Amendment_0003_(8-13-19).pdf

PDF 541 KB Posted

Attached to
Braddock L/D Interlock Control System Replacement
Solicitation number
W911WN19B8006
Issued by

About this file

Amendment 0003 - To extend bid due date, provide responses to vendor questions, and to revise sections in the Technical Specifications.

View the file

Other files

File Type Posted
Bid_Results.pdf PDF
41_24_26_-_Amendment_4.pdf PDF
Amendment_0004_(8-16-19).pdf PDF
01_35_00.00_08_-_Amendment_4.pdf PDF
01_35_00.00_08.pdf PDF
01_22_00.00_08.pdf PDF
Amendment_0002.pdf PDF
Site_Visit_Talking_Points_and_Sign-in_Sheet.pdf PDF
Amendment_0001.pdf PDF
W911WN19B8006.pdf PDF
Contract_and_Reference_Drawings.pdf PDF
Technical_Specifications.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W81ET491270464

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

RE: W911WN19B8006 (Interlock Control System Replacement, Monongahela River Basin, Braddock L/D)

The purpose of this amendment is to:

1. Extend the bid due date from Thursday August 15, 2019 (1PM ET) to Tuesday August 20, 2019 (11AM ET) 2 Provide responses to additional vendor questions;

3. Revise the Technical Specif ications, as detailed in the Summary of Changes; and

4. All other terms and conditions remain unchanged and in full force and effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 13-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W911WN19B8006

X 9B. DATED (SEE ITEM 11)

09-Jul-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

13-Aug-2019

CODE

U.S. ARMY ENGINEER DISTRICT, PITTSBURGH

ATTN CELRP-RC-P

W S MOORHEAD FEDERAL BUILDING

1000 LIBERTY AVENUE ROOM 2203

PITTSBURGH PA 15222-4186

W911WN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911WN19B8006

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)

The following have been added by full text:

SUMMARY OF CHANGES

Q4. Spec Section 01 35 00.00 08, paragraph 1.6.5 – “Access to Project Site” states there is a weight limit of 100 pounds per square foot along the grating over the miter gate walkway. This would prevent any person over 100 lbs from crossing the miter gate walkway. Please provide an accurate weight limit for the miter gate walkways.

A4. This is the standard surface area loading the miter gate walkways, grating, planking and support members which the miter gate walkways are designed to support. For example, let’s say the entire surface area was 3 feet wide by 10 feet long, the weight limit would be 3,000 pounds (3x10x100lbs/sq ft.) . The 100 psf for the construction load is considered a heavy loaded platform surface area loading whereby the entire surface area of the miter gate grating from each end of the walkway supports is fully loaded. Larger construction loads may be acceptable pending the Government’s review. The equipment or loading requirements will be evaluated during the construction submittal process when actual equipment and locations are submitted based on the Contractor’s means and methods.

Q5. Spec Section 01 35 00.00 08 has conflicting work restrictions regarding the period that the government repair party will be on site from 6/22/20 to 8/22/20 putting the river chamber out of service. Paragraph 1.8.1 states that “the land chamber will not be allowed to be taken out of operation and no interruption of commercial traffic through the land chamber will be permitted during the period the river chamber is out of service.” Paragraph 1.8.2 makes a similar statement. Paragraph 1.13.4.1 states that while the government is performing repair work at the dam between 6/22 and 8/22/2020, the contractor will not be granted access to the project site at all during this period.

- Which statement is correct?

- Is the contractor allowed to work on site during this period if it does not require work on the river chamber or a temporary closure of the land chamber?

- If no work is permitted during this period, will the contract’s duration be extended to allow a full 365 calendar days for the completion of the project?

A5. Spec Section 01 35 00.00 08, Paragraph 1.13.4.1 is revised in this Amendment 0003 to prohibit the contractor from accessing the river chamber while the Government repair fleet is performing work. As stated in paragraph 1.8.3.1 the contractor may perform work in the land chamber while the Government repair fleet is performing work, but no temporary closures of the land chamber will be permitted.

Q6. Spec section 01 35 00.00 08, paragraph 1.15, states that the lock chamber crossover will need to be continuously pumped out to permit access in order to pull cables from middle wall to river or land walls, and that removal of silt and debris will also be required. From past experience, there are significant oil leaks which collect in the crossover during pumping. If the contractor is pumping out the crossover, will we be allowed to discharge the pumped out water into the river, or will it need to be collected and hauled off site for proper disposal or filtered before discharging into the river.

A6. Spec section 01 35 00.00 08 has been revised to transfer responsibility of crossover dewatering and sediment removal from the Contractor to the Government.

Q7. Since the presence of lead paint is known, should the contractor include hazardous waste management and disposal in our proposal for CLIN 0003?

A7. Lead paint is present at the lock and the contractor shall include appropriate handling and disposal within the contract line item.

Q8. Drawing M-1020 provides a note and spec 02 41 00 paragraph 3.2, details that the existing interlock valves in the gallery beneath the operations building are to be removed. Does the government anticipate the contractor will be able to remove these valves while still maintaining the operation of both chambers?

A8. To remove the valves for a chamber, that chamber must be shut down. However, each middle wall gallery valve has an isolation or control valve on its upstream and downstream side. Therefore, it’s possible to isolate the valves for one chamber for removal while maintaining operation of the other chamber. See reference drawings O37-L2-27/4.2, O37-L2-27/2.1, and O37-L2-27/1.1.

Q9. What is the current hydraulic system oil’s cleanliness level? Spec 41 24 26, paragraph 2.4 states new oil added must be filtered to a 10 micron level. Is the system’s existing oil filtered to the same level?

A9. The last oil sample taken in March 2019 indicated oil cleanliness of 24/21/15 based on ISO 4406. The Government is currently engaged in cleaning the oil to a 10 micron level.

Q10. The mechanical drawings provide simple line diagrams to show where the manifolds are to be installed. Has any consideration been given by the Corps to the amount of actual space needed to insert the manifolds with ball valves and bypass lines into the existing piping? It appears there is not enough space on the lines to simply insert a manifold block?

A10. The piping in the machinery recesses may be reconfigured as necessary to install the new equipment, as it is unlikely the current piping configuration allows for a simple insertion of a manifold block. For example, the plan view on drawing M-4022 shows new piping extending to the opposite wall of the machinery recess, whereas the existing piping is all along one wall. The determination of how to repipe to insert new equipment is left to the contractor, as different bidders may propose new equipment with different exterior dimensions and space requirements.

Q11. What material should the manifold be cast or machined from? What type of hydraulic fluid is to be used?

A11. Steel or aluminum are the only acceptable manifold materials, and the hydraulic system uses a petroleum-based anti-wear ISO VG 32 hydraulic fluid.

CERTIFIED FINAL DOCUMENTS – W911WN19B8006 TECHNICAL SPECIFICATIONS

The following Sections have been revised:

01 35 00.00 08 SPECIAL PROCEDURES

a. Paragraph 1.13.4.1 Access Restrictions - Specification has been revised to clarify access during the Government repair work on the river chamber.

b. Paragraph 1.15 Crossover - Specification has been revised to transfer the responsibility of dewatering the crossover from the Contractor to the Government.

01 22 00.00 08 PRICE AND PAYMENT PROCEDURES

a. Paragraph 1.1.2.1 Payment - Specification has been revised to remove the requirement of dewatering and sediment removal.

SECTION 00 10 00 - SOLICITATION

The required response date/time has changed from 15-Aug-2019 01:00 PM to 20-Aug-2019 11:00 AM.

(End of Summary of Changes)