Amendment 0005 Spec Spection 09 97 02.pdf

PDF 62 KB Posted

Attached to
Dashields Waterway Sign Installation and Mooring Cell Repairs
Solicitation number
w911wn20b8005
Issued by

About this file

This specification covers painting requirements for hydraulic structures. It identifies surfaces to be painted, including sheet piles, line hooks, check posts, and signage. Required painting systems include Systems 16-A and 23-D. System 16-A involves shop or field application of zinc-rich and alkyd topcoats to sheet piles and components. System 23-D is a three-coat aluminum pigmented epoxy system for the sign frame. The specification also addresses surface preparation, painting application methods, inspection requirements, and identifies color schemes.

View the file

Other files

File Type Posted
Bid Results List Virtual Bid Opening 9-8-20.pdf PDF
Attendance Register Virtual Bid Opening 9-8-20.pdf PDF
Amendment 0005 Specs Section 01 35 26.00 08.pdf PDF
Amendment 0005.pdf PDF
Amendment 0005 Specs Section 01 45 00.00.pdf PDF
Amendment 00005 Determination PA20200002 (Aug 21 2020) Attachment 3 replaces prior Attachment 3.pdf PDF
Pre-Bid Viritual Site Visit Engineering Discussion (Solic Attachment 4).pdf PDF
Pre-Bid Virtual Site Visit List of Attendees.pdf PDF
Pre-Bid Virtual Site Visit Contracting Discussion.pdf PDF
Amendment 0004 Spec Section 01 57 20.00 10.pdf PDF
Amendment 0004 Spec Section 01 35 00.00 08.pdf PDF
Amendment 0004 Spec Section 01 45 00.15 10.pdf PDF
Amendment 0004 W911WN20B8005.pdf PDF
Amendment 0004 Spec Section 01 22 00.00 08.pdf PDF
Amendment 0004 Spec Section 03 30 53.pdf PDF
Amendment 0004 Wage Determination PA20200002 (July 31 2020) Attachment 3 (replaced prior Attachment 3.pdf PDF
A.02 Dashields L&D New Mooring Cell and Waterway Sign, Visual Presentation, Attachment 4.pdf PDF
B.08 W911WN20B8005 (Dashields Waterway Signage and Mooring Cell Repairs).pdf PDF
A.03 Contract and Reference Drawings, Dashields L&D New Mooring Cell and Waterway Sign, Attachment 2.pdf PDF
B.04 Wage Determination PA20200002 (July 24, 2020), Attachment 3.pdf PDF
A.03 Tech Specs - Dashields New Mooring Cell and Waterway Sign, Attachment 1.pdf PDF
Show all 21

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DSH New Mooring Cell and Waterways Danger Sign

SECTION TABLE OF CONTENTS

DIVISION 09 - FINISHES

SECTION 09 97 02

PAINTING: HYDRAULIC STRUCTURES

PART 1 GENERAL

1.1 REFERENCES

1.2 SUBMITTALS

1.3 QUALIFICATIONS

1.3.1 Qualified Painting Contractor

1.3.2 Coating Inspector Qualifications

1.3.3 Qualified Paint Applicator

1.3.3.1 Test Plate

1.3.3.2 Certification Test Procedure

1.3.3.3 Certification Criteria

1.3.4 Coating Thickness Gage Qualification

1.4 DELIVERY, STORAGE, AND HANDLING

1.5 AMBIENT CONDITIONS

PART 2 PRODUCTS

PART 3 EXECUTION

3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED

3.1.1 General Requirements

3.1.2 Ferrous Surfaces Subject to Severe Exposure

3.2 PAINT APPLICATION

3.2.1 General

3.2.2 Mixing and Thinning

3.2.3 Time Between Surface Preparation and Painting

3.2.4 Method of Paint Application

3.2.5 Coverage and Film Thickness

3.2.5.1 Dry Film Thickness Measurement on Ferrous Metal

3.2.6 Progress of Painting Work

3.2.7 Contacting Surfaces

3.2.8 Drying Time Prior to Immersion

3.2.9 Protection of Painted Surfaces

3.3 PAINT SYSTEMS APPLICATION

3.3.1 Fabricated and Assembled Items

3.3.2 Surface Preparation

3.3.3 System 16-A

3.3.4 System No. 23-D

3.3.5 Existing System

3.3.6 Protection of Unpainted Items and Cleanup

3.4 INSPECTION

3.5 TOUCH-UP PAINTING

3.6 PAINTING SCHEDULES

-- End of Section Table of Contents --

SECTION 09 97 02 Page 1 CERTIFIED FINAL DOCUMENT - W911WN20B8005 Amendment 0002

SECTION 09 97 02 Page 2

SECTION 09 97 02

PAINTING: HYDRAULIC STRUCTURES

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

AISC SPE-P1 Sophisticated Paint Endorsement - Enclosed

AISC SPE-P2 Sophisticated Paint Endorsement - Covered

ASTM INTERNATIONAL (ASTM)

ASTM D1045 (2014) Sampling and Testing Plasticizers Used in Plastics

ASTM D1152 (2006; R 2012) Methanol (Methyl Alcohol)

ASTM D1153 (2012) Methyl Isobutyl Ketone

ASTM D1200 (2010; R 2014) Viscosity by Ford Viscosity Cup

ASTM D1210 (2005; R 2014) Fineness of Dispersion of Pigment-Vehicle Systems by Hegman-Type Gage

ASTM D153 (1984; R 2014) Specific Gravity of Pigments

ASTM D235 (2002; R 2012) Mineral Spirits (Petroleum Spirits) (Hydrocarbon Dry Cleaning Solvent)

ASTM D281 (2012; R 2016) Standard Test Method for Oil Absorption of Pigments by Spatula Rub-Out

ASTM D2917 (2007; R 2013) Methyl Isoamyl Ketone

ASTM D3465 (2014) Standard Test Method for Purity of Monmeric Plasticizers by Gas Chromatography

ASTM D3721 (2005; R 2011) Synthetic Red Iron Oxide Pigment

ASTM D4228 (2005; R 2017) Standard Practice for Qualification of Coating Applicators for Application of Coatings to Steel Surfaces

ASTM D4417 (2014) Field Measurement of Surface

SECTION 09 97 02 Page 3

Profile of Blast Cleaned Steel

ASTM D520 (2000; R 2011) Zinc Dust Pigment

ASTM D561 (1982; R 2014) Carbon Black Pigment for Paint

ASTM D7091 (2013) Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings Applied to Ferrous Metals and Nonmagnetic, Nondestructive Coatings Applied to Non-Ferrous Metals

ASTM D740 (2011) Methyl Ethyl Ketone

ASTM D841 (2017) Standard Specification for Nitration Grade Toluene

ASTM D962 (1981; R 2014) Aluminum Powder and Paste Pigments for Paints

ASTM E1347 (2006; R 2011) Color and Color Difference Measurement by Tristimulus (Filter) Colorimetry

INTERNATIONAL SAFETY EQUIPMENT ASSOCIATION (ISEA)

ANSI/ISEA Z358.1 (2014) American National Standard for Emergency Eyewash and Shower Equipment

ANSI/ISEA Z87.1 (2015) Occupational and Educational Personal Eye and Face Protection Devices

MASTER PAINTERS INSTITUTE (MPI)

MPI 9 (2012) Alkyd, Exterior Gloss (MPI Gloss Level 6)

MPI 23 (2012) Primer, Metal, Surface Tolerant

MPI 114 (Oct 2009) Interior Latex, Gloss, MPI Gloss Level 6

MPI 212 (Oct 2009) Floor Coating, Thin Film, for Aircraft Maintenance Facilities

MPI 46 (Oct 2009) Interior Enamel Undercoat

MPI 47 (2012) Alkyd, Interior, Semi-Gloss (MPI Gloss Level 5)

MPI 48 (2012) Alkyd, Interior, Gloss (MPI Gloss Level 6-7)

MPI 49 (2012) Alkyd, Interior, Flat (MPI Gloss Level 1)

SECTION 09 97 02 Page 4

MPI 50 (2012) Primer Sealer, Latex, Interior

MPI 51 (2012) Alkyd, Interior, (MPI Gloss Level 3)2

MPI 52 (2012) Latex, Interior, (MPI Gloss Level 3)

MPI 53 (2012) Latex, Interior, Flat (MPI Gloss Level 1)

MPI 54 (2012) Latex, Interior, Semi-Gloss (MPI Gloss Level 5)

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 70 (2017; ERTA 1-2 2017; TIA 17-1; TIA 17-2;

TIA 17-3; TIA 17-4; TIA 17-5; TIA 17-6;

TIA 17-7; TIA 17-8; TIA 17-9; TIA 17-10;

TIA 17-11; TIA 17-12; TIA 17-13; TIA

17-14) National Electrical Code

NATIONAL INSTITUTE FOR OCCUPATIONAL SAFETY AND HEALTH (NIOSH)

NIOSH 2003-154 (2003; 4th Ed; Supple 3) NIOSH Manual of Analytical Methods

SOCIETY FOR PROTECTIVE COATINGS (SSPC)

SSPC 7/NACE No.4 (2007; E 2004) Brush-Off Blast Cleaning

SSPC Guide 6 (2015) Guide for Containing Surface Preparation Debris Generated During Paint Removal Operations

SSPC PS 26.00 (2000; E 2004) Aluminum Pigmented Epoxy Coating System Materials Specification, Performance-Based (Type I for use over Blast Cleaned Steel and Type II for use over Hand Cleaned Steel)

SSPC PA 17 (2012; E 2012) Procedure for Determining Conformance to Steel Profile/Surface Roughness/Peak Count Requirements

SSPC PA 2 (2015; E 2017) Procedure for Determining Conformance to Dry Coating Thickness Requirements

SSPC Paint 20 (2002; E 2004) Zinc-Rich Primers (Type I, Inorganic, and Type II, Organic)

SSPC Paint 25 (1997; E 2004) Zinc Oxide, Alkyd, Linseed Oil Primer for Use Over Hand Cleaned Steel, Type I and Type II

SSPC Paint 27 (1982; E 2004) Basic Zinc Chromate-Vinyl Butyral Wash Primer

SSPC Paint 33 (2006; R 2015; E 2015) Coal Tar Mastic, SECTION 09 97 02 Page 5

Cold-Applied

SSPC Paint 36 (2006) Two-Component Weatherable Aliphatic Polyurethane Topcoat, Performance-Based

SSPC Paint 38 (2006) Single-Component Moisture-Cure Weatherable Aliphatic Polyurethane Topcoat, Performance-Based

SSPC Paint 40 (2007) Zinc-Rich Moisture-Cure Polyurethane Primer, Performance-Based

SSPC Paint 41 (2008) Moisture-Cured Polyurethane Primer or Intermediate Coat, Micaceous Iron Oxide Reinforced, Performance-Based

SSPC QP 1 (2012; E 2012) Standard Procedure for Evaluating Painting Contractors (Field Application to Complex Industrial Structures)

SSPC QP 2 (2009; E 2013) Standard for Evaluating Painting Contractors (Removal of Hazardous Coatings from Industrial/Marine Structures)

SSPC QP 3 (2010) Standard Procedure for Evaluating Qualifications of Shop Painting Applicators

SSPC SP 1 (2015) Solvent Cleaning

SSPC SP 3 (1982; E 2004) Power Tool Cleaning

SSPC SP 5/NACE No. 1 (2007) White Metal Blast Cleaning

SSPC SP 6/NACE No.3 (2007) Commercial Blast Cleaning

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 (2014) Safety and Health Requirements Manual

U.S. DEPARTMENT OF DEFENSE (DOD)

MIL-DTL-24441 (2009; Rev D) Paint, Epoxy-Polyamide, General Specification for

U.S. GENERAL SERVICES ADMINISTRATION (GSA)

CID A-A-3130 (Rev A) Paint (For Application to Wet Surfaces)

FED-STD-595 (Rev C; Notice 1) Colors Used in Government Procurement

U.S. NATIONAL ARCHIVES AND RECORDS ADMINISTRATION (NARA)

29 CFR 1910 Occupational Safety and Health Standards

29 CFR 1910.134 Respiratory Protection

SECTION 09 97 02 Page 6

29 CFR 1910.146 Permit-required Confined Spaces

29 CFR 1910.20 Access to Employee Exposure and Medical Records

29 CFR 1910.94 Ventilation

29 CFR 1926.62 Lead

40 CFR 117 Determination of Reportable Quantities for Hazardous Substances

40 CFR 122 EPA Administered Permit Programs: The National Pollutant Discharge Elimination System

40 CFR 261 Identification and Listing of Hazardous Waste

40 CFR 262 Standards Applicable to Generators of Hazardous Waste

40 CFR 262.22 Number of Copies

40 CFR 263 Standards Applicable to Transporters of Hazardous Waste

40 CFR 302 Designation, Reportable Quantities, and Notification

40 CFR 355 Emergency Planning and Notification

40 CFR 50 National Primary and Secondary Ambient Air Quality Standards

40 CFR 50.12 National Primary and Secondary Ambient Air Quality Standards for Lead

40 CFR 50.6 National Primary and Secondary Ambient Air Quality Standards for PM10

40 CFR 58 Ambient Air Quality Surveillance

40 CFR 60 Standards of Performance for New Stationary Sources

49 CFR 171 General Information, Regulations, and Definitions

1.2 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

SECTION 09 97 02 Page 7

Manufacturer's Product Data Sheet; G, RO

SD-04 Samples

Product Samples; G, RO

Solvent and Thinners; G, RO

SD-06 Test Reports

Inspection Reports; G, RO

SD-07 Certificates

Qualified Painting Contractor; G, RO

Coating Inspector Qualifications; G, RO

Qualified Paint Applicator; G, RO

Coating Thickness Gage Qualification

1.3 QUALIFICATIONS

Qualifications and experience shall comply with the following.

1.3.1 Qualified Painting Contractor

Submit a copy of one of the following certificates as required for all shop painting:

SSPC QP 3 Enclosed or Covered

AISC SPE-P1

AISC SPE-P2

1.3.2 Coating Inspector Qualifications

Submit documentation of certification for all coating inspectors. The documentation shall include the inspector identification numbers, date of qualification, and expiration date. Submit one of the following certificates:

SSPC Protective Coating Inspector Level 2

National Association of Corrosion Engineers (NACE) Certified Paint Inspector Level 2

1.3.3 Qualified Paint Applicator

Submit records of qualification tests for each Qualified Coating Applicator. Prior to the initiation of any work all coating applicators shall be tested and certified as meeting the requirements of ASTM D4228.

Certification must be administered by an authorized Government representative. Applicators failing the certification procedure will not be permitted to apply any paint on the project.

SECTION 09 97 02 Page 8

1.3.3.1 Test Plate

The test plate shall adhere to ASTM D4228 or consist of a 6 by 6 feet steel plate with a 3/8 inch minimum thickness. The test plate must be in the vertical position and must have at least six bolts, three with bolt heads exposed and three with threads exposed, a 12-inch wide flange and a 6-inch diameter pipe each 18 inches long welded perpendicular to the test panel and a 6-inch deep T-beam with sealed ends welded horizontal across the test panel one foot up from the bottom all within the area to be painted on one side. Bolts shall be 1 inch minimum diameter. One painter per test panel. Alternative test panels are not permitted without Government approval.

The test plate shall adhere to ASTM D4228. However, the test plate shall consist of a 6 by 6 feet steel plate with 3/8 inch minimum thickness with at least two wide flange beams welded horizontally across the test panel, one foot below the top and one foot above the bottom of the plate within the area to be painted. Two vertical wide flange beams shall be welded to the plate connecting between the horizontal beams. Two 3/8 inch beam stiffeners shall be welded to the inside of each horizontal beam along with two 3/8 inch stiffeners (intercostals) welded to the plate at the same location. Standard cope and extended cope details and arrangement shall be similar to the “Typical Intercostal & Girder Stiffener” and “Typical Diaphragm” details shown on the contract drawings. The test plate shall have at least nine holes for 1 inch diameter bolts, with three holes empty, three with bolts heads exposed, and three with threads exposed. The test plate shall be painted in the vertical position. One painter per test panel. Alternative test panels are not permitted without Government approval.

1.3.3.2 Certification Test Procedure

Conduct certification testing of paint applicators at the work site in coordination with the Contracting Officer's Representative. Supply the fabricated test plates to be used for the tests and provide crane service, rigging, and any other work necessary to provide accessibility for the certification testing and inspection. In preparation, clean and prepare the test plates in accordance with the requirements of the contracted work. Perform abrasive blasting with the blast media to be used in the contract. The paints to be applied shall be Contractor supplied materials and shall be those previously tested and approved for use on the contract. Paints shall be applied as specified in the contract. The painter being tested shall mix and thin the paints to be used in the test and shall set up and adjust the application equipment for use. Each painter shall apply each of the types of paint comprising the specified system. The test plate shall be painted in a near vertical position.

1.3.3.3 Certification Criteria

Evaluate the paint applicator based on the conformance of the applied paint system to the requirements of the specifications. Deficiencies in the coatings, improper mixing or improper application methods are basis for failure. The Government representative shall be the sole judge as to the acceptability of each paint applicator's performance.

1.3.4 Coating Thickness Gage Qualification

Submit Coating Thickness Gage Qualification documentation of

SECTION 09 97 02 Page 9 manufacturer's certification for all coating thickness gages. Type 2 gages as described in ASTM D7091 shall be used to make all coating thickness measurements on ferrous metal substrates. Gages shall have an accuracy of +/- 3 percent or better. Gages to be used on the job shall be certified by the manufacturer as meeting these requirements.

1.4 DELIVERY, STORAGE, AND HANDLING

Process and package paints to ensure that within a period of one year from date of manufacture, they will not gel, liver, or thicken deleteriously, or form gas in the closed container. Paints, unless otherwise specified or permitted, shall be packaged in standard containers not larger than 5 gal, with removable friction or lug-type covers. Containers for vinyl-type paints shall be lined with a coating resistant to solvents in the formulations and capable of effectively isolating the paint from contact with the metal container . Each container of paint or separately packaged component thereof shall be labeled to indicate the purchaser's order number, date of manufacture, manufacturer's batch number, quantity, color, component identification and designated name, and formula or specification number of the paint together with special labeling instructions, when specified. Paint shall be delivered to the job in unbroken containers. Paints that can be harmed by exposure to cold weather shall be stored in ventilated, heated shelters. All paints shall be stored under cover from the elements and in locations free from sparks and flames.

1.5 AMBIENT CONDITIONS

Paint shall be applied in accordance with the manufacturers written instructions and only to surfaces that are a minimum of 5 degrees above the dew point temperature and that are completely free of moisture as determined by sight and touch. Paint shall not be applied to surfaces upon which there is detectable frost or ice. Except as otherwise specified, the temperature of the surfaces to be painted and of air in contact therewith shall be not less than 45 degrees F during paint application nor shall paint be applied if the surfaces can be expected to drop to 32 degrees F or lower before the film has cured . During periods of inclement weather, painting may be continued by enclosing the surfaces and utilizing climate control equipment (e.g. dehumidification, heaters, etc.), provided the minimum temperatures and surface dryness requirements prescribed previously are maintained until the coating has cured. Paint shall not be applied to surfaces heated by direct sunlight or other sources to temperatures that will cause detrimental blistering, pinholing, or porosity of the film.

