RFIs_W911XK19B0015_Sheboygan_Breakwater_Repair.pdf

PDF 129 KB Posted

Attached to
FY19 SHEBOYGAN SOUTH BREAKWATER REPAIR
Solicitation number
W911XK19B0015
Issued by

View the file

Other files

File Type Posted
Construction_Abstract_Sheboygan_South_Breakwater.lsx.pdf PDF
W911XK19B0015-0005.pdf PDF
SPECIFICATION_AMEND_0005.pdf PDF
PLANS_SHEET_RR100_AMEND_0005.pdf PDF
W911XK19B0015_0004.pdf PDF
Sheboygan_Concrete_Foot_Block_Photos.pdf PDF
W911XK19B0015_0002.pdf PDF
W911XK19B0015_0001.pdf PDF
SOLICITATION_W911XK19B0015.pdf PDF
SPECIFICATION.pdf PDF
DRAWING-PLANS.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Bid Inquiry Contractor Report All Inquiries

Project: FY19 Sheboygan Harbor South Breakwater Repairs Review: Sheboygan South Breakwater Repair Bidder Inquiry Placeholder (00001) (sorted by CommentID ) Displaying 11 inquiries.

Id Discipline Sheet Detail Spec 8136354 Structural Instructions to Bidders Section 00 21 13 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is there going to be a Pre-Bid Meeting or Site Visit for this project?

On: Aug 12 2019.

Government Response. . An organized site visit has not been scheduled for this project. It is our understanding that the breakwater does not have restricted access and can be viewed at any time. Site Visits can be coordinated with Dan Wiesner, Chief of Construction, at 920-388-3720. On: Aug 13 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8137942 Contracting V-301 Section M & N Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Sections M & N on sheet V-301 provides note that the concrete foot blocks are heavily scoured and have uneven settlement. Is there an underwater survey that indicates actual elevations of the concrete foot blocks after the settlement? Please advise.

On: Aug 13 2019.

Government Response. . There is no survey available of the concrete foot blocks. However, several photographs of the scoured concrete foot blocks will be loaded to www.fbo.gov. On: Aug 15 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142321 Contracting 05 41 10-2.1.2 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Pile Shoes - are pile shoes required on all sheet piles?

On: Aug 15 2019.

Government Response. . Pile shoes are not required. Reference amendment. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142334 Contracting 02 13 90-3.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Indicates removal of wood piling and other items that do not apply? Also indicates that existing stone and concrete should be incorporated into the site. Are the concrete slabs removed from the top of the breakwater supposed to be incorporated into the site or disposed of offsite?

On: Aug 15 2019.

Government Response. . The removal of the timber structure does not apply to this project. An amendment has been issued. Yes, concrete removed shall be incorporated into the project. On: Aug 26 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142336 Contracting S-501 & S-502 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Page 1 of 3ProjNet: Logged In User

8/26/2019https://www.projnet.org/projnet/binKornHome/index.cfm?strKornCob=BicPublicReportAl...

Temporary and Typical end closure sheet pile will hit wood crib base blocks. Are the sheet pile to stop at that elevation or is the wood to be removed?

On: Aug 15 2019.

Government Response. . Sheet pile will stop at the elevation of the timber crib base. No portion of the timber structure shall be removed. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142346 Contracting S-501 E6 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Are the 3/4" concrete anchor bolts to be installed down to water surface or down to lake bed?

On: Aug 15 2019.

Government Response. . Concrete anchor bolts at the pier head connection will extend down to the lake bed. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142349 Contracting S-502 F6 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Is the bolt detail two bolts per each sheet pile or two bolts per each pan?

On: Aug 15 2019.

Government Response. . The bolt detail is of two bolts per sheet pile. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142363 Contracting RR100 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Storage area shown does not connect to the channel. This is required to transfer materials and concrete trucks from the storage area onto a barge. Could you please include access to the water and perhaps require construction of a pedestrian walk around the back side of the storage area so pedestrians can still access the portion of the breakwater that will not be closed for construction? or is the entire breakwater closed for construction?

On: Aug 15 2019.

Government Response. . Revetment may be used to load barges not for storage. Precautions must be made to ensure that loading on the revetment does not exceed the design load of 150 psf. An amendment has been issued. The breakwater will be closed for construction. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8142369 Contracting 01 45 00-3.4.3 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

This paragraph contains personnel requirements unrelated to this project. Please update the list of specialized CQC personnel required on this project.

On: Aug 15 2019.

Government Response. . List of specialized CQC personnel will be updated. AN Amendment has been issued. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8144287 Contracting 03 25 00-3.1 Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Joints - joints are to be installed at locations shown on plans. They are not shown on plans. What is the required spacing for expansion joints?

Page 2 of 3ProjNet: Logged In User

On: Aug 16 2019.

Government Response. . Joint requirements can be found in general notes sheet S-100 as well as required joint between new and existing concrete sheet S-101. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

8145558 Contracting none Comment Classification: Unclassified\\For Official Use Only (U\\FOUO)

Posted photo of missing foot block - is the missing foot block in the sheet pile driving line excavation?

On: Aug 16 2019.

Government Response. . Existing foot block is a portion of the concrete foot block near the pier head and is not in the sheet pile driving line excavation. On: Aug 26 2019 Current Request Status: Request Closed

Information for this report is procurement sensitive.

Report Complete

UNCLASSIFIED\\FOR OFFICIAL USE ONLY

Patent 11/892,984 ProjNet property of ERDC since 2004.

Page 3 of 3ProjNet: Logged In User

File details come from the government source that posted it.