W26GLG20276136

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation Number W91236-12-R-0019, Multiple Aw ard Task Order Contract (MATOC) for Construction Projects at Arlington National Cemetery, Arlington, VA is amended as follow s:

See Continuation Page

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 30-Apr-2013

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91236-12-R-0019

X 9B. DATED (SEE ITEM 11)

14-Feb-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

29-Apr-2013

CODE

USA ENGINEER DISTRICT, NORFOLK

CONTRACTING OFFICE

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W91236-12-R-0019

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

The following items are applicable to this modification:

SECTION 00 11 00 - SOLICITATION, OFFER & AWARD

1. The following items are applicable to the MATOC scope of work:

a. DELETE existing Amendment 0002, attachment 2, section 00 22 10 para 5.2.2.a and REPLACE with “Presume a task order AWARD date of 17 June 2013. The Government does not guarantee award on that date.”

b. DELETE existing Amendment 0002, attachment 2, section 00 22 10 para

5.2.2.b.(i) and REPLACE with “physical construction work during regular working hours shall consist of an 8 hour period during the hours of 06:30 AM to 08:00 PM, Monday through Friday, excluding Government holidays.

During the weekdays, Monday through Friday, deliveries to the jobsite will be restricted to the hours of 06:30 a.m. to 08:00 a.m. With 24 hour written notification by the contractor deliveries on weekends and/or holidays and/or after regular working hours may be made available. All such deliveries shall be pre‐approved by the contacting officer ‐ but are not guaranteed.”

c. ADD to existing Amendment 0002, attachment 2, section 00 2210 para

5.2.2.b.(iii) “Work outside regular working hours requires Contracting Officer approval. Make application 15 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours. During periods of darkness, the different parts of the work shall be lighted in a manner approved by the Contracting Officer. Schedule contract work such as to make utility cut overs after regular working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise.

Work outside of regular working hours shall not interfere with the Marine Corp Sunset Parades which occur every Tuesday evening from 05:00 pm ‐ 11:00 pm.

Alternative work/delivery periods for nights, weekends and holidays are available upon written request by the contractor. Requests for additional work and/or regular extended hours shall require written approval from the Contracting Officer 7 days in advance of the proposed work period.

No work shall be performed outside the previously stated hours without prior written approval of the Contracting Officer.”

d. DELETE existing Amendment 0002, Attachment 1, para 1.1 and REPLACE with “This contract shall apply to projects at Arlington National Cemetery. The term of the contract is limited to a five (5) year base period.”

e. DELETE existing CLIN 0001 (from original solicitation on page 3 of 167) and REPLACE with “Multiple Award Task Order Contract (MATOC) for Design, Construction, or Design‐Build projects at Arlington National Cemetery, Arlington VA. This contract is for a base period of five (5) years. All projects under this MATOC POOL shall not exceed $35,000,000.00”

2. The following items are applicable to the seed project scope of work:

a. DELETE the following portion of existing Amendment 0007 specification section

01 14 00.00 50 para 1.3.3 Work Outside Regular Hours “The Parking Garage must be fully operational and occupiable on the weekend of Easter (March 29th ‐ March 31st) and on the weekend of Memorial Day (May 24th ‐ May 27th). No work or staging of materials shall be permitted during these dates. The job site must be clear of all contractor related materials, equipment or supplies. All contractor related materials, equipment or supplies shall be removed a minimum 24 hours before time period listed above.”

b. REPLACE in kind with “The Parking Garage must be fully operational and occupiable on the weekend of Labor Day (August 30th ‐ September 5th) and on the weekend of Veterans Day (November 8th – November 11th). No work or staging of materials shall be permitted during these dates. The job site must be clear of all contractor related materials, equipment or supplies. All contractor related materials, equipment or supplies shall be removed a minimum 24 hours before time period listed above.”

3. Reference Amendment 0002, Section 00 22 20:

a. On page 45, DELETE “Volume 2 ‐ Remaining Performance Capability Proposal” and REPLACE with “Volume 2 ‐ Pro Forma Information and Price”.

b. On page 50, DELETE “Volume 2 – Remaining Performance Capability and Price” and REPLACE with “Volume 2 – Pro Forma Information and Price”.

c. DELETE paragraph 6.3, 6.3.1 and 6.3.1 (a).

d. On page 45 and 47, DELETE “Volume 2 – Tab C – Required Pre‐Award Information, Not Rated”.

e. ADD to the end of paragraph 5.1, “Number of copies: Submit one original and four (4) copies of printed matter (Bound Volumes) and one CD. For Pro Forma Information, submit the original and one copy.”