About this file

Amendment 00004

View the file

Other files

File Type Posted
Disregard Award.docx DOCX document
Abstract W911XK-10-B-0007.pdf PDF
RFI 09092010.pdf PDF
Detail Sheet 39.pdf PDF
ss1-2.pdf PDF
RFI 09072010.pdf PDF
Sheet 2.pdf PDF
Amendment 0003.pdf PDF
Amendment 00002.pdf PDF
Amendment 0001.pdf PDF
RFI 08042010.pdf PDF
C-101.pdf PDF
10B0007.pdf PDF
W911XK-10-B-0007 IFB.pdf PDF
Sources Sought Fillable Form.pdf PDF
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA)

W911XK-10-B-0007, FY10 ARRA Southfield Drain No. 2, Drain Rehabilitation Project Cured in Place Pipe Lining (CIPP) System, and Sew er Line Cleaning, MI

This Amendment is being issued to delete the Wage Determination MI84 Dated 08/13/2010 and add Wage Determination MI84 Dated 09/03/2010

No other changes.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 25

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 03-Sep-2010

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-B-0007

X 9B. DATED (SEE ITEM 11)

30-Jul-2010

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

03-Sep-2010

CODE

CONTRACTING DIVISION

DETROIT DISTRICT, USAED

477 MICHIGAN AVENUE, RM 700

DETROIT MI 48226

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-10-B-0007

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 00004

SECTION 00800 - Special Contract Requirements

Delete:WAGE DETERMINATION MI84 Dated 08/13/2010

Add: WAGE DETERMINATION MI84

Dated 09/03/2010

SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS The following have been deleted:

WAGE DETERMINATION

The following have been added by full text:

WAGE DETERMINATION

General Decision Number: MI100084 09/03/2010 MI84

Superseded General Decision Number: MI20080084

State: Michigan

Construction Types: Building and Heavy

County: Oakland County in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS (does not include airport or bridge construction projects, or sewer or water line work if it is incidental to a highway construction project)

Modification Number Publication Date 0 03/12/2010 1 04/16/2010 2 05/07/2010 3 06/04/2010 4 07/02/2010 5 08/06/2010 6 08/13/2010 7 09/03/2010

ASBE0025-003 06/01/2010

Rates Fringes

ASBESTOS WORKER/INSULATOR

Includes the application of all insulating materials, protective coverings, coatings, and finishings to all types of mechanical systems..........$ 31.07 23.88

FOOTNOTE: Work requiring a spray coating in the application:

Five percent (5%) per hour additional.

BOIL0169-001 07/01/2008

Rates Fringes

BOILERMAKER......................$ 31.953 20.869

BRMI0001-002 06/01/2008

Rates Fringes

Bricklayer, Stonemason, Pointer, Caulker & Cleaner.......$ 34.05 15.33

FOOTNOTES:

Using acid material in laying bricks: $2.00 additional per hour.

Working on two point swing stage: $2.25 additional per hour.

Sandblasting: $2.00 additional per hour.

Laying carbon material: $2.00 additional per hour.

Gunite work: $2.00 additional per hour.

Hot work: $3.00 additional per hour.

BRMI0001-003 09/01/2009

Rates Fringes

CEMENT MASON.....................$ 31.91 13.69

BRMI0032-001 06/01/2009

Rates Fringes

MARBLE FINISHER..................$ 24.86 16.51

MARBLE SETTER....................$ 31.34 16.51

TERRAZZO FINISHER................$ 25.33 16.51

TERRAZZO WORKER..................$ 30.80 16.51

TILE FINISHER....................$ 24.88 16.51

TILE SETTER......................$ 30.75 16.51

FOOTNOTES:

Work on scaffolding over 15 ft.: $1.25 per hour additional.

Swing stage work: $1.50 per hour additional.

Terrazzo grinding: $0.50 per hour above the terrazzo finisher rate.

Terrazzo work grinding vertical work and stairs: $1.50 per hour above the terrazzo finisher rate.

CARP0687-004 06/01/2007

Rates Fringes

CARPENTER (Drywall Hanger).......$ 26.88 15.27 Diver............................$ 33.19 17.95 Piledriver.......................$ 26.597 25.08%+8.916

FOOTNOTES:

Piledrivers:

Loftsperson or sticker: $0.55 per hour additional.