PART 2 PRODUCTS

Product Samples of each batch of thinner, solvent, and paint shall be submitted to the Government for testing. Sampling and shipping cost are the responsibility of the Contractor. Ship to attn: Brooke Divan, 3909 Halls Ferry Rd, Vicksburg, MS 39180 Submit Manufacturer's Product Data Sheet for each type of paint used; for products that are specified to be applied in accordance with the manufacturer's recommendations, submit the paint manufacturer's product data sheet or other written instructions for those products. Submit samples of all special paint formula, Military, Master Painter Institute, and SSPC paints and samples of solvents or thinners used to reduce the viscosity of the paint. Allow at least 30 calendar days for sampling and testing of samples of paints and thinners.

Sampling may be at the work site or source of supply. Notify the Contracting Officer's Representative when the paint and thinner are

SECTION 09 97 02 Page 10 available for sampling. Sampling of each batch will be witnessed by the Contracting Officer's Representative unless otherwise specified or directed. Submit a 1-quart sample of paint and thinner for each batch proposed for use. The sample shall be labeled to indicate formula or specification number and nomenclature, batch number, batch quantity, color, date made, and applicable project contract number. Testing will be performed by the Government. Costs for retesting rejected material will be deducted from payments to the Contractor at the rate of $950 dollars for each paint sample retested and $250 dollars for each thinner retested.

PART 3 EXECUTION

3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED

The sheet piles and all components are categorized as being "subject to severe exposure" and are subject to extended periods of immersion. The existing check posts are to be cleaned sufficiently to remove all loose paint and any debris that may be adhered to them and to prepare them for a new paint system.

3.1.1 General Requirements

Clean surfaces to be painted before applying paint or surface treatments.

Remove deposits of grease or oil in accordance with SSPC SP 1 , prior to mechanical cleaning. Solvent cleaning shall be accomplished with mineral spirits or other low toxicity solvents or degreaser having a flash point above 100 degrees F, that is compatible with the coating being used. Use clean cloths and clean fluids to avoid leaving a thin film of greasy residue on the surfaces being cleaned. Protect items not to be prepared or coated from damage by the surface preparation methods. Machinery shall be protected against entry of blast abrasive and dust into working parts.

Cleaning and painting shall be so programmed that dust or other contaminants from the cleaning process do not fall on wet, newly painted surfaces, and surfaces not intended to be painted shall be suitably protected from the effects of cleaning and painting operations. Welding of, or in the vicinity of, previously painted surfaces shall be conducted in a manner to prevent weld spatter from striking the paint and to otherwise reduce coating damage to a minimum; paint damaged by welding operations shall be restored to original condition. Surfaces to be painted that will be inaccessible after construction, erection, or installation operations are completed shall be painted before they become inaccessible.

3.1.2 Ferrous Surfaces Subject to Severe Exposure

Ferrous surfaces subject to extended periods of immersion or as otherwise required shall be dry blast-cleaned to SSPC SP 5/NACE No. 1 . The blast profile, unless otherwise specified, shall be 1.5 to 2.5 mils as measured by ASTM D4417, Method C, SSPC PA 17 to be used for the amount of testing.

Appropriate abrasive blast media shall be used to produce the desired surface profile and to give an angular anchor tooth pattern. If recycled blast media is used, an appropriate particle size distribution shall be maintained so that the specified profile is consistently obtained. Steel shot or other abrasives that do not produce an angular profile shall not be used. Weld spatter not dislodged by blasting shall be removed with impact or grinding tools and the areas reblasted prior to painting.

Surfaces shall be dry at the time of blasting. Blast cleaning to SSPC SP 5/NACE No. 1 shall be completed as necessary. Within 8 hours after blast cleaning, and in any case prior to the deposition of any detectable moisture, contaminants, or corrosion, all ferrous surfaces

SECTION 09 97 02 Page 11 shall be cleaned of dust and abrasive particles by brush, vacuum cleaner, and/or blown down with clean, dry, compressed air, and given the first coat of paint. Upon written request by the Contractor, the Contracting Officer's Representative may authorize mill or shop cleaning of assembled or partially assembled components specified to receive one of the vinyl-type paint systems. The surfaces, if shop blasted, shall be shop coated with the first and second coats of the specified paint system except that moisture cure urethane and epoxy zinc-rich primed surfaces shall receive an extra single spray coat of the zinc primer at the time painting is started, as specified in the paint system instructions. The shop coating shall be maintained in good condition by cleaning and touching up of areas damaged during the construction period. If pinpoint or general rusting appears, surfaces shall be reblasted and repainted at no added cost to the Government. Prior to the application of subsequent coats, soiled areas of the shop coating shall be thoroughly cleaned and all welds or other unpainted or damaged areas shall be cleaned and coated in a manner to make them equivalent to adjacent, undamaged paint surfaces.

3.2 PAINT APPLICATION

3.2.1 General

The finished coating shall cover all surfaces that are to be exposed to the air, in contact with concrete, or in contact with fill material and shall be free from holidays, pinholes, bubbles, runs, drops, ridges, waves, laps, excessive or unsightly brush marks, dry spray/overspray, cracking, blisters and variations in color, texture, and gloss.

Application of initial or subsequent coatings shall not commence until the Contracting Officer's Representative has verified that atmospheric conditions and the surfaces to be coated are satisfactory. Each paint coat shall be applied in a manner that will produce an even, continuous film of uniform thickness. Edges, corners, crevices, seams, joints, welds, rivets, corrosion pits, and other surface irregularities shall be stripe coated with the striping extending a minimum of 1 inch on either side of surface irregularity. Spray equipment shall be equipped with traps and separators and, where appropriate, mechanical agitators, pressure gauges, pressure regulators, and screens or filters. Air caps, nozzles, and needles shall be as recommended by the spray equipment manufacturer for the material being applied. Airless-type spray equipment may be used only on broad, flat, or otherwise simply configured surfaces, except that it may be employed for general painting if the spray gun is equipped with dual or adjustable tips of proper types and orifice sizes. Airless-type equipment shall not be used for the application of vinyl paints.

3.2.2 Mixing and Thinning

Paints shall be thoroughly mixed, strained where necessary, and kept at a uniform composition and consistency during application. Dry-powder pigments specified to be added at the time of use shall, with the aid of powered stirrers, be incorporated into the vehicle or base paint in a manner that will produce a smooth, homogeneous mixture free of lumps and dry particles. Where necessary to suit conditions of the surface temperature, weather, and method of application, the paint may be thinned immediately prior to use. Thinning shall generally be limited to the addition of not more than 1 pint per gal of the proper thinner; this general limitation shall not apply when more specific thinning instructions are provided. Paint that has been stored at low temperature, shall be brought up to at least 70 degrees F before being mixed and thinned, and its temperature in the spray tank or other working container

SECTION 09 97 02 Page 12 shall not fall below 60 degrees F during the application. Paint that has deteriorated in any manner to a degree that it cannot be restored to essentially its original condition by customary mixing methods shall not be used and shall be removed from the work site. Paint and thinner that is more than 1 year old shall be resampled and resubmitted for testing to determine its suitability for application. Moisture cure urethane paint shall be resampled and resubmitted for testing to determine its suitability for application whenever the paint is more than six months old as indicated by the date of manufacture on the container.

3.2.3 Time Between Surface Preparation and Painting

Surfaces that have been cleaned and/or otherwise prepared for painting shall be primed as soon as practicable after such preparation has been completed but, in any event, prior to any deterioration of the prepared surface.

3.2.4 Method of Paint Application

Unless otherwise specified, paint shall be applied by brush, roller, or spray to ferrous and nonferrous metal surfaces. Paints with suspended metallics are not to be applied by use of rollers. Striping shall be directed toward ensuring adequate coverage of edges, corners, crevices, pits, rivets, bolts, welds, and similar surface irregularities. Other methods of application to metal surfaces shall be subject to the specific approval of the Contracting Officer's Representative. Paint on plaster, concrete, or other nonmetallic surfaces shall be applied by brush, roller, and/or spray.

3.2.5 Coverage and Film Thickness

Film thickness or spreading rates shall be as specified hereinafter.

Where no spreading rate is specified, the paint shall be applied at a rate consistent with the manufacturer's written instructions. In any event, the combined coats of a specified paint system shall completely hide base surface and the finish coats shall completely hide undercoats of dissimilar color.

3.2.5.1 Dry Film Thickness Measurement on Ferrous Metal

Where dry film thickness requirements are specified for coatings on ferrous surfaces, measurements shall be made with a gage qualified in accordance with paragraph Coating Thickness Gage Qualification. They shall be calibrated and used in accordance with ASTM D7091. Prior to each use the Base Metal Reading (BMR) shall be established for the gage as specified in the test method. Accuracy of the gage shall be verified using plastic shims as specified by the test method both prior to and following each set of measurements. Frequency of measurements shall be as recommended for field measurements by SSPC PA 2 , except that measurements shall be performed on all areas of the structure being coated. Thickness measurements shall be reported as the mean for each spot determination.

3.2.6 Progress of Painting Work

Where field painting on any type of surface has commenced, the complete painting operation, including priming and finishing coats, on that portion of the work shall be completed as soon as practicable, without prolonged delays. Sufficient time shall elapse between successive coats to permit them to dry properly for recoating, and this period shall be modified as

SECTION 09 97 02 Page 13 necessary to suit adverse weather conditions. Paint shall be considered dry for recoating when it feels firm, does not deform or feel sticky under moderate pressure of the finger, and the application of another coat of paint does not cause film irregularities such as lifting or loss of adhesion of the undercoat. All coats of all painted surfaces shall be unscarred and completely integral at the time of application of succeeding coats. At the time of application of each successive coat, undercoats shall be cleaned of dust, grease, overspray, or foreign matter by means of airblast, solvent cleaning, or other suitable means. Cement and mortar deposits on painted steel surfaces, not satisfactorily removed by ordinary cleaning methods, shall be brush-off blast cleaned and completely repainted as required. Undercoats of high gloss shall, if necessary for establishment of good adhesion, be scuff sanded, solvent wiped, or otherwise treated prior to application of a succeeding coat. Field coats on metal shall be applied after erection except as otherwise specified and except for surfaces to be painted that will become inaccessible after erection.

3.2.7 Contacting Surfaces

When riveted or ordinary bolted contact is to exist between surfaces of ferrous or other metal parts of substantially similar chemical composition, such surfaces will not be required to be painted, but any resulting crevices shall subsequently be filled or sealed with paint.

Contacting metal surfaces formed by high-strength bolts in friction-type connections shall not be painted. Where a nonmetal surface is to be in riveted or bolted contact with a metal surface, the contacting surfaces of the metal shall be cleaned and given three coats of the specified primer.

Unless otherwise specified, corrosion-resisting metal surfaces, including cladding therewith, shall not be painted.

3.2.8 Drying Time Prior to Immersion

Minimum drying periods after final coat prior to immersion shall be in accordance with manufacturers written instructions. In absence of manufacturers written instructions the following times shall be observed:

vinyl-type paint systems at least 3 days. Minimum drying periods shall be increased twofold if the drying temperature is below 65 degrees F and/or if the immersion exposure involves considerable abrasion.

3.2.9 Protection of Painted Surfaces

Where shelter and/or heat are provided for painted surfaces during inclement weather, such protective measures shall be maintained until the paint film has cured and discontinuance of the measures is authorized.

Items that have been painted shall not be handled, worked on, or otherwise disturbed until the paint coat is fully cured. All metalwork coated in the shop shall be stored out of contact with the ground in a manner and location that will minimize the formation of water-holding pockets;

soiling, contamination, and deterioration of the paint film, and damaged areas of paint on such metalwork shall be cleaned and touched up without delay.

3.3 PAINT SYSTEMS APPLICATION

The required paint systems and the surfaces to which they shall be applied are shown in this paragraph, and/or in the drawings. Supplementary information follows.

SECTION 09 97 02 Page 14

3.3.1 Fabricated and Assembled Items

Items that have been fabricated and/or assembled into essentially their final form and that are customarily cleaned and painted in accordance with the manufacturer's standard practice will be exempted from equivalent surface preparation and painting requirements described herein, provided that:

a. Surfaces primed (only) in accordance with such standard practices are compatible with specified field-applied finish coats.

b. Surfaces that have been primed and finish painted in accordance with the manufacturer's standard practice are of acceptable color and are capable of being satisfactorily touched up in the field.

c. Items expressly designated herein to be cleaned and painted in a specified manner are not coated in accordance with the manufacturer's standard practice if different from that specified herein.

3.3.2 Surface Preparation

The method of surface preparation and pretreatment shown in the tabulation of paint systems is for identification purposes only. Cleaning and pretreatment of surfaces prior to painting shall be accomplished in accordance with detailed requirements previously described.

3.3.3 System 16-A

Brush or spray the first coat all coats in the shop or field as indicated.

Touch up the coating in the field as necessary to maintain its integrity at all times. Apply the second and third coats in the field. Procure all materials from the same coating manufacturer and apply each coat in accordance with the manufacturer's written instructions. The finish color must be as indicated. Do not apply paint to running surfaces of bearings and machinery. Remove pipe-threading and cutting compounds by solvent washing prior to application of paint to pipe surfaces.

3.3.4 System No. 23-D

Apply the coating system in accordance with the manufacturer's written instructions. It must be a 3-coat system plus an additional stripe coat applied by brush to all edges, corners, welds, fasteners, and other surface irregularities. Allow the stripe coat to dry as recommended by the manufacturer, prior to the application of the first full coat. The aluminum pigmented topcoat will not meet the SSPC Paint Procure all materials from the same coating manufacturer. The individual paints comprising the system must have been tested and passed all requirements of the applicable SSPC standards. Application must be by spray, brush, or roller. Comply with the manufacturer's recommendations regarding mixing and thinning requirements, and pot life requirements, dry film thickness per coat and minimum and maximum dry time between coats. Do not use coating material that has thickened appreciably. Areas of bubbling noted upon curing of any individual coat must be removed by sanding or screening, the edges feathered, and the coat reapplied to the repaired areas before a subsequent coat is applied.

3.3.5 Existing System

The surfaces of the existing sign frame are painted with Devoe Bar-Rust

SECTION 09 97 02 Page 15

235. The Contractor shall provide an epoxy paint system with at least two coats that is equivalent in color to and is compatible with the Devoe Bar-Rust 235 system. Surfaces shall be prepared and paint shall be applied in accordance with the paint manufacturer's written instructions.

3.3.6 Protection of Unpainted Items and Cleanup

Walls, equipment, fixtures and all other items in the vicinity of the surfaces being painted shall be maintained free from damage by paint or painting activities. Paint spillage and painting activity damage shall be promptly repaired.

3.4 INSPECTION

Inspect and document all work phases and operations on a daily basis.

Submit daily Inspection Reports. As a minimum the daily report shall contain the following:

a. Inspections performed, including the area of the structure involved and the results of the inspection.

b. Surface preparation operations performed, including the area of the structure involved, the mode of preparation, the kinds of solvent, abrasive, or power tools employed, and whether contract requirements were met.

c. Thinning operations performed, including thinners used, batch numbers, and thinner/paint volume ratios.

d. Application operations performed, including the area of the structure involved, mode of application employed, ambient temperature, substrate temperature, dew point, relative humidity, type of paint with batch numbers, elapsed time between surface preparation and application, elapsed time for recoat, condition of underlying coat, number of coats applied, and if specified, measured dry film thickness or spreading rate of each new coating.

3.5 TOUCH-UP PAINTING

Upon completion of work, damaged surfaces shall be recoated with the paint system which was originally used to coat the surface. Any damaged surface on the components of the Government Furnished framing shall be touch-up painted with the Existing System. Surfaces shall be prepared and paint shall be applied in accordance with the paint manufacturer's written instructions, except that Contractor shall apply touch-up paint only with brushes or rollers.

SECTION 09 97 02 Page 16

3.6 PAINTING SCHEDULES

SYSTEM NO.

16-A

Items or surfaces to be coated: Sheet Piles, Line Hooks, Line Hook Pocket Plates and Stiffening Plates, Armor Banding Shim Blocks

SURFACE

PREPARATION

1st COAT 2nd COAT 3rd COAT

As specified for each type of surface

MPI 23 MPI 9

Finish Color: Black

MPI 9

Finish Color: Black

SYSTEM NO.

16-A

Items or surfaces to be coated: Check Posts, Ladder, Ladder Cover, Ladder Base Plates, Pipe Guard, Armor Banding

SURFACE

PREPARATION

1st COAT 2nd COAT 3rd COAT

As specified for each type of surface

MPI 23 MPI 9

Finish Color: Bright Yellow

MPI 9

Finish Color: Bright Yellow

SYSTEM NO. 23-D Alternate 2

Items or surfaces to be coated: Sign Frame, Sign Base Plates, Sign Lug Plates

SURFACE PREPARATION 1st COAT 2nd COAT 3rd COAT

Power tool clean SSPC Paint 41 SSPC Paint 41 Finish color: Match that of Devoe Bar-Rust 235

SSPC Paint 41 Finish color: Match that of Devoe Bar-Rust 235

-- End of Section --

SECTION 09 97 02 Page 17

09 97 02 - PAINTING: HYDRAULIC STRUCTURES
09 97 02 - PAINTING: HYDRAULIC STRUCTURES
PART 1 GENERAL
1.1 REFERENCES
1.2 SUBMITTALS
1.3 QUALIFICATIONS
1.3.1 Qualified Painting Contractor
1.3.2 Coating Inspector Qualifications
1.3.3 Qualified Paint Applicator
1.3.3.1 Test Plate
1.3.3.2 Certification Test Procedure
1.3.3.3 Certification Criteria

1.3.4 Coating Thickness Gage Qualification

1.4 DELIVERY, STORAGE, AND HANDLING
1.5 AMBIENT CONDITIONS
PART 2 PRODUCTS
PART 3 EXECUTION
3.1 CLEANING AND PREPARATION OF SURFACES TO BE PAINTED
3.1.1 General Requirements
3.1.2 Ferrous Surfaces Subject to Severe Exposure
3.2 PAINT APPLICATION
3.2.1 General
3.2.2 Mixing and Thinning
3.2.3 Time Between Surface Preparation and Painting
3.2.4 Method of Paint Application
3.2.5 Coverage and Film Thickness
3.2.5.1 Dry Film Thickness Measurement on Ferrous Metal
3.2.6 Progress of Painting Work
3.2.7 Contacting Surfaces
3.2.8 Drying Time Prior to Immersion
3.2.9 Protection of Painted Surfaces
3.3 PAINT SYSTEMS APPLICATION
3.3.1 Fabricated and Assembled Items
3.3.2 Surface Preparation
3.3.3 System 16-A
3.3.4 System No. 23-D
3.3.5 Existing System
3.3.6 Protection of Unpainted Items and Cleanup
3.4 INSPECTION
3.5 TOUCH-UP PAINTING
3.6 PAINTING SCHEDULES

File details come from the government source that posted it. Updated .