Text version
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 23 PAGES
FY14 Mac Lock Modernization - Amendment 0003
01 22 00.00 10 SD-01 Preconstruction Submittals
1.2 G AOFSchedule of Prices
01 33 00 SD-01 Preconstruction Submittals 1.8Submittal Register
01 35 13.10 SD-01 Preconstruction Submittals 1.7.2Payrolls and Basic Records
1.7.3 G AOFProgress Chart
1.5.6 G AOFUtility Location Findings
SD-07 Certificates 2.2As-Built Technician's
Qualifications
2.2 G AOFAs-built Drawings
01 35 29 SD-01 Preconstruction Submittals G AOFHazardous Energy Control Plan
1.6 G AOFAccident Prevention Plan (APP)
1.7 G AOFActivity Hazard Analysis (AHA)
1.6.1 G AOFCrane Critical Lift Plan
1.5.1.3 G AOFCrane Operator Qualification
SD-06 Test Reports 1.11.1Accident Reports 1.11.3Monthly Exposure Reports 1.11.4Crane Reports
SD-07 Certificates 1.8Confined Space Entry Permit 1.8Hot work permit 1.11.5Certificate of Compliance
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 23 PAGES
01 38 00 SD-01 Preconstruction Submittals
3.1.2 G AOFPhoto Work Plan
2.1.1 G AOFDigital Photographs
3.3 G AOFVideo Recordings
01 45 04.00 10 SD-01 Preconstruction Submittals
3.2 G AOFContractor Quality Control (CQC)
Plan 01 57 20.00 20 SD-01 Preconstruction Submittals
1.7 G AOFEnvironmental Protection Plan
01 58 01 SD-02 Shop Drawings
2.1 G AOFSign Layouts
01 78 00.00 40 SD-01 Preconstruction Submittals
1.3Reproducible Drawings 1.3CAD System Drawings
SD-02 Shop Drawings 1.3Record Drawings
SD-03 Product Data 1.3Spare Parts Data
SD-07 Certificates 1.3Work Plan
SD-08 Manufacturer’s Instructions 1.3Preventative Maintenance 1.3Condition Monitoring (Predictive
Testing) 1.3Inspection 1.3Posted Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 23 PAGES
01 78 00.00 40 SD-10 Operation and Maintenance Data
3.1Operation and Maintenance Manuals
02 41 00 SD-01 Preconstruction Submittals 1.6.1Existing Conditions
SD-07 Certificates
1.9 G AOFDemolition Plan
1.4.1Notifications
SD-11 Closeout Submittals 1.4.2Receipts
02 81 00 SD-03 Product Data
3.1 G AOFOn-site Hazardous Waste
Management 3.2Notices of Non-Compliance and
Notices of Violation SD-06 Test Reports
3.7 G AOFRecordkeeping
3.7 G AOFException Reports
2.1.1Packaging Notifications
SD-07 Certificates 1.4.3Certification 3.2.4Security Plan
1.4.1 G AOFTransportation and Disposal
Coordinator
1.4.2 G AOFTraining
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 23 PAGES
02 81 00 3.2.2EPA Off-Site Policy 3.2.5Certificates of Disposal
3.2.3 G AOFShipping Documents and
Packagings Certification
3.6 G AOFWaste Minimization
02 82 14.00 10 SD-02 Shop Drawings
1.4 G AOFDetailed Drawings
SD-03 Product Data
3.4.4.1 G AOFAsbestos Waste Shipment
Records
3.4.3 G AOFWeight Bills and Delivery Tickets
1.11 G AOFRespiratory Protection Program
3.4 G AOFCleanup and Disposal
1.5 G AOFQualifications
1.10Training Program
1.12 G AOFLicenses, Permits and
Notifications SD-06 Test Reports
3.2 G AOFExposure Assessment and Air
Monitoring
SD-07 Certificates 1.9Medical Surveillance
Requirements 02 82 33.13 20 SD-03 Product Data
1.6.4 G AOFVacuum Filters
1.6.1 G AOFRespirators
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 23 PAGES
02 82 33.13 20 SD-06 Test Reports
1.5.2.3 G AOFSampling Results
1.5.2.3 G AOFOccupational and Environmental
Assessment Data Report SD-07 Certificates
1.5.1.1 G AOFQualifications of CP
1.5.1.4 G AOFTesting Laboratory
1.5.1.2 G AOFTraining Certification
1.5.1.3 G AOFNotification of the
Commencement of LBP Hazard Abatement
1.5.1.5 G AOFThird Party Consultant