Loftsperson or sticker on heights over 150 feet: $0.80 per hour additional.

Welder: $0.55 per hour additional.

CARP1045-007 06/01/2008

Rates Fringes

FLOOR LAYER: Carpet.............$ 29.10 14.117

CARP1045-016 06/01/2008

Rates Fringes

LATHER...........................$ 23.69 13.52

CARP1102-003 06/01/2008

Rates Fringes

MILLWRIGHT.......................$ 28.35 27.02

ELEC0017-011 06/02/2009

REMAINDER OF COUNTY:

Line Construction:

Cable splicer; Line technician when helio-arc welding.....................$ 37.47 15.01 Combination driver/groundman............$ 26.05 11.90 Combination equipment operator & groundman........$ 27.61 12.32 Groundman...................$ 23.99 11.34 Lineman.....................$ 37.47 15.01

TECHNICIAN

ALL COMMERCIAL WORK EXCEPT

LINE CONSTRUCTION:..........$ 33.85 13.60

ELEC0058-005 03/01/2006

Rates Fringes

ELECTRICIAN

Work on sound and communications/limited-energy systems (including inter-communication public address, paging, music, security systems, nurse call systems, telecommunications (voice and data), fiber opticcabling systems, sound systems, broadband systems, computer network systems, CCTV systems, fire detection/signaling systems, and temperature control systems)............$ 27.83 3% + 6.25 All other work..............$ 33.55 3% + 14.16

FOOTNOTES:

All other work:

Work on a suspended swinging scaffold, bosun chair or swinging crane inside or outside of buildings at elevations in excess of 60 ft. above the surface immediately below (does not include work performed from catwalks with guardrails on swinging cranes): 15% per hour additional.

Work on stacks, radio, television and water towers at elevations in excess of 60 ft. above the surface immediately below (does not include work performed from catwalks with guardrails on swinging cranes): 15% per hour additional.

Work under compressed air in tunnels or shafts below the ground level: 15% per hour additional.

Additionally, work requiring the use of gas masks (does not apply to the use of dust respirators): 15% additional.

ELEC0876-011 06/01/2009

TOWNSHIP OF HOLLY:

Rates Fringes

LINE CONSTRUCTION

Cable Splicer...............$ 34.87 13.38 Light Equipment Operator/Groundman/Truck Driver/Groundman (winch, A-frame, diggers when used for distribution line truck and used for distribution work.

Distribution truck driver, 5th wheel type trucks, bucket trucks, ladder trucks and all live boom trucks, all equipment 85 hp or under)................$ 22.06 10.21 Lineman/Line Technician.....$ 33.49 13.03 Operator/Groundman (digger, tractor and setting rig with tracks or rough terrain vehicle, large bombardier, backhoe over 85 hp, hydraulic crane 10 ton or over).......$ 25.18 10.99 Truck driver/ground person (trucks with winch or boom or dump, other than distribution work)..........$ 21.00 9.95

FOOTNOTE: Operators of 5/8 yd. rated capacity backhoe or over, and operators of 25 ton, rated capacity, crane or over, and operators of heavy duty tension or pulling machinery on 345 KV and above, shall receive the line technician rate of pay.

ELEV0036-003 01/01/2010

Rates Fringes

ELEVATOR MECHANIC................$ 42.45 20.035

FOOTNOTE:

Vacation Pay: 8% with 5 or more years of service, 6% for 6 months to 5 years service.

Paid Holidays: New Years Day, Memorial Day, Independence Day, Labor Day, Veterans Day, Thanksgiving Day and Friday after, and Christmas Day.

ENGI0324-008 10/01/2009

ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,

BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,

CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,

DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND

TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,

IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,

KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,

MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,

MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,

MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,

OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.

CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,

VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES

OPERATOR: Power Equipment (Sewer Relining)

GROUP 1.....................$ 28.65 11.64

GROUP 2.....................$ 27.12 11.64

SEWER RELINING CLASSIFICATIONS

GROUP 1: Operation of audio-visual closed circuit TV system, including remote in-ground cutter and other equipment used in connection with the CCTV system

GROUP 2: Operation of hot water heaters and circulation systems, water jetters and vacuum and mechanical debris removal systems

ENGI0324-011 06/01/2009

Rates Fringes

OPERATOR: Power Equipment (Steel Erection)

GROUP 1....................$ 42.47 18.35

GROUP 2....................$ 43.47 18.35

GROUP 3....................$ 40.97 18.35

GROUP 4....................$ 41.97 18.35

GROUP 5....................$ 39.47 18.35

GROUP 6....................$ 40.47 18.35

GROUP 7....................$ 39.20 18.35

GROUP 8....................$ 40.20 18.35

GROUP 9....................$ 38.75 18.35

GROUP 10....................$ 39.75 18.35

GROUP 11....................$ 38.02 18.35

GROUP 12....................$ 39.02 18.35

GROUP 13....................$ 37.66 18.35

GROUP 14....................$ 38.66 18.35

GROUP 15....................$ 37.02 18.35

GROUP 16....................$ 30.21 18.35

GROUP 17....................$ 28.80 18.35

GROUP 18....................$ 35.57 18.35

FOOTNOTE:

Paid Holidays: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Engineer when operating combination of boom and jib 400' or longer

GROUP 2: Engineer when operating combination of boom and jib 400' or longer on a crane that requires an oiler

GROUP 3: Engineer when operating combination of boom and jib 300' or longer

GROUP 4: Engineer when operating combination of boom and jib 300' or longer on a crane that requires an oiler

GROUP 5: Engineer when operating combination of boom and jib 220' or longer

GROUP 6: Engineer when operating combination of boom and jib 220' or longer on a crane that requires an oiler

GROUP 7: Engineer when operating combination of boom and jib 140' or longer

GROUP 8: Engineer when operating combination of boom and jib 140' or longer on a crane that requires an oiler

GROUP 9: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level)

GROUP 10: Tower crane and derrick operator (where operator's work station is 50 ft. or more above first sub-level) on a crane that requires an oiler

GROUP 11: Engineer when operating combination of boom and jib 120' or longer

GROUP 12: Engineer when operating combination of boom and jib 120' or longer on a crane that requires an oiler

GROUP 13: Crane operator; job mechanic; 3 drum hoist and excavator

GROUP 14: Crane operator on a crane that requires an oiler

GROUP 15: Hoisting operator; 2 drum hoist and rubber tire backhoe

GROUP 16: Compressor or welder operator

GROUP 17: Oiler

GROUP 18: Forklift and 1 drum hoist

ENGI0324-019 09/01/2009

ZONE 1: Livingston, Washtenaw, Wayne, Macomb, Monroe and Oakland

ZONE 2: Ingham, Lenawee and Shiawassee

OPERATOR: Power Equipment (Underground construction-includes sewer)

AREA 1

GROUP 1....................$ 29.28 17.85

GROUP 2....................$ 24.55 17.85

GROUP 3....................$ 23.82 17.85

GROUP 4....................$ 23.25 17.85

Power equipment operators -underground construction (includes sewer):

AREA 2

GROUP 1....................$ 27.57 17.85

GROUP 2....................$ 22.68 17.85

GROUP 3....................$ 22.18 17.85

GROUP 4....................$ 21.90 17.85

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Backfiller tamper; Backhoe; Batch plant operator (concrete); Clamshell; Concrete paver (2 drums or larger);

Conveyor loader (Euclid type); Crane (crawler, truck type or pile driving); Dozer; Dragline; Elevating grader;

Endloader; Gradall (and similar type machine); Grader;

Mechanic; Power shovel; Roller (asphalt); Scraper (self-propelled or tractor drawn); Side boom tractor (type D-4 or equivalent and larger); Slip form paver; Slope paver; Trencher (over 8 ft. digging capacity); Well drilling rig; Concrete pump with boom operator and Hydro Excavator

GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;

Pump (1 or more-6-in. discharge or larger-gas or diesel-powered or powered by generator of 300 amperes or more-inclusive of generator); Side boom tractor (smaller than type D-4 or equivalent); Tractor (pneu-tired, other than backhoe or front end loader); Trencher (8-ft. digging capacity and smaller) and Vac Truck

GROUP 3: Air compressors (600 cfm or larger); Air compressors (2 or more-less than 600 cfm); Boom truck (non-swinging, non- powered type boom); Concrete breaker (self-propelled or truck mounted - includes compressor); Concrete paver (1 drum-l/2 yd. or larger); Elevator (other than passenger);

