SECTION 26 24 19 00 26 - Amendment 0001

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY15 ST MARYS PROTECTIVE RELAYS AND STATION SERVICE UPGRADES STMARYSPRANDSSU2

Amendment 0001

SECTION TABLE OF CONTENTS

DIVISION 26 - ELECTRICAL

SECTION 26 24 19.00 26

MOTOR CONTROL CENTERS

PART 1 GENERAL

1.1 GENERAL INFORMATION

1.2 REFERENCES

1.3 SUBMITTALS

1.4 DESIGN MEETING

1.5 OPERATION AND MAINTENANCE DATA

1.6 DRAWINGS

1.6.1 Outline Drawings

1.6.2 Connection/Assembly Drawings

1.7 GENERAL REQUIREMENTS

1.7.1 Standard Products

1.7.2 Delivery, Storage, and Handling

1.7.3 Accessories and Tools

1.7.4 Spare Parts

PART 2 PRODUCTS

2.1 MOTOR CONTROL CENTER (MCC)

PART 3 EXECUTION

3.1 EQUIPMENT TO BE REMOVED

3.2 EQUIPMENT TO BE INSTALLED

3.2.1 General

3.2.2 Motor Control Centers

3.2.2.1 General

3.2.2.2 Cables and Conduit

3.2.2.3 Motor Control Circuits

3.3 DELIVERY, STORAGE, AND HANDLING

3.4 MOTOR CONTROL CENTER TESTS

3.4.1 Factory Test Procedure

3.4.2 Factory Test Reports

3.5 FIELD TESTING

3.6 Commissioning

-- End of Section Table of Contents --

SECTION 26 24 19.00 26 Page 1

SECTION 26 24 19.00 26

MOTOR CONTROL CENTERS

PART 1 GENERAL

1.1 GENERAL INFORMATION

This section covers the electrical equipment and work to complete the installation of Motor Control Centers the replacement/installation of all load/control cables to the first point of termination with equipment.

1.2 REFERENCES

The following publications of the issues listed below, but referred to thereafter by basic designation only, form a part of this specification to the extent indicated by the references thereto.

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)

NEMA ICS 2 (2000; R 2005; Errata 2008) Standard for Controllers, Contactors, and Overload Relays Rated 600 V

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with SECTION 01 33 00 SUBMITTAL PROCEDURES:

SD-01 Preconstruction Submittals

Starter and Controls Relocation Plan; G, AOF Submit no more than 90 days prior to removal of equipment.

Design Meeting Request; I, AOF Submit no more than 60 days prior to meeting.

SD-02 Shop Drawings

Outline Drawings; G, AOF

Connection/Assembly Drawings: G, AOF

SD-03 Product Data

Motor Control Center, G, AOF

Nameplates, G, AOF

SD-06 Test Reports

Factory Test Reports; G, AOF

SECTION 26 24 19.00 26 Page 2

SD-10 Operation and Maintenance Data

MOTOR CONTROL CENTERS, Data Package 3; G, AOF

Submit in accordance with Section 01 78 23 OPERATION AND MAINTENANCE DATA and Section 01 78 00 CLOSEOUT SUBMITTALS.

1.4 DESIGN MEETING

The contractor shall schedule a meeting at the manufacturers factory seven

(7) days after submittal of SD-02 Shop Drawings, Shop Drawings and SD-03 Product Data, Equipment. The purpose of the meeting is to review the submittal with the manufacturers product engineer and the contractor in a face-to-face setting. Notify the Contracting Officer in writing with a design meeting request prior to the scheduled meeting date. The COR or their designee will attend the meeting and the Contractor shall have in attendance, at a minimum: The foreman overseeing the equipment installation for the Contractor and the Product Engineer for the manufacturer.

1.5 OPERATION AND MAINTENANCE DATA

The Contractor shall submit a complete set of MOTOR CONTROL CENTERS, to include, but not limited to, complete manufacturer's data sheets, installation and trouble shooting manuals, parts listings, and equipment descriptions for all equipment installed under this Contract.

1.6 DRAWINGS

1.6.1 Outline Drawings

The Contractor shall, within 60 calendar days date of receipt of Notice to Proceed, submit for the approval of the Contracting Officer six (6) copies of outline drawings of all equipment to be furnished under this contract, together with weights and overall dimensions. Drawings shall show the general arrangement and overall dimensions of the motor control. These drawings shall show space requirements, details of any floor supports to be embedded in concrete and provisions for conduits for external cables.

1.6.2 Connection/Assembly Drawings

The Contractor shall within 120 calendar days after date of receipt of Notice to Proceed, submit for the approval of the Contracting Officer six

(6) copies of electrical equipment drawings. The motor control center drawings shall include a connection diagram with wire designations and schematic diagrams to illustrate operation of associated motor unit controls. An individual wiring diagram for each motor control center shall be submitted. Wiring diagrams shall be in a form showing physical arrangement of the control center with interconnecting wiring shown by lines or by terminal designations (wireless). A single-line diagram, equipment list and nameplate schedule shall be provided for each motor control center.

1.7 GENERAL REQUIREMENTS

1.7.1 Standard Products

Material and equipment shall be standard products of a manufacturer regularly engaged in their manufacture and shall essentially duplicate

SECTION 26 24 19.00 26 Page 3 items that have been in satisfactory use for at least 2 years prior to proposal due date. All materials shall conform to the requirements of these specifications. Materials shall be of high quality, free from defects and imperfections, of recent manufacture, and of the classification and grades designated. All materials, supplies, and articles not manufactured by the Contractor shall be the products of other recognized reputable manufacturers. If the Contractor desires for any reason to deviate from the standards designated in these specifications, he shall, after award, submit a statement of the exact nature of the deviation, and shall submit, for the approval of the Contracting Officer, complete specifications for the materials which he proposes to use.

1.7.2 Delivery, Storage, and Handling

The equipment shall be shipped as completely assembled and wired as feasible so as to require a minimum of installation work. Each shipping section shall be properly match marked to facilitate reassembly, and shall be provided with removable lifting channels with eye bolts for attachment of crane slings to facilitate lifting and handling. Any device which cannot withstand the hazards of shipment when mounted in place on the equipment shall be carefully packed and shipped separately. These devices shall be marked with the number of the panel which they are to be mounted on and fully identified. All finished painted surfaces and metal work shall be wrapped suitably or otherwise protected from damage during shipment. Sections of equipment crated for shipment shall be of such size, including crates, that they will pass through an 8-foot by 11-foot door opening. All spare parts and accessories shall be carefully packaged and clearly marked. All electrical material and equipment delivered to site, shall until immediately prior to installation, be protected from damaging environmental and construction activities. Special care shall be taken for panelboards, transformers, motors and control equipment. Control equipment shall include, but not be limited to, motor control center, motor starters, contactors, control stations, circuit breakers, and various types of switches. The above equipment and devices shall be kept dry and free from precipitation and condensation during storage, installation, and after installation. All electrical equipment shall be stored in completely enclosed containers and in a humidity-controlled environment per NEMA ICS 2.

Method of on-site storage and storage containers will be subject to approval by the Contracting Officer. The Contractor shall be responsible for energizing the heaters mounted in the equipment or to provide other means as required to avoid damage to the equipment due to, at a minimum, humidity and weather.

1.7.3 Accessories and Tools

The contractor shall furnish any accessories and/or special tools required for maintaining and testing the apparatus. These accessories and/or special tools should include but not limited to:

a. Hand tools for unique or customer fasteners

b. Remote racking accessories

c. Tools necessary for supporting and lifting starters out of the switchboard for maintenance and/or replacement

d. Programming and test software

e. Special test devices needed to test device features such as overloads and overcurrent protective devices

SECTION 26 24 19.00 26 Page 4

1.7.4 Spare Parts

A listing of manufacturer's reccommended spare parts shall be furnished as specified in SECTION 01 78 23 "OPERATION AND MAINTENANCE DATA" paragraphs "Spare Parts and Supply Lists" and "Parts Identification". All spare parts shall be of the same material and workmanship, shall meet the same requirements, and shall be interchangeable with the corresponding original parts furnished.

PART 2 PRODUCTS

2.1 MOTOR CONTROL CENTER (MCC)

Point of Contact:

Bob Benedict Rockwell Automation rjbenedict@ra.rockwell.com

(440) 646-4202

(440) 622-2402

MCCs for this contract are listed in the table below. The table shows Rockwell Automation Part Numbers, Drawing File reference numbers, Item numbers, MCC name, and contract option.

Rockwell Automation Contract Parts MCC Name Option QMPJC0009-A0 Aux AC MCC Unit 1 B QMPJC0009-B0 Aux AC MCC Unit 2 B QMPJC0009-C0 Aux AC MCC Unit 3 B QMPJC0009-D0 Aux AC MCC Unit 3A B QMPJC0009-E0 Aux DC MCC Unit 1 B QMPJC0009-F0 Aux DC MCC Unit 2 B QMPJC0009-G0 Aux DC MCC Unit 3 B QMPJC0009-H0 Aux DC MCC Unit 3A B QMPJC0009-I0 Aux AC MCC 587 BASE QMPJC0009-J0 Station Service DC MCC BASE QMPJC0009-K0 Station Service AC MCC A QMPJC0009-L0 Heat and Vent MCC A

PART 3 EXECUTION

3.1 EQUIPMENT TO BE REMOVED

Based on a approved Equipment Removal, installation, and testing Plan and Schedule (SECTION 01 91 00.00 26), the contractor shall remove the following equipment:

a. Switchboards and Panelboards as shown on the Contract Drawings.

b. All cables from the Switchboards and Panelboards to the first point of termination. The approximate length of each cable removed is shown in the cable schedule.

c. Switchboards and Panelboards locations within the Powerhouse are

SECTION 26 24 19.00 26 Page 5 shown on the reference drawings of the Switchboards and Panelboards elevations and bill of materials. These drawings are included in the contract reference drawing set.

3.2 EQUIPMENT TO BE INSTALLED

3.2.1 General

Based on a approved Equipment Removal, Installation, and Testing Plan and Schedule (SECTION 01 91 00.00 26), the approved installation drawings, and the specifications, the Contractor shall install, connect with all wiring and make ready for field testing the installed equipment.

3.2.2 Motor Control Centers

3.2.2.1 General

New replacements for motor control centers as shown on the contract drawings and all necessary installation hardware.

3.2.2.2 Cables and Conduit

Provide cables from the motor control centers to the first point of termination for removals in subparagraph 3.1 of this SECTION.

3.2.2.3 Motor Control Circuits

a. Dewatering Pump 1 and 2:

1) The Contractor shall install controls.

2) CONTROL WIRING: The controls shall have four PLC inputs for HI, HIHI, LOW, and spare; control voltage for probes and control circuits shall be provided and coordinated with the Government.

b. Emergency Station Sump Pump:

1) THe Contractor shall install controls.

2) CONTROL WIRING: The Contractor shall connect the hard-wired probe system as described in section 'Emergency Station Sump Configuration as a PLC input via the ethernet/IP drop of the MCC unit.

3.3 DELIVERY, STORAGE, AND HANDLING

a. The contractor shall provide written notification to the Government 14 calendar days prior to shipment of equipment.

b. The equipment shall be shipped as completely assembled and wired as feasible, and shall be wrapped suitably or otherwise protected from damage during shipment. All breakers and other electrical material delivered to site, shall until immediately prior to installation, be protected from damaging environmental and construction activities. The equipment shall be kept dry and free from precipitation and condensation during storage, installation, and after installation. All electrical equipment shall be stored in completely enclosed containers and in a humidity-controlled environment. Method of on-site storage and storage containers will be subject to approval by the Contracting

SECTION 26 24 19.00 26 Page 6

Officer.

3.4 MOTOR CONTROL CENTER TESTS

3.4.1 Factory Test Procedure

Rockwell Automation to perform all standard factory tests.

3.4.2 Factory Test Reports

Rockwell Automation to provide all factory test reports.

3.5 FIELD TESTING

Motor-control centers shall be subjected to continuity and insulation tests after the installation has been completed and before the motor-control center is energized.

Contractor shall provide test equipment, labor, and personnel to perform the tests required in the field. Conduct continuity tests using a dc device with bell or buzzer.

Motor-control centers shall be completely isolated from extraneous electrical connections. Substation feeder breakers, circuit breakers in switchboards, and other disconnecting devices shall be used to isolate the motor-control center under test.

Conduct insulation tests on 600-volt motor-control centers using a 1,000-volt insulation-resistance test set. Record readings every 15 seconds for the first minute and every minute thereafter for 10 minutes.

Resistance between phase conductors and between phase conductors and ground shall be not less than 50 megohms.

Conduct insulation tests on motor-control centers 480 volts or less using a 500-volt insulation-resistance test set. Record readings every 15 seconds for the first minute and every minute thereafter for 10 minutes.

Resistance between phase conductors and between phase conductors and ground shall be not less than 25 megohms.

Prior to final acceptance the motor control center shall be energized and loaded (to the maximum load possible, but not less than 10 percent of expected full load)for a minimum of 10 minutes and the temperature measured, with a non-contact device, to verify connection integrity. The temperature detector shall be accurate within 0.5 degrees C. Each phase temperature of 3 phase circuits and individual connections compared to other similarly loaded connections shall be within 3 degrees C of each other. Temperatures outside these values warrant investigation.

Conduct phase-rotation tests on all three-phase circuits using a phase-rotation indicating instrument. Phase rotation of electrical connections to motors and other connected equipment shall be clockwise.

Record test data and include location and identification of motor-control centers and megohm readings versus time.

Final acceptance shall depend upon the satisfactory performance of the motor-control centers under test. No motor-control center shall be energized until recorded test data have been approved by the Contracting Officer. Provide final test reports to the Contracting Officer. Reports

SECTION 26 24 19.00 26 Page 7 shall have a cover letter/sheet clearly marked with the System name, Date, and the words "Final Test Reports - Forward to the Systems Engineer/Condition Monitoring Office/Predictive Testing Group for inclusion in the Maintenance Database."

3.6 Commissioning

The Contractor shall be responsible for performing all equipment commissioning required by the equipment manufacturers and as noted in SECTION 01 91 00.00 26 SYSTEMS TESTING AND COMMISSIONING of this contract.

-- End of Section --

SECTION 26 24 19.00 26 Page 8

DIVISION 26 - ELECTRICAL
MOTOR CONTROL CENTERS
MOTOR CONTROL CENTERS
PART 1 GENERAL
1.1 GENERAL INFORMATION
1.2 REFERENCES
1.3 SUBMITTALS
1.4 DESIGN MEETING
1.5 OPERATION AND MAINTENANCE DATA
1.6 DRAWINGS
1.6.1 Outline Drawings
1.6.2 Connection/Assembly Drawings
1.7 GENERAL REQUIREMENTS
1.7.1 Standard Products
1.7.2 Delivery, Storage, and Handling
1.7.3 Accessories and Tools
1.7.4 Spare Parts
PART 2 PRODUCTS
2.1 MOTOR CONTROL CENTER MCC
PART 3 EXECUTION
3.1 EQUIPMENT TO BE REMOVED
3.2 EQUIPMENT TO BE INSTALLED
3.2.1 General
3.2.2 Motor Control Centers
3.2.2.1 General
3.2.2.2 Cables and Conduit
3.2.2.3 Motor Control Circuits
3.3 DELIVERY, STORAGE, AND HANDLING
3.4 MOTOR CONTROL CENTER TESTS
3.4.1 Factory Test Procedure
3.4.2 Factory Test Reports
3.5 FIELD TESTING
3.6 Commissioning