Additional_questions_were_received_on_11_September.pdf
PDF 47 KB Posted
- Solicitation number
- W911XK19R0023
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IMG_0034.JPG | JPG image | |
| 20180126_101431.jpg | JPG image | |
| Additional_Government_Response_to_Questions.pdf | ||
| W911XK19R0023-0001.pdf | ||
| Government_Response_to_Questions.pdf | ||
| Sketch_1_Enclosure_Schematic_Elevation.pdf | ||
| Sketch_3_2019_Winter_Work_Site_Plan.pdf | ||
| Reference_Drawings.pdf | ||
| W911XK19R0023.pdf | ||
| Sketch_2_Enclosure_Schematic_Elevation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional questions were received on 11 September
Reference CLIN 0016
Question 1. What is the Vertical pumping distance?
Answer. 65 feet
Question 2. What is the Horizontal pumping distance?
Answer. 200 feet
Question 3. What is the Type of Pump set up: cable deployed, deployed off excavator or stand-alone unit?
Answer. Stand-alone Unit
Reference CLIN 0019
Question 4. How close can one park a delivery truck to the scaffolding installation location?
Answer. During the period that the MacArthur Lock temporary bridge is in place, a delivery truck will be able to get within approximately 400 feet of the south end of Poe Lock Gate 1. The truck can park while unloading, but not for extended periods.
Question 5. Will we be parking at the top and lowering the material down into the Lock area?
Answer. Scaffold materials will need to be unloaded from the delivery truck and moved approximately 400 feet to the point where they can be lowered to the Gate 1 sill area.
Small load handling equipment can traverse this area, but it is quite congested.