Text version

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 12 PAGES

FY15 ST MARYS PROTECTIVE RELAYS AND STATION SERVICE UPGRADES

01 32 01.00 10 SD-01 Preconstruction Submittals

1.3 G AOProject Scheduler Qualifications

3.4.1 G AOPreliminary Project Schedule

3.4.2 G AOInitial Project Schedule

3.6.2 G AOPeriodic Schedule Update

01 33 00 SD-01 Preconstruction Submittals

1.1.1 G AOFSubmittal register

01 35 13.10 SD-01 Preconstruction Submittals Payrolls and Basic Records

1.4.7 G AOFUtility Location Findings

SD-07 Certificates

2.1As-Built Technician's Qualifications

2.1 G AOFAs-built Drawings

01 35 26 SD-01 Preconstruction Submittals

1.6 G AOFAccident Prevention Plan (APP)

G AOFActivity Hazard Analysis (AHA) G AOFCrane Critical Lift Plan G AOFCrane Operators GSite Layout Plan G AOFAccess/Haul Road Plan

Traffic Control Plan G AOFFall Protection and Prevention

Plan Demolition/Renovation Plan Precast Concrete Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 12 PAGES

01 35 26 SD-06 Test Reports 1.11Notifications and Reports

Accident Reports Crane Reports

SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit

License Certificates

1.11.4 G AOFCertificate of Compliance

01 38 00 SD-01 Preconstruction Submittals 2.1.1Compact Disk (CD) 3.3Video Cassettes

01 45 04.00 10 SD-01 Preconstruction Submittals 3.2Quality Control Plan

01 54 19.10 28 SD-01 Preconstruction Submittals

1.3 G AOFUse Of Powerhouse Bridge

Crane

1.3.2 G AOFQualifications

01 57 20.10 28 SD-01 Preconstruction Submittals

1.5.1 G AOFInstructor Qualifications

1.5.2 G AOFTraining Program

1.8.1 G AOFEnvironment Protection Plan

SD-03 Product Data

1.16 G AOFQuarry or Soil Source

01 57 20.20 28 SD-01 Preconstruction Submittals

1.4.1.1 G AOFSampling And Analysis Plan

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 12 PAGES

01 57 20.20 28 1.6.2 G AOFRCRA Metal Based Paint disposal procedure

1.9 G AOFWaste Management Handling

Plan

1.9.1 G AOFHazardous Waste Handling Plan

1.9.2 G AOFSolid Waste Management Plan

And Permit

1.9.3 G AOFWaste Determination

Documentation

1.9.4 G AOFRCRA Metals Waste

Management Plan

1.9.5 G AOFAsbestos Waste Management

Plan

1.11 G AOFHazardous Substance Tracking

Plan SD-03 Product Data

1.6 G AOFAll Metal Binding Product(s)

SD-06 Test Reports

1.11.1 I AOFWeekly Updates To The

Hazardous Substances Tracking Plan

1.9.5 G AOFDelivery Tickets

1.9.5 G AOFWaste Shipment Records

SD-07 Certificates

1.3 G AOFContractor's environmental

manager

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 12 PAGES

01 57 20.20 28 1.9.2.1 G AOFSolid Waste Management Report SD-11 Closeout Submittals

1.4.1.1 G AOFHazardous Waste Manifest

Documentation

01 78 00 SD-03 Product Data 1.2.2As-Built Record of Equipment and Materials 1.6.1Warranty Management Plan 1.6.5Warranty Tags 1.3Spare Parts Data

SD-08 Manufacturer’s Instructions 1.4Preventative Maintenance 1.4Condition Monitoring (Predictive

Testing) 1.4Inspection 1.6.1Instructions

SD-10 Operation and Maintenance Data

1.8Operation and Maintenance Manuals

SD-11 Closeout Submittals 1.2.1Record Drawings

1.5 GCertification of EPA Designated

Items 01 91 00.00 26 SD-01 Preconstruction Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 12 PAGES

01 91 00.00 26 1.5.2 G AOFEquipment Commissioning Testing Plan and Schedule

3.2 G AOFField Test Plans

1.6.1 G AOFCommissioning Agent's

qualifications SD-06 Test Reports

1.5.5 G AOFEquipment Commissioning

Testing Report

02 82 13.01 28 SD-01 Preconstruction Submittals

1.9.1 I ECCSite Safety and Health Plan

(SSHP)

SD-06 Test Reports

1.9.3 I ECCAir Sampling Results

SD-07 Certificates

1.9.2 I ECCQualification

1.9.4 I ECCMandatory Waste Shipment

Record 02 83 33.13 28 SD-01 Preconstruction Submittals

1.5 G SOQualified Personnel

SD-03 Product Data

3.1.1 G ECCMetal Binding Product

SD-06 Test Reports

1.3.2 G SOTest Results

SD-07 Certificates

1.3.2 G SOTesting Laboratory

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 12 PAGES

02 83 33.13 28 3.2.2.1 I ECCSalvaged Material Containing Contaminated Waste

3.2.2.1 I ECCCopies of Notifications

03 20 01.00 10 SD-02 Shop Drawings

3.1 G EC-GReinforcement

SD-07 Certificates

2.3Reinforcing Steel 03 31 01.00 10 SD-01 Preconstruction Submittals

Batching and Mixing Equipment Conveying and Placement Equipment

SD-06 Test Reports G EC-GConcrete Mixture Proportions

SD-07 Certificates G EC-GCementitious Material G EC-GAggregates G EC-GManufacturer's Literature

13 48 00.00 26 SD-02 Shop Drawings

2.4 G AOFDetail Drawings

SD-03 Product Data

2.3 G AOFConcrete Anchors

1.4.4 G AOFSeismic Equipment Certification

SD-05 Design Data

1.7 G AOFStructural Design Calculations for

Seismic Restraints SD-06 Test Reports

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 12 PAGES

13 48 00.00 26 3.4.2.1 G AOFConcrete Anchor Test Reports

3.4.1 G AOFContractor Qualification Testing

26 00 00.00 26 SD-01 Preconstruction Submittals

3.9 GEquipment Crate Size, Storage

Location and Proposed Routing at Site

1.7 ILead Electrician Qualifications

G AOFFloor Cover Design

SD-02 Shop Drawings G AOFTransformer Installation Detail

Drawings G AOFAssembly and Detail Drawings

SD-03 Product Data

2.1.1 I AOFRigid Metal Conduit

2.1.2 I AOFLiquid Tight Flexible Steel

Conduit

2.1.4 I AOFRigid Metal Conduit Fittings

2.1.5 I AOFConduit Hangers

2.1.6 I AOFWireways

2.1.7 I AOFBoxes And Enclosures

2.3 I AOFTerminal Blocks

2.5 I AOFBoxes, Cabinets, and Enclosures

2.5.5 GPaint

I AOFRelays (Control, Auxiliary, Undervoltage)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 12 PAGES

26 00 00.00 26 I AOFControl, Instrument, and Selector Switches

G AOFEscutcheons and Nameplates

2.9 I AOFIndicating Lamp Assemblies

2.10 I AOFPush Buttons

2.11 I AOFControl Transformers

2.12 I AOFReceptacles

G AOFReplacement Relay Board Panels

2.13.3 G AOFAmmeters

G AOFTest Switches

2.15 G AOFMolded-Case Circuit Breakers

SD-06 Test Reports

3.10 I AOFField Test Reports

SD-08 Manufacturer’s Instructions

2.16.2 GSpare Parts

26 05 13.00 26 SD-03 Product Data

2.1 G AOMedium-Voltage Cable

3.1.10 G AOMedium-Voltage Cable

Terminations

2.3.1 G AOGround Conductors

SD-06 Test Reports

3.2.1 G AOInsulation Resistance Test

3.2.1 G AOHigh Potential Test

3.2.1Shield Resistance Test

26 05 19.00 26 SD-03 Product Data

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 12 PAGES

26 05 19.00 26 2.1 G AOFInsulated Wire and Cable

2.6 G AOFSpecial Wire And Cable

SD-06 Test Reports

3.2.1 G AOFInsulation-Resistance Test

3.2.1 G AOFContinuity Test

3.2.1 G AOFPhase-Rotation Tests

3.2.1 G AOFShield Resistance Test

3.2.1 G AOFHigh Potential Test

1.4.5 G AOFCondition Assessment of Existing

600 Volt Cables 26 12 19.10 26 SD-02 Shop Drawings

1.5.1 GPad-mounted transformer

drawings

SD-03 Product Data

2.2 GPad-mounted transformers

GExterior Cabinet Paint Color GMedium voltage cable terminations 2.6Padlocks

G, LRE-SA-SECURITY OFFICER

SD-06 Test Reports

3.6.1 GAcceptance checks and tests

SD-07 Certificates

1.4.1 GQualifications

2.2.2.1 GTransformer Efficiencies

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 12 PAGES

26 12 19.10 26 SD-09 Manufacturer’s Field Reports

2.7.2 Gdesign tests

2.7.3 Groutine and other tests

SD-10 Operation and Maintenance Data

1.6 GTransformer(s)

SD-11 Closeout Submittals

2.7.1 GTransformer test schedule

26 24 19.00 26 SD-01 Preconstruction Submittals

G AOFStarter and Controls Relocation Plan

1.4 I AOFDesign Meeting Request

SD-02 Shop Drawings

1.6.1 G AOFOutline Drawings

1.6.2 G AOFConnection/Assembly Drawings

SD-03 Product Data G AOFMotor Control Center G AOFNameplates

SD-06 Test Reports

3.4.2 G AOFFactory Test Reports

SD-10 Operation and Maintenance Data

1.5 G AOFMOTOR CONTROL CENTERS

26 28 01.00 26 SD-03 Product Data

2.1 G AOFEquipment List

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 12 PAGES

26 28 01.00 26 3.2 G AOFInstallation SD-06 Test Reports

3.3 G AOFManufacturer's Test Reports

3.4 G AOFFIELD TESTING

SD-07 Certificates G AOFDevices and Equipment

26 32 36.00 26 SD-03 Product Data GBattery Charger

SD-05 Design Data 3.2.4Plan for field tests 3.2.6Plan for Operational Tests

SD-06 Test Reports

3.2.4 G AOFField Test Report

3.2.6 G AOFOperational Test Report

27 21 10.00 26 SD-01 Preconstruction Submittals

1.4 G AOFFiber Test Plan

3.5.2.3calculated circuit loss 1.5Quality Assurance Plan

SD-03 Product Data

2.1 G AOFManufacturer's Catalog Data

2.2 G AOFMaterial and Equipment List

SD-06 Test Reports

3.5.3 GFiber Test Report

SD-07 Certificates

1.4 GQualifications

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 12 PAGES

27 21 10.00 26 3.3 GInstallation Procedures SD-10 Operation and Maintenance Data

2.1Operations and Maintenance Manual

31 00 00 SD-06 Test Reports Testing

SD-07 Certificates Testing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR