FY17 CLINTON RIVER MOUTH - HABITAT RESTORATION - RTA FY17CLINTONRIVER
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 32 11
SOIL SURFACE EROSION CONTROL
08/08
PART 1 GENERAL
1.1 SUMMARY OF WORK
1.2 SUBMITTALS
1.3 QUALITY ASSURANCE
1.3.1 Installer's Qualification
1.3.2 Erosion Potential
1.3.3 Substitutions
1.3.4 SUSTAINABLE DESIGN REQUIREMENTS
1.3.4.1 Local/Regional Materials
1.3.4.2 Biobased Materials
1.4 DELIVERY, STORAGE, AND HANDLING
1.5 SCHEDULING
1.6 WARRANTY
PART 2 PRODUCTS
2.1 MULCH
2.1.1 Straw
2.1.2 Hay
2.1.3 Hydraulic Mulch
2.1.4 Dye
2.2 GEOTEXTILE FABRICS
2.2.1 Geotextile Filter Fabric for Silt Fence
2.2.2 Geotextile Fabric for Temporary Stone Access Drive
2.3 SEDIMENT FENCING
2.4 AGGREGATE
2.5 WATER
PART 3 EXECUTION
3.1 WEATHER CONDITIONS
3.2 SITE PREPARATION
3.2.1 Soil Test
3.2.2 Layout
3.2.3 Obstructions Below Ground
3.3 INSTALLATION
3.3.1 Construction Entrance
3.3.2 Mulch Installation
3.3.3 Mulch Control Netting
3.3.4 Mechanical Anchor
3.4 Sediment Fencing
3.4.1 Turf Reinforcement Matting
3.5 CLEAN-UP
3.6 MAINTENANCE RECORD
3.6.1 Maintenance
SECTION 31 32 11 Page 1
3.6.2 Maintenance Instructions
3.6.3 Patching and Replacement
-- End of Section Table of Contents --
SECTION 31 32 11 Page 2
SECTION 31 32 11
SOIL SURFACE EROSION CONTROL
08/08
PART 1 GENERAL
1.1 SUMMARY OF WORK
The work consists of furnishing and installing temporary and permanent soil surface erosion control materials to prevent the pollution of air, water, and land, including fine grading, mulching, vegetative measures, structural measures, and miscellaneous related work, within project limits and in areas outside the project limits where the soil surface is disturbed from work under this contract at the designated locations. This work includes all necessary materials, labor, supervision and equipment for installation of a complete system. Submit a listing of equipment to be used for the application of erosion control materials. Prior to the initiation of any permitted construction activities, a sedimentation barrier shall be constructed immediately down gradient of the construction site.
Sedimentation barriers shall be specifically designed to handle the sediment type and load of the construction site throughout the anticipated time of construction and unstable site conditions. The sedimentation barrier shall be maintained in good working order throughout the duration of the project. Upon project completion, the accumulated materials shall be removed and disposed of at a type 2 landfill site (non-wetland, non-floodplain) site and stabilized with seed and mulch. The sedimentation barrier shall then be removed in its entirety and the area restored to its original configuration and cover. All raw areas in uplands resulting from the permitted construction activity shall be effectively stabilized with sod and/or seed and mulch (or other technology specified by this permit or project plans) in a sufficient quantity and manner to prevent erosion and any potential siltation to surface waters or wetlands. Temporary stabilization measures shall be installed before or upon commencement of the permitted activity, and shall be maintained until permanent measures are in place. Permanent measures shall be in place within five (5) days of achieving final grade. All fill/backfill shall consist of clean inert material that will not cause siltation nor contain soluble chemicals, pollutants, or contaminants. All fill placed on the DNR Harley Ensign boating site shall be contained in such a manner so as not to erode into any surface water, flood plain, or wetland. Planting of the site will occur in the spring of 2018, all finished upland areas associated with the permitted activity shall be stabilized with sod and/or seed and mulch, riprap, or other technically effective methods as necessary to prevent erosion. All raw earth within 100 feet of a lake, stream, or wetland that is not brought to final stabilization by the end of the active growing season shall be temporarily stabilized with mulch blankets in by 10 October 2017. Refer to MDEQ Permit attached to SECTION 01 99 90 LISTING OF ENCLOSED DOCUMENTS, EXHIBITS AND OTHER ATTACHMENT. Turbidity curtain will only be required if the contractor's activities to plant the Great Lakes Marshes areas will create a significant disturbance to the existing fill material , such as using construction or landscaping equipment for the planting work.
