRO FORMA INFORMATION
Factor Location Description
FACTOR 3
TAB A
Price (Standard Form 1442 and Contract Line Item Schedule)
N/A TAB B Bid Guarantee
N/A TAB C Required Pre-Award Information
N/A TAB D Subcontracting Plan (if required)
6.0 EVALUATION APPROACH – VOLUME 1 – PERFORMANCE CAPABILITY
All proposals will be subject to evaluation by the Source Selection Evaluation Board (SSEB).
6.1 The overarching evaluation approach for all factors is as follows:
6.1.1 Adequacy of Response. The Government will evaluate the proposal to determine if, based on the Offeror’s record of specialized experience and past performance, it has a reasonable expectation that the Offeror will be able to successfully perform the required effort.
6.2 TAB B - FACTOR 1 - SPECIALIZED EXPERIENCE
6.2.1 SUBMISSION REQUIREMENTS:
6.2.1.1 The Offeror shall demonstrate recent, relevant experience as a prime contractor or joint venture partner on similar projects, using the form provided in Attachment 2, entitled “Company Specialized Experience - Offeror.”
6.2.1.2 If the Offeror is a joint venture, the proposal shall describe the role that each firm in the joint venture will play in executing the project. The demonstrated experience may come from any of the entities involved in the venture so long as they served as a prime contractor on the example project.
6.2.1.3 When proposing as a…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .