Bid_Results.pdf

PDF 116 KB Posted

Attached to
Braddock L/D Interlock Control System Replacement
Solicitation number
W911WN19B8006
Issued by

View the file

Other files

File Type Posted
01_35_00.00_08_-_Amendment_4.pdf PDF
41_24_26_-_Amendment_4.pdf PDF
Amendment_0004_(8-16-19).pdf PDF
01_35_00.00_08.pdf PDF
Amendment_0003_(8-13-19).pdf PDF
01_22_00.00_08.pdf PDF
Amendment_0002.pdf PDF
Site_Visit_Talking_Points_and_Sign-in_Sheet.pdf PDF
Amendment_0001.pdf PDF
Contract_and_Reference_Drawings.pdf PDF
W911WN19B8006.pdf PDF
Technical_Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID RESULTS

W911WN19B8006

INTERLOCK CONTROL SYSTEM REPLACEMENT,

MONONGAHELA RIVER BASIN, BRADDOCK L/D

PITTSBURGH, PA ALLEGHENY COUNTY PA

Bid Opening: 20 AUGUST 2019

Contractor's Name & Address Total Bid Amount

Advanced Integration Group, Inc. $1,536,269.00

Thoroughbred Construction Group $1,369,000.00

Government Estimate w/o Profit $ 695,055.00

File details come from the government source that posted it.