01_22_00.00_10_AMENDMENT_0001.pdf

PDF 37 KB Posted

Attached to
FY18 St. Louis River AOC Slip 3 and Slip C Remedial Cap
Solicitation number
W911XK18B0007
Issued by

About this file

Specifications 01 22 00.00 10 Amendment 0001

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTI ON 01 22 00. 00 10

PRI CE AND PAYMENT PROCEDURES ( AMENDMENT 1)

08/15

PART 1 GENERAL

1. 1 SI NGLE JOB PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act f or whi ch cont r act j ob payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. Al l cost s f or i t ems of wor k, whi ch ar e not speci f i cal l y ment i oned t o be i ncl uded i n a par t i cul ar j ob or uni t pr i ce payment i t em, ar e i ncl uded i n t he l i s t ed j ob i t em most c l osel y associ at ed wi t h t he wor k i nvol ved. The j ob pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or whi ch separ at e payment i s not ot her wi se pr ovi ded.

1. 2 UNI T PRI CE PAYMENT I TEMS

Payment i t ems f or t he wor k of t hi s cont r act on whi ch t he cont r act uni t pr i ce payment s wi l l be made ar e l i s t ed i n t he BI DDI NG SCHEDULE and descr i bed bel ow. The uni t pr i ce and payment made f or each i t em l i st ed const i t ut es f ul l compensat i on f or f ur ni shi ng al l pl ant , l abor , mat er i al s, and equi pment , and per f or mi ng any associ at ed Cont r act or qual i t y cont r ol , envi r onment al pr ot ect i on, meet i ng saf et y r equi r ement s, t est s and r epor t s, and f or per f or mi ng al l wor k r equi r ed f or each of t he uni t pr i ce i t ems.

1. 3 BI DDI NG SCHEDULE

1. 3. 1 0001 Mobi l i zat i on and Demobi l i zat i on

1. 3. 1. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h mobi l i zat i on and demobi l i zat i on. Thi s i t em consi st s of al l mat er i al s and l abor r equi r ed t o compl et e t he wor k of pr epar at i on and di st r i but i on of t he pr econst r uct i on submi t t al s as speci f i ed i n SECTI ON 01 33 00 Submi t t al Pr ocedur es. Thi s i t em al so consi st s of al l mat er i al s, l abor , and equi pment t o compl et e wor k act i v i t i es f or mobi l i zat i on and demobi l i zat i on. Mobi l i zat i on wor k shal l i ncl ude, but not be l i mi t ed t o, obt ai ni ng of al l per mi t s speci f i ed i n SECTI ON 01 11 00 Summar y of Wor k t hat ar e not obt ai ned by t he Gover nment ;

movi ng ont o t he s i t e of al l equi pment and per sonnel ; t r anspor t at i on t o and f r om t he si t e; shop dr awi ng pr epar at i on; submi t t al s; admi ni st r at i on;

det ai l ed const r uct i on l ayout s; and coor di nat i on necessar y f or t he Cont r act or t o pr ovi de and mai nt ai n per sonnel and equi pment at t he pr oj ect s i t e t o compl et e wor k r equi r ed under t he Cont r act . Mobi l i zat i on cost s shal l al so i ncl ude pr ovi di ng per sonal pr ot ect i ve equi pment ( PPE) t o al l s i t e per sonnel . Demobi l i zat i on wor k shal l i ncl ude, but not be l i mi t ed t o, decont ami nat i on of s l i p l evel i ng dr edge bucket ; r emovi ng al l equi pment ;

mat er i al s; t empor ar y const r uct i on f aci l i t i es, f i el d of f i ces, ut i l i t i es, and f enci ng; and r est or at i on OF Cont r act or ar r anged st agi ng ar eas t o pr econst r uct i on condi t i ons.

SECTI ON 01 22 00. 00 10 Page 1

AMENDMENT 1

1. 3. 1. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 2 0002 Tur bi di t y Cur t ai n I nst al l at i on & Mai nt enance of Sl i p 3 & C

1. 3. 2. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h t he i nst al l at i on, mai nt enance, and r emoval of t he r equi r ed ( 2) Tur bi di t y Cur t ai ns as speci f i ed i n SECTI ON 35 20 23 DREDGI NG.

1. 3. 2. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 3 0003 Pi l ot Test s Sl i p 3 & C

1. 3. 3. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h t he pi l ot t est s per f or med i n Sl i p 3 and Sl i p C as speci f i ed i n SECTI ON 35 20 24 CAP CONSTRUCTI ON.

1. 3. 3. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 4 0004 Sl i p Level i ng - Sl i p 3

1. 3. 4. 1 Payment

Thi s i t em shal l i ncl ude gr adi ng t he sl i p bot t om as shown on dr awi ngs CN 101 and CN 102. Al l mat er i al wi t hi n t he desi gnat ed pr oj ect ar ea t hat i s above - 10. 5 LWD shal l be dr edged and pl aced wi t hi n t he pr oj ect ar ea i n t he open wat er pl acement ar eas bel ow - 10. 5 LWD. Thi s pay i t em shal l i ncl ude t he cost of r emoval , conveyance and pl acement of al l mat er i al s meet i ng t he descr i pt i on speci f i ed i n SECTI ON 35 20 23 " DREDGI NG" par agr aph " Char act er of Mat er i al s" and as shown on t he dr awi ngs and as speci f i ed her ei n, except or i gi nal mat er i al s, l edge r ock, boul der s, cobbl es, r ock f r agment s, wr ecks, scr ap mat er i al s, snags, st umps, pi l es, debr i s or ot her mat er i al whi ch cannot be r emoved by t he pl ant speci f i ed i n t he accept ed bi d, or t he equi val ent of such pl ant , wi t hout bl ast i ng or speci al appar at us. The uni t pr i ce shal l al so i ncl ude t he cost of al l wor k r equi r ed t o be per f or med f or t he use of t he pl acement ar ea. Not hi ng i n t hi s par agr aph shal l be const r ued as pr ohi bi t i ng t he r emoval of except ed mat er i al by speci al means at t he pr i ces agr eed and appr oved i n accor dance wi t h appl i cabl e pr ovi s i ons of t he cont r act .

The quant i t i es t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) f r om t he dr edge and pl acement ar eas of Sl i p 3.

1. 3. 4. 2 Uni t of Measur e

Uni t of measur e: Job

SECTI ON 01 22 00. 00 10 Page 2

1. 3. 5 0005 Subaqueous Cap Layer A Const r uct i on and Ar ea B - Sl i p 3

1. 3. 5. 1 Payment

Thi s i t em shal l i ncl ude al l wor k necessar y f or t he const r uct i on of Layer A of t he subaqueous cap i ncl udi ng dr edgi ng f r om t he Feder al Navi gat i on Channel and pl acement wi t hi n Sl i p 3 as speci f i ed i n SECTI ON 35 20 24 CAP CONSTRUCTI ON and shown i n t he dr awi ngs.

The pr i ce f or dr edgi ng shal l i ncl ude t he cost of r emoval , conveyance and pl acement of al l mat er i al s meet i ng t he descr i pt i on speci f i ed i n SECTI ON 35 20 24 CAP CONSTRUCTI ON and as shown on t he dr awi ngs and as speci f i ed her ei n, except or i gi nal mat er i al s, l edge r ock, boul der s, cobbl es, r ock f r agment s, wr ecks, scr ap mat er i al s, snags, st umps, pi l es, debr i s or ot her mat er i al whi ch cannot be r emoved by t he pl ant speci f i ed i n t he accept ed bi d, or t he equi val ent of such pl ant , wi t hout bl ast i ng or speci al appar at us. The pr i ce shal l al so i ncl ude t he cost of al l wor k r equi r ed t o be per f or med f or t he use of t he pl acement ar ea. Not hi ng i n t hi s par agr aph shal l be const r ued as pr ohi bi t i ng t he r emoval of except ed mat er i al by speci al means at t he pr i ces agr eed and appr oved i n accor dance wi t h appl i cabl e pr ovi s i ons of t he cont r act .

The cap t hi ckness t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) at t he pl acement s i t e i n Sl i p 3. The mi ni mum r equi r ed Layer A const r uct ed t hi ckness i s 22 i nches and t he const r uct ed t hi ckness shal l not exceed 28 i nches. Cost s associ at ed wi t h pl acement or r emoval of addi t i onal mat er i al s t o meet speci f i ed t hi ckness t ol er ances wi l l not be pai d by t he Gover nment .

1. 3. 5. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 6 0006 Subaqueous Cap Layer B Const r uct i on Shal l ow Ar ea, Ar ea B and Tr ansi t i on Ar ea - Sl i p 3

1. 3. 6. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, t r anspor t i ng, st ockpi l i ng ( i f appl i cabl e) , pl aci ng, const r uct i ng, and mai nt ai ni ng unt i l accept ed t he Layer B subaqueous cap at desi gnat ed ar ea wi t hi n Sl i p 3 as speci f i ed i n SECTI ON 35 20 24 ' CAP CONSTRUCTI ON' and shown i n t he cont r act dr awi ngs. Thi s i t em al so i ncl udes payment associ at ed wi t h t he pr epar at i on and r est or at i on of st agi ng ar eas ar r anged by Cont r act or whi ch shoul d be r et ur ned t o pr e- const r uct i on condi t i on or bet t er upon compl et i on of pr oj ect . Cost s associ at ed wi t h obt ai ni ng l and f or st ockpi l i ng wi l l not be pai d f or .

The cap t hi ckness t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) at t he pl acement s i t e. The mi ni mum r equi r ed Layer B const r uct ed t hi ckness i s 6 i nches and t he const r uct ed t hi ckness shal l not exceed 12 i nches. Cost s associ at ed wi t h pl acement or r emoval of addi t i onal mat er i al s t o meet speci f i ed t hi ckness t ol er ances wi l l not be pai d by Gover nment .

1. 3. 6. 2 Uni t of Measur e

Uni t of measur e: Job

SECTI ON 01 22 00. 00 10 Page 3

1. 3. 7 0007 Subaqueous Cap Layer B Const r uct i on Deep Ar ea and Apr on Ar ea - Sl i p 3

1. 3. 7. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, t r anspor t i ng, st ockpi l i ng ( i f appl i cabl e) , pl aci ng, const r uct i ng, and mai nt ai ni ng unt i l accept ed t he Layer B subaqueous cap at desi gnat ed ar ea wi t hi n Sl i p 3 as speci f i ed i n SECTI ON 35 20 24, ' CAP CONSTRUCTI ON' and shown i n t he cont r act dr awi ngs. Thi s i t em al so i ncl udes payment associ at ed wi t h t he pr epar at i on and r est or at i on of st agi ng ar eas ar r anged by Cont r act or whi ch shoul d be r et ur ned t o pr e- const r uct i on condi t i on or bet t er upon compl et i on of pr oj ect . Cost s associ at ed wi t h obt ai ni ng l and f or st ockpi l i ng wi l l not be pai d f or .

The cap t hi ckness t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) at t he pl acement s i t e. The mi ni mum r equi r ed Layer B const r uct ed t hi ckness i s 6 i nches and t he const r uct ed t hi ckness shal l not exceed 12 i nches. Cost s associ at ed wi t h pl acement or r emoval of addi t i onal mat er i al s t o meet speci f i ed t hi ckness t ol er ances wi l l not be pai d by Gover nment .

1. 3. 7. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 8 0008 Subaqueous Cap Layer A Const r uct i on - Sl i p C

1. 3. 8. 1 Payment

Thi s i t em shal l i ncl ude al l wor k necessar y f or t he const r uct i on of Layer A of t he subaqueous cap i ncl udi ng dr edgi ng f r om t he Feder al Navi gat i on Channel and pl acement at desi gnat ed ar ea wi t hi n Sl i p C as speci f i ed i n SECTI ON 35 20 24 CAP CONSTRUCTI ON and shown i n t he dr awi ngs.

The Cont r act pr i ce f or dr edgi ng shal l i ncl ude t he cost of r emoval , conveyance and pl acement of al l mat er i al s meet i ng t he descr i pt i on speci f i ed i n SECTI ON 35 20 24 CAP CONSTRUCTI ON and as shown on t he dr awi ngs and as speci f i ed her ei n, except or i gi nal mat er i al s, l edge r ock, boul der s, cobbl es, r ock f r agment s, wr ecks, scr ap mat er i al s, snags, st umps, pi l es, debr i s or ot her mat er i al whi ch cannot be r emoved by t he pl ant speci f i ed i n t he accept ed bi d, or t he equi val ent of such pl ant , wi t hout bl ast i ng or speci al appar at us. The pr i ce shal l al so i ncl ude t he cost of al l wor k r equi r ed t o be per f or med f or t he use of t he pl acement ar ea.

Not hi ng i n t hi s par agr aph shal l be const r ued as pr ohi bi t i ng t he r emoval of except ed mat er i al by speci al means at t he pr i ces agr eed and appr oved i n accor dance wi t h appl i cabl e pr ovi s i ons of t he cont r act .

The cap t hi ckness t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) at t he pl acement s i t e i n Sl i p C. The mi ni mum r equi r ed Layer A const r uct ed t hi ckness i s 22 i nches and t he const r uct ed t hi ckness shal l not exceed 28 i nches. Cost s associ at ed wi t h pl acement or r emoval of addi t i onal mat er i al s t o meet speci f i ed t hi ckness t ol er ances wi l l not be pai d by Gover nment .

1. 3. 8. 2 Uni t of Measur e

Uni t of measur e: Job

SECTI ON 01 22 00. 00 10 Page 4

1. 3. 9 0009 Subaqueous Cap Layer B Const r uct i on, and Cove, and Apr on Ar ea - Sl i p C

1. 3. 9. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, t r anspor t i ng, st ockpi l i ng ( i f appl i cabl e) , pl aci ng, const r uct i ng, and mai nt ai ni ng unt i l accept ed t he Layer B subaqueous cap at desi gnat ed ar ea wi t hi n Sl i p C as speci f i ed i n SECTI ON 35 20 24 ' CAP CONSTRUCTI ON' and shown i n t he cont r act dr awi ngs. Thi s i t em al so i ncl udes payment associ at ed wi t h t he pr epar at i on and r est or at i on of st agi ng ar eas ar r anged by Cont r act or whi ch shoul d be r et ur ned t o pr e- const r uct i on condi t i on or bet t er upon compl et i on of pr oj ect . Cost s associ at ed wi t h obt ai ni ng l and f or st ockpi l i ng wi l l not be pai d f or .

The cap t hi ckness t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) at t he pl acement s i t e. The mi ni mum r equi r ed Layer B const r uct ed t hi ckness i s 6 i nches and t he const r uct ed t hi ckness shal l not exceed 12 i nches. Cost s associ at ed wi t h pl acement or r emoval of addi t i onal mat er i al s t o meet speci f i ed t hi ckness t ol er ances wi l l not be pai d by Gover nment .

1. 3. 9. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 10 0010 Subaqueous Cap Layer B Const r uct i on at Cove Mout h/ Wal l Fai l ur e Ar eas - Sl i p C

1. 3. 10. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, t r anspor t i ng, st ockpi l i ng ( i f appl i cabl e) , pl aci ng, const r uct i ng, and mai nt ai ni ng unt i l accept ed t he Layer B subaqueous cap at desi gnat ed ar ea wi t hi n Sl i p C as speci f i ed i n SECTI ON 35 20 24 ' CAP CONSTRUCTI ON' and shown i n t he cont r act dr awi ngs. Thi s i t em al so i ncl udes payment associ at ed wi t h t he pr epar at i on and r est or at i on of st agi ng ar eas ar r anged by Cont r act or whi ch shoul d be r et ur ned t o pr e- const r uct i on condi t i on or bet t er upon compl et i on of pr oj ect . Cost s associ at ed wi t h obt ai ni ng l and f or st ockpi l i ng wi l l not be pai d f or .

The cap t hi ckness t o be used f or payment shal l be f r om t he pr i or and post bat hymet r i c sur veys ( by Gover nment ) at t he pl acement s i t e. The mi ni mum r equi r ed Layer B const r uct ed t hi ckness i s 8 i nches and t he const r uct ed t hi ckness shal l not exceed 14 i nches. Cost s associ at ed wi t h pl acement or r emoval of addi t i onal mat er i al s t o meet speci f i ed t hi ckness t ol er ances wi l l not be pai d by Gover nment .

1. 3. 10. 2 Uni t of Measur e

Uni t of measur e: Job

1. 3. 11 0011 Subaqueous Ri pr ap - Sl i p 3 & Sl i p C

1. 3. 11. 1 Payment

Payment wi l l be made f or cost s associ at ed wi t h f ur ni shi ng, t r anspor t i ng, st ockpi l i ng ( i f appl i cabl e) , pl aci ng, const r uct i ng, and mai nt ai ni ng unt i l accept ed t he Ri p Rap wi t hi n Sl i p 3 & C as speci f i ed i n SECTI ON 35 20 24

SECTI ON 01 22 00. 00 10 Page 5

' CAP CONSTRUCTI ON' and shown on t he cont r act dr awi ngs.

Cont r act or shal l measur e r i p r ap quant i t i es usi ng met hods descr i bed i n t he 2016 Mi nnesot a Depar t ment of Tr anspor t at i on ( MNDOT) St andar d Speci f i cat i on of Const r uct i on Sect i on 1901. 8 MASS.

1. 3. 11. 2 Uni t of Measur e

Uni t of measur e: Ton ( 2, 000 l bs)

1. 3. 12 0012 Debr i s Removal and Di sposal

1. 3. 12. 1 Payment

Thi s i t em shal l i ncl ude debr i s r emoval wi t hi n t he cap ar eas i n Sl i p 3 and Sl i p C, t r anspor t , and di sposal of t he debr i s at a Type I I I l andf i l l appr oved by t he COR. Al l debr i s wi t hi n t he desi gnat ed cap ar eas t hat ext ends mor e t han 2 f eet above f i nal l evel i ng gr ade i n Sl i p 3, or above exi st i ng mud l i ne i n Sl i p C, shal l be r emoved by t he Cont r act or and di sposed of of f - s i t e pr i or t o cap const r uct i on i n t he s l i ps.

1. 3. 12. 2 Uni t of Measur e

Uni t of Measur e: Ton ( 2000 l bs)

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

3. 1 BASI S FOR SETTLEMENT OF PROPOSALS

Act ual cost s wi l l be used t o det er mi ne equi pment cost s f or a set t l ement pr oposal submi t t ed on t he t ot al cost basi s under Feder al Acqui s i t i on Regul at i on ( FAR) 49. 206- 2( b) . I n eval uat i ng a t er mi nat i on set t l ement pr oposal usi ng t he t ot al cost basi s, t he f ol l owi ng pr i nci pl es wi l l be appl i ed t o det er mi ne al l owabl e equi pment cost s:

( a) Act ual cost s f or each pi ece of equi pment , or gr oups of s i mi l ar ser i al or ser i es equi pment , need not be avai l abl e i n t he cont r act or ' s account i ng r ecor ds t o det er mi ne t ot al act ual equi pment cost s.

( b) I f equi pment cost s have been al l ocat ed t o a cont r act usi ng pr edet er mi ned r at es, t hose char ges wi l l be adj ust ed t o act ual cost s.

( c) Recor ded j ob cost s adj ust ed f or unal l owabl e expenses wi l l be used t o det er mi ne equi pment oper at i ng expenses.

( d) Owner shi p cost s ( depr eci at i on) wi l l be det er mi ned usi ng t he cont r act or ' s depr eci at i on schedul e ( subj ect t o t he pr ovi s i ons of Feder al Acqui s i t i on Regul at i on ( FAR) 31. 205- 11) .

( e) Li cense, t axes, st or age and i nsur ance cost s ar e nor mal l y r ecover ed as an i ndi r ect expense and unl ess t he cont r act or char ges t hese cost s di r ect l y t o cont r act s, t hey wi l l be r ecover ed t hr ough t he i ndi r ect expense r at e.

SECTI ON 01 22 00. 00 10 Page 6

3. 2 3. 2 EQUI PMENT OWNERSHI P AND OPERATI NG EXPENSE SCHEDULE

( a) Thi s c l ause does not appl y t o t er mi nat i ons. Feder al Acqui s i t i on Regul at i on ( FAR) par t 49.

b) Al l owabl e cost s f or const r uct i on and mar i ne pl ant and equi pment i n sound wor kabl e condi t i on owned or cont r ol l ed and f ur ni shed by a cont r act or or subcont r act or at any t i er shal l be based on act ual cost dat a f or each pi ece of equi pment or gr oups of s i mi l ar ser i al and ser i es f or whi ch t he Gover nment can det er mi ne bot h owner shi p and oper at i ng cost s f r om t he cont r act or ' s account i ng r ecor ds. When bot h owner shi p and oper at i ng cost s cannot be det er mi ned f or any pi ece of equi pment or gr oups of s i mi l ar ser i al or ser i es equi pment f r om t he cont r act or ' s account i ng r ecor ds, cost s f or t hat equi pment shal l be based upon t he appl i cabl e pr ovi s i ons of Engi neer Pamphl et ( EP) 1110- 1- 8, Const r uct i on Equi pment Owner shi p and Oper at i ng Expense Schedul e, Regi on 4. Wor ki ng condi t i ons shal l be consi der ed t o be aver age f or det er mi ni ng equi pment r at es usi ng t he schedul e unl ess speci f i ed ot her wi se by t he cont r act i ng of f i cer . For equi pment not i ncl uded i n t he schedul e, r at es f or compar abl e pi eces of equi pment may be used or a r at e may be devel oped usi ng t he f or mul a pr ovi ded i n t he schedul e. For f or war d pr i c i ng, t he schedul e i n ef f ect at t he t i me of negot i at i ons shal l appl y. For r et r oact i ve pr i c i ng, t he schedul e i n ef f ect at t he t i me t he wor k was per f or med shal l appl y.

( c) Equi pment r ent al cost s ar e al l owabl e, subj ect t o t he pr ovi s i ons of FAR

31. 105( d) ( i i ) and FAR 31. 205- 36. Rat es f or equi pment r ent ed f r om an or gani zat i on under common cont r ol , l ease- pur chase ar r angement s, and sal e- l easeback ar r angement s, wi l l be det er mi ned usi ng t he schedul e, except t hat act ual r at es wi l l be used f or equi pment l eased f r om an or gani zat i on under common cont r ol t hat has an est abl i shed pr act i ce of l easi ng t he same or s i mi l ar equi pment t o unaf f i l i at ed l essees.

( d) When act ual equi pment cost s ar e pr oposed and t he t ot al amount of t he pr i c i ng act i on exceeds t he si mpl i f i ed acqui s i t i on t hr eshol d ( SAT) , t he cont r act i ng of f i cer shal l r equest t he cont r act or t o submi t ei t her cer t i f i ed cost or pr i c i ng dat a, or par t i al / l i mi t ed dat a, as appr opr i at e.

The dat a shal l be submi t t ed on St andar d For m 1411, Cont r act Pr i c i ng Pr oposal Cover Sheet .

- - End of Sect i on - -

SECTI ON 01 22 00. 00 10 Page 7

File details come from the government source that posted it.