Attachment_3_-_Reference_Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- W911WN18B8002
About this file
Attachment 3 - Reference Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| BidResults.doc | DOC document | |
| Bid_Opening_Contractor_Attendance.DOC | DOC document | |
| W911WN18B8002_0002.pdf | ||
| W911WN18B8002_0001.pdf | ||
| Attachment_1_-_Specifications.pdf | ||
| W911WN18B8002.pdf | ||
| Attachment_2_-_Contract_Drawings.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REFERENCE DRAWINGS
LIFT GATES - 2018
FABRICATION OF VERTICAL
PENNSYLVANIA
BEAVER COUNTY
MONTGOMERY LOCKS AND DAM
OHIO RIVER
OF ENGINEERS
US ARMY CORPS
PITTSBURGH DISTRICT
W911WN18B8002RFP No.
CERTIFIED FINAL DOCUMENTS
APRIL 2018
CONTRACT NO.
NOTE: THE STACKING ARRANGEMENT OF CHAIN
COMPONENTS ARE SHOWN INCORRECTLY IN THE PLAN
VIEW ABOVE. THE CORRECT ARRANGEMENT IS SHOWN
IN THE ELEVATION VIEW BELOW.
SPARE PART QUANTITES SHOWN ARE THE TOTAL REQUIRED
FOR THIS CONTRACT
KEYWAY TAPERS UP AT END AS SHOWN TO
MATCH EXISTING KEY
| REF COVER |
| 106712 |
| 126713 |
| 3682-01-G1 |
| 4689-AA-2 |
| 4689-AC-2 |
| 4689-AD-2 |
| 4689-AH-2 |
| 4689-AJ-2 |
| 4689-X-1 |
| 4689-Z-1 |
| A4477-1 |
| A4477-2 |
| A4477-3 |
| A4477-4 |
| A4480-1 |
| A4480-2 |
| A4480-3 |
| O-LMO_55-1.1 |
File details come from the government source that posted it.