Maintenance person; Pump (2 or more-4-in. up to 6-in.

discharge-gas or diesel powered-excluding submersible pumps); Pumpcrete machine (and similar equipment); Wagon drill (multiple); Welding machine or generator (2 or more-300 amp. or larger-gas or diesel powered)

GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine (self-propelled); Farm tractor (with attachment); Finishing machine (concrete); Fire person; Hydraulic pipe pushing machine; Mulching equipment; Oiler; Pumps (2 or more up to 4-in. discharge, if used 3 hours or more a day, gas or diesel powered - excluding submersible pumps); Roller (other than asphalt); Stump remover; Trencher (service);

Vibrating compaction equipment, self-propelled (6 ft. wide or over); End dump operator; Sweeper (Wayne type and similar equipment); Water Wagon; Extend-a boom-forklift

ENGI0324-020 06/01/2010

Rates Fringes

OPERATOR: Power Equipment

GROUP 1....................$ 37.99 18.90

GROUP 2....................$ 36.49 18.90

GROUP 3....................$ 34.99 18.90

GROUP 4....................$ 34.69 18.90

GROUP 5....................$ 33.87 18.90

GROUP 6....................$ 33.01 18.90

GROUP 7....................$ 32.04 18.90

GROUP 8....................$ 30.33 18.90

GROUP 9....................$ 23.02 18.90

GROUP 10....................$ 21.99 18.90

FOOTNOTES:

Tower cranes: to be paid the crane operator rate determined by the combined length of the mast and the boom. If the worker must climb 50 ft. or more to the work station, $.25 per hour additional.

Derrick and cranes where the operator must climb 50 ft. or more to the work station, $.25 per hour additional to the applicable crane operator rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

GROUP 1: Crane with boom and jib or leads 400' or longer

GROUP 2: Crane with boom and jib or leads 300' or longer

GROUP 3: Crane with boom and jib or leads 220' or longer

GROUP 4: Crane with boom and jib or leads 140' or longer

GROUP 5: Crane with boom and jib or leads 120' or longer

GROUP 6: Regular crane operator, job mechanic, and concrete pump with boom operator

GROUP 7: Regular enginee, Hydro-Excavator, Remote Controlled Concrete Breaker

GROUP 8: Engineer when operating forklift, lull, extend-a-boom forklift

GROUP 9: Engineer when operating compressor or welding machine

GROUP 10: Fire tender or oiler

ENGI0325-003 10/01/2009

AREA 1: LIVINGSTON, MACOMB, MONROE, OAKLAND, WASHTENAW AND

WAYNE COUNTIES

AREA 2: INGHAM, LENAWEE AND SHIAWASSEE COUNTIES

Power equipment operators -hazardous waste removal:

(AREA 1)

LEVEL A:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator,power shovel operators..................$ 32.80 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 34.48 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 34.78 17.80

GROUP 1....................$ 31.83 17.80

GROUP 2....................$ 27.60 17.80

LEVEL B AND C:

Crane operator, mechanic, dragline operator, boom truck operator, concrete pump with boom operator, power shovel operator......$ 31.85 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 33.53 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.83 17.80

GROUP 1....................$ 30.88 17.80

GROUP 2....................$ 26.65 17.80

LEVEL D WHEN CAPPING

LANDFILL:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator,power shovel operator...................$ 29.68 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.98 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.28 17.80

GROUP 1....................$ 29.33 17.80

GROUP 2....................$ 25.10 17.80

LEVEL D:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator,power shovel operator...................$ 30.55 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.53 17.80 Engineer when OperatingCrane with Boom and Jib or Leads 140' or Longer.....................$ 32.23 17.80

GROUP 1....................$ 29.58 17.80

GROUP 2....................$ 25.35 17.80

Power equipment operators -hazardous waste removal:

(AREA 2)

LEVEL A:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator...................$ 31.09 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 32.77 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 33.07 17.80

GROUP 1....................$ 30.12 17.80

GROUP 2....................$ 25.72 17.80

LEVEL B AND C:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator, power shovel operator...................$ 30.14 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 31.71 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 32.03 17.80

