Amendment 3 Solicitation

View the file

Other files for this federal contract opportunity

Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES41007102

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

REPLACE WAGE RATE MI33 DATE 8/1/14 WITH WAGE RATE DATED 8/15/14.

ALL BIDDER INQUIRIES MUST BE SUBMITTED TO PROJNET BY 8:00 AM EST ON 25 AUGUST 2014 REVISE SECTION 01 33 00, SECTION 26 00 00.00 20, SECTION 26 05 71.00 40, SECTION 26 20 00, SECTION 26 28 01.00 10 and SECTION

26 29 01.00 10 WITHOUT RE-ISSUE OF THE SPECIFICATION.

REPLACE SECTION 26 24 19.00 40 AND SECTION 26 29 23 and SECTION 40 95 00 OF THE SPECIFICATIONS IN ITS ENTIRETY.

REVISE THE BID OPENING DATE TO AUGUST 28, 2014.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 14

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 22-Aug-2014

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-14-B-0013

X 9B. DATED (SEE ITEM 11)

22-Jul-2014

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

22-Aug-2014

CODE

CONTRACTING BRANCH

USACE DETROIT DISTRICT

477 MICHIGAN AVENUE, 7TH FLOOR

DETROIT MI 48226-4523

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-14-B-0013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 3

CHANGES TO SPECIFICATIONS

SECTION 01 33 00 SUBMITTAL PROCEDURES

‐Revise Section 01 33 00 SUBMITTAL PROCEDURES as shown without re‐ issuing:

DELETE Submittal Register in its entirety. Replace with REVISED Submittal Register, Attached.

SECTION 26 00 00.00 20 Basic Electrical Materials and Methods ‐Revise Section 26 00 00.00 20 without re‐issuing:

ADD to Para 1.6.2: At the end of the paragraph add: “This requirement does not apply to sole sourced equipment.”

ADD to Para 2.1: At the end of the paragraph add: “No corrosion testing will be executed on sole sourced equipment.”

ADD to Para 3.1: At the end of the paragraph add: “Sole sourced equipment shall be painted the standard manufacturer color.”

SECTION 26 05 71.00 40, Low Voltage Over‐current Protective Devices SECTION 26 05 71.00 40 Low Voltage Over‐current Protective Devices without re‐issueing

ADD to Para 1.2: At the end of the SD‐03 paragraph add: “Except in the case of sole source equipment.”

ADD to Para 1.2: At the end of the SD‐07 paragraph add: “Except in the case of sole source equipment.”

DELETE sentence from paragraph 2.1: “Provide full‐voltage, full magnetic devices for the control and protection of single‐ and three‐phase, 60‐hertz, squirrel‐cage induction motors in accordance with NEMA ICS 1, NEMA ICS 2, and UL 508 for magnetic motor controllers.”

ADD sentence to paragraph 2.1: “Provide full‐voltage, full magnetic devices for the control and protection of single‐ and three‐phase, 60‐hertz, squirrel‐cage induction motors in accordance with NEMA ICS 1, NEMA ICS 2, and UL 845 for magnetic motor controllers.”

ADD to Para 2.9: “Conduct short‐circuit tests in accordance with Section 2 of NEMA ICS 1, except in the case of sole source equipment where standard factory testing applies.”

SECTION 26 20 00 Interior Distribution System ‐Revise SECTION 26 20 00 Interior Distribution System without re‐issuing

ADD to Para 1.3, SD‐03: “Except in the case of sole source equipment” ADD to Para 1.3, SD‐07: “Except in the case of sole source equipment” DELETE Para 1.4.3 and 1.4.3.1 since these requirements do not apply to sole source equipment.

SECTION 26 24 19.00 40 MOTOR CONTROL CENTERS

‐Replace SECTION 26 24 19.00 40 MOTOR CONTROL CENTERS in its entirety. Changes are as shown below.

DELETE from para 1.1: “IEEE C57.12.01, NEMA ICS 8, NEMA ST 1”

DELETE from para 1.3, SD‐07: Remove Certificate paragraph for Motor Control Centers

DELETE paragraph 2.3 WIRING ADD paragraph 2.3 WIRING: “All control wire is to be provided per manufacturer requirement and industry standards.”

DELETE paragraph 2.5 SPACE HEATERS ADD paragraph 2.5 SPACE HEATERS: “Provide space heaters where indicated shown on the drawings.”

DELETE from paragraph 2.6.3: “Vertical section shall be 20 inches deep and buses, control wiring, control transformers, small power transformers, terminal blocks, line terminals, cable supports, and clamps shall be accessible from the front.”

ADD to paragraph 2.6.3: “Vertical section shall be 15 or 30 inches deep and buses, control wiring, control transformers, small power transformers, terminal blocks, line terminals, cable supports, and clamps shall be accessible from the front.”

DELETE paragraph 2.6.3.5 SILLS and renumber remaining paragraphs of 2.6.3 accordingly.

DELETE from Paragraph 2.6.3.5 NEMA 12R (title) ADD to Paragraph 2.6.3.5: NEMA 12 (revised title)

DELETE from Paragraph 2.6.3.5 NEMA 12: “The motor control center shall be non‐walk in NEMA Type 12R enclosure as shown on the drawings.”

ADD to Paragraph 2.6.3.5 NEMA 12: “The motor control center shall be non‐walk in NEMA Type 12 enclosure as shown on the drawings.”

DELETE sentence from para 2.6.4.1 Horizontal Bus: “Provide each control center assembly with a three‐ phase main horizontal bus, with a continuous current rating not less than 800 amperes, located across the top of each vertical section.”

ADD sentence to para 2.6.4.1 Horizontal Bus: “Provide each control center assembly with a three‐phase main horizontal bus, with a continuous current rating not less than 800 amperes, located across the cenerline of each vertical section.”

DELETE paragraph 2.6.4.4, Neutral Bus

DELETE sentence from para 2.6.5.2 Auxiliary Contacts: “Each controller shall be provided with a minimum of three auxiliary contacts which can be easily changed from normally open to normally closed.”

ADD sentence to para 2.6.5.2 Auxiliary Contacts: “Each controller shall be provided with a minimum of two auxiliary contacts which can be easily changed from normally open to normally closed.”

DELETE sentence from para 2.6.8: Transformers shall be drawout type.

ADD sentence to para 2.6.8: “Transformers shall be fixed frame type.”

DELETE paragraph 2.6.9, Ground Detector Indicator and renumber remaining paragraphs of 2.6 accordingly.

DELETE first sentence from para 2.6.11 Control Transformers: “Mount control transformers for several starter units in a separate compartment and connect its primary windings to the main bus through a molded case circuit breaker of suitable rating.”

DELETE sentence from para 2.6.12 Accessories and Control Devices: “Control accessories shall be provided, and shall be suitable for mounting on the front of, or inside, the control centers as indicated on the drawings.”

ADD sentence to para 2.6.12 Accessories and Control Devices: “Control accessories shall be provided, and shall be suitable for mounting on the front of, or inside, the control centers.”

DELETE sentence from para 2.7.7.3 Feeder Disconnects: “Where required, fusible disconnect and circuit breaker feeder circuits shall have a DeviceNet I/O Module containing at least two inputs and one output.”

ADD sentence to para 2.7.7.3 Feeder Disconnects: “Where required, fusible disconnect and circuit breaker feeder circuits shall have a DeviceNet I/O Module containing at least three inputs (open, close, and trip) and zero output.”

DELETE sentence from para 2.11: “Equipment located indoors shall be ANSI Light, and equipment located outdoors shall be ANSI Light Grey. All touch‐up work shall be done with manufacturer's coatings as supplied under paragraph Spare Parts.”

ADD sentence to para 2.11: “Equipment located indoors shall be ANSI Light Gray (except in the case of sole source equipment), and equipment located outdoors shall be ANSI Light Grey (except in the case of sole source equipment). All touch‐up work shall be done with manufacturer's coatings as supplied under paragraph Spare Parts.”

DELETE sentence from para 2.12: “The factory test equipment and the test methods used shall conform to the applicable NEMA standards and shall be subject to the approval of the Contracting Officer.”

ADD sentence to para 2.12: “The factory test equipment and the test methods used shall be subject to the approval of the Contracting Officer.”

DELETE paragraph 2.12.1.1 Dielectric Tests and renumber remaining paragraphs of 2.12.1 accordingly.

DELETE sentence from para 3.2: “Provide test equipment, labor, and personnel to perform the tests required.”

ADD sentence to para 3.2: “Contractor shall provide test equipment, labor, and personnel to perform the tests required in the field.”

SECTION 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION

‐Revise SECTION 26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION as shown without re‐ issuing:

DELETE sentence from paragraph 2.4 “Motor controls and motor control centers shall be in accordance with NEMA ICS 1, NEMA ICS 2, NEMA ICS 3 and NEMA ICS 6, and UL 508 and UL 845.”

ADD sentence to paragraph 2.4: “Motor controls and motor control centers shall be in accordance with NEMA ICS 1, NEMA ICS 2, NEMA ICS 3 and NEMA ICS 6, and UL 845.”

DELETE sections a. – j. from paragraph 2.8.6 Solid State Trip Elements ADD to paragraph 2.8.6 Solid State Trip Elements: “a. Long‐time current pick‐up; b. Short time current pick‐up; c.

Short time I square times t switch; d. Instantaneous current pick‐up; e. Ground‐fault pick‐up in no case greater than 1200 amperes. Sensing of ground fault current at the main bonding jumper or ground strap shall not be permitted. Zone‐selective interlocking shall be provided as shown; f. Ground‐fault I square times t switch; g.

Overload and Ground‐fault trip indicators shall be provided; h. Overload and Ground‐fault trip indicators shall be provided.

SECTION 26 29 01.00 10 ELECTRIC MOTORS, 3‐PHASE VERTICAL INDUCTION TYPE

‐ Revise SECTION 26 29 01.00 10 ELECTRIC MOTORS, 3‐PHASE VERTICAL INDUCTION TYPE as shown without re‐ issuing:

In Paragraph 2.2, A, 1:

REPLACE sentence "Where special enclosures or assembly are required, it will be specified on the Motor Data Sheet."

WITH "Special enclosures or assemblies may be required."

SECTION 26 29 23 VARIABLE FREQUECY DRIVE SYSTEMS UNDER 600 VOLTS

‐Replace SECTION 26 29 23 VARIABLE FREQUECY DRIVE SYSTEMS UNDER 600 VOLTS in its entirety. Changes are as shown below.

DELETE SECTION 26 29 23 VARIABLE FREQUECY DRIVE SYSTEMS UNDER 600 VOLTS

ADD REVISED: SECTION 26 29 23 VARIABLE FREQUECY DRIVE SYSTEMS UNDER 600 VOLTS incorporating changes below as part of this amendment.

DELETE sentence from paragraph 1.3.1.1: “Computing devices, as defined by 47 CFR 15, MIL‐STD‐461 rules and regulations, shall be certified to comply with the requirements for class A computing devices and labeled as set forth in part 15.

ADD sentence to paragraph 1.3.1.1: “Computing devices, as defined by 47 CFR 15, MIL‐STD‐461 rules and regulations, shall be designed to comply with the requirements for class A computing devices and labeled as set forth in part 15.”

DELETE Paragraph 1.3.2.2 Sensor and Control Wiring Surge Protection ADD Paragraph 1.3.2.2 Sensor and Control Wiring Surge Protection: “I/O functions as specified shall be protected against surges induced on control and sensor wiring installed outdoors and as shown.”

DELETE from Para 1.4, SD‐06: “VFD test reports”

DELETE from paragraph 2.1: “s. Provide properly sized NEMA rated by‐pass and isolation contactors to enable operation of motor in the event of VFD failure. Mechanical and electrical interlocks shall be installed between the by‐pass and isolation contactors. Provide a selector switch and transfer delay timer.”

SECTION 40 95 00 PROCESS INTEGRATION

‐Replace SECTION 40 95 00 PROCESS INTEGRATION in its entirety. Changes are as shown below.

DELETE sentence from para 2.7.1 PLC General Requirements: “PLCs shall meet the requirements of Class A computing devices, and shall be labeled as set forth in 47 CFR 15 and shall be able to withstand conducted susceptibility test as outlined in NEMA ICS 1, NEMA ICS 2, NEMA ICS 3, and IEEE C37.90.1.”

ADD sentence to para 2.7.1 PLC General Requirements: “PLCs shall meet the requirements of Class A computing devices, and shall be labeled as set forth in 47 CFR 15 and shall be able to withstand conducted susceptibility test as outlined in IEC 61131‐2 and IEEE C37.90.1.”

DELETE sentence from para 2.7.2 Modular Chassis Based PLC: “Modules shall plug directly into the backplane.”

ADD after first sentence of para 2.8.1 Operating System: “At the beginning of the software development phase, the latest firmware and development software shall be baselined for the project. Version updates during the software development/test phases shall only be done if necessary.”

ADD sentence to para 2.9.1.1 Enclosures: “Continuous hinges shall be used when available for the enclosure size and type needed.”

DELETE from paragraphs 2.9.1.2, 2.9.1.3, 2.9.1.5: “NEMA ICS 1, NEMA ICS 2”

DELETE from paragraph 2.9.1.6: “Relays and Contactors shall comply with IEEE C37.90.”

DELETE from paragraph 2.9.1.7: “Terminal blocks shall comply with NEMA ICS 4 and UL 1059.”

DELETE from paragraph 2.9.1.10: “LCD Screen mounting brackets shall be provided as an articulating arm compatible with the existing or new screen depending on if Option #1 CCTV system is exercised.”

ADD to paragraph 2.9.1.10: “LCD screens shall be mounted on the Control Console as shown on Drawings E1655.”

DELETE from paragraph 2.11.1.5: “Program/screen checkout and debug facilities shall include display of dynamic and/or simulated system variables and points on the programming screens.”

ADD to paragraph 2.11.1.5: “The PLC programming software shall be capable of use for debugging.”

DELETE from paragraph 2.11.1.6: “and 2) in bar chart form with a minimum of 360 15‐minute divisions and 31 1‐day divisions to be displayed on the X‐axis.”

DELETE first sentence from paragraph 2.11.1.7: “The user shall be able to call up the following displays by dedicated function keys on the touch screen or pull down menu and shall be able to page forward and backward on linked multiple page displays.”

ADD sentence to beginning of paragraph 2.11.1.7: “The user shall be able to call up the following displays by dedicated function keys on the touch screen or pull down menu.”

DELETE sentence from para 2.11.2.5: “The system shall maintain an ASCII disk file logging all operators logged onto the system, alarm acknowledgements, commands issued and all database modifications for each password.”

ADD to the end of para 2.11.5: “The system reaction time shall be demonstrated during the factory acceptance test by PLC simulation.”

DELETE from para 2.11.5.2 Location: “System normal heavy load conditions, as specified, shall have 50 percent of the changes and alarms, including no less than one of each type, occurring at a single PLC with the remaining changes and alarms distributed among the remaining PLCs.”

ADD para 2.11.5.2 Location: “System normal heavy load conditions, as specified, shall have all of the changes and alarms occurring at a single PLC.”

DELETE from the end of para 2.11.6 Control Panel and Circuit Alarms: “point not responding to command; and point change of state without command.”

ADD to paragraph 2.12.1 Factory Test Setup: “The Contractor shall provide the motors, encoders, and rotary limit switch panel for the factory test.”

DELETE sentence from para 3.2.4.2 Power Monitoring Devices: “It shall be Rockwell Bulletin 1404‐M6 Powermonitor 3000 with DeviceNet communication.”

ADD sentence to para 3.2.4.2 Power Monitoring Devices: “It shall be Rockwell Bulletin 1404‐M6 Powermonitor 5000 with DeviceNet communication.”

DELETE sentence from para 3.3.2.1 Power Line Surge Protection: “Protection shall meet the requirements of IEEE C62.41.1 and IEEE C62.41.2.”

ADD sentence to para 3.3.2.1 Power Line Surge Protection: “Surge suppressors shall be MTL Instruments MA15 Series or MA30 Series or approved equal.”

DELETE paragraph 3.3.2.2 Sensor and Control Wiring Surge Protection ADD paragraph 3.3.2.2 Sensor and Control Wiring Surge Protection: “Digital and analog inputs shall be protected against surges induced on control and sensor wiring. Protection shall meet the requirements of IEEE C62.41.1, IEEE C62.41.2, and IEEE C62.45Protect digital and analog outputs against surges induced on control and sensor wiring installed outdoors and as shown. Fuses shall not be used for surge protection. Surge suppressors shall be MTL Instruments ZB24580 or MTL Instruments SD Series or approved equal.”

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 26-Aug-2014 02:00 PM to 28-Aug-2014 02:00 PM.

SECTION 00100 - BIDDING SCHEDULE/INSTRUCTIONS TO BIDDERS

The following have been modified:

INQUIRIES AND RFIS

Bidders shall not include identifying information in any submitted inquiry.

***Please Note: Offerors shall only submit one question per inquiry. Inquiries containing multiple questions may be rejected.

1.1. Prospective Offerors should submit questions concerning this bid via Bidder Inquiry in

ProjNet at www.projnet.org/projnet.

