AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY19 Sheboygan South Breakw ater Repair, Wisconsin

This amendment is issued to make changes to the Specif ications and Plans. The responsed date has changed to 29 August 2019 at 2:00pm Eastern. Reference changes on the follow ing pages. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911XK19B0015

X 9B. DATED (SEE ITEM 11)

22-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Aug-2019

CODE

U.S.ARMY ENGINEER DISTRICT, DETROIT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK19B0015

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

AMENDMENT 0005

CHANGES TO SPECIFICATIONS

1. SECTION - 01 45 00.00 10 QUALITY CONTROL – PART 3 EXECUTION – 3.4.3 CQC Personnel.

Deleted - Language from paragraph 3.4.3 CQC Personal and revised to new language.

Added/Revised – New Language paragraph 3.4.3 CQC Personnel:

“In addition to CQC personnel specified elsewhere in the contract, provide as part of the CQC organization specialized personnel to assist the CQC System Manager for the following areas: civil, structural. These individuals or specialized technical companies are directly employed by the prime Contractor and cannot be employed by a supplier or subcontractor on this project; be responsible to the CQC System Manager; be physically present at the construction site during work on the specialized personnel’s areas of responsibility; have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals can perform other duties but need to be allowed sufficient time to perform the specialized personnel's assigned quality control duties as described in the Quality Control Plan. A single person can cover more than one area provided that the single person is qualified to perform quality control activities in each designated and that workload allows.”

2. SECTION 02 13 90 SITE PREPARATION – PART 3 EXECUTION – 3.1 REMOVAL OF OBSTRUCTIONS.

Deleted - Language from paragraph 3.1 REMOVAL OF OBSTRUCTIONS and revised with new language.

Added/Revised New language paragraph 3.1 REMOVAL OF OBSTRUCTIONS:

“The existing items which are to be removed to allow for the required construction work shall be as indicated on the drawings and specified herein. All of the area within the limits of the required work, as shown on the drawings, shall be cleared of vegetation, scrap, organic debris, and other unsatisfactory materials. Existing concrete cap to be partially removed as shown on the drawings. Existing stone and concrete shall be incorporated into the work and not be removed from the site. Protruding metal items, shall be cut off and removed. Warning signs and posts within construction boundaries shall be removed during construction, stored and reinstalled at completion of construction.

The waste materials obtained from these operations shall be disposed of as specified in Paragraph "DISPOSAL."

Replacement of signs and mounting posts shall be as directed by Government's on-site representative.”

3. SECTION 05 41 10 – METAL SHEET PILING - PART 2 PRODUCTS

Deleted - Paragraph 2.1.2 Pile Shoes.

CHANGES TO PLANS

Added General Notes to Sheet RR100:

1. THE EXISTING REVETMENT MAY BE USED FOR CONSTRUCTION SITE ACCESS.

2. THE CONTRACTOR SHALL TAKE THE NECESSARY PRECAUTIONS TO ENSURE THE

EXISTING REVETMENT DOES NOT EXCEED DESIGN LOAD OF 150 PSF.

W911XK19B0015

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 28-Aug-2019 02:00 PM to 29-Aug-2019 02:00 PM.

(End of Summary of Changes)