GROUP 1....................$ 29.17 17.80

GROUP 2....................$ 24.78 17.80

LEVEL D WHEN CAPPING

LANDFILL:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator,power shovel operator...................$ 28.59 17.80 Engineer when operating crane with boom and jib or leads 140' or longer....$ 30.27 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.57 17.80

GROUP 1....................$ 27.62 17.80

GROUP 2....................$ 23.23 17.80

LEVEL D:

Crane operator, mechanic, dragline operator, boom truck operator and concrete pump with boom operator,power shovel operator...................$ 28.84 17.80 Engineer when operating crane with boom and jib or leads 220' or longer....$ 30.82 17.80 Engineer when OperatingCrane with Boom and Jib or Leads 140' or Longer.....................$ 30.52 17.80

GROUP 1....................$ 27.87 17.80

GROUP 2....................$ 23.48 17.80

HAZARDOUS WASTE REMOVAL CLASSIFICATIONS

GROUP 1: Backhoe, batch plant operator, clamshell, concrete breaker when attached to hoe, concrete cleaning decontamination machine operator, concrete pump, concrete paver, crusher, dozer, elevating grader, endloader, farm tractor (90 h.p. and higher), gradall, grader, heavy equipment robotics operator, loader, pug mill, pumpcrete machines, pump trucks, roller, scraper (self-propelled or tractor drawn), side boom tractor, slip form paver, slope paver, trencher, ultra high pressure waterjet cutting tool system operator, vactors, vacuum blasting machine operator, vertical lifting hoist, vibrating compaction equipment

(self-propelled), well drilling rig, hydro excavator

GROUP 2: Air compressor, concrete breaker when not attached to hoe, elevator, end dumps, equipment decontamination operator, farm tractor (less than 90 h.p.), forklift, generator, heater, mulcher, pigs (portable reagent storage tanks), power screens, pumps (water), stationary compressed air plant, sweeper, welding machine and water wagon

ENGI0325-016 05/01/2010

Rates Fringes

OPERATOR: Power Equipment (Gas Distribution and Duct Installation Work)

GROUP 1.....................$ 25.98 18.90

GROUP 2.....................$ 25.85 18.90

GROUP 3.....................$ 24.72 18.90

GROUP 4.....................$ 24.15 18.90

SCOPE OF WORK:

The construction, installation, treating and reconditioning of pipelines transporting gas vapors within cities, towns, subdivisions, suburban areas, or within private property boundaries, up to and including private meter settings of private industrial, governmental or other premises, more commonly referred to as "distribution work," starting from the first metering station, connection, similar or related facility, of the main or cross country pipeline and including duct installation.

POWER EQUIPMENT - GAS DISTRIBUTION CLASSIFICATIONS

GROUP 1: Backhoe, crane, grader, mechanic, dozer (D-6 equivalent or larger), side boom (D-4 equivalent or larger), trencher(except service), endloader (2 yd.

capacity or greater)

GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2

yd. capacity), side boom (under D-4 capacity), backfiller, pumps (1 or 2 of 6-inch discharge or greater), boom truck (with powered boom), tractor (wheel type other than backhoe or front endloader)

GROUP 3: Tamper (self-propelled), boom truck (with non-powered boom), concrete saw (20 hp or larger), pumps (2 to 4 under 6-inch discharge), compressor (2 or more or when one is used continuously into the second day) and trencher (service).

GROUP 4: Oiler, hydraulic pipe pushing machine, grease person and hydrostatic testing operator

IRON0025-012 06/01/2009

IRONWORKER

Ornamental and Structural...$ 29.26 27.62 Reinforced..................$ 26.83 24.26

IRON0025-015 09/01/2009

Rates Fringes

Ironworker - pre-engineered metal building erector...........$ 21.10 20.72

LABO0005-019 10/01/2008

Rates Fringes

Laborers - hazardous waste abatement:

Level A, B or C.............$ 27.44 12.13 Work performed in conjunction with site preparation not requiring the use of personal protective equipment;

Also, Level D...............$ 26.44 12.13

* LABO0259-006 09/01/2010

Rates Fringes

Laborers - tunnel, shaft and caisson:

GROUP 1.....................$ 21.37 13.75

GROUP 2.....................$ 21.48 13.75

GROUP 3.....................$ 21.54 13.75

GROUP 4.....................$ 21.72 13.75

GROUP 5.....................$ 21.97 13.75

GROUP 6.....................$ 22.30 13.75

GROUP 7.....................$ 15.58 13.75

SCOPE OF WORK: Tunnel, shaft and caisson work of every type and description and all operations incidental there to, including, but not limited to, shafts and tunnels for sewers, water, subways, transportation, diversion, sewerage, caverns, shelters, aquafers, reservoirs, missile silos and steel sheeting for underground construction.

LABORER CLASSIFICATIONS

GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog house tender, testing (on gas), watchman

GROUP 2: Manhole, headwall, catch basin builder, bricklayer tender, mortar and material mixer

GROUP 3: Air tool operator (jackhammer, bush hammer and grinder), first bottom, second bottom, cage tender, car pusher, carrier, concrete, concrete form, concrete repair, cement invert laborer, cement finisher, concrete shoveler, conveyor, floor, gasoline and electric tool operator, gunite, grout operator, welder, heading dinky person, inside lock tender, pea gravel operator, pump, outside lock tender, scaffold, top signal person, switch person, track, tugger, utility person, vibrator, winch operator, pipe jacking, wagon drill and air track operator and concrete saw operator (under 40 h.p.)

GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner plate, long haul dinky driver and well point

GROUP 5: Tunnel, shaft and caisson miner, drill runner, key board operator, power knife operator, reinforced steel or mesh (e.g. wire mesh, steel mats, dowel bars, etc.)

GROUP 6: Dynamite and powder

GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.

LABO0260-006 08/01/2010

Rates Fringes

Asbestos Laborer Includes removing and disposing of all insulation materials from walls, ceilings, floors, columns, and all other non-mechanical surfaces; and removal of insulating materials from mechanical systems that are to be demolished;

loading/unloading of bagged and tagged materials at the disposal site (includes lead paint abatement clean-up).........$ 25.09 11.94

* LABO0334-004 09/01/2010

Rates Fringes

Laborers - open cut:

GROUP 1.....................$ 21.22 13.75

GROUP 2.....................$ 21.33 13.75

GROUP 3.....................$ 21.38 13.75

GROUP 4.....................$ 21.46 13.75

GROUP 5.....................$ 21.52 13.75

GROUP 6.....................$ 18.97 13.75

GROUP 7.....................$ 15.59 13.75

SCOPE OF WORK:

Open cut construction work shall be construed to mean work which requires the excavation of earth including industrial, commercial and residential building site excavation and preparation, land balancing, demolition and removal of concrete and underground appurtenances, grading, paving, sewers, utilities and improvements; retention, oxidation, flocculation and irrigation facilities, and also including but not limited to underground piping, conduits, steel sheeting for underground construction, and all work incidental thereto, and general excavation.

Open cut construction work shall also be construed to mean waterfront work, piers, docks, seawalls, breakwalls, marinas and all incidental work. Open cut construction work shall not include any structural modifications, alterations, additions and repairs to buildings, or highway work, including roads, streets, bridge construction and parking lots or steel erection work and excavation for the building itself and back filling inside of and within 5 ft.

of the building and foundations, footings and piers for the building. Open cut construction work shall not include any work covered under Tunnel, Shaft and Caisson work.

LABORER CLASSIFICATIONS

GROUP 1: Construction laborer

GROUP 2: Mortar and material mixer, concrete form person, signal person, well point person, manhole, headwall and catch basin builder, headwall, seawall, breakwall and dock builder

GROUP 3: Air, gasoline and electric tool operator, vibrator operator, driller, pump person, tar kettle operator, bracer, rodder, reinforced steel or mesh person (e.g., wire mesh, steel mats, dowel bars, etc.), welder, pipe jacking and boring person, wagon drill and air track operator and concrete saw operator (under 40 h.p.), windlass and tugger person and directional boring person, cement finisher

GROUP 4: Trench or excavating grade person

GROUP 5: Pipe layer (including crock, metal pipe, multi-plate or other conduits)

GROUP 6: Grouting person, audio-visual television operations and all other operations in connection with closed circuit television inspection, pipe cleaning and pipe relining work, installation and repair of water service pipe and appurtenances

GROUP 7: Restoration laborer, seeding, sodding, planting, cutting, mulching and top soil grading; and the restoration of property such as replacing mailboxes, wood chips, planter boxes, flagstones, etc.