SECTION 31 32 11 Page 3
1.2 SUBMITTALS
Approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Work sequence schedule; G Erosion control plan; G
SD-02 Shop Drawings
Layout; G Obstructions Below Ground; G Maintenance Record; G.
SD-03 Product Data
Work sequence schedule;
Hydraulic Mulch; G Geotextile Fabrics for silt fence and temporary stone access drive;
G.
Turf Reinforcement Matting; G Submit manufacturer's literature including physical characteristics, application and installation instructions.
SD-04 Samples
In addition to the samples, submit certification of recycled content or Statement of recycled content. Also submit certification of origin including the name, address and telephone number of manufacturer.
Geosynthetic binders
1 quart Mulch 2 pounds Hydraulic mulch 2 pounds Geotextile fabrics for silt fence and temporary stone access drive 6 inch square Turf Reinforcement Matting 6 inch square
SD-06 Test Reports
Hydraulic Mulch Geotextile Fabrics for silt fence and temporary stone access drive Sand Gravel Turf Reinforcement Matting
SD-07 Certificates
Mulch Hydraulic Mulch
SECTION 31 32 11 Page 4
Geotextile Fabrics for silt fence and temporary stone access drive Installer's Qualification Turf Reinforcement Matting
SD-8 Operation and Maintenance Data
Maintenance Instructions; G, AOF
1.3 QUALITY ASSURANCE
1.3.1 Installer's Qualification
The installer shall be certified by the manufacturer for training and experience installing the material. Submit the installer's company name and address, and/or certification.
1.3.2 Erosion Potential
Assess potential effects of soil management practices on soil loss in accordance with ASTM D6629. Assess erodibility of soil with dominant soil structure less than 2.8 to 3.1 inches in accordance with ASTM D5852.
1.3.3 Substitutions
Substitutions will not be allowed without written request and approval from the Contracting Officer.
1.3.4 SUSTAINABLE DESIGN REQUIREMENTS
1.3.4.1 Local/Regional Materials
Use materials or products extracted, harvested, or recovered, as well as manufactured, within a 500 mile radius from the project site, if available from a minimum of three sources. Submit documentation indicating distance between manufacturing facility and the project site. Indicate distance of raw material origin from the project site. Indicate relative dollar value of local/regional materials to total dollar value of products included in project.
1.3.4.2 Biobased Materials
Use biobased materials when feasible and as specified. Submit documentation indicating type of biobased material in product and biobased content.
1.4 DELIVERY, STORAGE, AND HANDLING
Prior to delivery of materials, submit certificates of compliance attesting that materials meet the specified requirements. Store materials in designated areas and as recommended by the manufacturer protected from the elements, direct exposure, and damage. Do not drop containers from trucks. Material shall be free of defects that would void required performance or warranty.
a. Furnish Turf Reinforcement Matting and geotextile fabric in rolls with suitable wrapping to protect against moisture and extended ultraviolet exposure prior to placement. Label erosion control blanket and geotextile fabric rolls to provide identification
SECTION 31 32 11 Page 5 sufficient for inventory and quality control purposes.
c. Inspect seed upon arrival at the jobsite for conformity to species and quality. Seed that is wet, moldy, or bears a test date five months or older, shall be rejected.