Qualifications
1.5.3 G AOFLead-Based Paint/Paint With
Lead Removal/Control Plan
1.6.3 G AOFRental Equipment Notification
1.5.2.6 G AOFRespiratory Protection Program
1.5.2.7 G AOFHazard Communication Program
3.5.2 G AOFEPA or State approved
hazardous waste treatment, storage, or disposal facility
1.5.2.8 G AOFLead Waste Management Plan
1.6.4 G AOFVacuum Filters
3.5.1.1 G AOFClearance Certification
SD-11 Closeout Submittals
3.5.2.1 G AOFhazardous waste manifest
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 23 PAGES
02 82 33.13 20 1.5.2.4 G AOFMedical Examinations
1.5.1.2 G AOFTraining Certification
3.5.2.1 G AOFTurn-In Documents or Weight
Tickets 02 84 33 SD-07 Certificates
1.7.1Training certification 1.7.2Qualifications of CIH 1.7.3PCB removal work plan 1.7.4PCB disposal plan 1.7.5Notification 3.8Transporter certification 3.5.4Certification of Decontamination 3.5.5Post cleanup sampling 3.8.1Certificate of disposal
26 05 00.00 40 SD-01 Preconstruction Submittals
2.1.1 G AOFConduits and Raceways
2.1.3 G AOFWire and Cable
2.1.5 G AOFSwitches
2.1.6 G AOFReceptacles
2.1.7 G AOFOutlets, Outlet Boxes, and Pull
Boxes
2.1.9 G AOFCircuit Breakers
2.1.8 G AOFPanelboards
2.1.10 G AOFLamps and Lighting Fixtures
2.1.11 G AOFDry-Type Distribution
Transformers
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 23 PAGES
26 05 00.00 40 2.1.12 G AOFSpare Parts
2.1.2 G AOFCable Trays
SD-03 Product Data
2.1.1 G AOFConduits and Raceways
2.1.3 G AOFWire and Cable
2.1.5 G AOFSwitches
2.1.6 G AOFReceptacles
2.1.7 G AOFOutlets, Outlet Boxes, and Pull
Boxes
2.1.9 G AOFCircuit Breakers
2.1.8 G AOFPanelboards
2.1.10 G AOFLamps and Lighting Fixtures
2.1.11 G AOFDry-Type Distribution
Transformers
2.1.12 G AOFSpare Parts
2.1.2 G AOFCable Trays
SD-06 Test Reports
3.2 G AOFContinuity Test
3.2 G AOFPhase-Rotation Tests
3.2 G AOFInsulation Resistance Test
SD-08 Manufacturer’s Instructions 1.5Manufacturer's Instructions
26 05 13.00 40 SD-03 Product Data
2.2.1 G AOFMultiple-Conductor Shielded
Cables
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 23 PAGES
26 05 13.00 40 2.2.2 G AOFMultiple-Conductor Nonshielded Cables
2.2.3 G AOFPortable Cables
2.3.3 G AOFNonmetallic Jacket
SD-06 Test Reports
3.2 G AOFDielectric Absorption Tests
3.2 G AOFHigh-Voltage Tests
3.2 G AOFRadiographic Tests
SD-07 Certificates 2.4certificates
2.2.1.1 G AOFLead Sheath
2.4.1 G AOFFlammability
3.1.3 G AOFMinimum Bending Radius
3.2 G AOFHigh-Voltage Tests
3.2 G AOFDielectric Absorption Tests
SD-08 Manufacturer’s Instructions 1.4Medium-Voltage Power Cables 1.4High-Voltage Power Cables 1.4Pothead Terminations
26 05 19.00 10 SD-03 Product Data
3.1 G AOFInstallation Instructions
SD-06 Test Reports
3.2 G AOFTests, Inspections, and
Verifications 26 05 71.00 40 SD-01 Preconstruction Submittals
2.5Fuses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 23 PAGES
26 05 71.00 40 SD-02 Shop Drawings
3.1 G AOFControl Devices
3.1 G AOFProtective Devices
SD-03 Product Data
2.1 G AOFMotor Control
2.2 G AOFInstrument Transformers
2.3 G AOFEnclosures
2.4 G AOFCircuit Breakers
3.1 G AOFControl Devices
2.7 G AOFTime Switches
2.8 G AOFProtective Relays
2.10 G AOFIndicating Lights
SD-07 Certificates 2.9Circuit Tests 2.9Circuit Tests 3.2Dielectric Tests
SD-08 Manufacturer’s Instructions 3.1Control Devices 3.1Protective Devices
SD-10 Operation and Maintenance Data
2.1.1Magnetic Motor Controllers 2.4Circuit Breakers 2.7Time Switches 2.8Protective Relays
26 05 73.13 08 SD-06 Test Reports
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 23 PAGES
26 05 73.13 08 3.2 G AOFArc Flash Analysis Report 26 12 16.30 SD-01 Preconstruction Submittals
Manufacturer's Installation Instructions
SD-10 Operation and Maintenance Data
2.2 G AOFTransformer
26 20 00 SD-02 Shop Drawings
2.14 G AOFPanelboards
2.15 G AOFTransformers
2.4 G AOFCable trays
3.1.9.1 G AOFMarking strips
SD-03 Product Data
2.13 G AOFReceptacles
2.14.2 G AOFCircuit breakers
2.11 G AOFSwitches
2.15 G AOFTransformers
2.17 G AOFMotor controllers
2.23 G AOFSurge protective devices
SD-06 Test Reports
3.5.2 G AOF600-volt wiring test
3.5.5 G AOFGrounding system test
3.5.3 G AOFTransformer tests
3.5.4 G AOFGround-fault receptacle test
SD-07 Certificates
2.12 G AOFFuses
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 23 PAGES
26 20 00 SD-09 Manufacturer’s Field Reports
2.25.1 G AOFTransformer factory tests
SD-10 Operation and Maintenance Data
1.5.1 G AOFElectrical Systems
26 24 16.00 40 SD-02 Shop Drawings
1.2 G AOFDetail Drawings
1.2 G AOFOutline Drawings
SD-03 Product Data
2.1.1 G AOFPanelboards
2.1.3 G AOFDirectory Card and Holder
SD-06 Test Reports
3.2 G AOFContinuity Tests
3.2 G AOFInsulation Tests
SD-07 Certificates 1.2Statements
SD-08 Manufacturer’s Instructions
2.1.1 G AOFPanelboards
26 24 19.00 40 SD-02 Shop Drawings
2.4.2 G AOFDrawings
2.2.1 G AOFShop Drawings
2.6 G AOFMotor Control Centers
SD-03 Product Data
1.4 G AOFEquipment
2.12Factory Tests
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 23 PAGES
26 24 19.00 40 SD-06 Test Reports 2.12Factory Tests
SD-08 Manufacturer’s Instructions 1.2Motor Control Units 1.2Protective Devices
26 28 01.00 10 SD-03 Product Data
2.11 G AOFFault Current Analysis
2.11 G AOFProtective Device Coordination
Study 2.1Equipment 1.4.1System Coordinator 3.3.5Protective Relays 3.2Installation
SD-06 Test Reports 3.3Field Testing
26 29 01.00 10 SD-02 Shop Drawings
2.2 G AOFMotors
SD-03 Product Data
1.4 G AOFMotor Performance
2.2 G AOFMotors
1.5.3Government Study
SD-06 Test Reports 2.6Form Wound Coil Test 2.7Winding Space Heater Test 2.2Testing & Final Inspection
SD-07 Certificates
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 23 PAGES
26 29 01.00 10 1.4Qualification Data SD-10 Operation and Maintenance Data
1.4Operation and Maintenance Manual
26 29 23 SD-02 Shop Drawings
1.5.1 G AOFSchematic diagrams
1.5.2 G AOFInterconnecting diagrams
1.5.3 G AOFInstallation drawings
SD-03 Product Data
2.1 G AOFVariable frequency drives
2.3 G AOFWires and cables
1.5.4 G AOFEquipment schedule
SD-06 Test Reports 3.2.2Performance Verification Tests 3.2.3Endurance Test
SD-08 Manufacturer’s Instructions 1.5.5Installation instructions
SD-09 Manufacturer’s Field Reports
2.5.1 G AOFVFD Factory Test Plan
1.5.6Factory test results
SD-10 Operation and Maintenance Data
2.1Variable frequency drives 27 10 00 SD-02 Shop Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 23 PAGES
27 10 00 1.6.1.1 G AOFTelecommunications drawings
1.6.1.2 G AOFTelecommunications Space
Drawings SD-03 Product Data
2.3 G AOFTelecommunications cabling
2.4.5 G AOFPatch panels
2.5 G AOFTelecommunications
outlet/connector assemblies
2.4.2 G AOFEquipment support frame
2.4.3 G AOFConnector blocks
SD-06 Test Reports 3.4.1Telecommunications cabling testing SD-07 Certificates
1.6.2.1 G AOFTelecommunications Contractor
1.6.2.2 G AOFKey Personnel
1.6.2.3 G AOFManufacturer Qualifications
1.6.3 G AOFTest plan
SD-09 Manufacturer’s Field Reports
2.9.1 G AOFFactory reel tests
SD-10 Operation and Maintenance Data
1.9.1 G AOFTelecommunications cabling and
pathway system
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 23 PAGES
27 10 00 1.9.2 G AOFRecord Documentation 27 13 23.00 40 SD-01 Preconstruction Submittals
1.4Qualifications
1.5.2.1 G AOFTelecommunications Contractor
1.5.2.2 G AOFKey Personnel
1.5.2.3 G AOFManufacturer Qualifications
1.4 G AOFQuality Assurance Plan
1.5 G AOFQuality Assurance Plan
SD-02 Shop Drawings
1.5.1 G AOFFiber Optic System
SD-03 Product Data
2.1.3.2 G AOFOptical Fibers
2.1 G AOFFiber Optic Cable Design
2.2 G AOFPre-Connected Cable Assembly
2.4 G AOFFiber Optic Terminal Cabinets
2.3 G AOFOptical Patch Panel Assemblies
2.1.1 G AOFFiber Optic Media Types
SD-06 Test Reports
2.5 G AOFFactory Test Certificates
3.12.1 G AOFMulti-mode OTDR Test
3.12.2 G AOFEnd-to-End Attenuation Tests
3.12.3 G AOFEnd-to-End Bandwidth Tests
1.5.5 G AOFFiber Optic Factory Test Plan
1.5.6 G AOFFiber Optic Field Tests Plan
SD-07 Certificates
1.5.4 G AOFManufacturer's qualifications
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 23 PAGES
27 13 23.00 40 SD-08 Manufacturer’s Instructions
1.5.3 G AOFFiber optic system instructions
40 95 00 SD-02 Shop Drawings 3.1.1Installation
Wiring 2.9.6Control Panel Drawings
2.9.6.2 G AOFMaster Remote Panel (MRP-1N)
2.9.6.2 G AOFMaster Remote Panel (MRP-2N)
G AOFMaster Remote Panel (MRP-18) G AOFMaster Control Panel (MCP-23)
2.9.6.3 G AOFRemote I/O Panel Fender No. 7
Boom (RP-F7B)
G AOFRemote I/U Panel Fender No. 8 Boom (RP-F8B)
2.9.6.4 G AOFRemote I/O Panel Fender No. 7
Pin (RP-F7P)
G AOFRemote T/0 Panel Fender No. 8 Pin (RP-FBP)
G AOFRemote I/O Panels for (Gates (Individual drawing packages for
RP-G2N, RF-G3N, RF-G4N,
RF-G5N, RF-G2S, RF-G3S,
RF-G4S, and RP-G5S) panels
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 23 PAGES
40 95 00 G AOFRemote I/O Panels for Valves (Individual drawing packages for RP-VlN, RP-V2N, RP-VlS, and RP-V2S) panels
G AOFControl Console C-lS (C-lS)
2.9.6.7 G AOFControl Console C-2S (C-2S)
2.9.6.7 G AOFControl Console enclosure
fabrication drawings
2.9.6.10 G AOFLockmaster HMI (LM-HMI)
G AOFLighting Relay Panel lS (LRP-lS)
2.9.6.8 G AOFLighting Relay Panel 2S
(LRP-2S)
G AOFLighting Relay Panel lN (LRP-lN) G AOFLighting Relay Panel 2N
(LRP-2N)
2.9.6.9 G AOFPower Panels for Control Panels
(Common drawing package) G AOFMotor Control Center MCC-lN
2.9.6.11 G AOFMotor Control Center MCC-2N
G AOFMotor Control Center Center
MC-1S
2.9.6.11 G AOFMotor Control Center MCC-2S
2.9.6.11 G AOFMotor Control Center Point I/O
Rack I/O Wiring
2.9.6.11 G AOFMotor Control Center VFD
Interface and Wiring
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 23 PAGES
40 95 00 SD-03 Product Data 3.5Control Drawings 2.9.1.1Panel enclosures
2.9.3 G AOFDisconnect switches
2.9.3Circuit protection as fuses, fuseblocks, circuit breakers
2.7.2.3 G AOFPower supplies
G AOFPLC and Remote I/0 Communication modules
2.10.3 G AOFNetwork Ethernet switches and
connectors
2.7.2 G AOFPLCs and chassis
2.7.2 G AOFPLC I/O cards and expansion
modules
2.7.3 G AOFRemote I/O cards and expansion
modules
2.9.1.9 G AOFGraphical user interfaces
2.9.1.5 G AOFPush buttons
2.9.1.2 G AOFPilot lights
2.9.1.3 G AOFSelector switches
2.9.1.4 G AOFSelector switches
2.9.1.6 G AOFRelays and Contactors
2.9.1.8Alarm horns
2.3.4 G AOFPower monitoring devices
2.7.3 G AOFIndustrial networked remote I/O
modules
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 23 PAGES
40 95 00 2.7.6 G AOFPLC I/O Terminal Block wiring systems
2.7.6 G AOFPLC I/O Terminal Block wiring
systems
2.7.6 G AOFPreconfigured cabling systems
G AOFLCD Screen mounting brackets
2.9.1 G AOFInstrumentation Wiring
2.3Sensors and Meters
2.3.3.3 G AOFWater level sensor WLl (Upper
Approach)
2.3.3.3 G AOFWater level sensor WL2 (Basin)
2.3.3.3 G AOFWater level sensor WL3 (Lower
Approach)
2.4.1.1 G AOFBubbler modulating valves and
actuators
2.4.1.2 G AOFBubbler modulating valves and
actuators G AOFRecess Bubbler control valves and actuators G AOFValve shaft sector gear·limit switches:
G AOFValve sector gear emergency stop limit switches
2.5.1 G AOFValve rotary limit switch bank
assemblies
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 23 PAGES
40 95 00 G AOFValve (emptying) rotary limit switch bank
G AOFValve (fill) rotary limit switch bank G AOFValve position encoders VP G AOFValve motor encoders VM
2.5.3 G AOFGate sector gear limit switches:
Gate sector gear emergency stop limit switches
G AOFGate miter proximity sensors
LSGM
G AOFGate rotary limit switch bank LS2 to 6
Gate anchorage overload regulator limit switches LSAR
G AOFGate position encoders GP G AOFGate motor encoders GM G AOFFender boom linear limit switch bank retrofit components LS4A/B G AOFFender boom latch on anvil and withdrawn limit switches LS5, 6
2.3.3.2 G AOFFender boom hydraulic unit
pressure sensor
2.3.2.3 G AOFFender boom pit 'cellar saver'
water switches G AOFFender boom inclinometer position sensor BP
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 23 PAGES
40 95 00 2.4.1.2 G AOFFender boom raise/lower solenoid and valve manifolds
G AOFFender boom over the wall limit switches LSBOW
G AOFFender pin end boom lowered limit switches LS3
G AOFFender pin linear limit switch bank retrofit components LS1,2
2.3.2.1 G AOFSump pump level controllers and
probes
2.3.2.2 G AOFSump pump high high level
switches
2.4 G AOFCompressed Air And Hydraulic
Equipment
2.11.1.1Graphical User Interface Screens
2.11.1.1 G AOFLock Overview
2.11.1.1 G AOFSummary Control and Interlock
Status
2.11.1.1 G AOFOperational Detail Control (Valve, Gate, Fender)
2.11.1.1 G AOFLighting Control (Recess, warning, pedestrian)
2.11.1.1 G AOFLighting Control (fill/empty
signals, traffic, heat lamps)
2.11.1.1 G AOFRecess Bubbler
2.11.1.1 G AOFSump Pump
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 23 PAGES
40 95 00 2.11.1.1 G AOFInterlock details
2.11.1.1 G AOFCommunication Status
2.11.1.1 G AOFPower Monitoring
2.11.1.1 G AOFMaintenance
2.11.1.1 G AOFLogical Condition Trees
2.8.8 G AOFProvide one (1) electronic copy
on CD of PLC logic at 50Design and 100Pre-FAT
G AOFProvide two (2) hardcopies of PLC program prior to at 50Design and 100'6 Pre- FAT
G AOFProvide two (2) hardcopies of data tables, memory layouts used for code development, safety & standard code divisions, alarm listings at 50'1; Design and 100'6 Pre-FAT
2.8.8 G AOFProvide (1) electronic copy on CD
of each DeviceNet Network configuration at 50Design and 100 Pre-FAT
2.8.8 G AOFProvide (1) electronic copy on CD
of each Ethernet Switch configuration at 50Design and 100Pre-FAT
3.8 G AOFTraining Manual
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 23 PAGES
40 95 00 3.6.2 G AOFPerformance Verification Test
(PVT)
2.12.2 G AOFFactory Test Procedure
SD-06 Test Reports
2.12.3Factory Test Report 3.6.1Testing, Adjusting and
Commissioning 3.6.2Performance Verification
Test(PVT) 3.6.3Endurance Test
SD-07 Certificates 3.3.2.2Control and Sensor Wiring
SD-10 Operation and Maintenance Data
1.3Instrumentation and Control System
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR