SL_US-DEEPEN_CN110_Amend0001.pdf
PDF 831 KB Posted
- Attached to
- New Soo Lock Upstream Channel Deepening Federal contract opportunity
- Solicitation number
- W911XK20B0001
About this file
This document provides details for a federal contract solicitation for channel deepening work. The U.S. Army Corps of Engineers, Detroit District, intends to issue an Invitation for Bid for the New Soo Lock Upstream Channel Deepening project at Sault Ste. Marie, Michigan. The scope of work includes deepening the upstream approach to the locks in the north canal to a depth of 29 feet below Low Water Datum plus 1 foot of required over-depth and 1 foot of allowable over-depth, requiring the removal of approximately 300,000 cubic yards of bedrock and overburden material. A firm-fixed price construction contract valued between $25-100 million will be awarded for a 22 month period of performance to the responsible bidder providing the lowest price. The project's NAICS code is 237990 and it has a small business size standard of $36.5 million.
SL_US-DEEPEN_CN110_Amend0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ABSTRACT OF OFFERS-CONSTRUCTION-1419_W911XK20B0001.pdf | ||
| W911XK20B0001_Amendment_0002.pdf | ||
| NOTICE_AM_0002_folder_incorrectly_labeled_AM0003.pdf | ||
| STORAGE_TANK_PHOTOGRAPHS,_LEAD_BASED_PAINT_TEST_RESULTS_&_WASTE.pdf | ||
| UPSTREAM_CHANNEL_DEEPENING_CADD_FILES.zip | ZIP file | |
| UCD_Trailer_Location.pdf | ||
| ZIP_Folder_01_99_90_ATTACHMENTS_(1).zip | ZIP file | |
| W911XK20B0001_Amendment_0001.docx.pdf | ||
| Pre-Bid_Site_Visit_Sign-In_Sheet.pdf | ||
| 01_99_90_Attachments.zip | ZIP file | |
| Upstream_Channel_Deepening_Certified_Final_RTA_Specs.pdf | ||
| W911XK20B0001_Invitation_for_Bid.pdf | ||
| Upstream_Channel_Deepening_Certified_Final_RTA_Plans.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTHWEST PIER
SOUTHWEST PIER
REQ'D ACCESS ROAD
EXISTING ACCESS ROAD
FROM MOORING SITE
EXISTING ACCESS ROAD
FLEETING/MOORING AREA
SHARED CONTRACTOR MARINE
S O
L
IC
IT
A T
IO
N N
O
D E
S
IG
N E
D B
Y
D E
S C
R
IP
T
IO
N
A
M A
R K
S
IZ
E
S U
B M
IT
T E
D B
Y
D A
T E
C O
N T
R A
C T N
O
C H
E C
K E
D B
Y
D R
A W
N B
Y
IS
S
U E D
A T
E
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
SHEET ID
®of Engineers
US Army Corps
U .S
A R
M Y C
O R
P S O
F E
N G
IN
E E
R S
M V
D
N D
C
IN
L A
N D N
A V
A G
A T
IO
N D
E S
IG
N C
E N
T E
R L
R D
S
A AF
E
Y
Y
T
P S
C O
R P
S
O F
E N
G I
N E
E R
S
D E
T R
O I
T
D I
S T
R I
C T
I n c r e a s e r o f i t
S u b m i t
V
C P
S
V a l u e n g i n e e r i g
SLC+018
SLC+033/RJ1269
The code SLC+018 does not exist in the feature table
The code SLC+033/RJ1269 does not exist in the feature table
D
D
D
D
D
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
D
D
D
D
D
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
D
D
D
D
D
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
C B
DS: LRE_Screen.dscript.dscriptPD: LRE_pdf.pltcfg2:58:42 PM 10/30/2019
...\Active Projects\CG-St Marys River, MI (471310)- New Soo Lock US Channel Deepen\3 - CADD\CAD_BIM\_Sheets\
R O J E
C T N
U M
B E
R
F
IL
E N
A M
E
A N
S I
CN110
T R
O
IT
M I
M
IC
H
IG
A N A
V E
D E
T R
O
IT
D
IS
T R
IC
T
M S
T R
U M
U
S T
R E
A M C
H A
N N
E L D
E E
P E
N
IN
G
N E
W S
O O L
O C
K
S A
U L T S
T E
M A
R
IE
M I
C H
IP
P E
W A C
O U
N T
Y
W
X K
B
S L
LEGEND
B
M E
L B
Y
T S
M
IT
H
P
R O
S S
N O
R T
H W
E S
T P
IE
R
C
O N
T R
O L
O V
E R
A L L P
L A
C E
M E
N T P
L A
N
REQ'D PLACEMENT AREA
FLOW
NORTH CANAL
SOUTH CANAL
REQ'D STONE PROTECTION STORAGE AREA
CERTIFIED FINAL - READY TO ADVERTISE
O C
T
B1
SCALE: 1" = 200'
N
400'0 200'
OVERALL REQUIRED PLACEMENT SITE - NORTHWEST PIER CONTROL
S L
U S -D
E E
P E
N
C N
.d g
CAPACITY OF THE REQUIRED PLACEMENT SITE.
DEEPENING OF THE CHANNEL (UP TO 307,500 CYD) FITS IN THE AVAILABLE
METHOD OF PLACEMENT TO ENSURE THAT ALL OF THE MATERIAL FROM THE
CONTRACTOR IS RESPONSIBLE TO MANAGE THE SIZE OF MATERIAL AND
REQUIRED PLACEMENT SITE IS APPROXIMATELY 398,800 CYD. THE
SECTION 31 10 00. THE TOTAL VOLUME OF AVAILABLE CAPACITY WITHIN THE
ALL MATERIAL SHALL BE PLACED WITHIN THE TOLERANCES IDENTIFIED IN 4.
THE WATERWAY.
OVERFLOW OUT OF THE DETENTION DITCH DOES NOT ENTER DIRECTLY INTO
THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING THAT ANY 3.
THE C.O.R.
PLACEMENT AREA IS NOT PERMITTED UNLESS DIRECTED OTHERWISE BY
IN SECTION 31 10 00. PLACEMENT OF MATERIAL OUTSIDE OF THE REQUIRED
LIFT THICKNESS AND COMPACTION REQUIREMENTS SHALL BE AS SPECIFIED
PLACEMENT PLANS AND SLOPES SHALL NOT EXCEED 2H:1V. THE SPECIFIC
THE TOP ELEVATION OF THE PLACEMENT SITE SHALL BE AS SHOWN ON THE 2.
ALL LOCAL, STATE AND FEDERAL REGULATIONS ARE ABIDED BY.
THAT RUNOFF DOES NOT ENTER DIRECTLY INTO THE WATERWAY AND THAT
EROSION AND SEDIMENT CONTROL MEASURES ARE IN PLACE TO ENSURE
FROM THE CHANNEL DEEPENING HAS COMMENCED AS LONG AS ALL SOIL
ACCESS ROAD AND DETENTION DITCH AFTER PLACEMENT OF MATERIAL
CONTRACTOR CAN PROPOSE TO SEGMENT THE CONSTRUCTION OF THE
DRAWINGS AND AS SPECIFIED IN SPECIFICATION SECTION 35 31 19. THE
REQ'D ACCESS ROADS AND DETENTION DITCH AS SHOWN ON THE
SECTION 31 10 00. ADDITIONALLY, THE CONTRACTOR SHALL CONSTRUCT THE
OF THE UNIT 10 SLUICEWAY OF VEGETATION AS DESCRIBED IN SPEC
THE CONTRACTOR WILL CLEAR THE ENTIRE NORTHWEST PIER AREA WEST 1.
GENERAL NOTES
A M
E N
D M
E N
T
R
E V
IS
E D N
O T
E
CN111
A1
CN112
A1
CN113
A1
CN114
A1
CN115
A1
CN116
A1
CN117
A1
File details come from the government source that posted it. Updated .