LABO0334-006 07/01/2010

Rates Fringes

Landscape Laborer

GROUP 1.....................$ 19.81 6.25

GROUP 2.....................$ 15.59 6.25

LANDSCAPE LABORER CLASSIFICATIONS

GROUP 1: Landscape specialist, including air, gas and diesel equipment operator and lawn sprinkler installer

GROUP 2: Landscape laborer: small power tool operator, material mover, truck driver and lawn sprinkler installer tender

LABO1076-003 06/01/2010

Rates Fringes

Laborers:

GROUP 1.....................$ 25.54 13.97

GROUP 2.....................$ 25.80 13.97

GROUP 3.....................$ 26.29 13.97

GROUP 4.....................$ 26.04 13.97

GROUP 5.....................$ 20.09 13.97

LABORER CLASSIFICATIONS

GROUP 1: Construction laborer, mason tender, carpenter tender, drywall handler, concrete chute and concrete bucket handler, cement finisher tender, concrete laborer, demolition laborer

GROUP 2: Signal person (on sewer and caisson work); air, electric or gasoline tool operator (including concrete vibrator operator, acetylene torch and air hammer operator); scaffold builder; caisson worker

GROUP 3: Lansing burner, blaster and powder person

GROUP 4: Burning bar and oxy-acetylene gun, expediter person, top and/or bottom person (blast furnace work) and furnace battery heater tender

GROUP 5: Cleaner/sweeper laborer, Furniture laborer

PREMIUM PAY:

Demolition laborer: A ten minute period for cleaning up shall be allowed before lunch and again at the end of a day's work.

Ground burner: Base wage shal be $.50 cents per hour more than the hourly rate for a demolition laborer(construction laborer).

High burner: Base wage shall be $1.00 per hour more than the hourly rate for demolition laborer(Construction Laborer).

LABO1076-005 07/01/2010

Oakland County and that portion of Livingston County north of State Highway M-59 and east of Oak Grove Road

Plasterer tender (Includes Plasterering Machine Operator)...$ 26.92 13.97

LABO1076-006 04/01/2010

ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,

BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,

CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,

DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND

TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,

IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,

KEWEENAW, LAKE, LAPEER, LEELANAU, LENAWEE, LIVINGSTON, LUCE,

MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,

MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,

MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,

OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.

CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,

VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES

LABORER (DISTRIBUTION WORK)

Zone 1......................$ 18.18 11.49 Zone 2......................$ 16.80 11.49 Zone 3......................$ 15.03 11.49 Zone 4......................$ 14.40 11.49 Zone 5......................$ 14.40 11.49

DISTRIBUTION WORK - The construction, installation, treating and reconditioning of distribution pipelines transporting coal, oil gas, or other similar materials, vapors or liquids, including portions of such pipelines within private property boundaries, up to and including the meter settings on residential, commercial, industrial, institutional, private and public structures. All work covering pumping stations and tank farms not covered by the Building Trades Agreement. Other distribution lines with the exception of sewer, water and cable television are included.

Underground Duct Layer Pay: $.40 per hour above the base pay rate.

Zone 1-Macomb,Oakland and Wayne Zone 2-Monroe and Washtenaw Zone 3-Bay, Genesee, Lapeer, Midland, Saginaw, Sanilac, Shiawassee and St. Clair Zone 4-Alger, Baraga, Chippewa, Delta, Dickinson,Gogebic, Houghton, Iron, Keweenaw, Luce, Mackinaw, Marquette, Menominee, Ontonagon and Schoolcraft Zone 5-Remaining counties in Michigan

PAIN0022-003 07/01/2009

Rates Fringes

DRYWALL FINISHER/TAPER

(Does not include Level 5 work (covering the whole board)).....................$ 25.75 15.90

PAINTER..........................$ 25.06 14.75

FOOTNOTES:

Drywall finisher:

Work spraying texture: $0.50 per hour additional.

Painter:

For all spray work and journeyman rigging for spray work, also blowing off, $0.80 per hour additional (applies only to workers doing rigging for spray work on off the floor work. Does not include setting up or moving rigging on floor surfaces, nor does it apply to workers engaged in covering up or tending spray equipment.

For all sandblasting and spray work performed on highway bridges, overpasses, tanks or steel, $0.80 per hour additional.