1.1.1. To submit and review bid inquiry items, bidders will need to be a current registered user or self register into the system. To self-register, go to the aforementioned web page and click on the BID tab. Select Bidder Inquiry, select agency USACE, and enter the Bidder Inquiry Key for this solicitation listed below, your email address, and then click login. Fill in all required information and click create user. Verify that information on next screen is correct and click continue.

1.1.2. From this page, you may view all bidder inquiries or add inquiry.

1.1.3. Offerors will receive an acknowledgement of their question via email, followed by an answer to their question after it has been processed by our technical team.

1.1.4. The Solicitation Number is: W911XK-14-B-0013

1.1.5. The Bidder Inquiry Key is: ICYWUY-2X3964

1.2. The Bidder Inquiry System will be unavailable for new inquires AFTER 8:00 AM EST ON 25 AUGUST 2014 to ensure adequate time is allotted to form an appropriate response and amend the solicitation if necessary.

1.3. Offerors are requested to review the specification in its entirety, review the Bidder Inquiry System for answers to questions prior to submission of a new inquiry.

1.4. The call center operates weekdays from 8AM to 5PM U.S. Central Time Zone

(Chicago). The telephone number for the Call Center is 800-428-HELP.

1.5. Offers will NOT be publicly opened. Information concerning the status of the evaluation and/or award will NOT be available after receipt of bids.

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS

The following have been added by full text:

MI 33, 8/15/2014

General Decision Number: MI140033 08/15/2014 MI33

Superseded General Decision Number: MI20130033

State: Michigan

Construction Type: Heavy

County: Chippewa County in Michigan.

HEAVY CONSTRUCTION PROJECTS

Modification Number Publication Date 0 01/03/2014 1 01/24/2014 2 02/07/2014 3 02/28/2014 4 04/18/2014 5 05/09/2014 6 05/16/2014 7 07/04/2014 8 08/01/2014 9 08/15/2014

BRMI0006-002 05/01/2011

Rates Fringes

BRICKLAYER.......................$ 26.40 15.51

* CARP1510-002 06/01/2014

Rates Fringes

CARPENTER, Includes Form Work....$ 23.10 18.15

ELEC1070-003 06/03/2013

Rates Fringes

ELECTRICIAN

Contracts $135,000 and under.......................$ 29.00 16.71 Contracts over $135,000.....$ 31.00 17.79

ENGI0326-006 05/01/2014

Rates Fringes

OPERATOR: Power Equipment Crane, main boom & jib 120' or longer..............$ 27.96 21.55 Crane, main boom & jib 140' or longer..............$ 28.21 21.55 Crane, main boom & jib 220' or longer..............$ 28.46 21.55

GROUP 1 -

Backhoe/Excavator;

Bulldozer; Crane;

Compactor; Scraper; Loader..$ 27.46 21.55 GROUP 2 - Boom truck (non-swing)......................$ 24.21 21.55 GROUP 3 - Oiler.............$ 22.69 21.55

FOOTNOTES: Premium rate: main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.

IRON0008-009 06/01/2013

Rates Fringes

IRONWORKER, REINFORCING AND

STRUCTURAL

Contracts $10,000,000 or greater.....................$ 25.75 23.17 Contracts less than $10,000,000.................$ 22.53 23.17

Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.

LABO1329-002 05/01/2014

Rates Fringes

LABORER

Common or General; Mason Tender - Cement/Concrete....$ 21.60 12.78 Pipelayer...................$ 22.00 12.78

PLAS0016-035 04/01/2014

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 20.17 10.13

PLUM0111-009 05/05/2014

Rates Fringes

PLUMBER/PIPEFITTER...............$ 30.72 20.80

TEAM0007-010 06/01/2014

Rates Fringes

TRUCK DRIVER

Lowboy/Semi-Trailer Truck...$ 25.15 .50 + a+b

FOOTNOTE:

a. $395.05 per week.

b. $56.10 daily.

SUMI2010-031 11/09/2010

Rates Fringes

LABORER: Landscape..............$ 10.89 1.74

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 12.98 6.12

OPERATOR: Grader/Blade..........$ 16.63 5.85

OPERATOR: Roller................$ 13.74 7.93

TRUCK DRIVER: Dump Truck........$ 12.63 1.25

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION

The following have been deleted:

MI 33, 08/01/2014

(End of Summary of Changes)

File details come from the government source that posted it. Updated .