This solicitation seeks proposals for the MacArthur Lock Tainter Valve Machinery Replacement project. The project involves replacing the mechanical drive system used to operate four tainter valves at the MacArthur Lock, excluding the motor. Work includes replacing components such as strut assemblies, gears, shafts, and bearings. There may also be some electrical wiring upgrades. Larger gears will be manufactured offsite and assembled onsite due to limited access. The estimated cost is between $5-10 million. The North American Industry Classification System code is 237990 and the size standard is $39.5 million in average annual receipts. Proposals are due in response to solicitation number W911XK20R0020 issued by the U.S. Army Corps of Engineers, Detroit District. Award will be made using a tradeoff process to the offeror providing the best value to the government.

View the file

Other files

File Type Posted
35 01 41.00 10.pdf PDF
Questions and Answers W911XK20R0020.pdf PDF
DC-79-070.pdf PDF
01 35 13.pdf PDF
W911XK20R0020 Amendment 0002.pdf PDF
G-002_AMD0002.pdf PDF
D1-14-06.pdf PDF
G-104_AMD0002.pdf PDF
Exhibit D.pdf PDF
Exhibit E.pdf PDF
Attachment 2.pdf PDF
W911XK20R0020 Solicitation 8 June 2020.pdf PDF
W911XK20R0020 RTA - SPECS.pdf PDF
W911XK20R0020 Amendment 0001.pdf PDF
W911XK20R0020 RTA - SPECS.pdf PDF
W911XK20R0020 Solicitation.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION W911XK20R0020

SOO MACARTHUR LOCK TAINTER VALVE MACHINERY REPLACEMENT

Attachment 1

PERFORMANCE RELEVANCY QUESTIONNAIRE

PART 1: EXPERIENCE INFORMATION FORM – PRIME CONTRACTOR

Provide the following information requested in this format for each of the three to five projects/contracts being described. Projects may be on going and cannot have been completed any earlier than 5 years from the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):_______________________________________________

B. Project/Contract Title: _______________________________________________________________

C. Contract Specifics:

1. Role (Check One): ______ Prime Contractor or ______ Subcontractor

2. Project/Contract Identification Number: ______________________________________________

3. Project/Contract Name: ___________________________________________________________

4. Contract Value: $____________________(initial) $____________________(final)

If value changed from initial to final, primary reason for change:

5. Completion Date: _________________(planned) _________________(actual/ forecast)

If value changed from planned to actual, primary reason for change:

6. Primary cause for Contract Modifications:

D. Provide a detailed description of the work performed under the contract, to include but not limited to: similarity of the construction methods; size; project scope; cost magnitude and complexity of work performed to those required for the proposed effort. Also discuss similarity of the client type and/or location at which work was performed to the location(s) at which work will be performed and the key personnel of the referenced project to the performance under the proposed contract.

In addition address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors please list name and principal areas of work they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this project.

4. If you intend to use any of the same key personnel on this solicitation’s project indicate by name and position those personnel occupied on the referenced contract. (Project Manager, Site Superintendent, Safety Officer, Quality Control Manager). Indicate what position they will have on this solicitation’s contract.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (see Section 00120 for information.) (Use as much space as necessary)

E. List point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired.

End of Part 1- Experience Information Form

**** Prepare and send Attachment 2 Questionnaire to the reference(s) for each of these projects. ****

PART 2: Provide the following information one time.

Additional offeror information required, but not project specific. This information need only be provided once in your submission package.

2 A. Applicable to all offerors - Describe your Compliance with the requirements of FAR clause 52.219-8, Utilization of Small Business Concerns (Oct 2014). (Even if you are a Small or Small Disadvantaged Business this clause in Federal Contracts applies. It is the policy of the United States that small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns shall have the maximum practicable opportunity to participate in performing contracts let by any Federal agency, including contracts and subcontracts for subsystems, assemblies, components, and related services for major systems. It is also policy to establish procedures to ensure the timely payment of amounts due pursuant to the terms of their subcontracts. Describe below the methods you have used to comply with this policy on prior federal contracts.

Include any evidence, or a point of contact to verify this information, if available.

2B: Unless previously discussed, provide the names of the following Key Personnel to be used on this project:

Project Manager, Site Safety & Health Officer, Site Superintendent, Quality Control Manager. In the event the intended key personnel for this construction do not have demonstrated past performance in the project(s) submitted in the Attachment 1, additional information is required. Each key personnel who is not currently a direct employee of the Offeror shall complete an executed “Subcontractor/ Key Personnel Information and Consent Form” as provided in the continuation section of Attachment 1. The Government may seek additional references and reserves the right to use the information provided to obtain additional references.

Attachment 1 Continued

SUBCONTRACTOR EXPERIENCE INFORMATION AND CONSENT FORM

PART 1 - SUBCONTRACTOR/KEY PERSONNEL INFORMATION AND CONSENT FORM

For The Release of Past Performance Information To The Prime Contractor

Past performance information concerning subcontractors and independent personnel cannot be disclosed to a private party without the subcontractor/person’s consent. Because a prime contractor is a private party, the Government will need that consent before disclosing subcontractor past and present performance information to the prime during exchanges. In an effort to assist the Government in assessing your past performance relevancy and confidence, we request that the following consent form be completed by the major subcontractors identified in your proposal. The completed consent forms should be returned to the offering prime contractor for submission with subcontractor information in the proposal.

_____________________________(Name of Firm or Person) is currently planning on participating as a (subcontractor and or Key Personnel) with _______________________________(prime contractor or name of entity providing proposal) in responding to the Solicitation Number W911XK20R0020 for the SOO MACARTHUR LOCK TAINTER VALVE MACHINERY REPLACEMENT construction project(s) issued by the U.S. Army Corps of Engineers.

We understand that the Government is placing increased emphasis on past performance in order to obtain best value in source selections. In order to facilitate the performance confidence assessment process we are signing this consent form to allow you to discuss our past and present performance information with the prime contractor during the source selection process.

___________________________________________ Date: _________________________________ (Signature)

(Title of Individual with authority to sign for and legally bind the company)

Company\ Name: __________________________________________ Telephone: _______________________

Address: ___________________________________________________________________________

City: _________________________________ State: ________ Zip Code:_________________

References (required contact for each project listed for subcontractor experience, and additional as desired):

1. Contract No. And Title_______________________________________________________________

Describe your role (Prime/Sub/Position) and work Performed ________________________________

Reference POC Name________________________________________ Phone__________________

Email address: _____________________________________________________________________

2. Contract No. And Title_______________________________________________________________

Describe your role (Prime/Sub/Position) and work Performed ________________________________

Reference POC Name________________________________________ Phone__________________

Email address: _____________________________________________________________________

3. Contract No. And Title_______________________________________________________________

Describe your role (Prime/Sub/Position) and work Performed ________________________________

Reference POC Name________________________________________ Phone__________________

Email address: _____________________________________________________________________

*** End of Part 1 – Consent Form ***

PART 2: SUBCONTRACTOR EXPERIENCE INFORMATION FORM

Prepare for each company or individual who is to perform twenty (20) percent or more of the work on the project

Provide the following information requested in this format for each of the two to three projects/contracts being described. Projects may be on going and cannot have been completed any earlier than 5 years from the solicitation issue date. Provide frank, concise comments regarding YOUR PERFORMANCE on the contracts you identify. Use as much space as required.

A. Offeror (Your) Name (Company/Division):_______________________________________________

B. Project/Contract Title: _______________________________________________________________

C. Contract Specifics:

1. Role (Check One): ______ Prime Contractor or ______ Subcontractor

2. Project/Contract Identification Number: ______________________________________________

3. Project/Contract Name: ___________________________________________________________

4. Total Contract Value: $____________________(initial) $____________________(final)

If value changed from initial to final, primary reason for change:

5. Completion Date: _________________(planned) _________________(actual/ forecast)

If value changed from planned to actual, primary reason for change:

6. Primary cause for Contract Modifications:

D. Provide a detailed description of the work performed under the contract, to include but not limited to: similarity of the construction methods; size; project scope; cost magnitude and complexity of work performed to those required for the proposed effort as described in Factor 1, Subfactor 1. Also discuss similarity of the client type and/or location at which work was performed to the location(s) at which work will be performed and the key personnel of the referenced project to the performance under the proposed contract.

In addition address the following

1. Describe the specific elements of the work performed by your firm.

2. Indicate what elements of work were performed by your major subcontractors and if those same subcontractors will be used on this project. If you intend to use these subcontractors please list name and principal areas of work they will perform.

3. Address any technical areas about this project you consider uniquely relevant to this project.

4. If you intend to use any of the same key personnel on this solicitation’s project indicate by name and position those personnel occupied on the referenced contract. (Project Manager, Site Superintendent, Quality Control Manager). Indicate what position they will have on this solicitation’s contract.

5. Describe why you believe the work is very relevant, relevant or semi-relevant to this solicited project. (see section 00120 for information.) (Use as much space as necessary)

E. List point of Contact for Owner/Government agency Contracting Officer and or inspector; include a current phone number and facsimile number. Email address is also desired.