For all brushing, cleaning and other preparatory work (other than spraying or steeplejack work) at scaffold heights of fifty (50) feet from the ground or higher, $0.50 per hour additional.

For all preparatorial work and painting performed on open steel under forty (40) feet when no scaffolding is involved, $0.50 per hour additional.

For all swing stage work - window jacks and window belts -exterior and interior, $0.50 per hour additional.

For all spray work and sandblaster work to a scaffold height of forty (40) feet above the floor level, $0.80 per hour additional.

For all preparatorial work and painting on all highway bridges or overpasses up to forty (40) feet in height, $0.50 per hour additional.

For all steeplejack work performed where the elevation is forty (40) feet or more, $1.25 per hour additional.

PAIN0357-005 06/01/2009

Rates Fringes

GLAZIER..........................$ 29.20 16.01

PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day;

provided that the employee has worked the last full regular scheduled work day prior to the holiday, and the first full regular scheduled work day following the holiday, provided the employee is physically able to work.

PLAS0067-001 06/01/2010

Rates Fringes

PLASTERER........................$ 30.78 13.92

* PLUM0098-006 06/28/2010

Rates Fringes

PLUMBER..........................$ 34.73 26.68

PLUM0190-005 05/01/2010

Rates Fringes

Gas Distribution Pipeline Welding in conjunction with gas distribution pipeline work...............$ 27.68 18.29 All other work..............$ 20.72 11.15

PLUM0636-005 06/07/2010

Rates Fringes

PIPEFITTER.......................$ 36.81 24.00

ROOF0149-001 06/01/2009

Rates Fringes

ROOFER

Roofer......................$ 29.16 20.55

Slater......................$ 30.31 20.55

* SFMI0704-001 08/01/2010

Rates Fringes

SPRINKLER FITTER (Fire Sprinklers)......................$ 39.38 22.54

SHEE0080-004 03/01/2010

Rates Fringes

SHEET METAL WORKER...............$ 35.37 21.82

TEAM0247-001 04/01/2010

Rates Fringes

TRUCK DRIVER

GROUP 1.....................$ 21.82 a GROUP 2.....................$ 21.96 a GROUP 3.....................$ 22.15 a

PAID HOLIDAYS: New Year's Day, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas Day. If any of the above holidays fall on a Sunday, the following Monday shall be considered the holiday and, if work is performed, the rate shall be double time.

FOOTNOTE:

a. $327.95 per week, plus $46.20 per day.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Truck driver on all trucks except semi trucks or tractor trailers, pole trailers, lowboys, straddle carriers, double bottom and special load permit vehicles

GROUP 2: Truck driver on semi trucks or tractor trailers except pole trailer driver, lowboy driver, straddle carriers, double bottom and special load permit vehicles

GROUP 3: Pole trailer driver, lowboy driver, straddle carriers, double bottom driver and special permit driver, fuel truck driver, bus driver and water truck driver

TEAM0247-011 04/01/2010

Rates Fringes

TRUCK DRIVER (Underground construction) GROUP 1.....................$ 21.82 a GROUP 2.....................$ 21.96 a GROUP 3.....................$ 22.15 a

PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July, Labor Day, Thanksgiving Day and Christmas Day.

SCOPE OF WORK: Excavation, site preparation, land balancing, grading, sewers, utilities and improvements; also including, but not limited to, tunnels, underground piping, retention, oxidation, flocculation facilities, conduits, general excavation and steel sheeting for underground construction. Underground construction work shall not include any structural modifications, alterations, additions and repairs to buildings or highway work, including roads, streets, bridge construction and parking lots or steel erection.

FOOTNOTE:

a. $327.95 per week+$46.20 per day.

TRUCK DRIVER CLASSIFICATIONS

GROUP 1: Truck driver on all trucks (EXCEPT dump trucks of 8 cubic yards capacity or over, pole trailers, semis, low boys, Euclid, double bottom and fuel trucks)

GROUP 2: Truck driver on dump trucks of 8 cubic yards capacity or over, pole trailers, semis and fuel trucks

GROUP 3: Truck driver on low boy, Euclid and double bottom

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

In the listing above, the "SU" designation means that rates listed under the identifier do not reflect collectively bargained wage and fringe benefit rates. Other designations indicate unions whose rates have been determined to be prevailing.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION