Shenango_2018_IDIQ_Exhibit_K_MAPS.pdf
PDF 3 MB Posted
- Solicitation number
- W911WN18T3005
About this file
Exhibit K Maps Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Price_Schedule.xlsx | XLSX spreadsheet | |
| W911WN18T3005-0002.pdf | ||
| Shenango_2018_IDIQ_Exhibits.pdf | ||
| Shenango_2018_IDIQ_Exhibit_K_MAPS.pdf | ||
| Price_Schedule_updated_26_Sep_2018.xlsx | XLSX spreadsheet | |
| W911WN18T3005-0001.pdf | ||
| Attachment_7_GFE_GFP.docx | DOCX document | |
| Price_Schedule.xlsx | XLSX spreadsheet | |
| Shenango_2018_IDIQ_Exhibits.docx | DOCX document | |
| Attachment_4_Accident_Investigation_Report.pdf | ||
| Attachment_5_Contract_Discrepancy_Report.pdf | ||
| Attachment_1_Quality_Control_Plan_Sample.doc | DOC document | |
| Attachment_6_Pesticide_Application_Record.pdf | ||
| W911WN18T3005.pdf | ||
| Attachment_3_Activity_Hazard_Analysis.xlsx | XLSX spreadsheet | |
| Attachment_2_Accident_Prevention_Plan_Sample.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MAHANEY RECREATION AREA
RESOURCE MANAGERS OFFICE, DAM AND OUTFLOW REC AREA
Mowing: 8 acres
LOWER MAHANEY
Mowing 12 Acres
UPPER MAHANEY
Mowing 15 Acres
**Red Highlighted area = Youth Soccer Fields, no mowing required
SHENANGO RECREATION AREA
INCLUDING MAIN ENTERANCE, MAINT COMPOUND, GOLDEN, CANAL, PINE
LOOPS and NEW & OLD DUCK CCAMPING AREA
Total Mowing Acres = 70
SHENANGO RECREATION AREA
MAIN ENTRANCE, BOAT LAUNCH AND DAY USE AREAS
Mowing = 12 Acres (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / MAINTENANCE COMPOUND
Mowing = 0.5 Acre (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / LAKE VIEW LOOP
Mowing = 7.5 Acres (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / GOLDEN LOOP
Mowing = 3.5 Acres (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / CANAL LOOP
Mowing = 6 Acres (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / PINE LOOP
Mowing = 17 Acres (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / OLD DUCK LOOP
Mowing = 7 Acres (detail of Shenango Recreation Area’s 70 acres)
SHENANGO RECREATION AREA / NEW DUCK LOOP
Mowing = 16.5 ACRES (detail of Shenango Recreation Area’s 70 acres)
CLARK RECREATION AREA
Mowing: 8 Acres
** Red Highlighted Area = Pollinator Plot, no mowing required
CHESTNUT RUN SWIM BEACH
Mowing = 17 Acres
CHESTNUT RUN SWIM BEACH SPRING CLEANING AREAS
1. Total Area 11 Acres 2. Male & Female Changing Area 3. Open Sided Shelter 4. Planting Beds
SHENANGO DAM, TYPE II MOWING
MOWING 5 ACRES
DISC GOLF COURSE MOWING SERVICES
Mowing = 2 Acres, Type II Mowing Height Specification
**Red Highlighted area = Youth Soccer Fields, no mowing required
12 13
YOUTH SOCCER FEILD
MAHANEY RECREATION AREA STAIRWELL
LEADING FROM UPPER TO LOWER MAHANEY BOAT LAUNCH
1920 Square feet of weed whacking
HERBICIDE APPLICATION
DAM SITE # 5
30,500 Square feet
File details come from the government source that posted it.