1.5 SCHEDULING
Submit a construction work sequence schedule, with the [state or local government approved] [approved] erosion control plan a minimum of 30 days prior to start of construction. The work schedule shall coordinate the timing of land disturbing activities with the provision of erosion control measures to reduce on-site erosion and off-site sedimentation. Coordinate installation of temporary erosion control features with the construction of permanent erosion control features to assure effective and continuous control of erosion, pollution, and sediment deposition. Include a vegetative plan with planting and seeding dates and fertilizer, lime, and mulching rates. Distribute copies of the work schedule and erosion control plan to site subcontractors. Address the following in the erosion control plan:
a. Statement of erosion control and stormwater control objectives.
b. Description of temporary and permanent erosion control, stormwater control, and air pollution control measures to be implemented on site.
c. Description of the type and frequency of maintenance activities required for the chosen erosion control methods.
d. Comparison of proposed post-development stormwater runoff conditions with predevelopment conditions.
1.6 WARRANTY
Erosion control material shall have a warranty for use and durable condition for project specific installations. Temporary erosion control materials shall carry a minimum eighteen month warranty. Permanent erosion control materials shall carry a minimum three year warranty
PART 2 PRODUCTS
2.1 MULCH
Mulch shall be free from weeds, mold, and other deleterious materials.
Mulch materials shall be native to the region.
2.1.1 Straw
Straw shall be stalks from oats, wheat, rye, barley, or rice, furnished in air-dry condition and with a consistency for placing with commercial mulch-blowing equipment.
2.1.2 Hay
Hay shall be native hay, sudan-grass hay, broomsedge hay, or other herbaceous mowings, furnished in an air-dry condition suitable for placing with commercial mulch-blowing equipment.
SECTION 31 32 11 Page 6
2.1.3 Hydraulic Mulch
Hydraulic mulch shall be made of 100 percent recycled material. Wood shall be naturally air-dried to a moisture content of 10.0 percent, plus or minus 3.0 percent. A minimum of 50 percent of the fibers shall be equal to or greater than 0.15 inch in length and a minimum of 75 percent of the fibers shall be retained on a 28 mesh screen. Hydraulic mulch shall have the following mixture characteristics:
CHARACTERISTIC (typical) VALUE pH 5.4 + 0.1
Organic Matter (oven dried basis) percent 99.3 within + 0.2
Inorganic Ash (oven dried basis) percent 0.7 within + 0.2
Water Holding Capacity percent 1,401
2.1.4 Dye
Dye shall be a water-activated, green color. Pre-package dye in water dissolvable packets in the hydraulic mulch.
2.2 GEOTEXTILE FABRICS
2.2.1 Geotextile Filter Fabric for Silt Fence
Geotextile fabric shall be Silt Fence conforming to 2012 MDOT specification Table 910-1 'Physical Requirement For Geotextiles'.
2.2.2 Geotextile Fabric for Temporary Stone Access Drive
Geotextile fabric shall be woven Geotextile separator (<50% elongation)conforming to 2012 MDOT specification table 910-1 'Physical Requirement For Geotextiles'.
2.3 SEDIMENT FENCING
Wood or burlap.
2.4 AGGREGATE
Aggregate shall be offsite material generated from grading and demolition operations, as available. Gravel shall be river run between a minimum 3/4" inches and a maximum 2" inches. Submit sieve test results for both gravel and sand. Sand shall be uniformly graded. Crushed concrete is not allowed.
2.5 WATER
Unless otherwise directed, water is the responsibility of the Contractor.
Water shall be potable or supplied by an existing irrigation system.
SECTION 31 32 11 Page 7
PART 3 EXECUTION
3.1 WEATHER CONDITIONS
Perform erosion control operations under favorable weather conditions;
when excessive moisture, frozen ground or other unsatisfactory conditions prevail, the work shall be stopped as directed. When special conditions warrant a variance to earthwork operations, submit a revised construction schedule for approval. Do not apply erosion control materials in adverse weather conditions which could affect their performance.
3.2 SITE PREPARATION
3.2.1 Soil Test
Test soil in accordance with ASTM D5268 and ASTM D4972 for determining the particle size and mechanical analysis. Sample collection onsite shall be random over the entire site. The test shall determine the soil particle size as compatible for the specified material.
3.2.2 Layout
Submit scale drawings defining areas to receive recommended materials as required by federal, state or local regulations. Erosion control material locations may be adjusted to meet field conditions. When soil tests result in unacceptable particle sizes, submit a shop drawing indicating the corrective measures.
3.2.3 Obstructions Below Ground
When obstructions below ground affect the work, submit shop drawings showing proposed adjustments to placement of erosion control material for approval.
3.3 INSTALLATION
Immediately stabilize exposed soil using fabric, mulch and seed.
Stabilize areas for construction access immediately as specified in the paragraph Construction Entrance. Install principal sediment basins and traps before any major site grading takes place. Provide additional sediment traps and sediment fences as grading progresses. Provide inlet and outlet protection at the ends of new drainage systems. Remove temporary erosion control measures at the end of construction and provide permanent seeding.
3.3.1 Construction Entrance
Provide as indicated on drawings, a minimum of 6 inches thick, at points of vehicular ingress and egress on the construction site. Construction entrances shall be cleared and grubbed, and then excavated a minimum of 3 inches prior to placement of the filter fabric and aggregate. The aggregate shall be placed in a manner that will prevent damage and movement of the fabric. Place fabric in one piece, where possible.
Overlap fabric joints a minimum of 12 inches.
3.3.2 Mulch Installation
Install mulch in the areas indicated.
SECTION 31 32 11 Page 8
3.3.3 Mulch Control Netting
Netting may be stapled over mulch according to manufacturer's recommendations.
3.3.4 Mechanical Anchor
Mechanical anchor shall be a V-type-wheel land packer; a scalloped-disk land packer designed to force mulch into the soil surface; or other suitable equipment.
3.4 Sediment Fencing
Install silt fence as per Macomb County details as shown in the drawings.
Do not attach filter fabric to existing trees. Secure filter fabric to the post and wire fabric using staples, tie wire, or hog rings. Imbed the filter fabric into the ground as indicated on drawings.
3.4.1 Turf Reinforcement Matting
A. Prior to placing TRM, contractor shall inspect sub grade to ensure proper compaction, graded smooth with no depressed voids, free from obstructions such as tree roots, projecting stones or other foreign matter, and has been seeded.
B. TRM shall be installed in accordance with manufacturer's instructions.
3.5 CLEAN-UP
Dispose of excess material, debris, and waste materials offsite at an approved landfill or recycling center. Clear adjacent paved areas.
Immediately upon completion of the installation in an area, protect the area against traffic or other use by erecting barricades and providing signage as required, or as directed. Upon project completion, the accumulated materials shall be removed and disposed of at an upland (non-wetland, non-floodplain) site and stabilized with seed and mulch. The sedimentation barrier shall then be removed in its entirety and the area restored to its original configuration and cover. All material used to construct the stabilized construction entrance shall be removed and taken offsite after project completion unless otherwise directed by the
COR.
3.6 MAINTENANCE RECORD
Furnish a record describing the maintenance work performed, record of measurements and findings for product failure, recommendations for repair, and products replaced.
3.6.1 Maintenance
Maintenance shall include eradicating weeds; protecting embankments and ditches from surface erosion; maintaining the performance of the erosion control materials and mulch; protecting installed areas from traffic.
3.6.2 Maintenance Instructions
Furnish written instructions containing drawings and other necessary information, describing the care of the installed material; including, when and where maintenance should occur, and the procedures for material replacement. Submit instruction for year-round care of installed
SECTION 31 32 11 Page 9 material. Include manufacturer supplied spare parts.
3.6.3 Patching and Replacement
Unless otherwise directed, material shall be placed, seamed or patched as recommended by the manufacturer. Remove material not meeting the required performance as a result of placement, seaming or patching from the site.
Replace the unacceptable material at no additional cost to the Government.
-- End of Section --