W56MES92320326
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W911XK19R023
This amendment is issued to revise Table Item 0006 in the Scope of Work as follow s;
Type of Material: changed from "80' Articulating Boom" to "60' Articulating Boom"
Description/Salient Characteristics: changed from "platform height of 80' minimum" to "platform height of 60' minimum"
Response date and all other terms and conditons remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 10
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 06-Sep-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911XK19R0023
X 9B. DATED (SEE ITEM 11)
28-Aug-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
06-Sep-2019
CODE
U.S.ARMY ENGINEER DISTRICT, DETROIT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK19R0023
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0001
This amendment is issued to revise Table Item 0006 in the Scope of Work as follows;
Type of Material: changed from "80' Articulating Boom" to "60' Articulating Boom"
Description/Salient Characteristics: changed from "platform height of 80' minimum" to "platform height of 60' minimum"
End of changes
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
SCOPE OF WORK
This contract consists of two major components:
A. The supply of various construction-related equipment B. The supply and set-up/removal of two enclosed, heated scaffold systems.
Item A: Construction-related Equipment Specifications
1. This equipment will be used to support work in and around a lock and dam structure and may be used in a lock that has been dewatered. The equipment shall be equipped with engineered lifting points capable of supporting the fully assembled and fueled unit with a crane. The equipment shall be capable of operating on concrete or grass surfaces in winter conditions, including bitter cold, ice, and snow. All combustion engine powered equipment shall be equipped with a cold starting package, including engine block heater and battery warmer and shall be able to start and operate at temperatures as low as -20 degrees F.
2. The rental equipment shall be equal to the specified equipment in the table below. Proposed Brand Name equipment equals shall be consistent with identified salient features in the table below and primarily includes reach capabilities, load capacities, physical weight, dimensions, pump operating capacity and pump flow capacity. Any equipment falling outside of these specifications must be approved by the designated Government Technical Point of Contact.
Item Type of Material Description / Salient Characterisitics Qty Unit Duration 0001 Crane Broderson IC-250-3 industrial carry deck crane; 4x4;
with all weather enclosed cab, door, and heat;
with 2 and 4 part line blocks; with sufficient wire rope to lower lowest point of hook on 4 part line block at least 60' below grade with boom fully retracted and horizontal; with swing away jib
1 EA Dec 2 2019 to April 15 2020
0002 Compact Track Loader with general purpose bucket
Caterpillar 249D or equal; With general purpose bucket; With lifting points; Minimum operating capacity 2300 lb, 50% tipping load
2 EA Dec 2 2019 to March 25 2020
0003 Hydronic Ground Heater & hose
Wacker Neuson E1250P or Equal; Diesel;
Minimum 140,000 btu/hr input; Minimum 1000' hose; with fork pockets;
with lift points; Minimum run time at 100% 60 hours
2 EA Dec 16 2019 to March 25 2020
0004 Arc Welder 500 Amp Diesel; towable;
300' stinger and ground cable each;
Welding stinger and air arc gouging assembly
2 EA Jan 6 2020 to March 25 2020
0005 Air Compressor Towable, diesel, minimum 75 cfm at 90 psi 2 EA Jan 6 2020 to March 25 2020
0006 60' Articulating Boom Aerial Work Platform
Articulated boom lift with platform height of 60’ minimum.
Horizontal outreach 39’ minimum.
Operating weight 28,000 pounds maximum.
4 wheel drive capable of driving on a 45% grade Equipped with lifting points for lifting/lowering by crane.
3’ x 8’ platform 500 pound unrestricted platform capacity 360 degree swing 130 degree jib articulation range Outside turning radius 12’ maximum 12” ground clearance
3 EA Dec 16 2019
March 25 2020
0007 80' Articulating Boom Aerial Work Platform
Articulated boom lift with platform height of 80’ minimum.
Horizontal outreach 50’ minimum.
Operating weight 36,500 pounds maximum.
4 wheel drive capable of driving on a 45% grade Equipped with lifting points for lifting/lowering by crane.
3’ x 8’ platform 500 pound unrestricted platform capacity 360 degree swing 130 degree jib articulation range Outside turning radius 20’ maximum 12” ground clearance
2 EA Dec 16 2019
March 25 2020
0008 Fueling Service Fueling supply if equipment is not fully fueled when returned. Gasoline and Diesel as required, not to exceed 200 gallons
200 GAL Dec 6 2019 to April 15 2020
0009 4” Suction Hose Eddy Pump HD4000 or equal; 6” suction, 200’ head, 1200 gpm maximum flow.
Capable of solids up to 3” and 40-70% solids in flow.
1 EA Oct 7 2019 to Feb 7 2020
0010 5” Suction Hose Heavy Duty Polyurethane; 3 at 10’ sections and 2 at 5’ sections
1 EA Oct 7 2019 to Feb 7 2020
0011 Delivery/Pickup Base Items 0001-0010
1 JOB
Option 1 Trailer mounted vacuum excavator
Ditch Witch FX-65 or HX-75 or Equal; 150' 4" hose in 25' and 50' lengths with quick disconnect fittings; 500 gallon minimum spoils tank capacity; 200 gallon minimum water tank capacity; diesel water heater;
Reverse flow;
Winterizing glycol injection package;
Prospector digging lance; (2) 48" extensions for digging lance; 4" extendable 2 in 1 tool
1 EA Dec 16 2019
Option 2 12" hydraulic pump and critically silenced diesel HPU, piping and appurtenances
Godwin Heidra 300 hydraulic pump and critically silenced diesel HPU; Pump with lifting eye and frame;
Hydraulic hose sufficient to place pump 150' from HPU 12" 150# flange discharge
2 EA Jan 13 2020 to March 25 2020
Option 3 12" hydraulic pump piping and appurtenances
Quantity 50 12" SDR 17 Polyethylene pipe 10' length with 150 lb flanges Quantity 6 12" SDR 17 Polyethylene pipe 5' length with 150 lb flanges Quantity 6 12" SDR 17 Polyethylene pipe 3' length with 150 lb flanges Quantity 6 12" SDR 17 Polyethylene pipe 1' length with 150 lb flanges Quantity 10 12" SDR 17 Polyethylene 90 degree elbows with 150 lb flanges Quantity 6 12" SDR 17 Polyethylene 45 degree elbows with 150 lb flanges Gaskets and bolts for 100 of the above flange connections
1 EA Jan 13 2020 to March 25 2020
Option 4 60’ Articulating Boom Aerial Work Platform
Articulated boom lift with platform height of 60’ minimum.
Horizontal outreach 39’ minimum.
Operating weight 28,000 pounds maximum.
4 wheel drive capable of driving on a 45% grade Equipped with lifting points for lifting/lowering by crane.
3’ x 8’ platform 500 pound unrestricted platform capacity 360 degree swing 130 degree jib articulation range Outside turning radius 12’ maximum 12” ground clearance
3 EA Dec 16 2019 to March 25 2020
Option 5 Delivery/Pickup Option
1 JOB Dec 16 2019 to March 25 2020
Option 6 Delivery/Pickup Options 2 & 3
1 JOB Jan 13 2020 to March 25 2020
Option 7 Delivery/Pickup Option
1 JOB Dec 16 2019
3. Rental costs will be paid on a prorated basis should the equipment be returned earlier than the stated rental period. The contractor shall provide a weekly value which will be credited to the government for each full week following the government’s notification that equipment is no longer necessary.
4. All equipment shall arrive in fully functional condition, meet all OSHA safety and EM 385-1-1 requirements to include all required annual inspections be complete before the equipment arrives onsite.
Cranes shall not require annual inspection during the period that it remains onsite under rental. All safety lock-outs and devices shall be functioning as intended by the manufacturer and come complete with all necessary documentation and certifications where applicable. Delivered equipment that is judged by the designated Government Representative to be unsafe or nonconforming shall be promptly removed from site at the Contractor’s expense.
5. Any routine equipment maintenance or any repairs required shall be furnished and installed by a qualified person supplied by the contractor. Daily equipment checks (supplied with the equipment) will be completed by the Government person operating the equipment. Any deficiencies noted will be promptly reported to the contractor who will have six (6) hours from the time of notification to correct the deficiencies.
6. The transportation and delivery costs of all rental equipment and associated materials to and from the job site at 119 East Water St., Sault Ste. Marie, MI 49783 is the responsibility of the contractor throughout the term of the contract.
7. The rental equipment shall be onsite on or before the date stated in the delivery schedule. Delivery shall be coordinated with a designated Government representative, and shall be scheduled to arrive at the job site Monday through Friday between the hours of 7:00 a.m. and 3:00 p.m. EST, excluding Federal holidays listed below. Coordination with the Government representative for a firm delivery time shall be made at least four (4) hours prior to delivery. Alternate delivery times must be approved on a case-by-case basis by the designated Government representative.
Anticipated Federal Holidays:
25 December 2019 – Christmas Day 1 January 2020 – New Year’s Day 20 January 2020 – Martin Luther King Day 17 ebruary 2020 – President’s Day
8. The rental period shall commence on the first full regular work day, Monday thru Friday, excluding weekends and Federal Holiday, following the day of delivery.
9. The contractor shall be capable of providing maintenance and repair on site, on an as needed basis within six (6) hours of the reported equipment deficiency, to include nights, weekends, and federal holidays. If the nonoperational equipment cannot be repaired within 24 hours, the contractor shall be required to replace the equipment in kind within 36 hours of the original notification.
10. The technical point of contact is Pete Sporte (906) 635-3456. Alternate points of contact are Aaron Miller
(906) 635-3472 and Justin Proulx (906) 635-3477.
Item B: Enclosed, Heated Scaffold System specifications
Overview:
The contractor shall provide two fully enclosed and heated scaffold structures approximately 80’ wide by 50’ high along with a stairway at one end of each enclosure in order for the Soo Area Office to perform maintenance on the Poe Lock miter gate #1 from January 22, 2020 to March 17, 2020. The heated, enclosed spaces shall be complete and available for the Government’s use for a continuous period of six weeks during that time period.
Proposal Requirements:
Along with the proposal, the bidder shall submit the following information that will be used to determine contractor responsibility for award:
1. Listing of the following tasks and whether a subcontractor or the bidder’s own forces will perform the work.
Identify subcontractor to be used for each task, including the city and state in which the main office is located.
a. Work Plan preparation
b. Engineering of scaffold/enclosure
c. Engineering of heating/ventilation system
d. Erection of scaffold/enclosure
e. Installation of heating/ventilation system
Reference Documents:
Attached sketches:
Sketch 1: Enclosure schematic – Plan Sketch 2: Enclosure schematic – Elevation Sketch 3: Site Plan
Drawings of existing construction:
D2-11-1: Lock Plan and Sections D2-11-3: North Wall D2-11-13: North Wall Sections D2-16-1: Lock Floor D2-16-7: Lock Floor Details D2-32-1: Miter Gate Framing D2-32-3: Top Girder D2-32-5: Intermediate Girders D2-32-6: Bottom Girder D2-35-1: Walkway
Safety Standards:
ASCE/SEI 7 – Minimum Design Loads for Buildings and Other Structures USACE EM 385-5-1 – Safety and Health Requirements Manual ANSI/ASSE Z359 series – Fall Protection and Arrest Standards
Specific requirements:
Scaffolding walkways shall be provided approximately every 7 feet vertically. Walkways shall be fully decked at least 36 inches wide for the full length of each level. Guard rails are not required but anchor points for fall protection shall be reachable from any point on the walkway.
Stairways shall have guard rails and toe boards in order to eliminate the need for fall protection while traversing them.
The enclosure shall be designed for structural loads in accordance with ASCE/SEI 7. The site’s basic wind speed is 90 miles per hour, the surface roughness category is C, and the exposure Category is C. The site’s ground snow load is 70 pounds per square foot.
Detailed drawings of the scaffolding configuration shall be submitted to the Government for approval by 15 October 2019. Scaffolding layout and anchoring shall be designed by a licensed professional engineer, with sealed calculations provided to the Government. The miter gate will be considered an adequate anchor for horizontal loads up to 10,000 pounds per location. Welding or drilling the existing gate members will NOT be permitted. Outside of the gate area, the contractor may install temporary anchors up to 8 inches deep in the concrete lock walls and floor system. Anchors shall be removed and any openings shall be patched upon removal.
A designated storage area will be provided at the Depot Lot. A designated staging area will be provided between the Poe and MacArthur Locks. A temporary bridge across the MacArthur Lock will be available from January 3, 2020 through April 7, 2020 for vehicular access to the staging area. The bridge is a single lane modular structure with 12’ width between guard rails and AASHTO HS25-44 load rating. The bridge deck will be 30” above the adjacent travelled surface and will have gravel slopes installed for transition. Other than for pedestrians, access to the north side of the Poe Lock is only available with floating plant resources. The Government will provide one day of floating plant resource for mobilization (approximately December 4, but no later than December 19) and demobilization (approximately May 1, but no later than May 15) of equipment.
Weather conditions during the time period include average low temperatures of 5 degrees F and average high temperatures of 20 degrees. It is not uncommon to have multiple days when the high temperature is subzero. The lowest anticipated temperature is 30 degrees below zero. Average snowfall during this time period is approximately 60 inches. The contractor is responsible for snow removal in his storage, staging, and work areas. The contractor is expected to work through all conditions unless the combination of temperature and wind causes a wind chill calculation lower than 20 degrees below zero.
The contractor shall provide all equipment and personnel necessary to erect and enclose the scaffold system. A Qualified Person for scaffolding shall be on site at all times work is being performed. The contractor shall provide all load-handling equipment and operators required to erect the enclosed scaffold. Prior contractors have positioned a 75 ton, 128’ boom, rough terrain crane near each gate.
Heating and ventilation shall be provided for each enclosure. The heating system shall be capable of maintaining a temperature of 70 degrees inside the enclosure when the outside temperature is -20 degrees F. A 4” natural gas connection supplying 6300 MBH will be available at the steam plant, which will require the contractor to supply and install approximately 600 feet of piping to reach the center of the bottom of the lock. The ventilation system shall be capable of 10 air changes per hour, with temperature inside enclosure dropping no more than 10 degrees F.
Lighting shall be provided within the enclosure, sufficient to provide 10 FC at each scaffold level.
Utilities: The Government will provide electrical power and natural gas as identified on the drawing. The Contractor shall provide any additional required utilities, including restroom facilities.
A work plan shall be submitted to the Government for approval by 31 October 2019. The work plan shall include:
1. Project schedule: Include delivery of materials to the facility, construction of stair scaffolding erection of gate scaffolding, enclosure of scaffolding, installation of heating and ventilating system, and remainder of appurtenances.
Include the removal of all items. Schedule shall be on a calendar day basis and shall include the following milestones:
- January 22: Scaffold erection within lock chamber shall begin
- March 17: All contractor materials and equipment out of lock
2. Logistics Plan: Include a drawing of the staging areas, crane positioning, and connection points to Government utilities. Provide heating and ventilation system information (system design basis, list of units with size, weight, output, and utility connection needs.) Identify load handling equipment (for both ground level and lock floor operations.) Identify the number of workers on each crew. Identify Government-provided equipment or resources needed.
3. Accident Prevention Plan (APP): Identify hazards associated with activities on site, how the hazards will be mitigated, who will be responsible, and the training of the persons involved. Minimum items to addressed include fall protection, load handling equipment, rigging, and scaffolding. The scaffold erector shall provide documentation of an ANSI Z359.2-compliant Comprehensive Managed Fall Protection Program with designation of authorized, competent, and qualified persons and program administrator. A project-specific fall protection plan including rescue plans shall be included in the APP.
Security and Clearance of Personnel
A. Security Requirements and Clearance of Personnel
• The work area is under civilian guard and is located in an area where security regulations are in effect.
• The Contractor shall acquaint itself with the prevailing security rules and regulations and comply therewith in conducting its operations.
• All personnel employed by the contractor in the performance of the services specified in this contract or any representative of the Contractor entering the work area shall conform to all security regulations and rules which may be in effect during the contract period.
B. E-Verify Program
• The Contractor must screen all personnel using the E-verify Program (http://www.dhs.gov/e-verify) to meet the established employment eligibility requirements.
• The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to ensure the correct information is entered into the E-verify system.
• An initial list of verified/eligible employees shall be provided to the COR no later than 3 business days after the initial contract award.
C. Clearance of Personnel
• All contractor and subcontractor employees entering the work site are required to have a background investigation to include a National Agency Check conducted along with a local records check and FBI National Criminal History Check (fingerprint check).
• The government will provide the required forms and conduct electronic fingerprinting.
• The contractor will be required to complete the forms and obtain fingerprints for each employee.
• The completed paperwork shall be provided to the Contracting Officers Representative.
• Each employee prior to starting work on the site must have a favorable adjudication.
• Contractor and subcontractor employees who have had a prior investigation by the Department of Defense or any of its sub departments will have their prior background investigations reviewed on a case by case basis for determination if the investigation is acceptable or current.
• All contractor and subcontractor employees in possession of a valid/current TWIC (Transportation Worker Identification Card) may forgo the background investigation process upon review/approval from the Detroit District Security Office, on a case by case basis.
• Contractor and subcontractor employees, who are in the process of obtaining a TWIC at the time of Contract execution, will not be accepted for clearance, these persons must undergo the background investigation process administered by the U.S. Army Corps of Engineers, Detroit District.
• Contractor and subcontractor employees in possession of a TWIC and who are Foreign Nationals must undergo a background investigation regardless of TWIC possession.
D. Security Access List
• The contractor shall be required to maintain a list of personnel needing access to the site.
• The list shall be updated at least weekly or each time a change is made.
• The template for the list will be provided to the contractor at the Pre-construction conference.
E. Security Checks
• The Contractor's employees must enter the site through the main security checkpoint unless otherwise approved by the Contracting Officer.
• All employees must carry pictured identification at all times.
• They must show I.D. upon request by security personnel.
• The Contractor's employees will be subject to such additional checks as may be deemed necessary to ensure that no violation of security rules has occurred.
F. Exclusion or Expulsion from the Site
• A negative background investigation may result in the exclusion or expulsion of the contractor employee from the site as determined by the District Security Office in accordance with AR 380-67. Failure to observe the security rules will result in the exclusion or expulsion of Contractor employees from the site.
• Exclusion or expulsion of an employee resulting from negative background check or the failure of an employee to observe the security rules shall not be subject to the Disputes clause and shall not result in an increase in the contract amount.
(End of Summary of Changes)