B08 Attachment 10 Maps.pdf
PDF 11 MB Posted
- Solicitation number
- W911WN23Q3012
About this file
This file attachment provides maps related to a federal contract opportunity issued by the Department of the Army Corps of Engineers Engineering District Pittsburgh. The solicitation seeks proposals for building and grounds maintenance services at Crooked Creek Lake in Ford City, Pennsylvania. Offerors must provide all labor, supervision, equipment, tools, materials, supplies and transportation necessary to perform grounds, building, and facility maintenance tasks. The period of performance is one base year with four option years. Proposals are due by June 15, 2023. The contractor will be selected based on a best value determination considering technical approach, past performance, and price. The incumbent contractor is [Contractor Name].
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W911WN23Q3012 0002 conform copy.pdf | ||
| B08 Attachment 11 - Price Schedule 0002.xlsx | XLSX spreadsheet | |
| W911WN23Q3012 0002.pdf | ||
| B08 Attachments 2-9 0002.pdf | ||
| W911WN23Q3012 0001.pdf | ||
| B08 Attachment 11 - Price Schedule 0001.xlsx | XLSX spreadsheet | |
| B08 Attachments 2-9 0001.pdf | ||
| W911WN23Q3012 0001 conformed copy.pdf | ||
| B08 Appendicies I-XI 0001.pdf | ||
| B07 Site Visit Sign-In Sheet 07 August 2023.jpg | JPG image | |
| B08 Attachments 1-9.pdf | ||
| B08 Attachment 11 - Price Schedule.xlsx | XLSX spreadsheet | |
| B08 Attachment 10 - Maps.pdf | ||
| B08 Appendicies I-X.pdf | ||
| B08 SF1449 Solicitation - W911WN23Q3012.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tunnelville Beach
Resource Manager's Office 114 Park Main Rd Ford City PA 16226
SITE 6
SITE 4
SITE 3
SITE 1
SITE 5
SITE 2
Kerr Rd
Rummel Rd
Dam Rd
Creek Church Rd
Lakeview Rd
Crooked Creek Dam Rd
Full p ool 917.4'
Crooked Creek
Cro o k ed Cr ee k
Horney Camp Run
Crooked Creek Dam
Spillway
Boat Ramp Area
Independence Day Use Area
Spillway Recreation Area
Maintenance Building Area and Outflow Road
Beach PeninsulaGrounds Garage and Dwellings
A-Frame Road Picnic Area
& the Meadow
Fisherman's Trail Area
Heritage Day Use Area
Justice Day Use Area
Shady Knoll
Hancock Bend Picnic
Area
Group Camping Area
Hancock Bend
Overlook Area
Campground Area
Tall Tree Picnic Area
Annex Building
Abbey's Road Area
Outflow Area
Beach Overlook
Area
CROOKED CREEK LAKE
Buildings and Grounds Contract
Index Map
Maps follow in site order:
1, 2, 3a, 3b, 4a, 4b, 5, and 6
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
T
T
T T
T T
T
AR9
AR8
AR7
AR6AR5
AR4
MAH
CCR
ARMSTRONG CO.
BUTLER
CO.
CLARION CO.
INDIANA
CO.
JEFFERSON
CO.
0 500 1,000 FEETI Coordinate System: NAD 1983 2011 StatePlane Pennsylvania South FIPS 3702 Ft US Projection: Lambert Conformal Conic
Legend
!(!(!(!( Site boundary
Unincorporated area boundary
Data: Esri, USGS, USACE
PAOH
NY
VAWV
MD
LOCATION Local Vicinity
Lake Erie
District
Attachment 10: Crooked Creek Lake Maps
To PA-66, Ford City
Crooked Creek Dam
Ab be y's Road Tra il
SongbirdTrail
Yo u Can
Tr ai l
Yo u
C an
Tr ai l
Kerr Rd
Over Look Rd
Pa rk
M ai n R d
Outflow Rd
Crooked Creek Dam Rd
Crooked Creek Office
Outdoor Discovery Center
Maintenance Building
Annex
Site 4 (sheet 1)
Site 2
Justice Pavilion
Heritage Pavilion
Overlook
Restroom
Fishing pier
Restroom
Sanitary dump station
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 1, Sheet 1 of 1
Annex, Resource Manager, Maintenance
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Access Road Clearing
Herbicide
Pruning Ornamental Plants
Mowing, Type I FDR
Mowing, Type II FDR
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
4a 4b
3b
3a
Map 1
Map index
Crooked Creek Dam
Crooked Creek Lake
Crooked Creek
Fitness Trail
Abbey' s R oa d Tr a il
Fit ne ss Tr ai l
Baker Trail
Ou tflow Rd
Crooked Creek Dam Rd
Tower
Spillway
Site 3 (sheet 1)
Site 1
Fit. Trl.
entrance
Restroom
Fishing pier
Ball diamond
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 2, Sheet 1 of 1
Dam and Outflow
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Herbicide
Herbicide
Mowing, Type I FDR
Mowing, Type II FDR
Mowing,Type I Dam Safety
Mowing,Type II Dam Safety
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
4a 4b
3b
3a
Map 2
Crooked Creek Dam
Crooked Creek Lake
Crooked Creek
Fi tness Trail
Baker Trail
Camp Rd
Outflow Rd
Cr oo ke d
Cr ee k D am R d
Visitor Information
Center
Dwelling
Spillway
Site 3 (sheet 1)
Site 2
Debris reduction zone
Fit. Trl.
entrance
Freedom Pavilion
Constitution Pavilion
Observation deck
Restroom
Fishing pier
Playground
Ball diamond
Bleachers Basketball
Gravel lot
Restroom
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 3, Sheet 1 of 2
Dam Tower, Dwellings, Spillway
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Drift, Debris, and Trash Removal
Herbicide
Leaf Removal
Brush Cutting
Herbicide
Mowing, Type I FDR
Mowing, Type I REC
Mowing, Spillway - FDR
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE. Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations3a
4a 4b
3b
Map 3a
Crooked Creek Dam
Crooked Creek Lake
Fi tness Trail
Baker Trail
Crooked Creek Dam Rd
Visitor Information Center
Dwelling
Dwelling
Tower
Grounds Garage
Spillway
Site 3 (sheet 1)
Site
Site 2
Constitution Pavilion Observation deckPlayground
Restroom
Trash boom
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 3, Sheet 2 of 2
Dam Tower, Dwellings, Spillway
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Access Road Clearing
Pruning Ornamental Plants
Brush Cutting
Herbicide
Mowing, Type I FDR
Mowing, Type II FDR
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE. Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
3b1
4a 4b
3a
Map 3b
Crooked Creek Lake
Ab b ey 's Road Tra il
You C an Trail
Songbird
Tra il
Fisherman's Trail
Son gb ird Tra il
B oat R am p
R d
Lake vie w Rd
Camping Area Rd
K err
R d
Creek Church Rd
Camp Ground Rd
Beach Rd
A-Frame Rd
Crooked Creek Dam Rd
Ove r Look Rd
Pa rk
M ai n Rd
Crooked Creek Office
Site 4 (sheet 2)
Site 2
Site 1
Justice Pavilion
Restroom
Ball diamond
Heritage Pavilion
Overlook
Fish.
Trail parking
Restroom
Playground
V'ball court
Ash (A-Fr.)
playg.
Restroom
Sanitary dump station
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 4, Sheet 1 of 2
Justice, A-Frame, Independence, Heritage
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Herbicide
Leaf Removal
Brush Cutting
Herbicide
Mowing, Type I REC
Mowing, Type II REC
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
4a
4b
3b
3a
Map 4a
Crooked Creek Lake
Fisherman's Trail
Camping Area Rd
Over Look Rd
Beach Rd
Site 4 (sheet 1)
Site 5
Restroom
Ball diamond
Heritage Pavilion
Independence Pavilion
Fish. Trail parking
Restroom
Playground
V'ball court
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 4, Sheet 2 of 2
Justice, A-Frame, Independence, Heritage
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Herbicide
Leaf Removal
Mowing, Type I REC
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE. Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
4b
4a
3b
3a
Map 4b óô óô óô óô óñóñ óñ óñ
Crooked Creek Lake
Bake r Tra il
Crooked Creek Dam Rd
Beach Rd
Tunnelville Beach
Beach Changing
Area
Dwelling
Dwelling Grounds Garage
Site 3 (sheet 1)
#3
#2
#1
#4
#2#4 #3
#1
#2
#1
Trash boom
Throw ring station
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 5, Sheet 1 of 1
Beach
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Buoy Placement, Depth gauge óô Buoy Placement, No boat óñ Buoy Placement, No swim
Herbicide
Leaf Removal
Beach Grooming
Herbicide
Mowing, Type I REC
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
4a 4b
3b
3a
Map 5
Crooked Creek Lake
Laurel Point Trail
Rummel Rd
Boat Ramp Rd
Lakeview Rd
Boat Launch
Liberty Pavilion
Hancock Bend Overlook
Playground
Restroom
CROOKED CREEK LAKE
Buildings and Grounds Contract
Site 6, Sheet 1 of 1
Hancock, Launch, Group Camping Area
Pub. 22 June 2023 USACE LRP Geospatial erik.w.breedon
0 100 200 FEETI
Legend
Access Road Clearing
Herbicide
Herbicide
Mowing, Type I REC
Mowing, Type II FDR
!( !( !( Site boundary
Trail
Data: Esri, USGS, USACE Imagery: PEMA 2018, except where high water obscured ground, e.g. beach; 2006 Commonwealth of Pennsylvania imagery used at these locations
4a 4b
3b
3a
Map 6
File details come from the government source that posted it. Updated .